Convention Center Modernization & Farmers Field
EIR Trans ortation Stud
Convention Center Modernization & Farmers Field Project - EIR Transportation Study The Mobility GroupTransportation Strategies & Solutions
8/4/2019 AD HOC Presentation 9-23-11
2/18
Comprehensive Transportation Study
Traffic Roadway Intersections
Traffic Freewa s Mainline and Ram s
Transit
Parking
Pedestrians
Convention Center Modernization & Farmers Field Project - EIR Transportation Study The Mobility GroupTransportation Strategies & Solutions
8/4/2019 AD HOC Presentation 9-23-11
3/18
Process
EIR Transportation Study
Workin closel with LADOT (MOU)
Community/Public Participation
Convention Center Modernization & Farmers Field Project - EIR Transportation Study The Mobility GroupTransportation Strategies & Solutions
8/4/2019 AD HOC Presentation 9-23-11
4/18
Broad Analytical Coverage
A. Traffic B. Transit
45 Freeway Ramps
16 Mainline Freewa Locations
Purple Line
Blue Line
+ CMP Locations as necessary
Expo Line
Metrolink
Buses
Convention Center Modernization & Farmers Field Project - EIR Transportation Study The Mobility GroupTransportation Strategies & Solutions
8/4/2019 AD HOC Presentation 9-23-11
5/18
8/4/2019 AD HOC Presentation 9-23-11
6/18
8/4/2019 AD HOC Presentation 9-23-11
7/18
Focus on Transit
Mode Splits in EIR
Convention Center Modernization & Farmers Field Project - EIR Transportation Study The Mobility GroupTransportation Strategies & Solutions
8/4/2019 AD HOC Presentation 9-23-11
8/18
Parking
45,800 parking spaces in Primary Parking area
38,350 available for Sunday daytime event
34,450 available for Saturda da time event
25,750 available for weekday evening event
Convention Center Modernization & Farmers Field Project - EIR Transportation Study The Mobility GroupTransportation Strategies & Solutions
8/4/2019 AD HOC Presentation 9-23-11
9/18
8/4/2019 AD HOC Presentation 9-23-11
10/18
Distributed Parking and Access Strategy
Access/egress routes from freeways to parking zones
Coordination with Downtown ExpressPark Program
Convention Center Modernization & Farmers Field Project - EIR Transportation Study The Mobility GroupTransportation Strategies & Solutions
8/4/2019 AD HOC Presentation 9-23-11
11/18
Convention Center Modernization & Farmers Field Project - EIR Transportation Study The Mobility GroupTransportation Strategies & Solutions
8/4/2019 AD HOC Presentation 9-23-11
12/18
8/4/2019 AD HOC Presentation 9-23-11
13/18
Multimodal Transportation Strategy and Mitigation
-
Improve Pico Station Express Park & Ride and Charter Bus
Significant Informational Programs
Ticket Bundling (Transit and Parking)
Traffic Management Measures
Improved Pedestrian Circulation
Localized Intersection Improvements
Event Coordination Plan
Neighborhood Protection Program
Convention Center Modernization & Farmers Field Project - EIR Transportation Study The Mobility GroupTransportation Strategies & Solutions
8/4/2019 AD HOC Presentation 9-23-11
14/18
Pico Station Concept
Convention Center Modernization & Farmers Field Project - EIR Transportation Study The Mobility GroupTransportation Strategies & Solutions
8/4/2019 AD HOC Presentation 9-23-11
15/18
Flower Street Cross Section @Pico Station
Convention Center Modernization & Farmers Field Project - EIR Transportation Study The Mobility GroupTransportation Strategies & Solutions
8/4/2019 AD HOC Presentation 9-23-11
16/18
Streetscape and Pedestrian Plan
Melendrez/Gehl Study
- Farmers Plaza
- Gilbert Lindsay Plaza- Pico Boulevard
- LA Live Way
- Flower Street/Pico Station
Extended Area Streetscape Guidelines
Convention Center Modernization & Farmers Field Project - EIR Transportation Study The Mobility GroupTransportation Strategies & Solutions
8/4/2019 AD HOC Presentation 9-23-11
17/18
Convention Center Modernization & Farmers Field Project - EIR Transportation Study The Mobility GroupTransportation Strategies & Solutions
8/4/2019 AD HOC Presentation 9-23-11
18/18
SB 292 Requires Event Center to be Best in NFL for
Trip Reduction
Event Centers trip ratio no more than 90% of trip ratio at any other NFL stadium
Annual Trip Reports after 2nd season
If trip ratio at Farmers Field is more than 90% of the trip ratio at next best NFL
stadium, City shall require additional trip reduction measures
Trip reduction measure used at other NFL stadiums presumed to be feasible unlesspreponderance of evidence demonstrates measure is infeasible
Feasibility of other measures is normal substantial evidence rule under CEQA
If additional measures are required, Annual Trip Reports shall be required for
another 5 years OR until Event Center is best in NFL for 2 consecutive years
Trip reduction measures are in addition to other mitigation measures required by
CEQA
Convention Center Modernization & Farmers Field Project - EIR Transportation Study The Mobility GroupTransportation Strategies & Solutions