  • METRADOS EJECUTADOSPROYECTO: SISTEMA DE UTILIZACION EN MEDIA TENSION 10 KV. SISTEMA DE AGUA POTABLE CP EL CARMELO

    PROPIETARIO: GOBIERNO REGIONAL DE LA LIBERTAD

    UBICACION: CALLE VICTOR RAUL HAYA DE LA TORRE

    ITEM E S P E C I F I C A C I O N E S

    Unid. Metrado

    1.00 SUMINISTRO DE MATERIALES

    1.1 POSTES, MENSULAS Y BARBOTANTE DE C.A.

    1.3 POSTE DE C.A.C. DE 13/400 /165/355mm. u 1

    1.4 ESTRUCTURA PARA S.A.M. DE C.A. COMPUESTO POR :

    - (01) POSTE DE C.A.C. DE 13/400 /165/355 mm.

    - (01) MEDIA LOZA DE C.A.V. DE 1.10m

    - (01) PALOMILLA DE C.A.V. DE 1.30m

    - (01) MENSULA DE C.A.V. DE 1.0m u 1

    1.5 CRUCETA DE C.A.V. DE 1.30m u 1

    1.6 MEDIA LOZA DE C.A.V. DE 1.10m PARA PMI u 1

    1.7 PALOMILLA DE C.A.V. DE 1.30m u 1

    2.00 AISLADORES

    2.1 AISLADOR HIBRIDO TIPO PEDESTAL TAYCO - 24 KV C/ESPIGA u 4

    3.00 FERRETERIA Y VARIOS

    3.1 CONECTOR BIMETALICO DE DOBLE VIA 35/35mm2 2 PERNOS u 6

    3.2 CONECTOR AMPAC 50/35mm2 u 3

    3.3 CONECTOR DE COBRE SPLIT BOLT PARA 35mm2 u 6

    3.4 TERMINALES A COMPRESION PARA CABLE 35 mm2. Pza 13

    3.5 TERMINALES A COMPRESION PARA CABLE 16 mm2. Pza 4

    3.6 SOPORTES DE FIJACION DE TRANSFORMADOR Y TRAFOMIX u 8

    3.7 PLANCHA DOBLADA DE COBRE TIPO "J" u 8

    3.8 CINTA BAND IT 3/4" ML 20

    3.9 HEBILLAS PARA CINTA BAND IT u 20

    3.10 CINTA VULCANIZANTE N 2229, 3M Rollo 1.00

    3.11 CINTA PLASTICA AISLANTE N33, 3M 1-1/2" Rollo 5

    4.00 CABLES, CONDUCTORES ELECTRICOS Y ACCESORIOS

    4.1 CABLE TIPO UNIPOLAR N2XSY - 8,7/15 KV, 25 mm2. m 136

    4.2 TERMINAL UNIPOLAR 15 KV, 25 mm2. TIPO EXTERIOR u 6

    4.3 CONDUCTOR DE COBRE CPI TEMPLE DURO 35mm2, 7 HILOS m 25

    4.4 CONDUCTOR DE COBRE TEMPLE BLANDO 35mm2, 7 HILOS m 50

    4.5 CABLE NYY-1 KV 3 - 1 x 16+1x10 mm2. m 25

    4.6 TUBO DE AG DE 1-1/2"x3.20m Pza 1

    4.7 CINTA SEALIZADORA PARA M.T. (COLOR ROJO) m 15

    4.8 TUBO DE AG DE 3"x3.20m Pza 2

    4.9 TUBO DE AG DE 2"x3.20m Pza 1

    4.10 DUCTO DE CONCRETO DE 4 VIAS m 10

    4.11 LADRILLO K.K. Und 105

    5.00 PUESTA A TIERRA

    5.1 VARILLA DE COBRE 16mm (5/8")x2.40m u 4

    5.2 CONECTOR VARILLA(5/8")- CABLE(35mm2) u 8

    5.3 CONECTOR DE COBRE TIPO PERNO PARTIDO P' COND. 35mm2 u 8

    5.4 TIERRA DE CHACRA m3 14

    5.5 DOSIS DE THORGEL u 8

    5.6 CAJUELA DE C.A.V CON TAPA PARA REGISTRO DE PUESTA A TIERRA. u 4

    6.00 TRANSFORMADOR Y TRAFOMIX

    6.1 TRANSFORMADOR TRIFASICO 10/0.398-0.230 KV,37.5 KVA Pza 1

    6.2 TRAFOMIX 10/0.230 V, 3 SIST. CLASE 0.2 S, (2)/5A Pza 1

    7.00 SECCIONADORES Y EQUIPOS DE PROTECCION

  • 7.1 SECCIONADOR UNIPOLAR TIPO CUT-OUT 27KV, 200 A, 150KV BIL. Pza 3

    7.2 SECCIONADOR UNIPOLAR TIPO CUT-OUT 27KV, 100 A, 150KV BIL. Pza 3

    7.3 FUSIBLES RAPIDOS TIPO CHICOTE 3 A. Pza 3

    7.4 FUSIBLES RAPIDOS TIPO CHICOTE 2 A. Pza 3

    8.00 EQUIPOS DE MEDICION Y ACCESORIOS

    8.1 MEDIDOR ELECTRONICO MODEM CELULAR GSM/GPRS Puerto

    RS232 de acuerdo a Especificaciones Tecnicas de Hidrandina S.A Pza 1

    8.2 MURETE DE CONCRETO ARMADO 1.40x0.90x0.35m Und 1

    8.3 CAJA METALICA PORTAMEDIDOR ELECTRONICO C/REJILLA Und 1

    8.4 CABLE EXTRAFLEXIBLE TIPO NLT 4x4mm2 Ml 20

    8.5 CINTA BAND IT 3/4" CON HEBILLAS Conj. 16

    9.00 TABLERO GENERALCON EQUIPOS

    9.1 TABLERO DE DISTRIBUCION, SISTEMA TRIFASICO 380/230 V,

    MONTAJE INTERIOR, AUTOSOPORTADO DE 2000x600x600mm

    PINTURA POLIESTEREPOXI GRIS RAK-7032 TEXTURIZADA

    CON CHAPA Y MANIJA, COMPUESTO DE:

    - (1) INTERRUP.TERMOMAG. DE 3x40-160 A, 380 V, 25 KA.

    - (1) ARRANCADOR ESTADO SOLIDO 40A ,380 V,60 Hz.

    - (1) INTERRUPTOR TERMOMAGNETICO 2x15A 220V

    - (1) INTERRUPTOR TERMOMAGNETICO 2x20A 220V

    - (1) VOLTIMETRO 0-500V

    - (1) AMPERIMETRO 0-200A

    - (3) BARRAS DE COBRE DE 5 x 30 x 600 mm (FASES)

    - (9) BARRAS DE COBRE DE 3 x 20 mm (derivaciones s.p.)

    - (1) BARRA DE COBRE DE 5 x 20 x 200 mm (NEUTRO)

