5. Valorizacion Final- Liquidacion

download 5. Valorizacion Final- Liquidacion

of 115

  • date post

    02-Nov-2015
  • Category

    Documents

  • view

    30
  • download

    0

Embed Size (px)

description

LIQUIDACION

Transcript of 5. Valorizacion Final- Liquidacion

FICHAI.- FICHA TCNICA DE OBRA

LIQUIDACION DE OBRA

1Obra: "INSTALACION Y MEJORAMIENTO DEL SISTEMA DE RIEGO TACABAMBA, DISTRITO DE TACABAMBA, PROVINCIA DECHOTA, REGION CAJAMARCA "2Ubicacin :DISTRITO DE TACABAMBA - CHOTA - CAJAMARCA3Metas:Obra Nueva ConstruccinINSTALACION Y MEJORAMIENTO DEL SISTEMA DE RIEGO TACABAMBA4Entidad Contratante:AGRO RURAL5Contratista:CONSORCIO SAN NICOLAS6Supervisor:ING. ADRIAN SAAVEDRA DIAZ CIP N 89186CIP N 84977Residente:ING. RAUL ALBERTO MONTEZA CORNEJO CIP N 77648CIP N 326038Financiamiento:RECURSOS DETERMINADOS9Licitacin Pblica :N 004-2012-AG-AGRO RURAL10Modalidad:PRECIOS UNITARIOS11 Contrato:021-2012-AG-AGRO RURAL LP 004-2012-AG-AGRO RURAL12Presupuesto base, con IGV y Fecha:5645229.08 (Junio 2012)13Presupuesto base, sin IGV y Fecha:4784092.44175647 (Junio 2012)4784092.4406779714Factor de Relacin (FR):1.0000015Monto del contrato, con IGV:5645229.0816Monto del contrato, sin IGV:4784092.4406779717Plazo de ejecucin, en d. n.:210DIAS CALENDARIOS18Plazo de ejecucin segn Bases Lic., en d.c.:210DIAS CALENDARIOS19Prrrogas, das calendarios:57Das20Prrrogas, das calendarios:10Das21Prrrogas, das calendarios97 diasDas22Adicionales de obra con IGV:0 23Adicionales de obra sin IGV:024Deductivo de obra con IGV:103230.97618773625Deductivo de obra sin IGV:87483.869650623826Fecha de Firma de Contrato de obra:20 DE SEPTIEMBRE DEL 201227Reconocimiento de mora Firma Contrato:028Comp.Gastos incump. entrega terreno :029Intereses por Mora, con IGV:030Intereses por Mora, sin IGV:031Mayor Gastos Gral. prorroga plazo, c/IGV:032Mayor Gastos Gral. prorroga plazo, s/IGV:033Adelanto directo con IGV y fecha de pago:1129045.828-Apr-1334Adelanto directo sin IGV y fecha de pago:956818.49152542435Adelantos para materiales, con IGV:2017585.6436Adelantos para materiales, sin IGV1709818.3389830537Entrega de terreno:18 DE OCTUBRE 201238Inicio oficial de plazo:01 DE NOVIEMBRE 2012 39Trmino original programado de obra:29 DE MAYO 201340Primera Paralizacion de Obra:DEL 08/02/2013 AL 05/04/201341Primera Ampliacion de Plazo:57DIAS CALENDARIOS42Segunda Paralizacion de Obra:DEL 06/04/2013 AL 16/04/2013DIAS CALENDARIOS43Segunda Ampliacion de Plazo:10DIAS CALENDARIOS44Ampliacion Segunda Ampliacin de Obra:DEL 17/04/2013 AL 22/07/201397 DIAS CALENDARIOS45Reinicio de obra:01 DE NOVIEMBRE 201346Trmino programado de obra:20 DE FEBRERO DEL 201447Trmino Real de obra:27 DE SETIEMBRE DEL 2014 48Constatacin Fsica:DEL 15 AL 18 DE ENERO DEL 201549Levantamiento de Observaciones:DEL 19 DE ENERO AL 13 DE FEBRERO DEL 201550Acta de Recepcin de Obra:04 DE MARZO DEL 201551Avance Real Acumulado :98.17%52Avance Programado Acumulado :100.00%53Situacin de la obra respecto del avance:OBRA CULMINADA

INFORMEA.-MONTO CONTRACTUAL (CD)(Sin IGV)4165007.03B.-MONTO CONTRACTUAL EJECUTADO (CD)(Sin IGV)4056437.73C.-VALORIZACIN CONTRACTUAL (V)= A1 = AVANCE DE OBRA ACUMULADO REAL 4056437.73D1 = DEDUCTIVO DE METRADO108569.3deductivo brindado por genaro (cuadro que fue enviado por el ing. Marcelo) D.-REAJUSTES.R1=REAJUSTE TOTAL(Sin IGV)129,553.31los reajustes varian producto de que el deductivo es incorrectoRP1= REAJUSTE PAGADO(Sin IGV)50,850.48REAJUSTES A FAVOR DEL CONTRATISTA (R) =78,702.83

