1244_36-01-MTO-1311-08_3

download 1244_36-01-MTO-1311-08_3

of 18

Transcript of 1244_36-01-MTO-1311-08_3

  • 7/25/2019 1244_36-01-MTO-1311-08_3

    1/18

    PROJECT: ING. DESARROLLO CAMPO CASTILLA

    INGENIERA DETALLADA RECOLECCIN - TRANSPORTE

    08

    CLIENT: ECOPETROL S.A.

    PROJECT No. UNITDOCUMENT

    CODESERIAL No. REV. SHEET

    MULTIPLE ACACIAS

    3 1 OF 18

    PIPING MATERIAL TAKE - OFF

    1244_36 01 MTO 1311

    ECOPIED,REPRODUCEDAND/O

    RCIRCULATEDWITHOUTAUTHORIZATION

    BESERCOPIADO,REPRODUCIDOY/OCIRCULADOSINSUAUTORIZACIN

    SOC-INGENIERA DETALLADA RECOLECCIN - TRANSPORTE CLIENT CODE:SOC-ON-0410-LI-TU-0008-R3

    H. GONZALEZ

    27-OCT-2011 ISSUED FOR CONSTRUCTIONREVISED AS SHOWN

    P. MANIGUA G. PADIERNA

    3

    FPP

    /REV.2

    2 23-SEP-2011 ISSUED FOR CONSTRUCTION

    1 20-OCT-2010 ISSUED FOR CONSTRUCTIONREVISED AS SHOWN

    REV. DATE DESCRIPTION

    H. GONZALEZ

    PREPARED

    H. GONZALEZ P. MANIGUA G. PADIERNA

    CHECKED AUTHORIZED

    G. SAAVEDRA G. PADIERNA

    THISDOCUMENTISPROPERTYOFTIPIELSAITMAYNOTB

    ESTEDOCUMENTOESPROPIEDADDE

    TIPIELSAYNODE

  • 7/25/2019 1244_36-01-MTO-1311-08_3

    2/18

    TABLA DE CONTENIDO

    Pag.

    1 CALIFICACION DEL DOCUMENTO 3

    2A MTO DE ING. DESARROLLO CAMPO CASTILLA 4

    2B MTO DE ING. DESARROLLO CAMPO CASTILLA - ELEMENTOS ESPECIALES 17

    3 LISTA DE EQUIPMENT COLLECTION PARA VALVULAS 18

    PROJECT: ING. DESARROLLO CAMPO CASTILLA

    INGENIERA DETALLADA RECOLECCIN - TRANSPORTE

    CLIENT: ECOPETROL S.A.

    PROJECT No. UNITDOCUMENT

    CODESERIAL No. REV. SHEET

    3 2 OF 181244_36 01 MTO 1311 08

    ECOPIED,REPRODUCEDAND/O

    RCIRCULATEDWITHOUTAUTHORIZATION

    BESERCOPIADO,REPRODUCID

    OY/OCIRCULADOSINSUAUTORIZACIN

    SOC-INGENIERA DETALLADA RECOLECCIN - TRANSPORTE CLIENT CODE:SOC-ON-0410-LI-TU-0008-R3

    THISDOCUMENTISPROPERTYOFTIPI

    ELSAITMAYNOTB

    ESTEDOCUMENTOESPROPIEDADDE

    TIPIELSAYNODE

  • 7/25/2019 1244_36-01-MTO-1311-08_3

    3/18

    1. CALIFICACION DEL DOCUMENTO

    1 El clculo de espesores de los Materiales de Tubera se elabor con Listado de Fluidos Revisin 0.

    ( No. de Documento 1244_36-01-NM-0002-01 )

    2. El conteo de Materiales se elabor con base en los siguientes documentos:

    ** P&ID's Revisin 0 / 1 - Emitidos para CONSTRUCCIN el 22 de Junio de 2010

    TIPO NUMERO TPL NUMERO ECP REV

    P&ID 1244_36-01-PID-0021-10-1 SOC-ON-0410-DD-PR-0018-R0 1

    P&ID 1244_36-01-PID-0021-11-1 SOC-ON-0410-DD-PR-0019-R0 1

    P&ID 1244_36-01-PID-0021-11-2 SOC-ON-0410-DD-PR-0019-R0 1

    P&ID 1244_36-01-PID-0021-20-1 SOC-ON-0410-DD-PR-0028-R0 1

    P&ID 1244_36-01-PID-0021-21-1 SOC-ON-0410-DD-PR-0029-R1 2

    ** Secciones y Detalles Trampas Mltiple de entrada EAC Revisin A - Emitidos para COMENTARIOS

    el 24 de Agosto de 2010

    TIPO NUMERO TPL NUMERO ECP REV

    PLANO DE DETALLE 1244_36-01-DW-1332-25-01 SOC-ON-0410-EP-TU-0025-RA 0

    PLANO DE DETALLE 1244_36-01-DW-1332-25-02 SOC-ON-0410-EP-TU-0025-RA 0

    ** -

    PROJECT: ING. DESARROLLO CAMPO CASTILLA

    INGENIERA DETALLADA RECOLECCIN - TRANSPORTE

    CLIENT: ECOPETROL S.A.

