CRONOGRAMA VALORIZADO

17
CRONOGRAMA VALORIZADO MENSUAL DE OBRA Obra SUSTITUCION, CONSTRUCCION, CULMINACION Y MEJORAMIENTO DE LA I.E.I. SANTA ROSA DEL DISTRITO DE SAN RAMÓN - CHANCHAMAYO - JUNIN Entidad GOBIERNO REGIONAL JUNIN Departamento JUNIN Provincia CHANCHAMAYO Distrito SAN RAMON Modalidad CONTRATA Item Descripción Precio MES MES MES MES MES MES MES MES 1 2 3 4 5 6 7 8 1 OBRAS PROVISIONALES 1.00 OBRAS PROVISIONALES 72,361.23 72,361.23 72,361.23 72,361.23 - - - - - - - 2 CULMINACION DE 09 AULAS EXISTENTES - SECUNDARIA 1.01 TRABAJOS PRELIMINARES 4,355.27 4,355.27 1.02 MUROS Y TABIQUES DE ALBAÑILERIA 3,744.72 3,744.72 2.01 REVOQUES ENLUCIDOS Y MOLDURAS 7,952.52 7,952.52 2.02 CIELORASOS 1,715.55 1,715.55 2.03 PISOS Y PAVIMENTOS 22,581.83 10,161.82 12,420.00 2.04 ZOCALOS Y CONTRAZOCALOS 140.04 140.04 2.05 CARPINTERIA DE MADERA 3,869.27 3,869.27 2.06 CARPINTERIA METALICA Y HERRERIA 4,860.03 4,860.03 2.07 CERRAJERIA 1,193.05 1,193.05 2.08 PINTURA 29,221.55 29,221.55 3.00 INSTALACIONES ELECTRICAS 31,299.68 31,299.68 110,933.50 8,099.99 19,969.94 12,420.00 9,922.35 60,521.22 - - - 3 SUSTITUCION DE 08 AULAS - PRIMARIA 1.01 TRABAJOS PRELIMINARES 893.22 893.22 1.02 MOVIMIENTO DE TIERRAS 14,832.02 14,832.02 1.03 CONCRETO SIMPLE 17,678.12 17,678.12 1.04 CONCRETO ARMADO 269,346.92 94,271.42 175,075.50 2.01 REVOQUE ENLUCIDOS Y MOLDURAS 58,067.19 29,033.60 29,033.60 2.02 CIELORASOS 18,100.37 18,100.37 2.03 PISOS Y PAVIMENTOS 31,307.00 31,307.00 2.04 REVESTIMIENTOS 2,058.04 2,058.04 2.05 ZOCALOS Y CONTRAZOCALOS 3,140.20 3,140.20 2.06 CARPINTERIA DE MADERA 2,640.93 2,640.93 2.07 CARPINTERIA METALICA Y HERRERIA 18,291.89 18,291.89 2.08 CERRAJERIA 795.37 795.37 2.09 VIDRIOS, CRISTALES Y SIMILARES 4,563.20 4,563.20 2.10 PINTURA 30,129.14 30,129.14 2.11 CUBIERTAS 16,908.26 16,908.26 2.12 VARIOS, LIMPIEZA Y JARDINERIA 1,142.46 1,142.46 3.00 INSTALACIONES ELECTRICAS 24,731.13 7,419.34 17,311.79 4.00 INSTALACIONES SANITARIAS 3,980.29 1,194.09 2,786.21 518,605.73 33,403.36 94,271.42 200,597.18 65,425.86 29,033.60 36,505.23 6,222.50 53,146.59 4 1.01 TRABAJOS PRELIMINARES 483.03 483.03 1.02 MOVIMIENTO DE TIERRAS 12,671.63 12,671.63 1.03 CONCRETO SIMPLE 15,682.47 15,682.47 1.04 CONCRETO ARMADO 208,503.72 72,976.30 135,527.42 2.01 REVOQUE ENLUCIDOS Y MOLDURAS 40,286.74 20,143.37 20,143.37 2.02 CIELORASOS 15,114.83 15,114.83 2.03 PISOS Y PAVIMENTOS 25,743.23 25,743.23 2.04 REVESTIMIENTOS 2,233.78 2,233.78 2.05 ZOCALOS Y CONTRAZOCALOS 3,190.62 3,190.62 2.06 CARPINTERIA DE MADERA 4,438.90 4,438.90 2.07 CARPINTERIA METALICA Y HERRERIA 17,287.79 17,287.79 2.08 CERRAJERIA 1,093.63 1,093.63 2.09 VIDRIOS, CRISTALES Y SIMILARES 4,244.71 4,244.71 2.10 PINTURA 22,660.01 22,660.01 CONSTRUCCION DE 01 LABORATORIO DE CIENCIA, TECNOLOGIA Y AMBIENTE, 01 SUM EN 1ER. NIVEL; Y SUSTITUCION DE 01 CENTRO DE COMPUTO Y DE AMBIENTES ADMINISTRATIVOS EN 2DO. NIVEL

Transcript of CRONOGRAMA VALORIZADO

Page 1: CRONOGRAMA VALORIZADO

CRONOGRAMA VALORIZADO MENSUAL DE OBRAObra SUSTITUCION, CONSTRUCCION, CULMINACION Y MEJORAMIENTO DE LA I.E.I. SANTA ROSA DEL DISTRITO DE SAN RAMÓN - CHANCHAMAYO - JUNIN

Entidad GOBIERNO REGIONAL JUNINDepartamento JUNIN Provincia CHANCHAMAYO Distrito SAN RAMONModalidad CONTRATA

Item Descripción PrecioMES MES MES MES MES MES MES

1 2 3 4 5 6 7

1 OBRAS PROVISIONALES

1.00 OBRAS PROVISIONALES 72,361.23 72,361.23 72,361.23 72,361.23 - - - - - -

2 CULMINACION DE 09 AULAS EXISTENTES - SECUNDARIA

1.01 TRABAJOS PRELIMINARES 4,355.27 4,355.27 1.02 MUROS Y TABIQUES DE ALBAÑILERIA 3,744.72 3,744.72 2.01 REVOQUES ENLUCIDOS Y MOLDURAS 7,952.52 7,952.52 2.02 CIELORASOS 1,715.55 1,715.55 2.03 PISOS Y PAVIMENTOS 22,581.83 10,161.82 12,420.00 2.04 ZOCALOS Y CONTRAZOCALOS 140.04 140.04 2.05 CARPINTERIA DE MADERA 3,869.27 3,869.27 2.06 CARPINTERIA METALICA Y HERRERIA 4,860.03 4,860.03 2.07 CERRAJERIA 1,193.05 1,193.05 2.08 PINTURA 29,221.55 29,221.55 3.00 INSTALACIONES ELECTRICAS 31,299.68 31,299.68

110,933.50 8,099.99 19,969.94 12,420.00 9,922.35 60,521.22 - -

3 SUSTITUCION DE 08 AULAS - PRIMARIA

1.01 TRABAJOS PRELIMINARES 893.22 893.22 1.02 MOVIMIENTO DE TIERRAS 14,832.02 14,832.02 1.03 CONCRETO SIMPLE 17,678.12 17,678.12 1.04 CONCRETO ARMADO 269,346.92 94,271.42 175,075.50 2.01 REVOQUE ENLUCIDOS Y MOLDURAS 58,067.19 29,033.60 29,033.60 2.02 CIELORASOS 18,100.37 18,100.37 2.03 PISOS Y PAVIMENTOS 31,307.00 31,307.00 2.04 REVESTIMIENTOS 2,058.04 2,058.04 2.05 ZOCALOS Y CONTRAZOCALOS 3,140.20 3,140.20 2.06 CARPINTERIA DE MADERA 2,640.93 2,640.93 2.07 CARPINTERIA METALICA Y HERRERIA 18,291.89 18,291.89 2.08 CERRAJERIA 795.37 795.37 2.09 VIDRIOS, CRISTALES Y SIMILARES 4,563.20 2.10 PINTURA 30,129.14 2.11 CUBIERTAS 16,908.26 16,908.26 2.12 VARIOS, LIMPIEZA Y JARDINERIA 1,142.46 3.00 INSTALACIONES ELECTRICAS 24,731.13 7,419.34 4.00 INSTALACIONES SANITARIAS 3,980.29 1,194.09 2,786.21

518,605.73 33,403.36 94,271.42 200,597.18 65,425.86 29,033.60 36,505.23 6,222.50

4

1.01 TRABAJOS PRELIMINARES 483.03 483.03 1.02 MOVIMIENTO DE TIERRAS 12,671.63 12,671.63 1.03 CONCRETO SIMPLE 15,682.47 15,682.47 1.04 CONCRETO ARMADO 208,503.72 72,976.30 135,527.42 2.01 REVOQUE ENLUCIDOS Y MOLDURAS 40,286.74 20,143.37 20,143.37 2.02 CIELORASOS 15,114.83 15,114.83 2.03 PISOS Y PAVIMENTOS 25,743.23 25,743.23 2.04 REVESTIMIENTOS 2,233.78 2,233.78 2.05 ZOCALOS Y CONTRAZOCALOS 3,190.62 3,190.62 2.06 CARPINTERIA DE MADERA 4,438.90 4,438.90 2.07 CARPINTERIA METALICA Y HERRERIA 17,287.79 17,287.79 2.08 CERRAJERIA 1,093.63 1,093.63 2.09 VIDRIOS, CRISTALES Y SIMILARES 4,244.71 2.10 PINTURA 22,660.01