    AISLADORES, CONECTORES Y CABLEADO Cjto 1.00

    ITEM ESPECIFICACIONES UND

    2.00 TRANSPORTE DE MATERIALES

    2.1 Postes y Pastorales Tn. 3.0

    2.2 Conductores electricos. Tn. 2.0

    2.3 Transformador de potencia y Trafomix Est. 1.0

    2.4 Varios Est. 1.0

    2.5 Puesta en obra de materiales. Est. 1.0

    ITEM ESPECIFICACIONES UND

    3.00 MONTAJE ELECTROMECANICO

    3.01 Varios

    3.01.1 Cartel de obra C/U 1

    3.01.2 Replanteo topografico, ubicacin de estructuras Km 0.10

    3.02 Postes y accesorios de concreto armado

    3.01.1 Transporte de poste de c.a.c. de almacen a punto de izaje C/U 2

    3.01.1 Excavacion de hueco para poste en terreno normal M3 1.79

    3.01.1 Izado de poste de c.a.c. de 13/400 C/U 2

    3.01.1 Cimentacion de poste de c.a.c. de 13/400 C/U 2

    3.01.3 Instalacion de mensulas de c.a.v. de 1.0m C/U 1

    3.01.4 Instalacion de media loza de c.a.v. de 1.10m C/U 2

    3.01.5 Instalacion de cruceta simetrica de 1.30m C/U 1

    3.01.5 Instalacion de cruceta asimetrica de 1.30m C/U 2

    3.02 AISLADORES

    3.02.1 Instalacion de aislador hibrido tipo Pin de 25 KV C/U 4.00

    3.03 PUESTA A TIERRA

    3.03.1 Excavacion de hueco para puesta a tierra M3 9.60

    3.03.1 Instalacion de varilla de cobre con relleno y compactado C/U 4.00

    3.04 TRANSFORMADOR Y TRAFOMIX

    3.04.1 Instalacion de transformador trifasico 37.5 KVA C/U 1.00

    3.04.2 Instalacion de trafomix C/U 1.00

    3.05 SECCIONADORES

    3.05.1 Instalacion de Seccionador Cut Out con fusibles 27 Kv C/U 6

  • 3.06 CABLES Y CONDUCTORES

    3.06.1 Apertura de zanja e instalacion de cable N2XSY 1x25mm2 Ml 25

    3.05.1 Instalacion de Terminales termocontraibles 15 Kv C/U 6.00

    3.06.2 Instalacion de ductos 4 vias Ml 10.00

    3.06.3 Aprtura de zanja e instalacion de cable NYY-1Kv 3-1x16mm2 Ml 25.00

    3.07 EQUIPOS DE MEDICION Y PRUEBAS ELECTRICAS

    3.07.1 Pruebas electricas de aislamiento, pozos y puesta en servicio Gbl 1.00

    3.08 TABLEROS Y EQUIPOS DE BAJA TENSION

    3.08.1 Instalacion de tablero de distribucion C/U 1.00

    3.09 SEALIZACION DE ESTRUCTURAS MT

    3.01.6 Enumeracion de postes, sealizacion de peligro, co-

    dificacion de Subestacion y puesta a tierra Gbl 2.00

    3.10 ELABORACION DE EXPEDIENTE FINAL CONFORME A OBRA

    3.10.1 Elaboracion de expediente de replanteo y tramites conformidad Gbl 1.00

    3.11 CONEXIN A RED DE HIDRANDINA

    3.11.1 Comprende las maniobras a realizar para la conexin ya sea en

    3.11.1 caliente o en frio. Gbl 1.00

  • PROYECTO: SISTEMA DE UTILIZACION EN MEDIA TENSION 10 KV. SISTEMA DE AGUA POTABLE CP EL CARMELO

    PROPIETARIO: GOBIERNO REGIONAL DE LA LIBERTAD

    UBICACION: CALLE VICTOR RAUL HAYA DE LA TORRE

    ITEM E S P E C I F I C A C I O N E S

    UND CANT. UNITARIO TOTAL

    1.00 SUMINISTRO DE MATERIALES

    1.1 POSTES, MENSULAS Y BARBOTANTE DE C.A.

    1.3 POSTE DE C.A.C. DE 13/400 /165/355mm. u 1 1,000.00 1,000.00

    1.4 ESTRUCTURA PARA S.A.M. DE C.A. COMPUESTO POR :

    - (01) POSTE DE C.A.C. DE 13/400 /165/355 mm. 1,000.00

    - (01) MEDIA LOZA DE C.A.V. DE 1.10m 1 175.00

    - (01) PALOMILLA DE C.A.V. DE 1.30m 1 95.00

    - (01) MENSULA DE C.A.V. DE 1.0m u 1 70.00 1,340.00

    1.5 CRUCETA DE C.A.V. DE 1.30m u 1 80.00 80.00

    1.6 MEDIA LOZA DE C.A.V. DE 1.10m PARA PMI u 1 175.00 175.00

    1.7 PALOMILLA DE C.A.V. DE 1.30m u 1 95.00 95.00

    SUB-TOTAL 1.100 : 2,690.00

    2.00 AISLADORES

    2.1 AISLADOR HIBRIDO TIPO PEDESTAL TAYCO - 24 KV C/ESPIGA u 4 178.00 712.00

    SUB-TOTAL 2.00 : 712.00

    3.00 FERRETERIA Y VARIOS

    3.1 CONECTOR BIMETALICO DE DOBLE VIA 35/35mm2 2 PERNOS u 6 12.00 72.00

    3.2 CONECTOR AMPAC 50/35mm2 u 3 65.00 195.00

    3.3 CONECTOR DE COBRE SPLIT BOLT PARA 35mm2 u 6 3.50 21.00

    3.4 TERMINALES A COMPRESION PARA CABLE 35 mm2. Pza 13 5.50 71.50

    3.5 TERMINALES A COMPRESION PARA CABLE 16 mm2. Pza 4 4.00 16.00

    3.6 SOPORTES DE FIJACION DE TRANSFORMADOR Y TRAFOMIX u 8 22.50 180.00

    3.7 PLANCHA DOBLADA DE COBRE TIPO "J" u 8 4.50 36.00

    3.8 CINTA BAND IT 3/4" ML 20 4.50 90.00

    3.9 HEBILLAS PARA CINTA BAND IT u 20 1.50 30.00

    3.10 CINTA VULCANIZANTE N 2229, 3M Rollo 1.00 123.00 123.00

    3.11 CINTA PLASTICA AISLANTE N33, 3M 1-1/2" Rollo 5 28.00 140.00

    SUB-TOTAL 3.00 : 974.50

    4.00 CABLES, CONDUCTORES ELECTRICOS Y ACCESORIOS

    4.1 CABLE TIPO UNIPOLAR N2XSY - 8,7/15 KV, 25 mm2. m 136 23.00 3,128.00

    4.2 TERMINAL UNIPOLAR 15 KV, 25 mm2. TIPO EXTERIOR u 6 195.00 1,170.00

    4.3 CONDUCTOR DE COBRE CPI TEMPLE DURO 35mm2, 7 HILOS m 25 14.00 350.00

    4.4 CONDUCTOR DE COBRE TEMPLE BLANDO 35mm2, 7 HILOS m 50 11.50 575.00

    4.5 CABLE NYY-1 KV 3 - 1 x 16+1x10 mm2. m 25 24.00 600.00

    4.6 TUBO DE AG DE 1-1/2"x3.20m Pza 1 30.00 30.00

    4.7 CINTA SEALIZADORA PARA M.T. (COLOR ROJO) m 15 0.10 1.50

    4.8 TUBO DE AG DE 3"x3.20m Pza 2 95.00 190.00

    4.9 TUBO DE AG DE 2"x3.20m Pza 1 95.00 95.00

    4.10 DUCTO DE CONCRETO DE 4 VIAS m 10 27.00 270.00

    4.11 LADRILLO K.K. Und 105 0.30 31.50

    SUB-TOTAL 4.00 : 6,441.00

    5.00 PUESTA A TIERRA

    5.1 VARILLA DE COBRE 16mm (5/8")x2.40m u 4 128.00 512.00

    5.2 CONECTOR VARILLA(5/8")- CABLE(35mm2) u 8 4.00 32.00

    5.3 CONECTOR DE COBRE TIPO PERNO PARTIDO P' COND. 35mm2 u 8 4.00 32.00

    5.4 TIERRA DE CHACRA m3 14 60.00 864.00

    5.5 DOSIS DE THORGEL u 8 50.00 400.00

    5.6 CAJUELA DE C.A.V CON TAPA PARA REGISTRO DE PUESTA A TIERRA. u 4 25.00 100.00

    SUB-TOTAL 5.00 : 1,940.00

    6.00 TRANSFORMADOR Y TRAFOMIX

    6.1 TRANSFORMADOR TRIFASICO 10/0.398-0.230 KV,37.5 KVA Pza 1 7,300.00 7,300.00

    6.2 TRAFOMIX 10/0.230 V, 3 SIST. CLASE 0.2 S, (2)/5A Pza 1 5,400.00 5,400.00

    SUB-TOTAL 6.00 : 12,700.00

    7.00 SECCIONADORES Y EQUIPOS DE PROTECCION

    7.1 SECCIONADOR UNIPOLAR TIPO CUT-OUT 27KV, 200 A, 150KV BIL. Pza 3 270.00 810.00

    7.2 SECCIONADOR UNIPOLAR TIPO CUT-OUT 27KV, 100 A, 150KV BIL. Pza 3 240.00 720.00

    7.3 FUSIBLES RAPIDOS TIPO CHICOTE 3 A. Pza 3 5.00 15.00

    COSTO

    Presupuesto Referencial

    METRADO

  • 7.4 FUSIBLES RAPIDOS TIPO CHICOTE 2 A. Pza 3 5.00 15.00

    SUB-TOTAL 7.00 : 1,560.00

    8.00 EQUIPOS DE MEDICION Y ACCESORIOS

    8.1 MEDIDOR ELECTRONICO MODEM CELULAR GSM/GPRS Puerto

    RS232 de acuerdo a Especificaciones Tecnicas de Hidrandina S.A Pza 1 4,100.00 4,100.00

    8.2 MURETE DE CONCRETO ARMADO 1.40x0.90x0.35m Und 1 200.00 200.00

    8.3 CAJA METALICA PORTAMEDIDOR ELECTRONICO C/REJILLA Und 1 72.00 72.00

    8.4 CABLE EXTRAFLEXIBLE TIPO NLT 4x4mm2 Ml 20 7.00 140.00

    8.5 CINTA BAND IT 3/4" CON HEBILLAS Conj. 16 6.00 96.00

    SUB-TOTAL 8.00 : 4,608.00

    9.00 TABLERO GENERALCON EQUIPOS

    9.1 TABLERO DE DISTRIBUCION, SISTEMA TRIFASICO 380/230 V,

    MONTAJE INTERIOR, AUTOSOPORTADO DE 2000x600x600mm

    PINTURA POLIESTEREPOXI GRIS RAK-7032 TEXTURIZADA

    CON CHAPA Y MANIJA, COMPUESTO DE:

    - (1) INTERRUP.TERMOMAG. DE 3x40-160 A, 380 V, 25 KA.

    - (1) ARRANCADOR ESTADO SOLIDO 40A ,380 V,60 Hz.

