Post on 06-Jul-2018
8/18/2019 volumen ASFALTO
1/13
0.13 0.14 0.3
25 3.25 3.50 7.50
50 6.50 7.00 15.00
75 9.75 10.50 22.50
100 13.00 14.00 30.00
125 16.25 17.50 37.50
150 19.50 21.00 45.00
175 22.75 24.50 52.50
200 26.00 28.00 60.00
225 29.25 31.50 67.50
250 32.50 35.00 75.00
275 35.75 38.50 82.50
300 39.00 42.00 90.00
325 42.25 45.50 97.50
350 45.50 49.00 105.00
375 48.75 52.50 112.50
400 52.00 56.00 120.00
425 55.25 59.50 127.50
450 58.50 63.00 135.00
475 61.75 66.50 142.50
500 65.00 70.00 150.00
525 68.25 73.50 157.50
550 71.50 77.00 165.00
575 74.75 80.50 172.50
600 78.00 84.00 180.00
625 81.25 87.50 187.50
650 84.50 91.00 195.00
675 87.75 94.50 202.50
700 91.00 98.00 210.00
725 94.25 101.50 217.50
750 97.50 105.00 225.00775 100.75 108.50 232.50
800 104.00 112.00 240.00
825 107.25 115.50 247.50
850 110.50 119.00 255.00
875 113.75 122.50 262.50
900 117.00 126.00 270.00
925 120.25 129.50 277.50
950 123.50 133.00 285.00
975 126.75 136.50 292.50
1000 130.00 140.00 300.002000 260.00 280.00 600.00
3000 390 00 420 00 900 00
Producción deAsfalto (Tn)
Cantidad deArena (m3)
Cantidad dePiedra (m3)
Cantidad dePolvillo (m3)
8/18/2019 volumen ASFALTO
2/13
4000 520.00 560.00 1200.00
5000 650.00 700.00 1500.00
6000 780.00 840.00 1800.00
7000 910.00 980.00 2100.00
8000 1040.00 1120.00 2400.00
9000 1170.00 1260.00 2700.00
10000 1300.00 1400.00 3000.00
8/18/2019 volumen ASFALTO
3/13
56
1,400
2,800
4,200
5,600
7,000
8,400
9,800
11,200
12,600
14,000
15,400
16,800
18,200
19,600
21,000
22,400
23,800
25,200
26,600
28,000
29,400
30,800
32,200
33,600
35,000
36,400
37,800
39,200
40,600
42,00043,400
44,800
46,200
47,600
49,000
50,400
51,800
53,200
54,600
56,000112,000
168 000
Cantidad deCemen. Asfal (lts)
8/18/2019 volumen ASFALTO
4/13
224,000
280,000
336,000
392,000
448,000
504,000
560,000
8/18/2019 volumen ASFALTO
5/13
55555
TANQUE DE GASOIL
Diámetro (d) 1.5 mtsRadio (R) 0.75 mts
Largo (l)3.68 mts
6503.1 lts
6500 lts
0.1 0.186 186.19
0.2 0.515 515.46
0.3 0.926 925.900.4 1.392 1392.16
0.5 1.898 1897.55
0.6 2.429 2429.10
0.7 2.976 2975.75
0.8 3.527 3527.34
0.9 4.074 4073.99
1.0 4.606 4605.55
1.1 5.111 5110.93
VolmenTeórico (V
T)
VolumenReal (V)
Altura(m)
Volumen(m3)
Volumen(Lts)
3,68mts 1,50mts
8/18/2019 volumen ASFALTO
6/13
1.2 5.577 5577.20
1.3 5.988 5987.64
1.4 6.317 6316.91
1.5 6.503 6503.10
8/18/2019 volumen ASFALTO
7/13
TA!"#$Diámetro (d)
Radio (R)
Largo (l)
0.2
0.4
0.60.8
1.0
1.2
1.4
1.6
1.8
2.0
2.2
VolmenTeórico (V
T)
VolmenReal (V)
Altura(m)
8,08mts
8/18/2019 volumen ASFALTO
8/13
2.4
2.6
2.8
3.0
3.2
3.4
8/18/2019 volumen ASFALTO
9/13
D$ C$%$!T& A'LT*C&3.43 mts
1.715 mts
8.08 mts
74660.26 lts
70000 lts
1.75 1753.05
4.87 4867.18
8.77 8770.1113.23 13231.98
18.10 18104.36
23.27 23274.72
28.65 28649.43
34.15 34145.36
39.68 39684.89
45.19 45192.23
50.59 50590.24
Volumen(m3)
Volumen(Lts)
3,43mts
8/18/2019 volumen ASFALTO
10/13
55.80 55796.89
60.72 60720.55
65.25 65252.29
69.25 69250.83
72.50 72504.23
74.56 74556.85
8/18/2019 volumen ASFALTO
11/13
8/18/2019 volumen ASFALTO
12/13
8/18/2019 volumen ASFALTO
13/13