    PROJECT No. UNITDOCUMENT

    CODESERIAL No. REV. SHEET

    3 3 de 181244_36 01 MTO 1311 08

    TIPO NUMERO TPL NUMERO ECP REV

    LAYOUT 1244_36-01-DW-1332-24-1 SOC-ON-0410-DL-TU-0024-R0 3

    LAYOUT 1244_36-01-DW-1332-24-2 SOC-ON-0410-DL-TU-0024-R0 2

    LAYOUT 1244_36-01-DW-1332-24-3 SOC-ON-0410-DL-TU-0024-R0 2

    ** Plot Plan Revisin B - Emitido para COMENTARIOS el 22 de Junio de 2010

    TIPO NUMERO TPL NUMERO ECP REV

    PLOT PLAN 1244_36-01-DW-00-51-01 SOC-ON-0410-EP-TU-0001-Rb 0

    ** Key Plan Revisin B - Emitido para COMENTARIOS el 22 de Junio de 2010

    TIPO NUMERO TPL NUMERO ECP REV

    KEY PLAN 1244_36-01-DW-00-53-01 SOC-ON-0410-EP-TU-0002-RB 0

    ** Listado de Lneas Revisin 0 - Emitido para CONTRUCCIN el 10 de Junio de 2010

    TIPO NUMERO TPL NUMERO ECP REV

    LISTADO DE LINEAS 1244_36-01-NM-0022-01 SOC-ON-0410-LI-PR-0003-R0 0

    ** Piping Class Revisin 0 - Emitido para COSNTRUCCIN el 23 de Junio de 2010

    TIPO NUMERO TPL NUMERO ECP REV

    PIPING CLASS 1244_36-01-JSD-1300-01 SOC-ON-0410-ET-TU-0004-R0 0

    3. Este MTO corresponde nicamente al MULTIPLE ACACIAS

    4. Las cantidades de "SPECIAL PART" estn de acuerdo a las cantidades suministradas por Diseo.

    SOC-INGENIERA DETALLADA RECOLECCIN - TRANSPORTE CLIENT CODE:SOC-ON-0410-LI-TU-0008-R3

  • 7/25/2019 1244_36-01-MTO-1311-08_3

    4/18

  • 7/25/2019 1244_36-01-MTO-1311-08_3

    5/18

  • 7/25/2019 1244_36-01-MTO-1311-08_3

    6/18

  • 7/25/2019 1244_36-01-MTO-1311-08_3

    7/18

  • 7/25/2019 1244_36-01-MTO-1311-08_3

    8/18

  • 7/25/2019 1244_36-01-MTO-1311-08_3

    9/18

  • 7/25/2019 1244_36-01-MTO-1311-08_3

    10/18

  • 7/25/2019 1244_36-01-MTO-1311-08_3

    11/18

  • 7/25/2019 1244_36-01-MTO-1311-08_3

    12/18

  • 7/25/2019 1244_36-01-MTO-1311-08_3

    13/18

  • 7/25/2019 1244_36-01-MTO-1311-08_3

    14/18

  • 7/25/2019 1244_36-01-MTO-1311-08_3

    15/18

  • 7/25/2019 1244_36-01-MTO-1311-08_3

    16/18

  • 7/25/2019 1244_36-01-MTO-1311-08_3

    17/18

  • 7/25/2019 1244_36-01-MTO-1311-08_3

    18/18

    3. EQUIPMENT COLLECTION LIST

    Las Vlvulas relacionadas en el MTO, presentan las siguientes caractersticas de acuerdo a su TAG NUMBER:

    VA-100

    VB-250

    VB-251

    VB-351

    VC-100

    PROJECT: ING. DESARROLLO CAMPO CASTILLA

    INGENIERA DETALLADA RECOLECCIN - TRANSPORTE

    CLIENT: ECOPETROL S.A.