    - (1) INTERRUPTOR TERMOMAGNETICO 2x15A 220V

    - (1) INTERRUPTOR TERMOMAGNETICO 2x20A 220V

    - (1) VOLTIMETRO 0-500V

    - (1) AMPERIMETRO 0-200A

    - (3) BARRAS DE COBRE DE 5 x 30 x 600 mm (FASES)

    - (9) BARRAS DE COBRE DE 3 x 20 mm (derivaciones s.p.)

    - (1) BARRA DE COBRE DE 5 x 20 x 200 mm (NEUTRO)

    AISLADORES, CONECTORES Y CABLEADO Cjto 1 10,712.00 10,712.00

    SUB-TOTAL 9.00 : 10,712.00

    TOTAL SUMINISTRO DE MATERIALES S/. 42,337.50

    ITEM ESPECIFICACIONES UND CANT. UNITARIO TOTAL

    2.00 TRANSPORTE DE MATERIALES

    2.1 Postes y Pastorales Tn. 3.0 100.00 300.00

    2.2 Conductores electricos. Tn. 2.0 100.00 200.00

    2.3 Transformador de potencia y Trafomix Est. 200.00

    2.4 Varios Est. 50.00

    2.5 Puesta en obra de materiales. Est. 200.00

    TOTAL TRANSPORTE:------------------------------------------------------------- S/. 950.00

    ITEM ESPECIFICACIONES UND CANT. UNITARIO TOTAL

    3.00 MONTAJE ELECTROMECANICO

    3.01 Varios

    3.01.1 Cartel de obra C/U 1 1,144.82 1,144.82

    3.01.2 Replanteo topografico, ubicacin de estructuras Km 0.10 847.37 84.74

    SUB TOTAL: 1,229.56

    3.02 Postes y accesorios de concreto armado

    3.01.1 Transporte de poste de c.a.c. de almacen a punto de izaje C/U 2 39.14 78.28

    3.01.1 Excavacion de hueco para poste en terreno normal M3 1.79 18.74 33.58

    3.01.1 Izado de poste de c.a.c. de 13/400 C/U 2 102.86 205.72

    3.01.1 Cimentacion de poste de c.a.c. de 13/400 C/U 2 71.40 142.80

    3.01.3 Instalacion de mensulas de c.a.v. de 1.0m C/U 1 35.15 35.15

    3.01.4 Instalacion de media loza de c.a.v. de 1.10m C/U 2 72.65 145.30

    3.01.5 Instalacion de cruceta simetrica de 1.30m C/U 1 38.22 38.22

    3.01.5 Instalacion de cruceta asimetrica de 1.30m C/U 2 47.45 94.90

    SUB TOTAL: 773.95

    3.02 AISLADORES

    3.02.1 Instalacion de aislador hibrido tipo Pin de 25 KV C/U 4 16.08 64.32

    SUB TOTAL: 64.32

    3.03 PUESTA A TIERRA

    3.03.1 Excavacion de hueco para puesta a tierra M3 9.60 18.74 179.90

    3.03.1 Instalacion de varilla de cobre con relleno y compactado C/U 4 170.10 680.4

    SUB TOTAL: 860.30

    3.04 TRANSFORMADOR Y TRAFOMIX

    3.04.1 Instalacion de transformador trifasico 37.5 KVA C/U 1 252.52 252.52

    3.04.2 Instalacion de trafomix C/U 1 252.52 252.52

    SUB TOTAL: 505.04

    3.05 SECCIONADORES

    METRADO COSTO

    METRADO COSTO

  • 3.05.1 Instalacion de Seccionador Cut Out con fusibles 27 Kv C/U 6 32 192.24

    SUB TOTAL: 192.24

    3.06 CABLES Y CONDUCTORES

    3.06.1 Apertura de zanja e instalacion de cable N2XSY 1x25mm2 Ml 25 17.05 426.25

    3.05.1 Instalacion de Terminales termocontraibles 15 Kv C/U 6 57.28 343.68

    3.06.2 Instalacion de ductos 4 vias Ml 10 22.14 221.40

    3.06.3 Aprtura de zanja e instalacion de cable NYY-1Kv 3-1x16mm2 Ml 25 13.91 347.75

    SUB TOTAL: 1,339.08

    3.07 EQUIPOS DE MEDICION Y PRUEBAS ELECTRICAS

    3.07.1 Pruebas electricas de aislamiento, pozos y puesta en servicio Gbl 1 1,340.74 1,340.74

    SUB TOTAL: 1,340.74

    3.08 TABLEROS Y EQUIPOS DE BAJA TENSION

    3.08.1 Instalacion de tablero de distribucion C/U 1 98.82 98.82

    SUB TOTAL: 98.82

    3.09 SEALIZACION DE ESTRUCTURAS MT

    3.01.6 Enumeracion de postes, sealizacion de peligro, co-

    dificacion de Subestacion y puesta a tierra Gbl 2 137.90 275.80

    SUB TOTAL: 275.80

    3.10 ELABORACION DE EXPEDIENTE FINAL CONFORME A OBRA

    3.10.1 Elaboracion de expediente de replanteo y tramites conformidad Gbl 1 1540 1,540

    SUB TOTAL: 1,540.00

    3.11 CONEXIN A RED DE HIDRANDINA

    3.11.1 Comprende las maniobras a realizar para la conexin ya sea en

    3.11.1 caliente o en frio. Gbl 1 3000 3,000

    SUB TOTAL: 3,000.00

    TOTAL MONTAJE ELECTROMECANICO: S/. 11,219.85

    RESUMEN GENERAL:

    MATERIALES Y EQUIPOS:---------------------------------------------------------------- 42,337.50

    MONTAJE ELECTROMECANICO:----------------------------------------------------- 11,219.85

    TRANSPORTE:----------------------------------------------------- 950.00

    COSTO DIRECTO (CD):----------------------------------------------------- 54,507.35

    GASTOS GENERALES(10% DEL CD):----------------------------------------------------- 5,450.74

    UTILIDAD(5% DEL CD):----------------------------------------------------- 2,725.37

    SUB TOTAL PRESUPUESTO:------------------------------------------------------------ 62,683.46

    IMPUESTO A LAS VENTAS (18%):--------------------------------------------------- 11,283.02

    TOTAL PRESUPUESTO EN 10 KV S/. 73,966.47

    FACTOR DE RELACION (0.9) MONTO CONTRATADO S/. 66,569.82

  • Ubicacin : CENTRO POBLADO EL CARMELO - VIRU, PROVINCIA DE VIRU

    LA LIBERTAD

    Entidad Contratante : GOBIERNO REGIONAL DE LA LIBERTAD

    Contratista : CONSTRUCTORA E INMOBILIARIA GARCIA & MEDRANO SAC

    Modalidad : A Suma Alzada

    Valor Referencial : 73,966.47S/ ( March-11 )

    .

    Presupuesto Contratado : 66,569.83S/ ( Incluye I.G.V. )

    Factor de Relacin ( F.R. ) : 0.90

    Presupuesto Contratado : 56,415.11S/ ( Sin I.G.V. )

    Plazo de Ejecucin : 45.00 ( Das Calendario )

    Adelanto Directo : -S/ ( 00/00/2011 ) ( Con I.G.V. )

    Adelanto para Materiales : -S/ ( 00/00/2011 ) ( Con I.G.V. )

    Fecha de Entrega de terreno : 4-Nov-11

    Fecha de Inicio de Obra : 5-Nov-11

    Fecha de Trmino de Obra : 19-Dec-11 6-Feb-00

    D A T O S G E N E R A L E S

    " SISTEMA DE UTILIZACION EN MEDIA TENSION 10 KV DEL PROYECTO

    SISTEMA DE BOMBEO DEL AGUA POTABLE DEL CENTRO POBLADO EL

    CARMELO - VIRU, PROVINCIA DE VIRU - LA LIBERTAD"

    Obra :

  • PROPIETARIO : GOBIERNO REGIONAL DE LA LIBERTAD

    UBICACIN : CENTRO POBLADO EL CARMELO - VIRU, PROVINCIA DE VIRU

    RESIDENTE : INGCARLO GIOVANNY MUSAYON URBINA

    SUPERVISOR : ING MANUEL ALFONSO ASMAT TERAN

    MES DE VALORIZACION: Dec-11

    Valorizacin mes V = 24,854.21

    Reintegros y otros R = 0.00

    VALORIZACION BRUTA VB = V+R 24,854.21

    Intereses ( i ) 0.00

    Amortizacin de Adelantos ( D ) 0.00

    VALORIZACION NETA VN = VB + i - D 24,854.21

    I.G.V. ( 18.00% ) = VN x 0.18 4,473.76

    Monto a Cancelar al Contratista

    - En Efectivo : VN - Fg - M 24,854.21

    - I.G.V. 4,473.76

    Calendario de Compromisos a Solicitar = VN + IGV = S/. 29,327.97

    FACTOR DE RELACION ( 0.9 ) S/. 26,395.16

    TOTAL A PAGAR AL CONTRATISTA S/. 26,395.16

    " SISTEMA DE UTILIZACION EN MEDIA TENSION 10 KV DEL

    PROYECTO SISTEMA DE BOMBEO DEL AGUA POTABLE DEL

    CENTRO POBLADO EL CARMELO - VIRU, PROVINCIA DE VIRU -

    OBRA

    R E S U M E N D E V A L O R I Z A C I O N D E O B R A No. 02

    :

  • PROPIETARIO : GOBIERNO REGIONAL DE LA LIBERTAD

    UBICACIN : CENTRO POBLADO EL CARMELO - VIRU, PROVINCIA DE VIRU

    RESIDENTE : INGCARLO GIOVANNY MUSAYON URBINA

    SUPERVISOR : ING MANUEL ALFONSO ASMAT TERAN

    FECHA : Dec-11

    Valorizacin Del Mes - V = 24,854.21

    I.G.V. ( 18.00% ) - V x 0.18 = 4,473.76

    Monto a Cancelar Al Contratista

    - En Efectivo : V 24,854.21

    - I.G.V. 4,473.76

    SUB TOTAL AL 100 % = V + IGV = S/. 29,327.97

    TOTAL AL 90 % S/. 26,395.16

    NOTA :

    Los metrados de obra ejecutados sern formulados y valorizados conjuntamente por el

    contratista y el inspector o supervisor, y presentados a la Entidad dentro de los plazos que

    establezca el contrato.

