Diseño Mezcla Concreto Buzones Al 30-12-14

17
ENCOFRADO BUZONES AGUA PARA PRUEBAS 3.1416 D H A(m2) V(M3) D D2 1.2 1.5 5.65 0.031 0.2 0.04 1.5 4 18.85 0.196 0.5 0.25 1.5 4.5 21.21 0.031 0.2 0.04 1.2 1.5 5.65 0.031 0.2 0.04 1.2 1.5 5.65 0.031 0.2 0.04 1.2 1.5 5.65 0.031 0.2 0.04

description

Diseño Mezcla Concreto Buzones Al 30-12-14

Transcript of Diseño Mezcla Concreto Buzones Al 30-12-14

ENCOFENCOFRADO BUZONESAGUA PARA PRUEBAS3.1416DHA(m2)V(M3)DD21.21.55.650.0310.20.041.5418.850.1960.50.251.54.521.210.0310.20.041.21.55.650.0310.20.041.21.55.650.0310.20.041.21.55.650.0310.20.04

EQUIVlt/seglt/minm3/horam3/24horaspie3/seggal/minmiles de gal/horamiles de gal/24 horas140084000504012096049.43221901331.41631954318010.82590.11482.853691 Kg/cm214.2234lb/pulg21 lb/pulg20.0703067Kg/cm21m1.422lb/pulg2Kg/cm2lb/pulg2m.c.apies de aguaatmmm de Hg0.001360.019330.135960.004460.0013161114.22341032.80830.967787600.070310.70382.306650.0680451.712lt/segm3/diapie3/segpie3/mingal/minmiles de gal/dia186.40.03532.11815.8522.8BARRAS DE ACERODenominacionDiam (pulg)A (cm2)Permetro (cm)Peso (kg/m)Denominacin actual21/40.3220.25N 8 AWG33/80.7130.5841/21.2941.0255/8251.663/42.8462.2677/83.8773.07815.184.0491 1/86.4595.08101 1/48.1910.16.42111 3/810.0611.27.95Alambre negro recocido #16N16 AWGTUBERIASPulg.mmPulg.mm6160348508200369001025038950123154010001435542105035.561640044110045.721845046115020500481200225505012502460052130054837.226650541350287005614003075058145032800601500

DISEOBuzonC.TerrenoC. de FondoLongSS CalculadoTramodesdehastadesdehastadesdehasta(m)(m/km)(m/km)1-21210.04410.0489.2448.99630.9582-BE12BE110.04810.3418.9968.60959.646.5BE1-BE2BE1BE210.34110.1438.6098.41338.805.05-45410.16610.1199.3668.82177.8574-34310.11910.1888.8218.53751.605.53-BE33BE310.18810.1798.5378.29944.405.45-65610.16610.0999.3668.82177.8576-BE46BE410.09910.0998.8218.61940.505.0BuzonesC.TerrenoH (m)TRAMOLONG.110.0440.801-230.95210.0481.052-BE159.64BE110.3411.07BE1-BE238.8BE210.1431.73BE3-344.4310.1881.653-451.6410.1191.304-577.85BE310.1791.885-677.85510.1660.806-BE440.5610.0991.28BE410.0991.481.270.2830.0068523002DNDmax Buzon (m)10060Hasta DN800 -- Di=1.2015060hasta DN1200 -- Di=1.5020080250-300100>300150

EXCAVProyectoExcavacinAlturaAltura11.201.401.211.411.511.711.611.8121.401.601.221.421.521.721.611.8131.601.801.231.431.531.731.621.8241.802.001.241.441.541.741.631.8352.002.201.251.451.551.751.641.8462.202.401.261.461.561.761.651.8572.402.601.271.471.571.771.661.8682.602.801.281.481.581.781.671.8792.803.001.291.491.591.791.681.88103.003.201.301.501.601.801.691.89113.203.401.311.511.611.811.701.90123.403.601.321.521.621.821.711.91133.603.801.331.531.631.831.721.92143.804.001.341.541.641.841.741.94154.004.201.351.551.651.851.751.95164.204.401.361.561.661.861.761.96174.404.601.371.571.671.871.771.97184.604.801.381.581.681.881.781.98194.805.001.391.591.691.891.791.99205.005.201.401.601.701.901.802.002130.101.711.9137.97221.511.721.922.00231.741.94241.751.95251.761.96261.771.97271.781.98281.791.99291.802.00301.812.01311.822.02321.832.03331.842.04341.852.05351.862.06361.872.07371.882.08381.892.09391.902.10401.912.11411.922.12421.932.13431.942.14441.952.15451.962.16461.972.17471.982.18481.992.19492.002.2086.0295.821.761.96