E.-VALORIZACIN BRUTA (VB)= (A1) +(R1)4,185,991.04

F.-AMORTIZACIN DE ADELANTOS.(D1) Amortizacin del adelanto directo (Sin IGV)956,818.49(D2) Amortizacin del adelanto para materiales(Sin IGV)1,709,818.34(D3) Amortizacin de Garantia del 10%0.00AMORTIZACIN DE GARANTIAS (D) =2,666,636.83

G.-PENALIDAD MAXIMA DEL 10% DEL MONTO CONTRACTUAL POR RETRASO EN LA CULMINACION DE LA OBRA(Sin IGV)478,409.24

H.-DEDUCTIVO POR REFORMULACION DE EXPEDIENTE Y REDUCCION DE METRADO(Sin IGV)7,169.68

I.-MAYORES GASTOS GENERALES (297 DAS)(Sin IGV)0.00no se acoje el mayor metradoINTERESES RETRAZOS EN PAGOS DE VALORIZACIONES(Sin IGV)489,091.37MAYORES METRADOS(Sin IGV)0.00no se acoje mayores gastos generale489,091.37s

J.-MONTO A FAVOR DEL CONTRATISTAMONTO TOTAL (I-G-H)3,512.45I.G.V. 18%632.24

PRESUPUESTO TOTAL4,144.69

TOTAL A FAVOR DEL CONTRATISTA4,144.69

sin tener en cuenta que debe pagar el mayor servicio de supervicion con un costo de22,765.98sale con deuda-18,621.29

conclusion : de no acojerce los mayores metrados y GG , la penalidad se lo viola :D

RESUMENRESUMEN VALORIZACINES

FINANCIA : PROGRAMA DE DESARROLLO PRODUCTIVO AGRARIO RURAL - AGRO RURALREGION:CAJAMARCAMONTO DEL PROYECTO (C.D.):4165007.026661EJECUTA : CONSORCIO SAN NICOLASDEPARTAMENTO:CAJAMARCAFECHA DE INICIO:11/1/12PROYECTO : "INSTALACION Y MEJORAMIENTO DEL SISTEMA DE RIEGO TACABAMBA "PROVINCIA:CHOTAPLAZO DE EJECUCIN:210 DIASMES : ABRIL 2015DISTRITO:TACABAMBAFECHA DE TERMINO:9/27/14ING RESIDENTE: ING. RAUL ALBERTO MONTEZA CORNEJO CIP N 77648ING SUPERVISOR: ERROR:#REF!

76489.6329065235DESCRIPCIONPARCIAL S/.VALORIZACION S/.Nov-12Dec-12Jan-13Nov-13Dec-13Jan-14Feb-14Mar-14Apr-14May-14Jun-14Sep-14EJECUTADODEDUCTIVOVISTA ALEGRE2,215,311.61147,537.02115,337.14674,959.49103,815.50207,895.49289,469.57230,334.380.0093,848.0852,572.1381,597.0982,578.642,079,944.53135,367.08PUSANGA1,667,821.7327,952.00109,286.78632,657.8870,849.9464,995.79101,288.82520,793.620.00121,495.0849,846.9428,685.020.001,727,851.87-60,030.14TUSPON281,873.650.000.000.0089,337.3938,352.2856,256.2973,718.350.0010,309.003,175.899,571.800.00280,721.001,152.65COSTO DIRECTO4,165,007.03175,489.02224,623.921,307,617.37264,002.83311,243.56447,014.68824,846.350.00225,652.16105,594.96119,853.9182,578.644,088,517.4076,489.631.84%GASTOS GENERALES (7.9% CD)329,100.0013,866.3517,748.77103,322.0020,860.3124,593.0635,321.0865,175.620.0017,830.018,343.649,470.316,524.99323,056.146,043.86UTILIDADES (6.47% CD)269,646.4212,218.2915,639.2791,041.8517,091.7921,670.0928,940.1553,401.320.0014,608.936,836.32-2,042.995,346.22264,751.234,895.19SUB - TOTAL4,763,753.45201,573.66258,011.951,501,981.23301,954.93357,506.71511,275.90943,423.290.00258,091.10120,774.91127,281.2394,449.854,676,324.7687,428.68I.G.V.857,475.6236,283.2646,442.15270,356.6254,351.8964,351.2192,029.66169,816.190.0046,456.4021,739.4822,910.6217,000.97841,738.4615,737.16PRESUPUESTO TOTAL5,621,229.07237,856.92304,454.101,772,337.85356,306.81421,857.92603,305.561,113,239.490.00304,547.50142,514.40150,191.86111,450.825,518,063.22103,165.85MITIGACION AMBIENTAL (INC. I.G.V.)24,000.000.000.000.000.000.000.000.000.000.000.000.0024,000.0024,000.000.0VALORIZACION (MONTO CONTRATADO)5,645,229.08237,856.92304,454.101,772,337.85356,306.81421,857.92603,305.561,113,239.490.00304,547.50142,514.40150,191.86135,450.825,542,063.22103,165.865,542,063.22REAJUSTE POR INDICE UNIFICADO "K"PORCENTAJE DE AVANCE FISICO100.00%4.21%5.39%31.40%6.31%7.47%10.69%19.72%0.00%5.39%2.52%2.66%2.40%98.17%1.83%NOTA: Los negativos se deben a que el expediente fue reformulado, existindo mayores metrados y partidas nuevas en sectores como Vista Alegre y Tusn, y menos metrados en el sector Pusanga.