CONSTRUCCION DE 01 LABORATORIO DE CIENCIA, TECNOLOGIA Y AMBIENTE, 01 SUM EN 1ER. NIVEL; Y SUSTITUCION DE 01 CENTRO DE COMPUTO Y DE AMBIENTES ADMINISTRATIVOS EN 2DO. NIVEL

Page 2: CRONOGRAMA VALORIZADO

CRONOGRAMA VALORIZADO MENSUAL DE OBRAObra SUSTITUCION, CONSTRUCCION, CULMINACION Y MEJORAMIENTO DE LA I.E.I. SANTA ROSA DEL DISTRITO DE SAN RAMÓN - CHANCHAMAYO - JUNIN

Entidad GOBIERNO REGIONAL JUNINDepartamento JUNIN Provincia CHANCHAMAYO Distrito SAN RAMONModalidad CONTRATA

Item Descripción PrecioMES MES MES MES MES MES MES

1 2 3 4 5 6 7

2.11 CUBIERTAS 14,283.21 14,283.21 2.12 VARIOS, LIMPIEZA Y JARDINERIA 2,227.88 3.00 INSTALACIONES ELECTRICAS 17,555.89 5,266.77 4.00 INSTALACIONES SANITARIAS 6,602.07 1,980.62 4,621.45

414,304.12 28,837.13 72,976.30 157,058.01 52,545.98 20,143.37 31,167.63 10,153.98

5 SUSTITUCION DE 03 TALLERES, COSMETOLOGIA, CONFECCION TEXTIL E INDUSTRIAS ALIMENTARIAS

1.01 TRABAJOS PRELIMINARES 820.34 820.34 1.02 MOVIMIENTO DE TIERRAS 18,779.10 18,779.10 1.03 CONCRETO SIMPLE 22,642.19 22,642.19 1.04 CONCRETO ARMADO 179,022.62 62,657.92 116,364.70 1.05 MUROS Y TABIQUES DE ALBAÑILERIA 20,675.82 10,337.91 10,337.91 1.06 ESTRUCTURA DE MADERA 41,024.93 41,024.93 2.01 REVOQUE ENLUCIDOS Y MOLDURAS 33,816.35 33,816.35 2.02 CIELORASOS 13,090.94 13,090.94 2.03 PISOS Y PAVIMENTOS 25,608.99 25,608.99 2.04 REVESTIMIENTOS 2,233.78 2,233.78 2.05 ZOCALOS Y CONTRAZOCALOS 3,708.88 3,708.88 2.06 CARPINTERIA DE MADERA 1,934.63 1,934.63 2.07 CARPINTERIA METALICA Y HERRERIA 12,902.27 2.08 CERRAJERIA 596.52 2.09 VIDRIOS, CRISTALES Y SIMILARES 3,826.92 2.10 PINTURA 19,666.42 2.11 CUBIERTAS 23,515.63 23,515.63 2.12 VARIOS, LIMPIEZA Y JARDINERIA 2,056.45 3.00 INSTALACIONES ELECTRICAS 23,680.25 7,104.08 4.00 INSTALACIONES SANITARIAS 10,451.80 3,135.54 7,316.26

460,054.84 42,241.63 62,657.92 150,119.95 55,071.71 10,337.91 72,516.28 11,484.68

6 SERVICIOS HIGIENICOS: NIVEL PRIMARIA Y DOCENTES, NIVEL SECUNDARIA

1.01 TRABAJOS PRELIMINARES 174.11 174.11 1.02 MOVIMIENTO DE TIERRAS 6,187.95 6,187.95 1.03 CONCRETO SIMPLE 11,524.14 11,524.14 1.04 CONCRETO ARMADO 18,096.10 6,333.63 11,762.46 1.05 MUROS Y TABIQUES DE ALBAÑILERIA 13,686.74 6,843.37 6,843.37 1.06 ESTRUCTURA DE MADERA 9,759.71 9,759.71 2.01 REVOQUE ENLUCIDOS Y MOLDURAS 11,594.81 11,594.81 2.02 CIELORASOS 17,369.12 17,369.12 2.03 PISOS Y PAVIMENTOS 18,398.52 18,398.52 2.04 ZOCALOS Y CONTRAZOCALOS 24,687.60 24,687.60 2.05 CARPINTERIA DE MADERA 2,671.64 2,671.64 2.06 CARPINTERIA METALICA Y HERRERIA 14,908.78 14,908.78 2.07 CERRAJERIA 795.37 2.08 VIDRIOS, CRISTALES Y SIMILARES 745.28 2.09 PINTURA 7,135.57 2.10 CUBIERTAS 8,966.93 8,966.93 2.11 VARIOS, LIMPIEZA Y JARDINERIA 390.31 3.00 INSTALACIONES ELECTRICAS 10,520.17 3,156.05 4.00 INSTALACIONES SANITARIAS 28,318.22 8,495.47 19,822.75

205,931.05 17,886.20 6,333.63 32,380.91 16,603.08 6,843.37 72,050.05 37,403.17

Page 3: CRONOGRAMA VALORIZADO

CRONOGRAMA VALORIZADO MENSUAL DE OBRAObra SUSTITUCION, CONSTRUCCION, CULMINACION Y MEJORAMIENTO DE LA I.E.I. SANTA ROSA DEL DISTRITO DE SAN RAMÓN - CHANCHAMAYO - JUNIN

Entidad GOBIERNO REGIONAL JUNINDepartamento JUNIN Provincia CHANCHAMAYO Distrito SAN RAMONModalidad CONTRATA

Item Descripción PrecioMES MES MES MES MES MES MES

1 2 3 4 5 6 7

7

1.01 TRABAJOS PRELIMINARES 6,360.59 6,360.59 1.02 MOVIMIENTO DE TIERRAS 47,563.58 47,563.58 1.03 CONCRETO SIMPLE 2,845.31 2,845.31 1.04 CONCRETO ARMADO 24,853.06 8,698.57 16,154.49 1.05 MUROS Y TABIQUES DE ALBAÑILERIA 4,330.17 2,165.09 2,165.09 1.06 ESTRUCTURA DE MADERA 1,427.90 1,427.90 2.01 REVOQUE ENLUCIDOS Y MOLDURAS 3,937.38 3,937.38 2.02 CIELORASOS 4,701.17 4,701.17 2.03 PISOS Y PAVIMENTOS 69,373.52 69,373.52 2.04 ZOCALOS Y CONTRAZOCALOS 1,460.07 1,460.07 2.05 CARPINTERIA DE MADERA 531.26 531.26 2.06 CARPINTERIA METALICA Y HERRERIA 883.37 883.37 2.07 CERRAJERIA 298.26 2.08 VIDRIOS, CRISTALES Y SIMILARES 164.38 2.09 PINTURA 1,973.79 2.10 CUBIERTAS 1,979.57 1,979.57 2.11 VARIOS, LIMPIEZA Y JARDINERIA 42,724.28 3.00 INSTALACIONES ELECTRICAS 86,376.40 25,912.92 4.00 INSTALACIONES SANITARIAS 89,039.65 26,711.90 62,327.76

390,823.74 56,769.48 8,698.57 70,758.88 3,592.98 2,165.09 79,472.15 63,742.38

8 CERCO PERIMETRICO Y EQUIPAMIENTO

1.01 ESTRUCTURAS 1,615.48 1,615.48 1.02 MOVIMIENTO DE TIERRAS 499.64 499.64 1.03 CONCRETO SIMPLE 302.88 302.88 1.04 CONCRETO ARMADO 5,007.65 5,007.65 1.05 MUROS Y TABIQUES DE ALBAÑILERIA 634.58 634.58 2.01 REVOQUE ENLUCIDOS Y MOLDURAS 32,601.65 32,601.65 2.02 CARPINTERIA METALICA Y HERRERIA 94,337.01 94,337.01 2.03 CERRAJERIA 250.42 250.42 2.04 PINTURA 13,405.22 13,405.22 2.05 VARIOS, LIMPIEZA Y JARDINERIA 90.32 90.32 3.00 EQUIPAMIENTO Y MOBILIARIO 177,790.71 177,790.71

326,535.55 2,418.00 5,642.23 32,601.65 94,587.43 191,286.24 - -

COSTO DIRECTO 2,499,549.75 262,017.02 270,550.01 655,936.58 297,749.39 320,330.80 291,711.34 129,006.72

GASTOS GENERALES 9% 224,959.48 23,581.53 24,349.50 59,034.29 26,797.44 28,829.77 26,254.02 11,610.60

UTILIDAD 8% 199,963.98 20,961.36 21,644.00 52,474.93 23,819.95 25,626.46 23,336.91 10,320.54

SUB TOTAL 2,924,473.21 306,559.91 316,543.51 767,445.80 348,366.78 374,787.03 341,302.27 150,937.86

I.G.V. 18% 526,405.18 55,180.78 56,977.83 138,140.24 62,706.02 67,461.67 61,434.41 27,168.81

PRESUPUESTO DE EJECUCION DE OBRA 3,450,878.39 361,740.69 373,521.35 905,586.04 411,072.80 442,248.70 402,736.67 178,106.67

PORCENTAJE AVANCE DEL MES : 10.48% 10.82% 26.24% 11.91% 12.82% 11.67% 5.16%PORCENTAJE DE AVANCE ACUMULADO 10.48% 21.31% 47.55% 59.46% 72.28% 83.95% 89.11%

8,733.90

OBRAS EXTERIORES: CASA DE FUERZA - COCINA, TANQUE ELEVADO - CISTERNA, PATIO DE FORMACION MULTIUSOS, LOSA DEPORTIVA Y RED EXTERNA DE INST. SANITARIAS Y ELECTRICAS

