Excel Trabajo Baño Completo o Critico (1)

Post on 10-Apr-2016

238 views 1 download

description

HJK

Transcript of Excel Trabajo Baño Completo o Critico (1)

ESTUDIANTE: VILCA BALBIN MARIO

CUADRO DE PERDIDAS DE CARGA Y PRESIONESANALISIS EN LA LONGITUD MAS DESFAVORABLE

TRAMO UHQ DN Di V

LONGITUDES EQUIVALENTES

CODO TEE CONTRAC ENSANC VALV. Comp

(lps) (mm) (mm) (m/seg) N° Le N° Le N° Le N° Le N° Le

ab 3 0.12 21 17.4 0.50 1 0.532bc 6 0.25 21 17.4 1.05 2 0.532 1 1.064cg 7.5 0.285 26.5 22.9 0.69 1 0.532 1 1.064dg 10.5 0.418 26.5 22.9 1.01 2 0.532 1 1.064 1 0.112ef 13.,5 0.41 26.5 22.9 1.00 2 0.532fg 16.5 0.47 33 24.9 0.97 1 1.554 1 0.216

ACUM TABLA

CUADRO DE PERDIDAS DE CARGA Y PRESIONESANALISIS EN LA LONGITUD MAS DESFAVORABLE

PRESION

(mca)

1.05 1.58 0.03 0.55 2.582.96 5.09 0.40 0.30 3.28

15 16.60 0.43 1.80 5.511.58 3.82 0.20 1.00 6.710.74 1.80 0.09 1.20 8.001.98 3.75 0.16 1.20 9.37

LONG. TRAMO RECTO

LONG. EQUIVAL. TOTAL

PERDIDA CARGA hf (m)

NPT LONG. VERTICAL