Hoja2CANTIDAD DE MATERIALES PARA CONSTRUCCION DE BUZONESVOLUMEN DE CONCRETO (M3)CANTIDAD DE MATERIALES3.1416F'c=210 kg/cm2 Prop: 1:2.5: 2.8F'c=280 kg/cm2 Prop: 1:1 1/2: 2 1/2F'c=175 kg/cm2 Prop: 1:2: 40.20Prof. Buzn (m)Di buzn (m)Dprom (m) (Di+2e)Vol.concreto pared (m3)Volumen losa fondo e=0.20m (m3)Volumen total (m3)Cemento (Bls)Arena (m3)Piedra 3/4" (m3)Agua (m3)Cemento (Bls)Arena (m3)Piedra 3/4" (m3)Agua (m3)Cemento (Bls)Arena (m3)Piedra 3/4" (m3)Agua (m3)1.000.801.200.62830.10050.72895.990.400.440.167.660.350.590.126.190.310.830.111.201.201.601.05560.22621.281810.530.710.770.2713.470.611.030.2010.880.541.460.191.501.201.601.31950.22621.545712.690.850.930.3316.250.741.240.2513.120.661.760.221.751.201.601.53940.22621.765614.500.971.060.3818.560.841.420.2814.990.752.020.262.001.201.601.75930.22621.985516.301.091.190.4220.870.951.600.3216.860.842.270.292.251.201.601.97920.22622.205418.111.221.320.4723.181.051.770.3518.720.932.520.322.501.201.602.19910.22622.425319.921.341.450.5225.491.161.950.3920.591.032.770.352.751.201.602.41900.22622.645221.721.461.590.5627.801.272.130.4222.461.123.020.383.001.201.602.63890.22622.865123.531.581.720.6130.121.372.300.4624.321.213.270.423.251.201.602.85890.22623.085125.331.701.850.6632.431.482.480.4926.191.313.520.453.501.201.603.07880.22623.305027.141.821.980.7034.741.582.660.5328.061.403.770.483.751.501.904.00550.35344.359035.792.402.610.9345.822.083.510.7037.001.854.970.634.001.501.904.27260.35344.626037.992.552.780.9948.622.213.720.7439.271.965.280.674.501.501.904.80660.35345.160142.372.853.101.1054.242.474.150.8243.802.195.890.755.001.501.905.34070.35345.694246.763.143.421.2159.852.724.580.9148.342.416.500.835.501.802.206.91150.50897.420560.944.094.451.5878.003.555.971.1962.993.158.471.086.001.802.207.53980.50898.048866.094.444.831.7184.603.856.471.2968.333.419.191.176.501.802.208.16820.50898.677171.254.785.211.8591.204.156.981.3973.663.689.901.267.002.002.409.67610.628310.304484.625.686.182.19108.314.938.291.6587.484.3711.761.497.502.002.4010.36730.628310.995690.296.066.602.34115.575.268.841.7693.344.6612.551.598.002.002.4011.05840.628311.686895.976.447.012.49122.845.599.401.8799.214.9513.341.698.502.002.4011.74960.628312.3779101.646.827.432.64130.105.929.961.98105.085.2514.131.799.002.002.4012.44070.628313.0691107.327.217.842.78137.376.2510.512.09110.945.5414.921.899.502.002.4013.13190.628313.7602113.007.598.252.93144.636.5811.072.20116.815.8315.701.9910.002.002.4013.82300.628314.4514118.677.978.673.08151.906.9111.622.31122.686.1316.492.091.00008.210.550.600.211 bolsa de cemento es igual a 1pie3 =0.0283168466m3Factores de proporcin F'c=210Relacin agregadosFactores de proporcin F'c=175Relacin agregadoscemento52.55441.0cemento59.42391.0arena gruesa1.59421.5arena gruesa1.48372.0Piedra1.60872.5Piedra1.42664.0agua159.88agua144.89Concreto F'c=210 kg/cm21.-Requisitos:Se quiere disear una mezcla de F'c a ser empleado en el vaceado de la zapata ,losa de fondo y cpula del reservorio.2.-Anlisis en Laboratorio:Del estudio hecho por laboratorio de transportes se obtiene los siguientes resultados de los anlisis de agregados de las muestrasN1 y N4 que encajan con las especificaciones para concreto y la N3 y N 2DESCRIPCIONCEMENTOAgregado FinoAgregado GruesoAguaa.-Peso especfico3.152.702.631.00b.-Peso seco compactado (kg/m3)1,250.001,567.001,597.001,000.0026.84c.-Tamao Mximo3/4"d.