Page 4: CRONOGRAMA VALORIZADO

CRONOGRAMA VALORIZADO MENSUAL DE OBRAObra SUSTITUCION, CONSTRUCCION, CULMINACION Y MEJORAMIENTO DE LA I.E.I. SANTA ROSA DEL DISTRITO DE SAN RAMÓN - CHANCHAMAYO - JUNIN

Entidad GOBIERNO REGIONAL JUNINDepartamento JUNIN Provincia CHANCHAMAYO Distrito SAN RAMONModalidad CONTRATA

Item Descripción PrecioMES MES MES MES MES MES MES

1 2 3 4 5 6 761,137.30

5,502.36

4,890.98

71,530.65

12,875.52

84,406.16 2.45%

Page 5: CRONOGRAMA VALORIZADO

CRONOGRAMA VALORIZADO MENSUAL DE OBRASUSTITUCION, CONSTRUCCION, CULMINACION Y MEJORAMIENTO DE LA I.E.I. SANTA ROSA DEL DISTRITO DE SAN RAMÓN - CHANCHAMAYO - JUNIN

MESTOTAL PROGRAMADO

8

72,361.23 - 72,361.23

4,355.27 3,744.72 7,952.52 1,715.55 22,581.83 140.04 3,869.27 4,860.03 1,193.05 29,221.55 31,299.68

- 110,933.50

893.22 14,832.02 17,678.12 269,346.92 58,067.19 18,100.37 31,307.00 2,058.04 3,140.20 2,640.93 18,291.89 795.37

4,563.20 4,563.20 30,129.14 30,129.14

16,908.26 1,142.46 1,142.46 17,311.79 24,731.13

3,980.29 53,146.59 518,605.73

483.03 12,671.63 15,682.47 208,503.72 40,286.74 15,114.83 25,743.23 2,233.78 3,190.62 4,438.90 17,287.79 1,093.63

4,244.71 4,244.71 22,660.01 22,660.01

Page 6: CRONOGRAMA VALORIZADO

CRONOGRAMA VALORIZADO MENSUAL DE OBRASUSTITUCION, CONSTRUCCION, CULMINACION Y MEJORAMIENTO DE LA I.E.I. SANTA ROSA DEL DISTRITO DE SAN RAMÓN - CHANCHAMAYO - JUNIN

MESTOTAL PROGRAMADO

8

14,283.21 2,227.88 2,227.88 12,289.12 17,555.89

6,602.07 41,421.72 414,304.12

820.34 18,779.10 22,642.19 179,022.62 20,675.82 41,024.93 33,816.35 13,090.94 25,608.99 2,233.78 3,708.88 1,934.63

12,902.27 12,902.27 596.52 596.52 3,826.92 3,826.92 19,666.42 19,666.42

23,515.63 2,056.45 2,056.45 16,576.18 23,680.25

10,451.80 55,624.76 460,054.84

174.11 6,187.95 11,524.14 18,096.10 13,686.74 9,759.71 11,594.81 17,369.12 18,398.52 24,687.60 2,671.64 14,908.78

795.37 795.37 745.28 745.28 7,135.57 7,135.57

8,966.93 390.31 390.31 7,364.12 10,520.17

28,318.22 16,430.64 205,931.05

Page 7: CRONOGRAMA VALORIZADO

CRONOGRAMA VALORIZADO MENSUAL DE OBRASUSTITUCION, CONSTRUCCION, CULMINACION Y MEJORAMIENTO DE LA I.E.I. SANTA ROSA DEL DISTRITO DE SAN RAMÓN - CHANCHAMAYO - JUNIN

MESTOTAL PROGRAMADO

8

6,360.59 47,563.58 2,845.31 24,853.06 4,330.17 1,427.90 3,937.38 4,701.17 69,373.52 1,460.07 531.26 883.37

298.26 298.26 164.38 164.38 1,973.79 1,973.79

1,979.57 42,724.28 42,724.28 60,463.48 86,376.40

89,039.65 105,624.20 390,823.74

1,615.48 499.64 302.88 5,007.65 634.58 32,601.65 94,337.01 250.42 13,405.22 90.32 177,790.71

- 326,535.55

272,247.91 2,499,549.75

24,502.31 224,959.48

21,779.83 199,963.98

318,530.05 2,924,473.21

57,335.41 526,405.18

375,865.46 3,450,878.39

10.89% 100.00%

100.00% 100.00%

Page 8: CRONOGRAMA VALORIZADO

PRESUPUESTO DETALLADO

Obra SUSTITUCION, CONSTRUCCION, CULMINACION Y MEJORAMIENTO DE LA I.E.I. SANTA ROSA DEL DISTRITO DE SAN RAMÓN - CHANCHAMAYO - JUNIN

Entidad GOBIERNO REGIONAL JUNIN Costo al

Departamento JUNIN Provincia

MODALIDAD CONTRATA

Item Descripción

1 OBRAS PROVISIONALES

1.00 OBRAS PROVISIONALES ######

2 CULMINACION DE 09 AULAS EXISTENTES - SECUNDARIA

1.01 TRABAJOS PRELIMINARES ### 1.02 MUROS Y TABIQUES DE ALBAÑILERIA ### 2.01 REVOQUES ENLUCIDOS Y MOLDURAS ### 2.02 CIELORASOS ### 2.03 PISOS Y PAVIMENTOS ### 2.04 ZOCALOS Y CONTRAZOCALOS ### 2.05 CARPINTERIA DE MADERA ### 2.06 CARPINTERIA METALICA Y HERRERIA ### 2.07 CERRAJERIA ### 2.08 PINTURA ### 3.00 INSTALACIONES ELECTRICAS ###

###3 SUSTITUCION DE 08 AULAS - PRIMARIA

1.01 TRABAJOS PRELIMINARES ### 1.02 MOVIMIENTO DE TIERRAS ### 1.03 CONCRETO SIMPLE ### 1.04 CONCRETO ARMADO ### 2.01 REVOQUE ENLUCIDOS Y MOLDURAS ### 2.02 CIELORASOS ### 2.03 PISOS Y PAVIMENTOS ### 2.04 REVESTIMIENTOS ### 2.05 ZOCALOS Y CONTRAZOCALOS ### 2.06 CARPINTERIA DE MADERA ### 2.07 CARPINTERIA METALICA Y HERRERIA ### 2.08 CERRAJERIA ### 2.09 VIDRIOS, CRISTALES Y SIMILARES ### 2.10 PINTURA ### 2.11 CUBIERTAS ### 2.12 VARIOS, LIMPIEZA Y JARDINERIA ### 3.00 INSTALACIONES ELECTRICAS ### 4.00 INSTALACIONES SANITARIAS ###

###

4

1.01 TRABAJOS PRELIMINARES ### 1.02 MOVIMIENTO DE TIERRAS ### 1.03 CONCRETO SIMPLE ### 1.04 CONCRETO ARMADO ### 2.01 REVOQUE ENLUCIDOS Y MOLDURAS ### 2.02 CIELORASOS ### 2.03 PISOS Y PAVIMENTOS ### 2.04 REVESTIMIENTOS ### 2.05 ZOCALOS Y CONTRAZOCALOS ### 2.06 CARPINTERIA DE MADERA ### 2.07 CARPINTERIA METALICA Y HERRERIA ### 2.08 CERRAJERIA ### 2.09 VIDRIOS, CRISTALES Y SIMILARES ### 2.10 PINTURA ### 2.11 CUBIERTAS ### 2.12 VARIOS, LIMPIEZA Y JARDINERIA ### 3.00 INSTALACIONES ELECTRICAS ### 4.00 INSTALACIONES SANITARIAS ###

###5 SUSTITUCION DE 03 TALLERES, COSMETOLOGIA, CONFECCION TEXTIL E INDUSTRIAS ALIMENTARIAS

1.01 TRABAJOS PRELIMINARES ### 1.02 MOVIMIENTO DE TIERRAS ### 1.03 CONCRETO SIMPLE ### 1.04 CONCRETO ARMADO ### 1.05 MUROS Y TABIQUES DE ALBAÑILERIA ### 1.06 ESTRUCTURA DE MADERA ### 2.01 REVOQUE ENLUCIDOS Y MOLDURAS ###

CONSTRUCCION DE 01 LABORATORIO DE CIENCIA, TECNOLOGIA Y AMBIENTE, 01 SUM EN 1ER. NIVEL; Y SUSTITUCION DE 01 CENTRO DE COMPUTO Y DE AMBIENTES ADMINISTRATIVOS EN 2DO. NIVEL

Page 9: CRONOGRAMA VALORIZADO

2.02 CIELORASOS ### 2.03 PISOS Y PAVIMENTOS ### 2.04 REVESTIMIENTOS ### 2.05 ZOCALOS Y CONTRAZOCALOS ### 2.06 CARPINTERIA DE MADERA ### 2.07 CARPINTERIA METALICA Y HERRERIA ### 2.08 CERRAJERIA ### 2.09 VIDRIOS, CRISTALES Y SIMILARES ### 2.10 PINTURA ### 2.11 CUBIERTAS ### 2.12 VARIOS, LIMPIEZA Y JARDINERIA ### 3.00 INSTALACIONES ELECTRICAS ### 4.00 INSTALACIONES SANITARIAS ###