    V A L O R I Z A C I O N - V D E O B R A No. 02

    OBRA :" SISTEMA DE UTILIZACION EN MEDIA TENSION 10 KV DEL

    PROYECTO SISTEMA DE BOMBEO DEL AGUA POTABLE DEL

    CENTRO POBLADO EL CARMELO - VIRU, PROVINCIA DE VIRU -

    Las valorizaciones tienen el carcter de pagos a cuenta y sern elaboradas el ltimo da de cada

    perodo previsto en las Bases o en el contrato, por el inspector o supervisor y el contratista.

    En el caso de las obras contratadas bajo el sistema a suma alzada, durante la

    ejecucin de la obra, las valorizaciones se formularn en funcin de los metrados ejecutados con

    los precios unitarios del Valor referencial, agregando separadamente los montos proporcionales

    de gastos generales y utilidad del valor referencial. El subtotal as obtenido se multiplicar por el

    factor de relacin, calculado hasta la quinta cifra decimal; a este monto se agregar, de ser el

    caso, el porcentaje correspondiente al Impuesto General a las Ventas.

  • PROPIETARIO : GOBIERNO REGIONAL DE LA LIBERTAD

    UBICACIN : CENTRO POBLADO EL CARMELO - VIRU, PROVINCIA DE VIRU

    RESIDENTE : INGCARLO GIOVANNY MUSAYON URBINA

    SUPERVISOR : ING MANUEL ALFONSO ASMAT TERAN

    FECHA : Dec-11

    Reintegro Del Mes - R = 0.00

    (Se calcular en la liquidacin de obra)

    I.G.V. ( 18.00% ) - R x 0.18 = -

    Monto a Cancelar Al Contratista

    - En Efectivo : R 0.00

    - I.G.V. -

    Calendario de Compromisos a Solicitar = K + IGV = S/. 0.00

    NOTA :

    - Posteriormente, cuando se conozcan los ndices Unificados de Precios que se deben aplicar,

    se calcular el monto definitivo de los reintegros que le corresponden y se pagarn con la

    valorizacin ms cercana posterior o en la liquidacin final .

    R E I N T E G R O - R D E O B R A No. 02

    OBRA :" SISTEMA DE UTILIZACION EN MEDIA TENSION 10 KV DEL

    PROYECTO SISTEMA DE BOMBEO DEL AGUA POTABLE DEL

    CENTRO POBLADO EL CARMELO - VIRU, PROVINCIA DE VIRU -

    - Tanto la elaboracin como la aplicacin de las frmulas polinmicas se sujetan a lo dispuesto

    en el Decreto Supremo N 011-79-VC y sus modificatorias,

    ampliatorias y complementarias.

    - Dado que los ndices Unificados de Precios de la Construccin son publicados por el INEI

    con un mes de atraso, los reintegros se calcularn en base al coeficiente de reajuste K

    conocido a ese momento

  • OBRA: SISTEMA DE UTILIZACION EN MEDIA TENSION 10 KV. SISTEMA DE AGUA POTABLE CP EL CARMELO

    PROPIETARIO: GOBIERNO REGIONAL DE LA LIBERTAD

    FECHA: 31 de Diciembre DEL 2011 VALOR REFERENCIAL

    CONTRATISTA: CONSTRUCTORA E INMOBILIARIA GARCIA & MEDRANO S.A.C. MONTO DEL CONTRATO

    Part. DESCRIPCION COSTO PARCIAL

    No. Unid. Cantidad Unitario Metrado S/. Metrado S/. Metrado S/. % Metrado S/. %

    1.00 SUMINISTRO DE MATERIALES 0.00% 0.00 0.00%

    1.1 POSTES, MENSULAS Y BARBOTANTE DE C.A.

    1.3 POSTE DE C.A.C. DE 13/400 /165/355mm. u 1 1,000.00 1,000.00 1 1,000.00 1.00 1,000.00 100.00% 0.00 0.00 0.00%

    1.4 ESTRUCTURA PARA S.A.M. DE C.A. COMPUESTO POR :

    - (01) POSTE DE C.A.C. DE 13/400 /165/355 mm. 1 1,000.00

    - (01) MEDIA LOZA DE C.A.V. DE 1.10m 1 175.00

    - (01) PALOMILLA DE C.A.V. DE 1.30m 1 95.00

    - (01) MENSULA DE C.A.V. DE 1.0m u 1 70.00 1,340.00 1 1,340.00 1.00 1,340.00 100.00% 0.00 0.00 0.00%

    1.5 CRUCETA DE C.A.V. DE 1.30m u 1 80.00 80.00 1 80.00 1.00 80.00 100.00% 0.00 0.00 0.00%

    1.6 MEDIA LOZA DE C.A.V. DE 1.10m PARA PMI u 1 175.00 175.00 1 175.00 1.00 175.00 100.00% 0.00 0.00 0.00%

    1.7 PALOMILLA DE C.A.V. DE 1.30m u 1 95.00 95.00 1 95.00 1.00 95.00 100.00% 0.00 0.00 0.00%

    SUB-TOTAL 1.100 : 2,690.00 2,690.00 0 0.00 2,690.00 100.00%

    2.00 AISLADORES

    2.1 AISLADOR HIBRIDO TIPO PEDESTAL TAYCO - 24 KV C/ESPIGA u 4 178.00 712.00 4 712.00 4.00 712.00 100.00% 0.00 0.00 0.00%

    SUB-TOTAL 2.00 : 712.00 712.00 0 0.00 712.00 100.00%

    3.00 FERRETERIA Y VARIOS

    3.1 CONECTOR BIMETALICO DE DOBLE VIA 35/35mm2 2 PERNOS u 6 12.00 72.00 6 72.00 6.00 72.00 100.00% 0.00 0.00 0.00%

    3.2 CONECTOR AMPAC 50/35mm2 u 3 65.00 195.00 3 195.00 3.00 195.00 100.00% 0.00 0.00 0.00%

    3.3 CONECTOR DE COBRE SPLIT BOLT PARA 35mm2 u 6 3.50 21.00 6 21.00 6.00 21.00 100.00% 0.00 0.00 0.00%

    3.4 TERMINALES A COMPRESION PARA CABLE 35 mm2. Pza 13 5.50 71.50 13 71.50 13.00 71.50 100.00% 0.00 0.00 0.00%

    3.5 TERMINALES A COMPRESION PARA CABLE 16 mm2. Pza 4 4.00 16.00 4 16.00 4.00 16.00 100.00% 0.00 0.00 0.00%

    3.6 SOPORTES DE FIJACION DE TRANSFORMADOR Y TRAFOMIX u 8 22.50 180.00 8 180.00 8.00 180.00 100.00% 0.00 0.00 0.00%

    3.7 PLANCHA DOBLADA DE COBRE TIPO "J" u 8 4.50 36.00 8 36.00 8.00 36.00 100.00% 0.00 0.00 0.00%

    3.8 CINTA BAND IT 3/4" ML 20 4.50 90.00 20 90.00 20.00 90.00 100.00% 0.00 0.00 0.00%

    3.9 HEBILLAS PARA CINTA BAND IT u 20 1.50 30.00 20 30.00 20.00 30.00 100.00% 0.00 0.00 0.00%

    3.10 CINTA VULCANIZANTE N 2229, 3M Rollo 1.00 123.00 123.00 1.00 123.00 1.00 123.00 100.00% 0.00 0.00 0.00%

    3.11 CINTA PLASTICA AISLANTE N33, 3M 1-1/2" Rollo 5 28.00 140.00 5 140.00 5.00 140.00 100.00% 0.00 0.00 0.00%

    SUB-TOTAL 3.00 : 974.50 974.50 0 0.00 974.50 100.00%

    4.00 CABLES, CONDUCTORES ELECTRICOS Y ACCESORIOS

    4.1 CABLE TIPO UNIPOLAR N2XSY - 8,7/15 KV, 25 mm2. m 136 23.00 3,128.00 0 0.00 136 3,128.00 136.00 3,128.00 100.00% 0.00 0.00 0.00%