4.21%5.39%31.40%6.31%7.47%10.69%19.72%0.00%5.39%2.52%2.66%2.40%175,489.02224,623.921,307,617.37264,002.82311,243.57447,014.69824,846.350.00225,652.15105,594.96119,853.9182,578.641.83%

VISTA ALEGREMETRADO DEFINITIVO DE LOS TRABAJOS EJECUTADOS Y VALORIZADOS - SECTOR VISTA ALEGRE

FINANCIA : PROGRAMA DE DESARROLLO PRODUCTIVO AGRARIO RURAL - AGRO RURALREGION: CAJAMARCAMONTO DEL PROYECTO (C.D.):2215311.608951EJECUTA : CONSORCIO SAN NICOLASDEPARTAMENTO: CAJAMARCAFECHA DE INICIO:11/2/12PROYECTO : "INSTALACION Y MEJORAMIENTO DEL SISTEMA DE RIEGO TACABAMBA "DISTRITO: TACABAMBAPLAZO DE EJECUCIN:MES : ABRIL 2015LUGAR:VISTA ALEGREFECHA DE TERMINO:ING RESIDENTE: ING. RAUL MONTEZA CORNEJO

PARTIDADESCRIPCIONUNDMETA TOTAL PROGRAMADAMETA TOTAL EJECUTADADEDUCTIVOMETRADOP. UNIT. S/SUB. TOTALMETRADOVALORIZ. S/.%METRADOVALORIZ. S/.%METRADOSUB. TOTAL%METRADOSUB. TOTAL%1OBRAS PROVISIONALES 1.01CARTEL DE OBRA und 1.001,584.491,584.491.001,584.49100.000.000.000.001.001,584.49100.000.000.000.001.02CASETA DE ALMACEN Y GUARDIANIA est 1.002,000.002,000.001.002,000.00100.000.000.000.001.002,000.00100.000.000.000.001.03FLETE TERRESTE vje 1.00120,960.34120,960.341.00120,960.34100.000.000.000.001.00120,960.34100.000.000.000.002TRABAJOS PRELIMINARES 0.000.000.000.002.01CAMINO DE ACCESOS km 2.00936.081,872.162.001,872.16100.000.000.000.002.001,872.16100.000.000.000.002.02MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.0010,000.0010,000.001.0010,000.00100.000.000.000.001.0010,000.00100.000.000.000.002.03TRAZO, NIVELACION Y REPLANTEO km 8.048,972.5772,139.468.0472,139.46100.000.000.000.008.0472,139.46100.000.000.000.003CAPTACION 0.000.000.003.01CAPTACION (MI QDA VISTA ALEGRE) 0.000.000.0003.01.01 TRABAJOS PRELIMINARES 0.000.000.0003.01.01.01 LIMPIEZA DEL TERRENO MANUAL m2 287.771.69486.33287.77486.33100.000.000.000.00287.77486.33100.000.000.000.0003.01.01.02 ENCAUZAMIENTO DE QUEBRADAS m3 345.607.542,605.82276.482,084.6680.0069.12521.1620.00345.602,605.82100.000.000.000.0003.01.02 MOVIMIENTO DE TIERRAS 0.000.000.0003.01.02.01EXCAVACION EN SECO m3 141.007.911,115.310.000.000.00141.001115.31100.00141.001,115.31100.000.000.000.0003.01.02.02 EXCAVACION BAJO AGUA m3 47.0012.82602.5423.50301.2750.0023.50301.2750.0047.00602.54100.000.000.000.0003.01.02.03EXCAVACION EN ROCA FIJA m3 44.0086.483,805.120.000.000.0044.003805.12100.0044.003,805.12100.000.000.000.0003.01.02.04 REFINE Y NIVELACION Y COMPACTACION (EN CAPTACION) m3 130.008.841,149.200.000.000.00130.001149.20100.00130.001,149.20100.000.000.000.0003.01.02.05 RELLENO COMPACTADO CON MATERIAL PROPIO EN CAPAS E=0.30 M m3 64.0020.761,328.640.000.000.0064.001328.64100.0064.001,328.64100.000.000.000.0003.01.02.06 ELIMINACION DE MATERIAL EXCEDENTE D= 100 M m3 95.00160.3715,235.1511.401,828.2212.0083.6013406.9388.0095.0015,235.15100.000.000.000.0003.01.03 OBRAS DE CONCRETO SIMPLE 0.000.000.0003.01.03.01 SOLADO DE CAPTACION 0.000.000.0003.01.03.01.01 CONCRETO SIM