###6 SERVICIOS HIGIENICOS: NIVEL PRIMARIA Y DOCENTES, NIVEL SECUNDARIA

1.01 TRABAJOS PRELIMINARES ### 1.02 MOVIMIENTO DE TIERRAS ### 1.03 CONCRETO SIMPLE ### 1.04 CONCRETO ARMADO ### 1.05 MUROS Y TABIQUES DE ALBAÑILERIA ### 1.06 ESTRUCTURA DE MADERA ### 2.01 REVOQUE ENLUCIDOS Y MOLDURAS ### 2.02 CIELORASOS ### 2.03 PISOS Y PAVIMENTOS ### 2.04 ZOCALOS Y CONTRAZOCALOS ### 2.05 CARPINTERIA DE MADERA ### 2.06 CARPINTERIA METALICA Y HERRERIA ### 2.07 CERRAJERIA ### 2.08 VIDRIOS, CRISTALES Y SIMILARES ### 2.09 PINTURA ### 2.10 CUBIERTAS ### 2.11 VARIOS, LIMPIEZA Y JARDINERIA ### 3.00 INSTALACIONES ELECTRICAS ### 4.00 INSTALACIONES SANITARIAS ###

###

7

1.01 TRABAJOS PRELIMINARES ### 1.02 MOVIMIENTO DE TIERRAS ### 1.03 CONCRETO SIMPLE ### 1.04 CONCRETO ARMADO ### 1.05 MUROS Y TABIQUES DE ALBAÑILERIA ### 1.06 ESTRUCTURA DE MADERA ### 2.01 REVOQUE ENLUCIDOS Y MOLDURAS ### 2.02 CIELORASOS ### 2.03 PISOS Y PAVIMENTOS ### 2.04 ZOCALOS Y CONTRAZOCALOS ### 2.05 CARPINTERIA DE MADERA ### 2.06 CARPINTERIA METALICA Y HERRERIA ### 2.07 CERRAJERIA ### 2.08 VIDRIOS, CRISTALES Y SIMILARES ### 2.09 PINTURA ### 2.10 CUBIERTAS ### 2.11 VARIOS, LIMPIEZA Y JARDINERIA ### 3.00 INSTALACIONES ELECTRICAS ### 4.00 INSTALACIONES SANITARIAS ###

###8 CERCO PERIMETRICO Y EQUIPAMIENTO

1.01 ESTRUCTURAS ### 1.02 MOVIMIENTO DE TIERRAS ### 1.03 CONCRETO SIMPLE ### 1.04 CONCRETO ARMADO ### 1.05 MUROS Y TABIQUES DE ALBAÑILERIA ### 2.01 REVOQUE ENLUCIDOS Y MOLDURAS ### 2.02 CARPINTERIA METALICA Y HERRERIA ### 2.03 CERRAJERIA ### 2.04 PINTURA ### 2.05 VARIOS, LIMPIEZA Y JARDINERIA ### 3.00 EQUIPAMIENTO Y MOBILIARIO ###

###COSTO DIRECTO ###

GASTOS GENERALES 9% ###

UTILIDAD 8% ###

SUB TOTAL ###

OBRAS EXTERIORES: CASA DE FUERZA - COCINA, TANQUE ELEVADO - CISTERNA, PATIO DE FORMACION MULTIUSOS, LOSA DEPORTIVA Y RED EXTERNA DE INST. SANITARIAS Y ELECTRICAS

Page 10: CRONOGRAMA VALORIZADO

I.G.V. 18% ###

PRESUPUESTO DE EJECUCION DE OBRA ###

Page 11: CRONOGRAMA VALORIZADO

PRESUPUESTO DETALLADO

SUSTITUCION, CONSTRUCCION, CULMINACION Y MEJORAMIENTO DE LA I.E.I. SANTA ROSA DEL DISTRITO DE SAN RAMÓN - CHANCHAMAYO - JUNIN

1/2/2012Distrito: SAN RAMON

PRECIO

72,361.23 72,361.23

4,355.27 3,744.72 7,952.52 1,715.55 22,581.83 140.04 3,869.27 4,860.03 1,193.05 29,221.55 31,299.68 110,933.50

893.22 14,832.02 17,678.12 269,346.92 58,067.19 18,100.37 31,307.00 2,058.04 3,140.20 2,640.93 18,291.89 795.37 4,563.20 30,129.14 16,908.26 1,142.46 24,731.13 3,980.29 518,605.73

483.03 12,671.63 15,682.47 208,503.72 40,286.74 15,114.83 25,743.23 2,233.78 3,190.62 4,438.90 17,287.79 1,093.63 4,244.71 22,660.01 14,283.21 2,227.88 17,555.89 6,602.07 414,304.12

820.34 18,779.10 22,642.19 179,022.62 20,675.82 41,024.93 33,816.35

Page 12: CRONOGRAMA VALORIZADO

13,090.94 25,608.99 2,233.78 3,708.88 1,934.63 12,902.27 596.52 3,826.92 19,666.42 23,515.63 2,056.45 23,680.25 10,451.80 460,054.84

174.11 6,187.95 11,524.14 18,096.10 13,686.74 9,759.71 11,594.81 17,369.12 18,398.52 24,687.60 2,671.64 14,908.78 795.37 745.28 7,135.57 8,966.93 390.31 10,520.17 28,318.22 205,931.05

6,360.59 47,563.58 2,845.31 24,853.06 4,330.17 1,427.90 3,937.38 4,701.17 69,373.52 1,460.07 531.26 883.37 298.26 164.38 1,973.79 1,979.57 42,724.28 86,376.40 89,039.65 390,823.74

1,615.48 499.64 302.88 5,007.65 634.58 32,601.65 94,337.01 250.42 13,405.22 90.32 177,790.71 326,535.55

2,499,549.75

224,959.48

199,963.98

2,924,473.21

Page 13: CRONOGRAMA VALORIZADO

526,405.18

3,450,878.39

Page 14: CRONOGRAMA VALORIZADO

CONSORCIO PATROMAQCRONOGRAMA VALORIZADO DE OBRA

OBRA: SUSTITUCION, CONSTRUCCION, CULMINACION Y MEJORAMIENTO DE LA I. E. INTEGRAL SANTA ROSA DEL DISTRITO DE SAN RAMON – CHANCHAMAYO - JUNIN FECHA: 3/2/2013MODALIDAD: CONTRATA REGION: JUNINEJECUTOR: CONSORCIO PATROMAQ PROVINCIA: CHANCHAMAYORESIDENTE: ARQ. FERNANDO TORRES SUAREZ DISTRITO: SAN RAMONSUPERVISOR : ARQ. RAUL HINOSTROZA CANO

Item Descripción Precio1° MES - FEB. 2° MES - MAR. 3° MES - ABR. 4° MES - MAY 5° MES - JUN 6° MES - JUL 7° MES - AGO 8° MES - SET 9° MES - OCT

TOTAL PROGRAMADO22/02/13 - 28/02/13 01/03/13 - 31/03/13 01/04/13 - 30/04/13 01/05/13 - 31/05/13 01/06/13 - 30/06/13 01/07/13 - 31/07/13 01/08/13 - 31/08/13 01/09/13 - 30/09/13 01/10/13 - 31/10/13

1 OBRAS PROVISIONALES 1.00 OBRAS PROVISIONALES 72,361.23 52,129.66 20,231.57 20,231.57

72,361.23 52,129.66 20,231.57 - - - - - - - 20,231.57 2 CULMINACION DE 09 AULAS EXISTENTES - SECUNDARIA

1.01 TRABAJOS PRELIMINARES 4,355.27 4,355.27 4,355.27 1.02 MUROS Y TABIQUES DE ALBAÑILERIA 3,744.72 3,744.72 3,744.72 2.01 REVOQUES ENLUCIDOS Y MOLDURAS 7,952.52 7,952.52 7,952.52 2.02 CIELORASOS 1,715.55 1,715.55 1,715.55 2.03 PISOS Y PAVIMENTOS 22,581.83 10,161.82 12,420.00 22,581.83 2.04 ZOCALOS Y CONTRAZOCALOS 140.04 140.04 140.04 2.05 CARPINTERIA DE MADERA 3,869.27 3,869.27 3,869.27 2.06 CARPINTERIA METALICA Y HERRERIA 4,860.03 4,860.03 4,860.03 2.07 CERRAJERIA 1,193.05 1,193.05 1,193.05 2.08 PINTURA 29,221.55 29,221.55 29,221.55 3.00 INSTALACIONES ELECTRICAS 31,299.68 31,299.68 31,299.68

110,933.50 8,099.99 19,969.94 12,420.00 9,922.35 60,521.22 - - - 110,933.50 3 SUSTITUCION DE 08 AULAS - PRIMARIA

1.01 TRABAJOS PRELIMINARES 893.22 893.22 893.22 1.02 MOVIMIENTO DE TIERRAS 14,832.02 14,832.02 14,832.02 1.03 CONCRETO SIMPLE 17,678.12 17,678.12 17,678.12 1.04 CONCRETO ARMADO 269,346.92 80,804.07 94,271.42 94,271.42 269,346.92 2.01 REVOQUE ENLUCIDOS Y MOLDURAS 58,067.19 29,033.60 29,033.60 58,067.19 2.02 CIELORASOS 18,100.37 18,100.37 18,100.37 2.03 PISOS Y PAVIMENTOS 31,307.00 31,307.00 31,307.00 2.04 REVESTIMIENTOS 2,058.04 2,058.04 2,058.04 2.05 ZOCALOS Y CONTRAZOCALOS 3,140.20 3,140.20 3,140.20 2.06 CARPINTERIA DE MADERA 2,640.93 2,640.93 2,640.93 2.07 CARPINTERIA METALICA Y HERRERIA 18,291.89 18,291.89 18,291.89 2.08 CERRAJERIA 795.37 795.37 795.37 2.09 VIDRIOS, CRISTALES Y SIMILARES 4,563.20 4,563.20 4,563.20 2.10 PINTURA 30,129.14 30,129.14 30,129.14 2.11 CUBIERTAS 16,908.26 16,908.26 16,908.26 2.12 VARIOS, LIMPIEZA Y JARDINERIA 1,142.46 1,142.46 1,142.46 3.00 INSTALACIONES ELECTRICAS 24,731.13 7,419.34 17,311.79 24,731.13 4.00 INSTALACIONES SANITARIAS 3,980.29 1,194.09 2,786.21 3,980.29