    4.2 TERMINAL UNIPOLAR 15 KV, 25 mm2. TIPO EXTERIOR u 6 195.00 1,170.00 6 1,170.00 0 - 6.00 1,170.00 100.00% 0.00 0.00 0.00%

    4.3 CONDUCTOR DE COBRE CPI TEMPLE DURO 35mm2, 7 HILOS m 25 14.00 350.00 25 350.00 0 - 25.00 350.00 100.00% 0.00 0.00 0.00%

    4.4 CONDUCTOR DE COBRE TEMPLE BLANDO 35mm2, 7 HILOS m 50 11.50 575.00 50 575.00 0 - 50.00 575.00 100.00% 0.00 0.00 0.00%

    4.5 CABLE NYY-1 KV 3 - 1 x 16+1x10 mm2. m 25 24.00 600.00 25 600.00 0 - 25.00 600.00 100.00% 0.00 0.00 0.00%

    4.6 TUBO DE AG DE 1-1/2"x3.20m Pza 1 30.00 30.00 1 30.00 0 - 1.00 30.00 100.00% 0.00 0.00 0.00%

    4.7 CINTA SEALIZADORA PARA M.T. (COLOR ROJO) m 15 0.10 1.50 15 1.50 0 - 15.00 1.50 100.00% 0.00 0.00 0.00%

    4.8 TUBO DE AG DE 3"x3.20m Pza 2 95.00 190.00 2 190.00 0 - 2.00 190.00 100.00% 0.00 0.00 0.00%

    4.9 TUBO DE AG DE 2"x3.20m Pza 1 95.00 95.00 1 95.00 0 - 1.00 95.00 100.00% 0.00 0.00 0.00%

    4.10 DUCTO DE CONCRETO DE 4 VIAS m 10 27.00 270.00 10 270.00 0 - 10.00 270.00 100.00% 0.00 0.00 0.00%

    4.11 LADRILLO K.K. Und 105 0.30 31.50 105 31.50 0 - 105.00 31.50 100.00% 0.00 0.00 0.00%

    SUB-TOTAL 4.00 : 6,441.00 3,313.00 0 3,128.00 6,441.00 100.00% 0.00 0.00%

    5.00 PUESTA A TIERRA

    5.1 VARILLA DE COBRE 16mm (5/8")x2.40m u 4 128.00 512.00 4 512.00 4.00 512.00 100.00% 0.00 0.00 0.00%

    5.2 CONECTOR VARILLA(5/8")- CABLE(35mm2) u 8 4.00 32.00 8 32.00 8.00 32.00 100.00% 0.00 0.00 0.00%

    5.3 CONECTOR DE COBRE TIPO PERNO PARTIDO P' COND. 35mm2 u 8 4.00 32.00 8 32.00 8.00 32.00 100.00% 0.00 0.00 0.00%

    5.4 TIERRA DE CHACRA m3 14 60.00 864.00 14 864.00 14.40 864.00 100.00% 0.00 0.00 0.00%

    5.5 DOSIS DE THORGEL u 8 50.00 400.00 8 400.00 8.00 400.00 100.00% 0.00 0.00 0.00%

    5.6 CAJUELA DE C.A.V CON TAPA PARA REGISTRO DE PUESTA A TIERRA. u 4 25.00 100.00 4 100.00 4.00 100.00 100.00% 0.00 0.00 0.00%

    SUB-TOTAL 5.00 : 1,940.00 1,940.00 0 0.00 1,940.00 100.00% 0.00 0.00 0.00%

    6.00 TRANSFORMADOR Y TRAFOMIX

    6.1 TRANSFORMADOR TRIFASICO 10/0.398-0.230 KV,37.5 KVA Pza 1 7,300.00 7,300.00 1 7,300.00 1.00 7,300.00 100.00% 0.00 0.00 0.00%

    6.2 TRAFOMIX 10/0.230 V, 3 SIST. CLASE 0.2 S, (2)/5A Pza 1 5,400.00 5,400.00 1 5,400.00 1.00 5,400.00 100.00% 0.00 0.00 0.00%

    SUB-TOTAL 6.00 : 12,700.00 12,700.00 0 0.00 12,700.00 100.00%

    7.00 SECCIONADORES Y EQUIPOS DE PROTECCION

    7.1 SECCIONADOR UNIPOLAR TIPO CUT-OUT 27KV, 200 A, 150KV BIL. Pza 3 270.00 810.00 3 810.00 3.00 810.00 100.00% 0.00 0.00 0.00%

    7.2 SECCIONADOR UNIPOLAR TIPO CUT-OUT 27KV, 100 A, 150KV BIL. Pza 3 240.00 720.00 3 720.00 3.00 720.00 100.00% 0.00 0.00 0.00%

    7.3 FUSIBLES RAPIDOS TIPO CHICOTE 3 A. Pza 3 5.00 15.00 3 15.00 3.00 15.00 100.00% 0.00 0.00 0.00%

    VALORIZACION N 02 al 31 de Diciembre del 2,011

    73,966.47

    66,569.83

    ACUMULADO SALDOMETRADO ANTERIOR ACTUAL

  • OBRA: SISTEMA DE UTILIZACION EN MEDIA TENSION 10 KV. SISTEMA DE AGUA POTABLE CP EL CARMELO

    PROPIETARIO: GOBIERNO REGIONAL DE LA LIBERTAD

    FECHA: 31 de Diciembre DEL 2011 VALOR REFERENCIAL

    CONTRATISTA: CONSTRUCTORA E INMOBILIARIA GARCIA & MEDRANO S.A.C. MONTO DEL CONTRATO

    Part. DESCRIPCION COSTO PARCIAL

    No. Unid. Cantidad Unitario Metrado S/. Metrado S/. Metrado S/. % Metrado S/. %

    VALORIZACION N 02 al 31 de Diciembre del 2,011

    73,966.47

    66,569.83

    ACUMULADO SALDOMETRADO ANTERIOR ACTUAL

    7.4 FUSIBLES RAPIDOS TIPO CHICOTE 2 A. Pza 3 5.00 15.00 3 15.00 3.00 15.00 100.00% 0.00 0.00 0.00%

    SUB-TOTAL 7.00 : 1,560.00 1,560.00 0 0.00 1,560.00 100.00% 0.00 0.00%

    8.00 EQUIPOS DE MEDICION Y ACCESORIOS

    8.1 MEDIDOR ELECTRONICO MODEM CELULAR GSM/GPRS Puerto

    RS232 de acuerdo a Especificaciones Tecnicas de Hidrandina S.A Pza 1 4,100.00 4,100.00 1 4,100.00 1.00 4,100.00 100.00% 0.00 0.00 0.00%

    8.2 MURETE DE CONCRETO ARMADO 1.40x0.90x0.35m Und 1 200.00 200.00 0 0.00 1 200.00 1.00 200.00 100.00% 0.00 0.00 0.00%

    8.3 CAJA METALICA PORTAMEDIDOR ELECTRONICO C/REJILLA Und 1 72.00 72.00 1 72.00 1.00 72.00 100.00% 0.00 0.00 0.00%

    8.4 CABLE EXTRAFLEXIBLE TIPO NLT 4x4mm2 Ml 20 7.00 140.00 20 140.00 20.00 140.00 100.00% 0.00 0.00 0.00%

    8.5 CINTA BAND IT 3/4" CON HEBILLAS Conj. 16 6.00 96.00 16 96.00 16.00 96.00 100.00% 0.00 0.00 0.00%

    SUB-TOTAL 8.00 : 4,608.00 4,408.00 0 200.00 4,608.00 100.00% 0.00 0.00%

    9.00 TABLERO GENERALCON EQUIPOS

    9.1 TABLERO DE DISTRIBUCION, SISTEMA TRIFASICO 380/230 V,

    MONTAJE INTERIOR, AUTOSOPORTADO DE 2000x600x600mm

    PINTURA POLIESTEREPOXI GRIS RAK-7032 TEXTURIZADA

    CON CHAPA Y MANIJA, COMPUESTO DE:

    - (1) INTERRUP.TERMOMAG. DE 3x40-160 A, 380 V, 25 KA.

    - (1) ARRANCADOR ESTADO SOLIDO 40A ,380 V,60 Hz.

    - (1) INTERRUPTOR TERMOMAGNETICO 2x15A 220V

    - (1) INTERRUPTOR TERMOMAGNETICO 2x20A 220V

    - (1) VOLTIMETRO 0-500V

    - (1) AMPERIMETRO 0-200A

    - (3) BARRAS DE COBRE DE 5 x 30 x 600 mm (FASES)

    - (9) BARRAS DE COBRE DE 3 x 20 mm (derivaciones s.p.)

    - (1) BARRA DE COBRE DE 5 x 20 x 200 mm (NEUTRO)

    AISLADORES, CONECTORES Y CABLEADO Cjto 1 10,712.00 10,712.00 0.00 0.00 1 10,712.00 1.00 10,712.00 100.00% 0.00 0.00 0.00%

    SUB-TOTAL 9.00 : 10,712.00 0.00 0 10,712.00 10,712.00 100.00% 10,712.00 100.00%

    TOTAL SUMINISTRO DE MATERIALES S/. 42,337.50 0

    ITEM ESPECIFICACIONES UND CANT.

