INVERSION: S/. 22,506,000.00 AÑO 1 AÑO 2 VOLUMEN PROD 240000.00 300000.00 INGRESOS VENTAS SOLES 3120000.00 3900000.00 EGRESOS CONCRETO 523200.00 654000.00 ACERO 391200.00 489000.00 MANO DE OBRA 192000.00 240000.00 EQUIPOS/MANT. 52800.00 66000.00 SUMINISTROS 422400.00 528000.00 SOBTOTAL 1581600.00 1977000.00 GASTOS GENERALES (10%) 158160.00 197700.00 TOTAL 1739760.00 2174700.00 SALDO OPERACIÓN 1380240.00 1725300.00 ACUMULATIVO S/. 1,380,240.00 S/. 2,760,480.00

description

costos de calidad

Transcript of Costos de Calidad

Page 1: Costos de Calidad

INVERSION: S/. 22,506,000.00

FLUJO DE CAJA PROYECTO: VIGUETASAÑO 1 AÑO 2 AÑO 3

VOLUMEN PROD 240000.00 300000.00 360000.00INGRESOSVENTAS SOLES 3120000.00 3900000.00 4680000.00

EGRESOS

CONCRETO 523200.00 654000.00 784800.00ACERO 391200.00 489000.00 586800.00MANO DE OBRA 192000.00 240000.00 288000.00EQUIPOS/MANT. 52800.00 66000.00 79200.00SUMINISTROS 422400.00 528000.00 633600.00SOBTOTAL 1581600.00 1977000.00 2372400.00GASTOS GENERALES (10%) 158160.00 197700.00 237240.00TOTAL 1739760.00 2174700.00 2609640.00

SALDO OPERACIÓN 1380240.00 1725300.00 2070360.00ACUMULATIVO S/. 1,380,240.00 S/. 2,760,480.00 S/. 4,485,780.00

Page 2: Costos de Calidad

FLUJO DE CAJA PROYECTO: VIGUETASAÑO 4 AÑO 5 AÑO 6 AÑO 7

360000.00 360000.00 360000.00 360000.00

4680000.00 4680000.00 4680000.00 4680000.00

784800.00 784800.00 784800.00 784800.00586800.00 586800.00 586800.00 586800.00288000.00 288000.00 288000.00 288000.00

79200.00 79200.00 79200.00 79200.00633600.00 633600.00 633600.00 633600.00

2372400.00 2372400.00 2372400.00 2372400.00237240.00 237240.00 237240.00 237240.00

2609640.00 2609640.00 2609640.00 2609640.00

2070360.00 2070360.00 2070360.00 2070360.00S/. 6,556,140.00 S/. 8,626,500.00 S/. 10,696,860.00 S/. 12,767,220.00

Page 3: Costos de Calidad

FLUJO DE CAJA PROYECTO: VIGUETASAÑO 8 AÑO 9 AÑO 10 AÑO 11

360000.00 360000.00 360000.00 360000.00

4680000.00 4680000.00 4680000.00 4680000.00

784800.00 784800.00 784800.00 784800.00586800.00 586800.00 586800.00 586800.00288000.00 288000.00 288000.00 288000.00

79200.00 79200.00 79200.00 79200.00633600.00 633600.00 633600.00 633600.00

2372400.00 2372400.00 2372400.00 2372400.00237240.00 237240.00 237240.00 237240.00

2609640.00 2609640.00 2609640.00 2609640.00

2070360.00 2070360.00 2070360.00 2070360.00S/. 14,837,580.00 S/. 16,907,940.00 S/. 18,978,300.00 S/. 21,048,660.00

Page 4: Costos de Calidad

FLUJO DE CAJA PROYECTO: VIGUETASAÑO 12 AÑO 13 AÑO 14 AÑO 15

360000.00 360000.00 360000.00 360000.00

4680000.00 4680000.00 4680000.00 4680000.00

784800.00 784800.00 784800.00 784800.00586800.00 586800.00 586800.00 586800.00288000.00 288000.00 288000.00 288000.00

79200.00 79200.00 79200.00 79200.00633600.00 633600.00 633600.00 633600.00

2372400.00 2372400.00 2372400.00 2372400.00237240.00 237240.00 237240.00 237240.00

2609640.00 2609640.00 2609640.00 2609640.00

2070360.00 2070360.00 2070360.00 2070360.00S/. 23,119,020.00 S/. 25,189,380.00 S/. 27,259,740.00 S/. 29,330,100.00

Page 5: Costos de Calidad

FLUJO DE CAJA PROYECTO: VIGUETASAÑO 16 AÑO 17 AÑO 18 AÑO 19

360000.00 360000.00 360000.00 360000.00

4680000.00 4680000.00 4680000.00 4680000.00

784800.00 784800.00 784800.00 784800.00586800.00 586800.00 586800.00 586800.00288000.00 288000.00 288000.00 288000.00

79200.00 79200.00 79200.00 79200.00633600.00 633600.00 633600.00 633600.00

2372400.00 2372400.00 2372400.00 2372400.00237240.00 237240.00 237240.00 237240.00

2609640.00 2609640.00 2609640.00 2609640.00

2070360.00 2070360.00 2070360.00 2070360.00S/. 31,400,460.00 S/. 33,470,820.00 S/. 35,541,180.00 S/. 37,611,540.00

Page 6: Costos de Calidad

FLUJO DE CAJA PROYECTO: VIGUETASAÑO 20

360000.00

4680000.00

784800.00586800.00288000.00

79200.00633600.00

2372400.00237240.00

2609640.00

2070360.00S/. 39,681,900.00

Page 7: Costos de Calidad

DATOSArea vigueta: 72.52 m2Peso acero 99 Kg.Long Acero 5 maño util 15 añosDepreciacion 125033.33rendimiento 3000 ml/diamant (10%) 0.18dias trabajados 26utilidad 30%PRECIO VENTA MERCADO 13 soles

ANALISIS DE COSTO UNITARIOm3/ml Pu /Soles Parcial

CONCRETO 0.007252 300 2.18 2.18ACERO 0.495 3.3 1.63 1.63SUMINISTROS (0.80) 0.80 0.80

666.67 2500 0.22 0.22

EQUIPOS/MANT. 1.76 1.76total 6.59

PRECIO VENTA 8.57

MANO DE OBRA (8 trab)rend. (3000 ml/dia)