518,605.73 114,207.43 94,271.42 119,793.10 65,425.86 29,033.60 36,505.23 6,222.50 53,146.59 518,605.73

4 1.01 TRABAJOS PRELIMINARES 483.03 483.03 483.03 1.02 MOVIMIENTO DE TIERRAS 12,671.63 12,671.63 12,671.63 1.03 CONCRETO SIMPLE 15,682.47 15,682.47 15,682.47 1.04 CONCRETO ARMADO 208,503.72 62,551.12 72,976.30 72,976.30 208,503.72 2.01 REVOQUE ENLUCIDOS Y MOLDURAS 40,286.74 20,143.37 20,143.37 40,286.74 2.02 CIELORASOS 15,114.83 15,114.83 15,114.83 2.03 PISOS Y PAVIMENTOS 25,743.23 25,743.23 25,743.23 2.04 REVESTIMIENTOS 2,233.78 2,233.78 2,233.78 2.05 ZOCALOS Y CONTRAZOCALOS 3,190.62 3,190.62 3,190.62 2.06 CARPINTERIA DE MADERA 4,438.90 4,438.90 4,438.90 2.07 CARPINTERIA METALICA Y HERRERIA 17,287.79 17,287.79 17,287.79 2.08 CERRAJERIA 1,093.63 1,093.63 1,093.63 2.09 VIDRIOS, CRISTALES Y SIMILARES 4,244.71 4,244.71 4,244.71 2.10 PINTURA 22,660.01 22,660.01 22,660.01 2.11 CUBIERTAS 14,283.21 14,283.21 14,283.21 2.12 VARIOS, LIMPIEZA Y JARDINERIA 2,227.88 2,227.88 2,227.88 3.00 INSTALACIONES ELECTRICAS 17,555.89 5,266.77 12,289.12 17,555.89 4.00 INSTALACIONES SANITARIAS 6,602.07 1,980.62 4,621.45 6,602.07

414,304.12 91,388.25 72,976.30 94,506.89 52,545.98 20,143.37 31,167.63 10,153.98 41,421.72 414,304.12 5 SUSTITUCION DE 03 TALLERES, COSMETOLOGIA, CONFECCION TEXTIL E INDUSTRIAS ALIMENTARIAS

1.01 TRABAJOS PRELIMINARES 820.34 820.34 820.34 1.02 MOVIMIENTO DE TIERRAS 18,779.10 18,779.10 18,779.10 1.03 CONCRETO SIMPLE 22,642.19 22,642.19 22,642.19 1.04 CONCRETO ARMADO 179,022.62 53,706.79 62,657.92 62,657.92 179,022.62 1.05 MUROS Y TABIQUES DE ALBAÑILERIA 20,675.82 10,337.91 10,337.91 20,675.82 1.06 ESTRUCTURA DE MADERA 41,024.93 41,024.93 41,024.93 2.01 REVOQUE ENLUCIDOS Y MOLDURAS 33,816.35 33,816.35 33,816.35 2.02 CIELORASOS 13,090.94 13,090.94 13,090.94 2.03 PISOS Y PAVIMENTOS 25,608.99 25,608.99 25,608.99 2.04 REVESTIMIENTOS 2,233.78 2,233.78 2,233.78 2.05 ZOCALOS Y CONTRAZOCALOS 3,708.88 3,708.88 3,708.88 2.06 CARPINTERIA DE MADERA 1,934.63 1,934.63 1,934.63 2.07 CARPINTERIA METALICA Y HERRERIA 12,902.27 12,902.27 12,902.27 2.08 CERRAJERIA 596.52 596.52 596.52 2.09 VIDRIOS, CRISTALES Y SIMILARES 3,826.92 3,826.92 3,826.92 2.10 PINTURA 19,666.42 19,666.42 19,666.42 2.11 CUBIERTAS 23,515.63 23,515.63 23,515.63 2.12 VARIOS, LIMPIEZA Y JARDINERIA 2,056.45 2,056.45 2,056.45 3.00 INSTALACIONES ELECTRICAS 23,680.25 7,104.08 16,576.18 23,680.25 4.00 INSTALACIONES SANITARIAS 10,451.80 3,135.54 7,316.26 10,451.80

460,054.84 95,948.41 62,657.92 96,413.17 55,071.71 10,337.91 72,516.28 11,484.68 55,624.76 460,054.84 6 SERVICIOS HIGIENICOS: NIVEL PRIMARIA Y DOCENTES, NIVEL SECUNDARIA

1.01 TRABAJOS PRELIMINARES 174.11 174.11 174.11 1.02 MOVIMIENTO DE TIERRAS 6,187.95 6,187.95 6,187.95 1.03 CONCRETO SIMPLE 11,524.14 11,524.14 11,524.14 1.04 CONCRETO ARMADO 18,096.10 6,333.63 11,762.46 18,096.10 1.05 MUROS Y TABIQUES DE ALBAÑILERIA 13,686.74 6,843.37 6,843.37 13,686.74 1.06 ESTRUCTURA DE MADERA 9,759.71 9,759.71 9,759.71 2.01 REVOQUE ENLUCIDOS Y MOLDURAS 11,594.81 11,594.81 11,594.81 2.02 CIELORASOS 17,369.12 17,369.12 17,369.12 2.03 PISOS Y PAVIMENTOS 18,398.52 18,398.52 18,398.52 2.04 ZOCALOS Y CONTRAZOCALOS 24,687.60 24,687.60 24,687.60 2.05 CARPINTERIA DE MADERA 2,671.64 2,671.64 2,671.64 2.06 CARPINTERIA METALICA Y HERRERIA 14,908.78 14,908.78 14,908.78 2.07 CERRAJERIA 795.37 795.37 795.37 2.08 VIDRIOS, CRISTALES Y SIMILARES 745.28 745.28 745.28 2.09 PINTURA 7,135.57 7,135.57 7,135.57 2.10 CUBIERTAS 8,966.93 8,966.93 8,966.93 2.11 VARIOS, LIMPIEZA Y JARDINERIA 390.31 390.31 390.31 3.00 INSTALACIONES ELECTRICAS 10,520.17 3,156.05 7,364.12 10,520.17 4.00 INSTALACIONES SANITARIAS 28,318.22 8,495.47 19,822.75 28,318.22

205,931.05 17,886.20 6,333.63 32,380.91 16,603.08 6,843.37 72,050.05 37,403.17 16,430.64 205,931.05

7 1.01 TRABAJOS PRELIMINARES 6,360.59 6,360.59 6,360.59 1.02 MOVIMIENTO DE TIERRAS 47,563.58 47,563.58 47,563.58 1.03 CONCRETO SIMPLE 2,845.31 2,845.31 2,845.31 1.04 CONCRETO ARMADO 24,853.06 8,698.57 16,154.49 24,853.06 1.05 MUROS Y TABIQUES DE ALBAÑILERIA 4,330.17 2,165.09 2,165.09 4,330.17 1.06 ESTRUCTURA DE MADERA 1,427.90 1,427.90 1,427.90 2.01 REVOQUE ENLUCIDOS Y MOLDURAS 3,937.38 3,937.38 3,937.38 2.02 CIELORASOS 4,701.17 4,701.17 4,701.17 2.03 PISOS Y PAVIMENTOS 69,373.52 69,373.52 69,373.52 2.04 ZOCALOS Y CONTRAZOCALOS 1,460.07 1,460.07 1,460.07 2.05 CARPINTERIA DE MADERA 531.26 531.26 531.26 2.06 CARPINTERIA METALICA Y HERRERIA 883.37 883.37 883.37 2.07 CERRAJERIA 298.26 298.26 298.26 2.08 VIDRIOS, CRISTALES Y SIMILARES 164.38 164.38 164.38 2.09 PINTURA 1,973.79 1,973.79 1,973.79 2.10 CUBIERTAS 1,979.57 1,979.57 1,979.57 2.11 VARIOS, LIMPIEZA Y JARDINERIA 42,724.28 42,724.28 42,724.28 3.00 INSTALACIONES ELECTRICAS 86,376.40 25,912.92 60,463.48 86,376.40 4.00 INSTALACIONES SANITARIAS 89,039.65 26,711.90 62,327.76 89,039.65

390,823.74 56,769.48 8,698.57 70,758.88 3,592.98 2,165.09 79,472.15 63,742.38 105,624.20 390,823.74 8 CERCO PERIMETRICO Y EQUIPAMIENTO

1.01 ESTRUCTURAS 1,615.48 1,615.48 1,615.48 1.02 MOVIMIENTO DE TIERRAS 499.64 499.64 499.64 1.03 CONCRETO SIMPLE 302.88 302.88 302.88 1.04 CONCRETO ARMADO 5,007.65 5,007.65 5,007.65 1.05 MUROS Y TABIQUES DE ALBAÑILERIA 634.58 634.58 634.58 2.01 REVOQUE ENLUCIDOS Y MOLDURAS 32,601.65 32,601.65 32,601.65 2.02 CARPINTERIA METALICA Y HERRERIA 94,337.01 94,337.01 94,337.01 2.03 CERRAJERIA 250.42 250.42 250.42 2.04 PINTURA 13,405.22 13,405.22 13,405.22 2.05 VARIOS, LIMPIEZA Y JARDINERIA 90.32 90.32 90.32 3.00 EQUIPAMIENTO Y MOBILIARIO 177,790.71 177,790.71 177,790.71