    2.00 TRANSPORTE DE MATERIALES

    2.1 Postes y Pastorales Tn. 3.0 100.00 300.00 3.0 300.00 0 - 3.00 300.00 100.00% 0.00 0.00 0.00%

    2.2 Conductores electricos. Tn. 2.0 100.00 200.00 1.5 150.00 1 50.00 2.00 200.00 100.00% 0.00 0.00 0.00%

    2.3 Transformador de potencia y Trafomix Est. 1.0 200.00 200.00 1.0 200.00 0 - 1.00 200.00 100.00% 0.00 0.00 0.00%

    2.4 Varios Est. 1.0 50.00 50.00 1.0 50.00 0 - 1.00 50.00 100.00% 0.00 0.00 0.00%

    2.5 Puesta en obra de materiales. Est. 1.0 200.00 200.00 1.0 200.00 0 - 1.00 200.00 100.00% 0.00 0.00 0.00%

    TOTAL TRANSPORTE:------------------------------------------------------------- S/. 950.00 900.00 50.00 950.00 100.00% 0.00 0.00%

    ITEM ESPECIFICACIONES UND

    3.00 MONTAJE ELECTROMECANICO

    3.01 Varios

    3.01.1 Cartel de obra C/U 1 1,144.82 1,144.82 1 1,144.82 0 - 1.00 1,144.82 100.00% 0.00 0.00 0.00%

    3.01.2 Replanteo topografico, ubicacin de estructuras Km 0.10 847.37 84.74 0.10 84.74 0 - 0.10 84.74 100.00% 0.00 0.00 0.00%

    SUB TOTAL: 1,229.56 1,229.56 0 0.00 1,229.56 100.00% 0.00 0.00%

    3.02 Postes y accesorios de concreto armado 0

    3.01.1 Transporte de poste de c.a.c. de almacen a punto de izaje C/U 2 39.14 78.28 2 78.28 0 - 2.00 78.28 100.00% 0.00 0.00 0.00%

    3.01.1 Excavacion de hueco para poste en terreno normal M3 1.79 18.74 33.58 1.79 33.58 0 - 1.79 33.58 100.00% 0.00 0.00 0.00%

    3.01.1 Izado de poste de c.a.c. de 13/400 C/U 2 102.86 205.72 1 102.86 1 102.86 2.00 205.72 100.00% 0.00 0.00 0.00%

    3.01.1 Cimentacion de poste de c.a.c. de 13/400 C/U 2 71.40 142.80 1 71.40 1 71.40 2.00 142.80 100.00% 0.00 0.00 0.00%

    3.01.3 Instalacion de mensulas de c.a.v. de 1.0m C/U 1 35.15 35.15 1 35.15 0 - 1.00 35.15 100.00% 0.00 0.00 0.00%

    3.01.4 Instalacion de media loza de c.a.v. de 1.10m C/U 2 72.65 145.30 1 72.65 1 72.65 2.00 145.30 100.00% 0.00 0.00 0.00%

    3.01.5 Instalacion de cruceta simetrica de 1.30m C/U 1 38.22 38.22 1 38.22 0 - 1.00 38.22 100.00% 0.00 0.00 0.00%

    3.01.5 Instalacion de cruceta asimetrica de 1.30m C/U 2 47.45 94.90 1 47.45 1 47.45 2.00 94.90 100.00% 0.00 0.00 0.00%

    SUB TOTAL: 773.95 479.59 0 294.36 773.95 100.00% 0.00 0.00%

  • OBRA: SISTEMA DE UTILIZACION EN MEDIA TENSION 10 KV. SISTEMA DE AGUA POTABLE CP EL CARMELO

    PROPIETARIO: GOBIERNO REGIONAL DE LA LIBERTAD

    FECHA: 31 de Diciembre DEL 2011 VALOR REFERENCIAL

    CONTRATISTA: CONSTRUCTORA E INMOBILIARIA GARCIA & MEDRANO S.A.C. MONTO DEL CONTRATO

    Part. DESCRIPCION COSTO PARCIAL

    No. Unid. Cantidad Unitario Metrado S/. Metrado S/. Metrado S/. % Metrado S/. %

    VALORIZACION N 02 al 31 de Diciembre del 2,011

    73,966.47

    66,569.83

    ACUMULADO SALDOMETRADO ANTERIOR ACTUAL

    3.02 AISLADORES 0

    3.02.1 Instalacion de aislador hibrido tipo Pin de 25 KV C/U 4 16.08 64.32 2.00 32.16 2 32.16 4.00 64.32 100.00% 0.00 0.00 0.00%

    SUB TOTAL: 64.32 32.16 0 32.16 64.32 100.00% 0.00 0.00%

    3.03 PUESTA A TIERRA 0

    3.03.1 Excavacion de hueco para puesta a tierra M3 9.60 18.74 179.90 9.60 179.90 0 - 9.60 179.90 100.00% 0.00 0.00 0.00%

    3.03.1 Instalacion de varilla de cobre con relleno y compactado C/U 4 170.10 680.40 2.00 340.20 2 340.20 4.00 680.40 100.00% 0.00 0.00 0.00%

    SUB TOTAL: 860.30 520.10 0 340.20 860.30 100.00% 0.00 0.00%

    3.04 TRANSFORMADOR Y TRAFOMIX 0

    3.04.1 Instalacion de transformador trifasico 37.5 KVA C/U 1 252.52 252.52 1.00 252.52 0 - 1.00 252.52 100.00% 0.00 0.00 0.00%

    3.04.2 Instalacion de trafomix C/U 1 252.52 252.52 0.00 0.00 1 252.52 1.00 252.52 100.00% 0.00 0.00 0.00%

    SUB TOTAL: 505.04 252.52 0 252.52 505.04 100.00% 0.00 0.00%

    3.05 SECCIONADORES 0

    3.05.1 Instalacion de Seccionador Cut Out con fusibles 27 Kv C/U 6 32 192.24 6 192.24 0 6.00 192.24 100.00% 0.00 0.00 0.00%

    SUB TOTAL: 192.24 192.24 0 0.00 192.24 100.00% 0.00 0.00%

    0

    0

    3.06 CABLES Y CONDUCTORES 0

    3.06.1 Apertura de zanja e instalacion de cable N2XSY 1x25mm2 Ml 25 17.05 426.25 25 426.25 0 - 25.00 426.25 100.00% 0.00 0.00 0.00%

    3.05.1 Instalacion de Terminales termocontraibles 15 Kv C/U 6 57.28 343.68 6.00 343.68 0 - 6.00 343.68 100.00% 0.00 0.00 0.00%

    3.06.2 Instalacion de ductos 4 vias Ml 10 22.14 221.40 10.00 221.40 0 - 10.00 221.40 100.00% 0.00 0.00 0.00%

    3.06.3 Aprtura de zanja e instalacion de cable NYY-1Kv 3-1x16mm2 Ml 25 13.91 347.75 0.00 0.00 25 347.75 25.00 347.75 100.00% 0.00 0.00 0.00%

    SUB TOTAL: 1,339.08 991.33 0 347.75 1,339.08 100.00% 0.00 0.00%

    3.07 EQUIPOS DE MEDICION Y PRUEBAS ELECTRICAS 0

    3.07.1 Pruebas electricas de aislamiento, pozos y puesta en servicio Gbl 1 1,340.74 1,340.74 0.00 0.00 1 1,340.74 1.00 1,340.74 100.00% 0.00 0.00 0.00%

    SUB TOTAL: 1,340.74 0.00 0 1,340.74 1,340.74 100.00% 0.00 0.00%

    3.08 TABLEROS Y EQUIPOS DE BAJA TENSION 0

    3.08.1 Instalacion de tablero de distribucion C/U 1 98.82 98.82 0.00 0.00 1 98.82 1.00 98.82 100.00% 0.00 0.00 0.00%

    SUB TOTAL: 98.82 0.00 0 98.82 98.82 100.00% 0.00 0.00%

    3.09 SEALIZACION DE ESTRUCTURAS MT 0

    3.01.6 Enumeracion de postes, sealizacion de peligro, co- 0

    dificacion de Subestacion y puesta a tierra Gbl 2 137.90 275.80 0.00 0.00 2 275.80 2.00 275.80 100.00% 0.00 0.00 0.00%

    SUB TOTAL: 275.80 0.00 0 275.80 275.80 100.00% 0.00 0.00%

    3.10 ELABORACION DE EXPEDIENTE FINAL CONFORME A OBRA 0

    3.10.1 Elaboracion de expediente de replanteo y tramites conformidad Gbl 1 1540 1,540.00 0.00 0.00 1 1,540.00 1.00 1,540.00 100.00% 0.00 0.00 0.00%

    SUB TOTAL: 1,540.00 0.00 0 1,540.00 1,540.00 100.00% 0.00 0.00%

    3.11 CONEXIN A RED DE HIDRANDINA 0

    3.11.1 Comprende las maniobras a realizar para la conexin ya sea en 0

    3.11.1 caliente o en frio. Gbl 1 3000 3,000.00 0.00 0.00 1 3,000.00 1.00 3,000.00 100.00% 0.00 0.00 0.00%