    PROJECT No. UNITDOCUMENT

    CODESERIAL No. REV. SHEET

    3 18 de 181244_36 01 MTO 1311 08

    Body/Bonnet: Bolted, Trim: API TRIM 8, Seats: Renewable type, Disc: Needle, Stem: O.S. & Y. / Rising StemRising Operator, Ends: As per ASME B16.11, Operation: Lever, Packing: Flexible Graphite, Comment: *

    Body: 2 - 3 Pieces - Split Body, Insert Seats & Seals: Viton, Ball: AISI 316, Stem: AISI 316 - Anti Blow Out, Seats:Viton, Arrangement: Trunnion Type, Fire Safe: API 607/ API 6FA, Operation: Gear, Comment: API 598 TEST, OtherRequirements: *, AUX BLEED & DRAIN CONNEC: *, Accessories: *

    Body: 2 - 3 Pieces - Split Body, Insert Seats & Seals: Viton, Ball: AISI 316, Stem: AISI 316 - Anti Blow Out, Seats:Viton, Arrangement: Trunnion Type, Fire Safe: API 607/ API 6FA, Operation: Gear, Comment: API 598 TEST, OtherRequirements: *, AUX BLEED & DRAIN CONNEC: *, Accessories: *

    Body: 2 - 3 Pieces - Split Body, Insert Seats & Seals: Viton, Ball: AISI 316, Stem: AISI 316 - Anti Blow Out, Seats:Viton, Arrangement: Trunnion Type, Fire Safe: API 607/ API 6FA, Operation: Gear, Comment: API 598 TEST, OtherRequirements: *, AUX BLEED & DRAIN CONNEC: *, Accessories: *

    Body/Bonnet: Bolted, Stud Bolts: Stud A193/B7- Nuts A194/2H, Gasket: Spiral/W AISI 304 - Graphite filler, Wedge:Solid Type, Seats: Renewable Type, Trim: F6 Stellite (API N. 8), Stem: O.S. & Y, Packing: Flexible Graphite,Operation: Hand Wheel, Comment: API 598 TEST, Port Opening: Reducer, Other Requirements: API 600 / API 602

    COPIED,REPRODUCEDAND/OR

    CIRCULATEDWITHOUTAUTHORIZATION

    ESERCOPIADO,REPRODUCIDO

    Y/OCIRCULADOSINSUAUTORIZACIN

    VC-200

    VC-250

    VC-300

    VC-350

    VC-350DBI

    SOC-INGENIERA DETALLADA RECOLECCIN - TRANSPORTE CLIENT CODE:SOC-ON-0410-LI-TU-0008-R3

    Body/Bonnet: Bolted, Stud Bolts: Stud A193/B7- Nuts A194/2H, Gasket: Spiral/W AISI 304 - Graphite filler, Wedge:Flexible, Seats: Renewable Type, Trim: F6 Stellite (API N. 8), Stem: O.S. & Y, Packing: Flexible Graphite,Operation: Gear, Comment: API 598 TEST, Port Opening: *, Other Requirements: API 600 / API 602

    Body/Bonnet: Bolted, Stud Bolts: Stud A193/B7- Nuts A194/2H, Gasket: Spiral/W AISI 304 - Graphite filler, Wedge:Flexible, Seats: Renewable Type, Trim: F6 Stellite (API N. 8), Stem: O.S. & Y, Packing: Flexible Graphite,Operation: Hand Wheel, Comment: API 598 TEST, Port Opening: *, Other Requirements: API 600 / API 602

    Body/Bonnet: Bolted, Stud Bolts: Stud A193/B7- Nuts A194/2H, Gasket: Spiral/W AISI 304 - Graphite filler, Wedge:Flexible, Seats: Renewable Type, Trim: F6 Stellite (API N. 8), Stem: O.S. & Y, Packing: Flexible Graphite,Operation: Gear, Comment: API 598 TEST, Port Opening: *, Other Requirements: API 600 / API 602

    Body/Bonnet: Bolted, Stud Bolts: Stud A193/B7- Nuts A194/2H, Gasket: Spiral/W AISI 316L-Graphite Filler, Wedge:Double Expanding Wedge - Through Conduit, Seats: Renewable Type, Trim: 13%Cr+HF(TungstenCarbide)Gateseat&seats, Stem: O.S. & Y, Packing: Flexible Graphite, Operation: Gear with Post Indicator, Comment: DoubleIsolation Duty, Port Opening: Through Conduit according to API 6D, Other Requirements: Leakage Rate B acc. ISO-5208

    Body/Bonnet: Bolted, Stud Bolts: Stud A193/B7- Nuts A194/2H, Gasket: Spiral/W AISI 304 - Graphite filler, Wedge:Flexible, Seats: Renewable Type, Trim: F6 Stellite (API N. 8), Stem: O.S. & Y, Packing: Flexible Graphite,Operation: Hand Wheel, Comment: API 598 TEST, Port Opening: *, Other Requirements: API 600 / API 602

    THISDOCUMENTISPROPERTYOFTIPIELSAITMAYNOTBE

    ESTEDOCUMENTOESPROPIEDADDETIPIELSAYNODEB