326,535.55 2,418.00 5,642.23 32,601.65 94,587.43 191,286.24 - - - 326,535.55

COSTO DIRECTO 2,499,549.75 52,129.66 406,949.33 270,550.01 458,874.61 297,749.39 320,330.80 291,711.34 129,006.72 272,247.91 2,447,420.09GASTOS GENERALES 9% 224,959.48 4,691.67 36,625.44 24,349.50 41,298.71 26,797.44 28,829.77 26,254.02 11,610.60 24,502.31 220,267.81UTILIDAD 8% 199,963.98 4,170.37 32,555.95 21,644.00 36,709.97 23,819.95 25,626.46 23,336.91 10,320.54 21,779.83 195,793.61SUB TOTAL 2,924,473.21 60,991.70 476,130.72 316,543.51 536,883.29 348,366.78 374,787.03 341,302.27 150,937.86 318,530.05 2,924,473.21I.G.V. 18% 526,405.18 10,978.51 85,703.53 56,977.83 96,638.99 62,706.02 67,461.67 61,434.41 27,168.81 57,335.41 526,405.18PRESUPUESTO DE EJECUCION DE OBRA 3,450,878.39 71,970.21 561,834.25 373,521.35 633,522.28 411,072.80 442,248.70 402,736.67 178,106.67 375,865.46 3,450,878.39PORCENTAJE AVANCE DEL MES : 2.08% 16.29% 10.82% 18.36% 11.91% 12.82% 11.67% 5.16% 10.89% 100.00%PORCENTAJE DE AVANCE ACUMULADO 2.08% 16.29% 27.11% 45.47% 57.39% 70.20% 81.87% 87.03% 97.92% 100.00%

CONSTRUCCION DE 01 LABORATORIO DE CIENCIA, TECNOLOGIA Y AMBIENTE, 01 SUM EN 1ER. NIVEL; Y SUSTITUCION DE 01 CENTRO DE COMPUTO Y DE AMBIENTES ADMINISTRATIVOS EN 2DO. NIVEL

OBRAS EXTERIORES: CASA DE FUERZA - COCINA, TANQUE ELEVADO - CISTERNA, PATIO DE FORMACION MULTIUSOS, LOSA DEPORTIVA Y RED EXTERNA DE INST. SANITARIAS Y ELECTRICAS

Page 15: CRONOGRAMA VALORIZADO

CONSORCIO PATROMAQCRONOGRAMA VALORIZADO DE OBRA

OBRA: SUSTITUCION, CONSTRUCCION, CULMINACION Y MEJORAMIENTO DE LA I. E. INTEGRAL SANTA ROSA DEL DISTRITO DE SAN RAMON – CHANCHAMAYO - JUNIN FECHA:MODALIDAD: CONTRATA REGION:EJECUTOR: CONSORCIO PATROMAQ PROVINCIA:RESIDENTE: ARQ. FERNANDO TORRES SUAREZ DISTRITO:SUPERVISOR : ARQ. RAUL HINOSTROZA CANO

Item Descripción Precio1° MES - FEB. 2° MES - MAR. 3° MES - ABR. 4° MES - MAY 5° MES - JUN 6° MES - JUL 7° MES - AGO 8° MES - SET

22/02/13 - 28/02/13 01/03/13 - 31/03/13 01/04/13 - 30/04/13 01/05/13 - 31/05/13 01/06/13 - 30/06/13 01/07/13 - 31/07/13 01/08/13 - 31/08/13 01/09/13 - 30/09/131 OBRAS PROVISIONALES

1.00 OBRAS PROVISIONALES 72,361.23 61,137.30 11,223.93 72,361.23 61,137.30 11,223.93 - - - - - -

2 CULMINACION DE 09 AULAS EXISTENTES - SECUNDARIA 1.01 TRABAJOS PRELIMINARES 4,355.27 4,355.27 1.02 MUROS Y TABIQUES DE ALBAÑILERIA 3,744.72 3,744.72 2.01 REVOQUES ENLUCIDOS Y MOLDURAS 7,952.52 7,952.52 2.02 CIELORASOS 1,715.55 1,715.55 2.03 PISOS Y PAVIMENTOS 22,581.83 10,161.82 12,420.00 2.04 ZOCALOS Y CONTRAZOCALOS 140.04 140.04 2.05 CARPINTERIA DE MADERA 3,869.27 3,869.27 2.06 CARPINTERIA METALICA Y HERRERIA 4,860.03 4,860.03 2.07 CERRAJERIA 1,193.05 1,193.05 2.08 PINTURA 29,221.55 29,221.55 3.00 INSTALACIONES ELECTRICAS 31,299.68 31,299.68

110,933.50 8,099.99 19,969.94 12,420.00 9,922.35 60,521.22 - - 3 SUSTITUCION DE 08 AULAS - PRIMARIA

1.01 TRABAJOS PRELIMINARES 893.22 893.22 1.02 MOVIMIENTO DE TIERRAS 14,832.02 14,832.02 1.03 CONCRETO SIMPLE 17,678.12 17,678.12 1.04 CONCRETO ARMADO 269,346.92 80,804.07 94,271.42 94,271.42 2.01 REVOQUE ENLUCIDOS Y MOLDURAS 58,067.19 29,033.60 29,033.60 2.02 CIELORASOS 18,100.37 18,100.37 2.03 PISOS Y PAVIMENTOS 31,307.00 31,307.00 2.04 REVESTIMIENTOS 2,058.04 2,058.04 2.05 ZOCALOS Y CONTRAZOCALOS 3,140.20 3,140.20 2.06 CARPINTERIA DE MADERA 2,640.93 2,640.93 2.07 CARPINTERIA METALICA Y HERRERIA 18,291.89 18,291.89 2.08 CERRAJERIA 795.37 795.37 2.09 VIDRIOS, CRISTALES Y SIMILARES 4,563.20 2.10 PINTURA 30,129.14 2.11 CUBIERTAS 16,908.26 8,454.13 8,454.13 2.12 VARIOS, LIMPIEZA Y JARDINERIA 1,142.46 3.00 INSTALACIONES ELECTRICAS 24,731.13 7,419.34 4.00 INSTALACIONES SANITARIAS 3,980.29 1,194.09 2,786.21

518,605.73 114,207.43 94,271.42 94,271.42 66,619.94 44,907.06 44,959.36 6,222.50

4 1.01 TRABAJOS PRELIMINARES 483.03 483.03 1.02 MOVIMIENTO DE TIERRAS 12,671.63 12,671.63 1.03 CONCRETO SIMPLE 15,682.47 15,682.47 1.04 CONCRETO ARMADO 208,503.72 62,551.12 72,976.30 72,976.30 2.01 REVOQUE ENLUCIDOS Y MOLDURAS 40,286.74 20,143.37 20,143.37 2.02 CIELORASOS 15,114.83 15,114.83 2.03 PISOS Y PAVIMENTOS 25,743.23 25,743.23 2.04 REVESTIMIENTOS 2,233.78 2,233.78 2.05 ZOCALOS Y CONTRAZOCALOS 3,190.62 3,190.62 2.06 CARPINTERIA DE MADERA 4,438.90 4,438.90 2.07 CARPINTERIA METALICA Y HERRERIA 17,287.79 17,287.79 2.08 CERRAJERIA 1,093.63 1,093.63 2.09 VIDRIOS, CRISTALES Y SIMILARES 4,244.71 2.10 PINTURA 22,660.01 2.11 CUBIERTAS 14,283.21 14,283.21 2.12 VARIOS, LIMPIEZA Y JARDINERIA 2,227.88 3.00 INSTALACIONES ELECTRICAS 17,555.89 5,266.77 4.00 INSTALACIONES SANITARIAS 6,602.07 1,980.62 4,621.45

414,304.12 91,388.25 72,976.30 94,506.89 52,545.98 20,143.37 31,167.63 10,153.98 5 SUSTITUCION DE 03 TALLERES, COSMETOLOGIA, CONFECCION TEXTIL E INDUSTRIAS ALIMENTARIAS

1.01 TRABAJOS PRELIMINARES 820.34 820.34 1.02 MOVIMIENTO DE TIERRAS 18,779.10 18,779.10 1.03 CONCRETO SIMPLE 22,642.19 22,642.19 1.04 CONCRETO ARMADO 179,022.62 53,706.79 62,657.92 62,657.92 1.05 MUROS Y TABIQUES DE ALBAÑILERIA 20,675.82 10,337.91 10,337.91 1.06 ESTRUCTURA DE MADERA 41,024.93 41,024.93 2.01 REVOQUE ENLUCIDOS Y MOLDURAS 33,816.35 33,816.35 2.02 CIELORASOS 13,090.94 13,090.94 2.03 PISOS Y PAVIMENTOS 25,608.99 25,608.99 2.04 REVESTIMIENTOS 2,233.78 2,233.78 2.05 ZOCALOS Y CONTRAZOCALOS 3,708.88 3,708.88 2.06 CARPINTERIA DE MADERA 1,934.63 1,934.63 2.07 CARPINTERIA METALICA Y HERRERIA 12,902.27 2.08 CERRAJERIA 596.52 2.09 VIDRIOS, CRISTALES Y SIMILARES 3,826.92 2.10 PINTURA 19,666.42 2.11 CUBIERTAS 23,515.63 23,515.63 2.12 VARIOS, LIMPIEZA Y JARDINERIA 2,056.45 3.00 INSTALACIONES ELECTRICAS 23,680.25 7,104.08 4.00 INSTALACIONES SANITARIAS 10,451.80 3,135.54 7,316.26

