Hoja1COSTOS INDIRECTOSPERSONAL PLANTA OFICINASUELDOMESES1 GERENTE1,500,0001.52,250,0001 SUBGERENTE2,500,00037,500,0001 CONTADOR1,500,00034,500,0001 AUXILIAR CONTABLE400,00031,200,0001 RECEPCIONISTA380,00031,140,0001 MENSAJERO350,00031,050,000PRESTACIONES4,309,500312,928,500SUBTOTAL30,568,500GASTOS GENERALES OFICINASVALORMESESALQUILER LOCAL500,00031,500,000SERVICIOS (AGUA, LUZ).200,0003600,000TELEFONO200,0003600,000VARIOS1,000,00033,000,000SUBTOTAL5,700,000TOTAL OFICINA36,268,500OBRAS EN EJECUCION5TOTAL POR OBRA7,253,700PERSONAL PLANTA OBRASUELDOMESES1 INGENIERO DIRECTOR OBRA2,000,00036,000,0001 RESIDENTE1,000,00033,000,0001 INSPECTOR700,00032,100,0001 ALMACENISTA350,00031,050,0001 VIGILANTE350,00031,050,000PRESTACIONES3,315,00039,945,000SUBTOTAL23,145,000GASTOS GENERALES OBRASVALORUND1 CAMPAMENTO 18 M2800,0001800,0001 TELEFONO FAX150,0001150,0001 COMPUTADOR800,0001800,000CONEXIN ELECTRICA150,0001150,0001 BAO PROVISONAL (3 MESES)200,0001200,000VARIOS700,0001700,000SUBTOTAL2,800,000TOTAL GASTOS EN OBRA25,945,000POLIZASVALORUNDSEGURO COLECTIVO DE VIDA600,0001600,000POLIZA DE SERIEDAD124,1201124,120GARANTIA UNICA1,237,72011,237,720ESTABILIDAD OBRA1,766,68011,766,680RESPOSABILIDAD CIVIL128,7601128,760SUBTOTAL3,857,280TOTAL GASTOS POLIZAS3,857,280DESCUENTOSVALORUNDESTAMPILLA PRODESARROLLO3,912,07513,912,075ESTAMPILLA PRO-UNIVALLE3,912,07513,912,075ESTAMPILLA PRO-DEPORTES3,912,07513,912,075CONTRIBUCION ESPECIAL19,560,374119,560,374SUBTOTAL31,296,599TOTAL DESCUENTOS31,296,599TOTAL GASTOS ADMINISTRATIVOS68,352,579COSTO DIRECTO OBRA391,207,476PORCENTAJE ADMINISTRACION18%PORCENTAJE IMPREVISTOS1%PORCENTAJE UTILIDAD5%A.I.U24%

Policarpa SalavarrietaCOSTOS INDIRECTOS POLICARPAPERSONAL PLANTA OFICINASUELDOMESES1 GERENTE1,500,000001 CONTADOR200,0003600,000SUBTOTAL600,000GASTOS GENERALES OFICINASVALORMESESSELECCIN DE PERSONAL2000001200000ALQUILER LOCAL500,00000SERVICIOS (AGUA, LUZ).200,00000TELEFONO200,00000VARIOS1,000,00000SUBTOTAL200,000TOTAL OFICINA800,000OBRAS EN EJECUCION5TOTAL POR OBRA160,000PERSONAL PLANTA OBRASUELDOMESES1 INGENIERO DIRECTOR OBRA1,500,000001 RESIDENTE1,000,000001 INSPECTOR700,000001 ALMACENISTA350,000001 VIGILANTE350,0002700,000PRESTACIONES455,00000SUBTOTAL700,000GASTOS GENERALES OBRASVALORUND1 CAMPAMENTO 18 M2800,000001 TELEFONO FAX150,000001 COMPUTADOR800,00000CONEXIN ELECTRICA150,000001 BAO PROVISONAL (3 MESES)200,00000VARIOS (Ensayos, papeleria, etc.)500,0001.5750,000SUBTOTAL750,000TOTAL GASTOS EN OBRA1,450,000POLIZASVALORUNDEPS Y ARP74,5006447,000POLIZA DE SERIEDAD35,000135,000GARANTIA UNICA85,795185,795ESTABILIDAD OBRA108,6041108,604RESPOSABILIDAD CIVIL35,000135,000SUBTOTAL711,399TOTAL GASTOS POLIZAS711,399DESCUENTOSVALORUNDPUBLICACION CONTRATO1660001166,000ESTAMPILLA PRODESARROLLO289,6121289,612ESTAMPILLA PRO-UNIVALLE289,6121289,612ESTAMPILLA PRO-DEPORTES434,4181434,418CONTRIBUCION OBRA CIVIL ESPECIAL1,448,05900RETENCION INDUSTRIA SERVICIOS 301(CONSTRUCCIONES 0.33%)95,572195,572RETEFUENTE OBRA CIVIL289,6121289,612APORTES SENA217,2091217,209APORTES BIENESTAR FAMILIAR217,2091217,2093x1000114,8121114,812VALLA150,0001150,000SUBTOTAL2,264,055CVY00TOTAL DESCUENTOS2,264,055343700.1428571429TOTAL GASTOS ADMINISTRATIVOS4,585,454COSTO DIRECTO OBRA17,906,531PORCENTAJE ADMINISTRACION25.6%PORCENTAJE IMPREVISTOS1.0%PORCENTAJE UTILIDAD0%A.I.U26.6%COSTO TOTAL22,669,668UTILIDAD NETA6,291,505VALOR CONTRATACION28,961,173ANTICIPO13,781,174COSTO FINANCIACION4,125,357PORCENTAJE UTILIDAD21.7%