    SUB TOTAL: 3,000.00 0.00 0 3,000.00 3,000.00 100.00% 0.00 0.00%

    TOTAL MONTAJE ELECTROMECANICO: 11,219.85 0

    0

    COSTO DIRECTO S/. 54,507.35 60.35% 32,895.00 39.65% 21,612.35 54,507.35 0.00% 0.00% 0.00 0.00%

    GASTOS GENERALES (10%) 10.00% 5,450.74 3,289.50 2,161.24 5,450.74 0.00 0.00

    UTILIDAD (5.0%) 5.00% 2,725.37 1,644.75 1,080.62 2,725.37 0.00 0.00

    COSTO TOTAL S/. 62,683.45 37,829.25 24,854.21 62,683.46 0.00 0.00

    IGV 18% 11,283.02 6,809.27 4,473.76 11,283.02 0.00 0.00

    73,966.47 60.35% 44,638.52 39.65% 29,327.97 73,966.48 0.00% 0.00% 0.00 0.00%

    TOTAL VALORIZADO PRESUPUESTO CONTRATADO

    FACTOR DE RELACION (0.9) S/. 66,569.83 40,174.67 26,395.16 66,569.83 0.00

  • CALCULO DE LA DEDUCCION POR ADELANTO QUE CORRESPONDE

    a) AVANCE EJECUTADO EN VALORIZACION N 02

    Monto Valorizado 29,327.97 (con I.G.V.)

    Monto del Contrato 66,569.83 (con I.G.V.)

    % DE AVANCE = 44.06%

    ADELANTO OTORGADO

    Adelanto otorgado 0.00 (con I.G.V.)

    Adelanto otorgado 0.00 (sin IGV)

    b) DEDUCCION QUE CORRESPONDE EN VALORIZACION No 01 :

    DEDUCCION (CON IGV) : 0.00

    DEDUCCION (SIN IGV) : 0.00

    A VALORIZACION UNICA DE OBRA

  • OBRA : " SISTEMA DE UTILIZACION EN MEDIA TENSION 10 KV DEL PROYECTO SISTEMA DE BOMBEO DEL AGUA POTABLE DEL CENTRO POBLADO EL CARMELO - VIRU, PROVINCIA DE VIRU - LA LIBERTAD"

    CONSTRUCTORA E INMOBILIARIA GARCIA & MEDRANO SAC

    Fecha Presupuesto : marzo 2011

    Frmula PolinmicaK = 0.05 Pr/Po + 0.063 ACFr/ACFo + 0.093 Cr/Co+ 0.30 TRr/TRo + 0.170 EQTr/EQTo + 0.179 Jr/Jo + 0.145 Gur/GUo

    Nomen- Indice ELEMENTO REPRESENTATIVO CoeficienteIncidencia Indices

    clatura Unificado Incidencia ( % ) Base Dec-11 Reajuste

    Mar-11

    P 42 POSTES Y ACCESORIOS DE CONCRETO 0.050 100.00% 227.69 0.00 -

    A 11 AISLADORES Y ACCESORIOS 0.063 100.00% 230.11 0.00 -

    C 8 CONDUCTOR, CABLES Y ACCESORIOS 0.093 100.00% 870.48 0.00 -

    TR 12 TRANSFORMADOR, TABLERO DE DISTRIBUCION 0.300 100.00% 279.63 0.00 -

    EQ 6 EQUIPO PROTECCION Y MEDICION 0.170 100.00% 367.30 0.00 -

    J 47 MONTAJE ELECTROMECANICO 0.179 100.00% 427.68 0.00 -

    T 32 TRANSPORTE 0.015 7.81% 423.94 0.00 -

    GU 39 GASTOS GENERALES Y UTILIDADES 0.130 92.19% 359.92 0.00 -

    Suma de Coeficientes ( Comprobacin ) 1.000 Factor Mensual De Reajuste : 0.000

    NOTA:

    - Dado que los ndices Unificados de Precios de la Construccin son publicados por el INEI con

    - Posteriormente, cuando se conozcan los ndices Unificados de Precios que se deben aplicar, se

    C A L C U L O D E L O S C O E F I C I E N T E S D E R E A J U S T E

    Ka

    - Tanto la elaboracin como la aplicacin de las frmulas polinmicas se sujetan a lo dispuesto

  • OBRA : " SISTEMA DE UTILIZACION EN MEDIA TENSION 10 KV DEL PROYECTO SISTEMA DE BOMBEO DEL AGUA POTABLE DEL CENTRO POBLADO EL CARMELO - VIRU, PROVINCIA DE VIRU - LA LIBERTAD"

    CONTRATISTA: CONSTRUCTORA E INMOBILIARIA GARCIA & MEDRANO S.A.C.

    VALORIZ. MES FORMULA VALORIZACION VALORIZACION K - 1 REAJUSTE REAJUSTE REAJUSTE REINTEGRO

    N VALORIZ. N PROGRAMADA REAL PROGRAMADO REAL RECONOCIDO EFECTIVO MATERIALES TOTAL

    ( 1 ) ( 2 ) ( 3 ) (4) = (1) x (3) (5) = (2) x (3) ( 6 ) ( 7 ) ( 8 ) (9)=(6)-[(7)+(8)]

    1.00 Dec-11 01 24,854.21 0.000 0.00 0.00 0.00 0.00 0.00 0.00

    0.00

    0.00 24,854.21 0.00 0.00 0.00 0.00

    TOTAL

    A PAGAR 0.00

    CONCLUSION : OBRA NORMAL S/. 24,854.21

    NOTA:

    - Posteriormente, cuando se conozcan los ndices Unificados de Precios

    que se deben aplicar, se calcular el monto definitivo de los reintegros

    que le corresponden y se pagarn con la valorizacin ms cercana

    posterior o en la liquidacin final .

    CALCULO DE REINTEGROS RECONOCIDOS

    DEDUCCIONES

    - Tanto la elaboracin como la aplicacin de las frmulas polinmicas se

    sujetan a lo dispuesto en el Decreto Supremo N 011-79-VC y sus

    modificatorias,ampliatorias y complementarias.

    - Dado que los ndices Unificados de Precios de la Construccin son

    publicados por el INEI con un mes de atraso, los reintegros se calcularn

    en base al coeficiente de reajuste K conocido a ese momento

  • PROYECTO: SISTEMA DE UTILIZACION EN MEDIA TENSION 10 KV. SISTEMA DE AGUA POTABLE CP EL CARMELO

    PROPIETARIO: GOBIERNO REGIONAL DE LA LIBERTADUBICACION: CALLE VICTOR RAUL HAYA DE LA TORRE

    Plazo de

    ejecucion

    :

    45 DIAS NATURALES

    Valor

    referencia

    l :

    73,966.47S/

    Fecha : NOV 2011

    30 DIAS 15 DIAS

    ITEM E S P E C I F I C A C I O N E S

    1.00 SUMINISTRO DE MATERIALES 0.00

    1.1 POSTES, MENSULAS Y BARBOTANTE DE C.A.

    1.3 POSTE DE C.A.C. DE 13/400 /165/355mm. 1,000.00 0.00

    1.4 ESTRUCTURA PARA S.A.M. DE C.A. COMPUESTO POR :

    - (01) POSTE DE C.A.C. DE 13/400 /165/355 mm.