460,054.84 95,948.41 62,657.92 96,413.17 55,071.71 10,337.91 72,516.28 11,484.68 6 SERVICIOS HIGIENICOS: NIVEL PRIMARIA Y DOCENTES, NIVEL SECUNDARIA

1.01 TRABAJOS PRELIMINARES 174.11 174.11 1.02 MOVIMIENTO DE TIERRAS 6,187.95 6,187.95 1.03 CONCRETO SIMPLE 11,524.14 11,524.14 1.04 CONCRETO ARMADO 18,096.10 6,333.63 11,762.46 1.05 MUROS Y TABIQUES DE ALBAÑILERIA 13,686.74 6,843.37 6,843.37 1.06 ESTRUCTURA DE MADERA 9,759.71 9,759.71 2.01 REVOQUE ENLUCIDOS Y MOLDURAS 11,594.81 11,594.81 2.02 CIELORASOS 17,369.12 17,369.12 2.03 PISOS Y PAVIMENTOS 18,398.52 18,398.52 2.04 ZOCALOS Y CONTRAZOCALOS 24,687.60 24,687.60 2.05 CARPINTERIA DE MADERA 2,671.64 2,671.64 2.06 CARPINTERIA METALICA Y HERRERIA 14,908.78 14,908.78 2.07 CERRAJERIA 795.37 2.08 VIDRIOS, CRISTALES Y SIMILARES 745.28 2.09 PINTURA 7,135.57 2.10 CUBIERTAS 8,966.93 8,966.93 2.11 VARIOS, LIMPIEZA Y JARDINERIA 390.31 3.00 INSTALACIONES ELECTRICAS 10,520.17 3,156.05 4.00 INSTALACIONES SANITARIAS 28,318.22 8,495.47 19,822.75

205,931.05 17,886.20 6,333.63 32,380.91 16,603.08 6,843.37 72,050.05 37,403.17

7 1.01 TRABAJOS PRELIMINARES 6,360.59 6,360.59 1.02 MOVIMIENTO DE TIERRAS 47,563.58 47,563.58 1.03 CONCRETO SIMPLE 2,845.31 2,845.31 1.04 CONCRETO ARMADO 24,853.06 8,698.57 16,154.49 1.05 MUROS Y TABIQUES DE ALBAÑILERIA 4,330.17 2,165.09 2,165.09 1.06 ESTRUCTURA DE MADERA 1,427.90 1,427.90 2.01 REVOQUE ENLUCIDOS Y MOLDURAS 3,937.38 3,937.38 2.02 CIELORASOS 4,701.17 4,701.17 2.03 PISOS Y PAVIMENTOS 69,373.52 69,373.52 2.04 ZOCALOS Y CONTRAZOCALOS 1,460.07 1,460.07 2.05 CARPINTERIA DE MADERA 531.26 531.26 2.06 CARPINTERIA METALICA Y HERRERIA 883.37 883.37 2.07 CERRAJERIA 298.26 2.08 VIDRIOS, CRISTALES Y SIMILARES 164.38 2.09 PINTURA 1,973.79 2.10 CUBIERTAS 1,979.57 1,979.57 2.11 VARIOS, LIMPIEZA Y JARDINERIA 42,724.28 3.00 INSTALACIONES ELECTRICAS 86,376.40 25,912.92 4.00 INSTALACIONES SANITARIAS 89,039.65 26,711.90 62,327.76

390,823.74 56,769.48 8,698.57 70,758.88 3,592.98 2,165.09 79,472.15 63,742.38 8 CERCO PERIMETRICO Y EQUIPAMIENTO

1.01 ESTRUCTURAS 1,615.48 1,615.48 1.02 MOVIMIENTO DE TIERRAS 499.64 499.64 1.03 CONCRETO SIMPLE 302.88 302.88 1.04 CONCRETO ARMADO 5,007.65 5,007.65 1.05 MUROS Y TABIQUES DE ALBAÑILERIA 634.58 634.58 2.01 REVOQUE ENLUCIDOS Y MOLDURAS 32,601.65 32,601.65 2.02 CARPINTERIA METALICA Y HERRERIA 94,337.01 94,337.01 2.03 CERRAJERIA 250.42 250.42 2.04 PINTURA 13,405.22 13,405.22 2.05 VARIOS, LIMPIEZA Y JARDINERIA 90.32 90.32 3.00 EQUIPAMIENTO Y MOBILIARIO 177,790.71 177,790.71

326,535.55 2,418.00 5,642.23 32,601.65 94,587.43 191,286.24 - -

COSTO DIRECTO 2,499,549.75 61,137.30 397,941.69 270,550.01 433,352.92 298,943.48 336,204.26 300,165.47 129,006.72GASTOS GENERALES 9% 224,959.48 5,502.36 35,814.75 24,349.50 39,001.76 26,904.91 30,258.38 27,014.89 11,610.60UTILIDAD 8% 199,963.98 4,890.98 31,835.34 21,644.00 34,668.23 23,915.48 26,896.34 24,013.24 10,320.54SUB TOTAL 2,924,473.21 71,530.64 465,591.78 316,543.51 507,022.92 349,763.87 393,358.99 351,193.60 150,937.86I.G.V. 18% 526,405.18 12,875.52 83,806.52 56,977.83 91,264.13 62,957.50 70,804.62 63,214.85 27,168.81PRESUPUESTO DE EJECUCION DE OBRA 3,450,878.39 84,406.16 549,398.30 373,521.35 598,287.05 412,721.36 464,163.60 414,408.44 178,106.67PORCENTAJE AVANCE DEL MES : 2.45% 15.92% 10.82% 17.34% 11.96% 13.45% 12.01% 5.16%PORCENTAJE DE AVANCE ACUMULADO 2.45% 18.37% 29.19% 46.53% 58.49% 71.94% 83.95% 89.11%

CONSTRUCCION DE 01 LABORATORIO DE CIENCIA, TECNOLOGIA Y AMBIENTE, 01 SUM EN 1ER. NIVEL; Y SUSTITUCION DE 01 CENTRO DE COMPUTO Y DE AMBIENTES ADMINISTRATIVOS EN 2DO. NIVEL

OBRAS EXTERIORES: CASA DE FUERZA - COCINA, TANQUE ELEVADO - CISTERNA, PATIO DE FORMACION MULTIUSOS, LOSA DEPORTIVA Y RED EXTERNA DE INST. SANITARIAS Y ELECTRICAS

Page 16: CRONOGRAMA VALORIZADO

CRONOGRAMA VALORIZADO DE OBRA

3/2/2013JUNINCHANCHAMAYOSAN RAMON

9° MES - OCTTOTAL PROGRAMADO

01/10/13 - 31/10/13

72,361.23 - 72,361.23

4,355.27 3,744.72 7,952.52 1,715.55 22,581.83 140.04 3,869.27 4,860.03 1,193.05 29,221.55 31,299.68

- 110,933.50

893.22 14,832.02 17,678.12 269,346.92 58,067.19 18,100.37 31,307.00 2,058.04 3,140.20 2,640.93 18,291.89 795.37

4,563.20 4,563.20 30,129.14 30,129.14

16,908.26 1,142.46 1,142.46 17,311.79 24,731.13

3,980.29 53,146.59 518,605.73

483.03 12,671.63 15,682.47 208,503.72 40,286.74 15,114.83 25,743.23 2,233.78 3,190.62 4,438.90 17,287.79 1,093.63

4,244.71 4,244.71 22,660.01 22,660.01

14,283.21 2,227.88 2,227.88 12,289.12 17,555.89

6,602.07 41,421.72 414,304.12

820.34 18,779.10 22,642.19 179,022.62 20,675.82 41,024.93 33,816.35 13,090.94 25,608.99 2,233.78 3,708.88 1,934.63

12,902.27 12,902.27 596.52 596.52 3,826.92 3,826.92 19,666.42 19,666.42

23,515.63 2,056.45 2,056.45 16,576.18 23,680.25

10,451.80 55,624.76 460,054.84

174.11 6,187.95 11,524.14 18,096.10 13,686.74 9,759.71 11,594.81 17,369.12 18,398.52 24,687.60 2,671.64 14,908.78

795.37 795.37 745.28 745.28 7,135.57 7,135.57

8,966.93 390.31 390.31 7,364.12 10,520.17

28,318.22 16,430.64 205,931.05

6,360.59 47,563.58 2,845.31 24,853.06 4,330.17 1,427.90 3,937.38 4,701.17 69,373.52 1,460.07 531.26 883.37

298.26 298.26 164.38 164.38 1,973.79 1,973.79

1,979.57 42,724.28 42,724.28 60,463.48 86,376.40

89,039.65 105,624.20 390,823.74

1,615.48 499.64 302.88 5,007.65 634.58 32,601.65 94,337.01 250.42 13,405.22 90.32 177,790.71

- 326,535.55

272,247.91 2,499,549.7524,502.31 224,959.4821,779.83 199,963.98

318,530.05 2,924,473.2157,335.41 526,405.18

375,865.46 3,450,878.3910.89% 100.00%

100.00% 100.00%

Page 17: CRONOGRAMA VALORIZADO

CRONOGRAMA VALORIZADO DE OBRA OBRA: “MEJORAMIENTO DEL CAMINO VECINAL EN EL ANEXO DE HUALAHOYO, DISTRITO EL TAMBO – HUANCAYO" - II ETAPAPROPIETARIO: MUNICIPALIDAD DISTRITAL DE EL TAMBOLUGAR: ANEXO DE HUALAHOYOPROVINCIA: HUANCAYOREIGION: JUNIN

