Presupuesto Alternativa 1

Post on 25-Sep-2015

1 views 0 download

description

PRESUPUESTO CARRETERA

Transcript of Presupuesto Alternativa 1

PRESUPUESTOS10PginaMDTCPresupuestoPresupuesto0491013 "MEJORAMIENTO DEL CAMINO VECINAL CRUCE SANTA LUCIA - LA SACILIA, DISTRITO DE TORIBIO CASANOVA,PROVINCIA DE CUTERVO, DEPARTAMENTO DE CAJAMARCA."Subpresupuesto001 "MEJORAMIENTO DEL CAMINO VECINAL CRUCE SANTA LUCIA - LA SACILIA"Costo al02/09/2013ClienteMUNICIPALIDAD DISTRITAL DE TORIBIO CASANOVALugarCAJAMARCA - CUTERVO - TORIBIO CASANOVAItemDescripcinUnd.MetradoPrecio S/.Parcial S/.01OBRAS PROVISIONALES15,440.7501.01 CAMPAMENTO PROVISIONAL DE OBRAm2300.0048.3814,514.0001.02 CARTEL DE OBRA 3.60 x 4.80 M.UND1.00926.75926.7502TRABAJOS PRELIMINARES68,947.7902.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOSGLB1.0053,062.9553,062.9502.02 TRAZO, NIVELACIN Y REPLANTEOKM13.351,173.1515,661.5502.03 MEJORAMIENTO DE ACCESO A CANTERAKM0.054,465.76223.2903EXPLANACIONES904,538.1403.01 CORTE EN MATERIAL SUELTOM321,629.365.02108,579.3903.02 CORTE EN ROCA SUELTAM311,896.4116.42195,339.0503.03 CORTE EN ROCA FIJAM31,663.8028.7747,867.5303.04 RELLENO CON MATERIAL PROPIOM31,181.137.238,539.5703.05 ELIMINACION DE MATERIAL EXCEDENTE HACIA BOTADEROS HASTA 1KM DE DISTANCIAM3K30,495.9910.22311,669.0203.06 ELIMINACION DE MATERIAL EXCEDENTE HACIA BOTADEROS MAYOR A 1KM DE DISTANCIAM3K36,278.256.41232,543.5804PAVIMENTOS629,141.6104.01 PERFILADO Y COMPACTADO EN ZONA DE CORTEM241,815.631.9782,376.7904.02 EXTRACCION Y APILAMIENTO MATERIAL DE CANTERAm39,750.623.9038,027.4204.03 ZARANDEO MATERIAL DE CANTERAm39,750.623.3332,469.5604.04 TRANSPORTE DE AFIRMADO HASTA 1 KM DE DISTANCIAM3K9,053.7812.22110,637.1904.05 TRANSPORTE DE AFIRMADO MAYOR A 1 KM DE DISTANCIAM3K35,701.856.41228,848.8604.06 EXTENDIDO, RIEGO Y COMPACTADO, MATERIAL DE AFIRMADOm262,173.542.20136,781.7905OBRAS DE ARTE Y DRENAJE283,818.6205.01 ALCANTARILLAS DE TMC = 36"50,250.8605.01.01 TRAZO Y REPLANTEO DE ALCANTARILLASm255.351.1463.1005.01.02 EXCAVACIN NO CLASIFICADA P/ESTRUCTURASM388.486.42568.0405.01.03 RELLENO CON MATERIAL PROPIO CON EQUIPOM317.407.23125.8005.01.04 RELLENO CON MATERIAL DE CANTERA CON EQUIPOM332.9269.202,278.0605.01.05 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIAM384.0616.311,371.0205.01.06 ALCANTARILLA DE TMC, =36"M27.00554.8414,980.6805.01.07 CONCRETO F'C=175 KG/CM2 + 30% PMM38.76485.884,256.3105.01.08 CONCRETO F'C=175 KG/CM2M321.52506.4510,898.8005.01.09 ENCOFRADO Y DESENCOFRADOM2109.3728.913,161.8905.01.10 ACERO DE REFUERZO FY= 4200 KG/CM2KG876.486.025,276.4105.01.11 TARRAJEO MEZCLA 1:5 C:Am297.5032.653,183.3805.01.12 EMBOQUILLADO CON CONCRETO FC = 140 KG/CM2 + 70% P.M.m314.75277.114,087.3705.02 BADENES63,117.7605.02.01 TRAZO Y REPLANTEO DE BADENESm2216.001.40302.4005.02.02 EXCAVACION DE BADENESM3161.776.421,038.5605.02.03 ELIMINACION DE MATERIAL EXCEDENTEM3194.1316.313,166.2605.02.04 CONCRETO F'C=175 KG/CM2 + 30% PMM387.03485.8842,286.1405.02.05 EMBOQUILLADO CON CONCRETO FC = 140 KG/CM2 + 70% P.M.m339.92277.1111,062.2305.02.06 ENCOFRADO Y DESENCOFRADOM2144.5928.914,180.1005.02.07 JUNTAS DE DILATACION E=1"m99.0010.931,082.0705.03 CUNETAS EN TIERRA18,425.0005.03.01 CUNETAS LONGITUDINALES SIN REVESTIRML5,500.003.3518,425.0005.04 CUNETAS REVESTIDAS152,025.0005.04.01 REVESTIMIENTO DE CUNETA TRIANGULARm2,500.0060.81152,025.0006MUROS DE CONTENCIN603,571.8706.01 OBRAS PRELIMINARES1,013.6006.01.01 TRAZO Y REPLANTEO DE MUROS DE CONTENCIONm2724.001.401,013.6006.02 MOVIMIENTO DE TIERRAS101,568.6006.02.01 EXCAVACION C/MAQUINARIA Y REFINE MANUAL DE ZANJAS PARA MUROS DE CONTENCIONm31,448.0013.9620,214.0806.02.02 RELLENO CON MATERIAL DE CANTERA CON EQUIPOM3859.7568.1558,591.9606.02.03 ELIMINACION DE MAT. EXCED. C/VOLQUETE DE 12 M3+CARGADOR FRONTAL D