    - (01) MEDIA LOZA DE C.A.V. DE 1.10m

    - (01) PALOMILLA DE C.A.V. DE 1.30m

    - (01) MENSULA DE C.A.V. DE 1.0m 1,340.00 0.00

    1.5 CRUCETA DE C.A.V. DE 1.30m 80.00 0.00

    1.6 MEDIA LOZA DE C.A.V. DE 1.10m PARA PMI 175.00 0.00

    1.7 PALOMILLA DE C.A.V. DE 1.30m 95.00 0.00

    2.00 AISLADORES

    2.1 AISLADOR HIBRIDO TIPO PEDESTAL TAYCO - 24 KV C/ESPIGA 712.00 0.00

    3.00 FERRETERIA Y VARIOS

    3.1 CONECTOR BIMETALICO DE DOBLE VIA 35/35mm2 2 PERNOS 72.00 0.00

    3.2 CONECTOR AMPAC 50/35mm2 195.00 0.00

    3.3 CONECTOR DE COBRE SPLIT BOLT PARA 35mm2 21.00 0.00

    3.4 TERMINALES A COMPRESION PARA CABLE 35 mm2. 71.50 0.00

    3.5 TERMINALES A COMPRESION PARA CABLE 16 mm2. 16.00 0.00

    3.6 SOPORTES DE FIJACION DE TRANSFORMADOR Y TRAFOMIX 180.00 0.00

    3.7 PLANCHA DOBLADA DE COBRE TIPO "J" 36.00 0.00

    3.8 CINTA BAND IT 3/4" 90.00 0.00

    3.9 HEBILLAS PARA CINTA BAND IT 30.00 0.00

    3.10 CINTA VULCANIZANTE N 2229, 3M 123.00 0.00

    3.11 CINTA PLASTICA AISLANTE N33, 3M 1-1/2" 140.00 0.00

    4.00 CABLES, CONDUCTORES ELECTRICOS Y ACCESORIOS

    4.1 CABLE TIPO UNIPOLAR N2XSY - 8,7/15 KV, 25 mm2. - 3,128.00

    4.2 TERMINAL UNIPOLAR 15 KV, 25 mm2. TIPO EXTERIOR 1,170.00 0.00

    4.3 CONDUCTOR DE COBRE CPI TEMPLE DURO 35mm2, 7 HILOS 350.00 0.00

    4.4 CONDUCTOR DE COBRE TEMPLE BLANDO 35mm2, 7 HILOS 575.00 0.00

    4.5 CABLE NYY-1 KV 3 - 1 x 16+1x10 mm2. 600.00 0.00

    4.6 TUBO DE AG DE 1-1/2"x3.20m 30.00 0.00

    4.7 CINTA SEALIZADORA PARA M.T. (COLOR ROJO) 1.50 0.00

    4.8 TUBO DE AG DE 3"x3.20m 190.00 0.00

    4.9 TUBO DE AG DE 2"x3.20m 95.00 0.00

    4.10 DUCTO DE CONCRETO DE 4 VIAS 270.00 0.00

    4.11 LADRILLO K.K. 31.50 0.00

    CRONOGRAMA DE AVANCE DE OBRA VALORIZADO

  • 5.00 PUESTA A TIERRA

    5.1 VARILLA DE COBRE 16mm (5/8")x2.40m 512.00 0.00

    5.2 CONECTOR VARILLA(5/8")- CABLE(35mm2) 32.00 0.00

    5.3 CONECTOR DE COBRE TIPO PERNO PARTIDO P' COND. 35mm2 32.00 0.00

    5.4 TIERRA DE CHACRA 864.00 0.00

    5.5 DOSIS DE THORGEL 400.00 0.00

    5.6 CAJUELA DE C.A.V CON TAPA PARA REGISTRO DE PUESTA A TIERRA. 100.00 0.00

    0.00

    6.00 TRANSFORMADOR Y TRAFOMIX

    6.1 TRANSFORMADOR TRIFASICO 10/0.398-0.230 KV,37.5 KVA 7,300.00 0.00

    6.2 TRAFOMIX 10/0.230 V, 3 SIST. CLASE 0.2 S, (2)/5A 5,400.00 0.00

    7.00 SECCIONADORES Y EQUIPOS DE PROTECCION

    7.1 SECCIONADOR UNIPOLAR TIPO CUT-OUT 27KV, 200 A, 150KV BIL. 810.00 0.00

    7.2 SECCIONADOR UNIPOLAR TIPO CUT-OUT 27KV, 100 A, 150KV BIL. 720.00 0.00

    7.3 FUSIBLES RAPIDOS TIPO CHICOTE 3 A. 15.00 0.00

    7.4 FUSIBLES RAPIDOS TIPO CHICOTE 2 A. 15.00 0.00

    0.00

    8.00 EQUIPOS DE MEDICION Y ACCESORIOS

    8.1 MEDIDOR ELECTRONICO MODEM CELULAR GSM/GPRS Puerto

    RS232 de acuerdo a Especificaciones Tecnicas de Hidrandina S.A 4,100.00 0.00

    8.2 MURETE DE CONCRETO ARMADO 1.40x0.90x0.35m - 200.00

    8.3 CAJA METALICA PORTAMEDIDOR ELECTRONICO C/REJILLA 72.00 0.00

    8.4 CABLE EXTRAFLEXIBLE TIPO NLT 4x4mm2 140.00 0.00

    8.5 CINTA BAND IT 3/4" CON HEBILLAS 96.00 0.00

    9.00 TABLERO GENERALCON EQUIPOS

    9.1 TABLERO DE DISTRIBUCION, SISTEMA TRIFASICO 380/230 V,

    MONTAJE INTERIOR, AUTOSOPORTADO DE 2000x600x600mm

    PINTURA POLIESTEREPOXI GRIS RAK-7032 TEXTURIZADA

    CON CHAPA Y MANIJA, COMPUESTO DE:

    - (1) INTERRUP.TERMOMAG. DE 3x40-160 A, 380 V, 25 KA.

    - (1) ARRANCADOR ESTADO SOLIDO 40A ,380 V,60 Hz.

    - (1) INTERRUPTOR TERMOMAGNETICO 2x15A 220V

    - (1) INTERRUPTOR TERMOMAGNETICO 2x20A 220V

    - (1) VOLTIMETRO 0-500V

    - (1) AMPERIMETRO 0-200A

    - (3) BARRAS DE COBRE DE 5 x 30 x 600 mm (FASES)

    - (9) BARRAS DE COBRE DE 3 x 20 mm (derivaciones s.p.)

    - (1) BARRA DE COBRE DE 5 x 20 x 200 mm (NEUTRO)

    AISLADORES, CONECTORES Y CABLEADO - 10,712.00

    -

    ITEM ESPECIFICACIONES

    2.00 TRANSPORTE DE MATERIALES

    2.1 Postes y Pastorales 300.00 0.00

    2.2 Conductores electricos. 150.00 50.00

    2.3 Transformador de potencia y Trafomix 200.00 0.00

    2.4 Varios 50.00 0.00

    2.5 Puesta en obra de materiales. 200.00 0.00

    ITEM ESPECIFICACIONES

    3.00 MONTAJE ELECTROMECANICO

    3.01 Varios

    3.01.1 Cartel de obra 1,144.82 0.00

  • 3.01.2 Replanteo topografico, ubicacin de estructuras 84.74 0.00

    3.02 Postes y accesorios de concreto armado

    3.01.1 Transporte de poste de c.a.c. de almacen a punto de izaje 78.28 0.00

    3.01.1 Excavacion de hueco para poste en terreno normal 33.58 0.00

    3.01.1 Izado de poste de c.a.c. de 13/400 102.86 102.86

    3.01.1 Cimentacion de poste de c.a.c. de 13/400 71.40 71.40

    3.01.3 Instalacion de mensulas de c.a.v. de 1.0m 35.15 0.00

    3.01.4 Instalacion de media loza de c.a.v. de 1.10m 72.65 72.65

    3.01.5 Instalacion de cruceta simetrica de 1.30m 38.22 0.00

    3.01.5 Instalacion de cruceta asimetrica de 1.30m 47.45 47.45

    3.02 AISLADORES

    3.02.1 Instalacion de aislador hibrido tipo Pin de 25 KV 32.16 32.16

    3.03 PUESTA A TIERRA

    3.03.1 Excavacion de hueco para puesta a tierra 179.90 0.00

    3.03.1 Instalacion de varilla de cobre con relleno y compactado 340.20 340.20

    3.04 TRANSFORMADOR Y TRAFOMIX

    3.04.1 Instalacion de transformador trifasico 37.5 KVA 252.52 0.00

    3.04.2 Instalacion de trafomix - 252.52

    3.05 SECCIONADORES

    3.05.1 Instalacion de Seccionador Cut Out con fusibles 27 Kv 192.24 0.00

    0.00

    3.06 CABLES Y CONDUCTORES

    3.06.1 Apertura de zanja e instalacion de cable N2XSY 1x25mm2 426.25 0.00

    3.05.1 Instalacion de Terminales termocontraibles 15 Kv 343.68 0.00

    3.06.2 Instalacion de ductos 4 vias 221.40 0.00

    3.06.3 Aprtura de zanja e instalacion de cable NYY-1Kv 3-1x16mm2 - 347.75

    3.07 EQUIPOS DE MEDICION Y PRUEBAS ELECTRICAS

    3.07.1 Pruebas electricas de aislamiento, pozos y puesta en servicio - 1,340.74

    -

    3.08 TABLEROS Y EQUIPOS DE BAJA TENSION

    3.08.1 Instalacion de tablero de distribucion - 98.82

    -

    3.09 SEALIZACION DE ESTRUCTURAS MT

    3.01.6 Enumeracion de postes, sealizacion de peligro, co-

    dificacion de Subestacion y puesta a tierra - 275.80

    -

    3.10 ELABORACION DE EXPEDIENTE FINAL CONFORME A OBRA

    3.10.1 Elaboracion de expediente de replanteo y tramites conformidad - 1,540.00

    -

    3.11 CONEXIN A RED DE HIDRANDINA

    3.11.1 Comprende las maniobras a realizar para la conexin ya sea en

    3.11.1 caliente o en frio. - 3,000.00

    -

    COSTO DIRECTO 32,895.00 21,612.35

    GASTOS GENERALES (10%) 3,289.50 2,161.24

    UTILIDAD (5.0 %) 1,644.75 1,080.62

    SUB TOTAL 37,829.25 24,854.20

    IMPUESTO IGV (18%) 6,809.27 4,473.76

    TOTAL PRESUPUESTO 44,638.52 29,327.96

    FACTOR DE RELACION (0.9) 40,174.67 26,395.16

    AVANCE PARCIAL (%) 60.35% 39.65%

    AVANCE ACUMULADO (%) 60.35% 100.00