Item Descripción Precio 1° MES 2° MES 3° MES 4° MES 5° MES TOTAL PROGRAMADO

1.00 AFIRMADO CAMINO VECINAL 402,959.27 91,753.91 130,887.09 132,966.62 48,389.03 13,247.18 417,243.83 01.01. OBRAS PRELIMINARES 17,819.20

01.01.01 CAMPAMENTO PROVISIONAL DE OBRA 3,730.00 746.00 746.00 746.00 746.00 746.00 3,730.00 01.01.02 TRAZO Y REPLATEO 1,984.99 1,984.99 1,984.99 01.01.03 CARTEL DE OBRA 3.60x2.40 MTS. SEGUN DISEÑO 3,975.14 1,325.05 1,325.05 1,325.05 3,975.14 01.01.04 TRAZO Y REPLANTEO DURANTE EL PROCESO DE EJECUCION 967.90 967.90 -

01.01.05 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS A OBRA

7,161.17 3,580.59 3,580.59 7,161.17 01.02. MOVIMIENTO DE TIERRAS 283,240.09 -

01.02.01 DESBROCE Y LIMPIEZA DE TERRENO 7,537.48 3,768.74 3,768.74 7,537.48 01.02.02 CORTE EN MATERIAL SUELTO 66,480.18 22,160.06 22,160.06 22,160.06 66,480.18 01.02.03 PERFILADO Y COMPACTADO DE SUB RASANTE EN ZONA DE CORTE 28,127.66 14,063.83 14,063.83 28,127.66 01.02.04 CONFORMACION DE TERRAPLEN CON MATERIAL 124,147.60 24,829.52 41,382.53 41,382.53 18,330.34 125,924.93 01.02.05 ELIMINACION DE MATERIAL EXCEDENTE 56,947.17 14,236.79 28,473.59 26,744.03 69,454.41

01.03. CONFORMACION DE PLATAFORMA DE RODADURA 86,310.03 - 01.03.01 EXTRACCION Y APILAMIENTO 22,592.52 11,296.26 11,296.26 22,592.52 01.03.02 ZARANDEO 8,139.95 4,069.98 4,069.98 8,139.95 01.03.03 CARGUIO 10897.57 5,448.79 5,448.79 10,897.57 01.03.04 TRANSPORTE DISTANCIA PROMEDIO D=1.50 KM 7,176.45 3,588.23 3,588.23 7,176.45

01.03.05 ESPARCIDO Y COMPACTADO E=0.15, REND.= 2560 M2/DIA FACTOR COMPACTACION

37,503.54 12501.18 12,501.18 12,501.18 37,503.54 01.04. CUNETAS LATERALES (SINREVESTIR) 8,180.90 -

01.04.01 CUNETA TRIANGULAR A=0.30, H=0.30 M. 8,180.90 4,090.45 4,090.45 8,180.90 01.05. VARIOS 7,409.05 -

01.05.01 REACONDICIONAMIENTO DE BUZON Y TAPAS DE BUZON 7,409.05 3,704.53 3,704.53 7,409.05 2.00 ALCANTARILLAS SECCION RECTANGULAR 183,706.25 7,070.44 10,141.74 56,262.83 53,277.14 56,954.11 183,706.25

02.01. OBRAS PRELIMINARES 10,334.43 - 02.01.01 TRAZO, NIVELACION Y REPLANTEO PRELIMINAR 489.30 489.30 489.30 02.01.02 DEMOLICION DE ALCANTARILLAS EXISTEN 6,997.08 3,498.54 3,498.54 6,997.08 02.01.03 ELIMINACION DE MATERIAL DEMOLIDO EN ALCANTARILLA 2,848.05 1,424.03 1,424.03 2,848.05

02.02. MOVIMIENTO DE TIERRAS 10,105.94 - 02.02.01 EXCAVACION PARA ESTRUCTURA (MANUAL) 6,165.20 3,082.60 3,082.60 6,165.20 02.02.02 RELLENO PARA ALCANTARILLA HASTA NIVEL DE RASANTE 25.59 25.59 25.59 02.02.03 ELIMINACION DE MATERIAL EXCEDENTE EN ALCANTARILLA 3,915.15 1,957.58 1,957.58 3,915.15

02.03. OBRAS DE ARTE 157,654.51 - 02.03.01 SOLADO e=3" 4,221.96 2,110.98 2,110.98 4,221.96 02.03.02 ENROCADO Y PROTECCION CON PIEDRA EMBOQUILLADA 549.32 549.32 549.32 02.03.03 CONCRETO f'c=210 kg/cm2 EN ALCANTARILLA 95,614.33 31,871.44 31,871.44 31,871.44 95,614.33 02.03.04 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 25,020.74 8,340.25 8,340.25 8,340.25 25,020.74 02.03.05 ENCOFRADO Y DESENCOFRADO EN ALCANTARILLA 31,675.67 10,558.56 10,558.56 10,558.56 31,675.67 02.03.06 EMBOQUILLADO DE PIEDRA 572.49 572.49 572.49

02.04. VARIOS 2,033.32 - 02.04.01 TARRAJEO INT. EXT. EN MUROS DE ALCANTARILLADO 1,452.97 1,452.97 1,452.97 02.04.02 PINTURA EN CONCRETO 580.35 580.35 580.35

02.05. ALCANTARILLAS REHABILITACION 3,578.05 - 02.05.01 LIMPIEZA DE MATERIAL COLMATADO EN ALCANTARILLAS 120.80 120.80 120.80 02.05.02 TARRAJEO Y RESANE EN ALCANTARILLAS 2,087.60 2,087.60 2,087.60 02.05.03 EMBOQUILLADO DE PIEDRA 511.15 511.15 511.15 02.05.04 PINTURA EN CONCRETO 858.50 858.50 858.50

3.00 PONTON RIO TUNSHO 5.70 ML 108,746.96 1,880.00 26,888.06 52,864.52 15,925.16 11,189.22 108,746.96 03.01. OBRAS PRELIMINARES 880.00 -

03.01.01 LIMPIEZA DEL TERRENO 508.20 508.20 508.20 03.01.02 TRAZO Y REPLANTEO PRELIMINAR 371.80 371.80 371.80

03.02. MOVIMIENTO DE TIERRAS 5,149.33 - 03.02.01 EXCAVACION EN ROCA SUELTA 2,073.23 2,073.23 2,073.23 03.02.02 RELLENO COMPACTADO CON MATERIAL SELECCIONADO 924.20 924.20 924.20 03.02.03 ELIMINACION DE MATERIAL EXCEDENTE 2,151.90 2,151.90 2,151.90

03.03. SUB ESTRUCTURAS DE PUENTE 52,098.22 03.03.01 ENCOFRADO Y DESENCOFRADO DE ESTRIBOS 18,147.34 9,073.67 9,073.67 18,147.34 03.03.02 CONCRETO CICLOPEO f'c=175 kg/cm2 + 25% PM. 33,950.88 11,316.96 11,316.96 11,316.96 33,950.88 03.04. SUPERES ESTRUCTURA DEL PUENTE 35,619.41 -

03.04.01 LOSA Y VEREDA 26,821.99 - 03.04.01.01 CONCRETO f'c=280 kg/cm2 16,737.93 16,737.93 16,737.93 03.04.01.02 ENCOFRADO Y DESENCOFRADO (LOSA Y VEREDA) 2,351.58 2,351.58 2,351.58

03.04.01.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 EN LOSAS Y VEREDAS

7,732.48 7,732.48 7,732.48 03.04.02. VARIOS 8,797.42 -

03.04.02.01 TARRAJEO EN EXTERIORES CON MORTERO 1:5 X 1,5 CM. 1,108.20 1,108.20 1,108.20 03.04.02.02 BARANDA METALICA DE DIAM. 2" 2,346.83 2,346.83 2,346.83 03.04.02.03 JUNTAS DE DILATACION DE ACERO 841.92 841.92 841.92 03.04.02.04 ADQUISICION Y COLOCACION DE PLANCHAS DE NEOPRENO 4,217.06 4,217.06 4,217.06 03.04.02.05 DRENAJE DE DE TABLERO CON TUBERIA PVC SAP DIAME. 3" 208.62 208.62 208.62 03.04.02.06 PINTURA EN BARANDA METALICA 74.79 74.79 74.79

03.05. PROTECCION AMBIENTAL 10,000.00 - 03.05.01 MITIGACION AMBIENTAL 10,000.00 2,500.00 2,500.00 2,500.00 2,500.00 10,000.00

03.06. FLETE TERRESTRE 5,000.00 - 03.06.01 TRANSPORTE DE MATERIAL DE CONSTRUCCION 5,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 5,000.00

COSTO DIRECTO 695,412.48 100,704.35 167,916.89 242,093.97 117,591.33 81,390.51 709,697.04GASTOS GENERALES 10 % 69,541.25 10,070.44 16,791.69 24,209.40 11,759.13 8,139.05 63,872.73UTILIDAD 8% 55,633.00 8,056.35 13,433.35 19,367.52 9,407.31 6,511.24 56,775.76SUB TOTAL 820,586.73 118,831.14 198,141.92 285,670.88 138,757.77 96,040.80 837,442.51I.G.V. 18% 147,705.61 21,389.60 35,665.55 51,420.76 24,976.40 17,287.34 150,739.65PRESUPUESTO DE EJECUCION DE OBRA 968,292.34 140,220.74 233,807.47 337,091.64 163,734.17 113,328.14 988,182.16PORCENTAJE AVANCE DEL MES : 14.48% 24.15% 34.81% 16.91% 11.70% 102.05%PORCENTAJE DE AVANCE ACUMULADO 14.48% 38.63% 73.44% 90.35% 102.05% 102.05%