-Mdulo de fuerza3.00e.-Porcentaje de absorcin1.00%2.00%f.-Contenido de humedad0.00%0.00%3.-Asentamiento.-Segn la tabla N1 y las condiciones de colocacin a ser empleados, permiten recomendar el empleo de un asentamiento de 1" -3"4.-Tamao mximo del agregado grueso.-El agregado grueso es graduado de la malla de 3/4" a la N 4 y es adecuada por lo quese considera para entrar a las tablas un tamao mximo de 3/4"5.- Contenido de aire.-Desde que la estructura a ser localizada no va a estar expuesta a condiciones de intemperismo severoa la probabilidad de ataque por sulfatos, no ser necesario incorporar aire a la mezcla.6.-Contenido de agua.-La tabla N2 nos indica que el volumen aproximado de agua de la mezcla necesario para obtener un asentamientode 1" a 3" con un concreto sin aire incorporado en el cual se va a utilizar un agregado grueso de 3/4" de tamao mximo es de 185 lts/m37.-Contenido de aire.-De acuerdo con la tabla N2 el contenido de aire que probablemente quede atrapado con la mezcla cuando secon un agregado grueso de 3/4" de tamao mximo es de 2%8.-Relacin agua cemento.-La table N3 nos indica que la relacin agua -cemento para obtener una resistencia a los 28 dias conconcreto sin aire incorporado es 0.53.9.-Factor Cemento.-Conociendo el contenido total de agua de la mezcla y la relacin agua-cemento de la misma se puede calcularel factor cemento dividiendo el primero entre el segundo.Factor cemento: 185/0.53 = 349 kg/m310.-Contenido de agregado grueso.-Para un agregadoi fino de mdulo de finura de 3.00 y un agregado grueso de tamao mximo3/4" la tabla N5 indica que puede emplearse para cada metro cbico de concreto 0.64 m3 de agregado grueso seco y compactado.Agregado grueso: 0.60*1,597=958 kg.11.-Contenido de agregado fino.-Conocidas las cantidades de cemento agua y agregado que interviene en la mezcla,el material necesario para completar el m3 consistir en agregado fino y aire atrapado.Volumen slido de cemento = 0.111m3Volumen de agua: 185/1000 = 0.185 m3Volumen de aire atrapado: 2% =0.020 m3Volmen slido de agrgado grueso: (958/(2.63*1000)) = 0.364Volumen Parcial =0.680 m3Volumen slido de agrgado fino: 1-0.68=0.32 m3Peso de agrgado fino seco: 0.320*2,700=864 kg.12.-Correccin por humedad del agregadoLos porcentajes de humedad de los agregados son:0%Los aportes de humedad sern:Agregado fino: 864*0.01=8.6 ltsAgregado grueso: 958*0.02=19.20 kg.Total: 28 lts= 8.60+19.20Agua efectiva: 185+28=213 ltsPesos estimados de materiales ya corregidos por humedad del agregado:Cemento: 349 kg349Agua efectiva: 213 lts213Agregado fino: 864 kg864Agregado grueso: 958 kg958Peso Total: 2,384 kgs./m313.-Proporciones en peso349/349 : 864/349 : 958/349 :213/349 = 1: 2.5 : 2.8: 0.61c: f:g:a14.-Peso por tanda de un saco:Cemento: 1*42.5=42.5 kg/saco42.5Agua efectiva: 0.61*42.5 =26 kg/sacoAgregado fino: 2.5*42.5=106 kg/sacoAgregado grueso: 2.8*42.5=119 kg/saco15.-Conversin a Proporcin por volumenLos pesos unitarios (de los agregados) secos son:P.U.S.F: 1567/35 = 44.77 kg/pie3P.U.S.G: 1597/35 = 45.63 kg/pie31: 2.5: 2.8: 0.61Por tanto:Cemento: 1 bls =1 pie31Agua: 2626Agregado fino: 106/44.77kg/p32.4Agregado grueso: 119/45.63kg/p32.61Nota 1p3=2 latasCemento: 1 bls=1 pie3=1.85 latas2latasAgua:26 lts26ltsArena gruesa: 2.4*2latas =4.44latasPiedra chancada =2.6*2latas =4.81latasTotal9.25latas

BUZONESCANTIDAD DE MATERIALES PARA CONSTRUCCION DE BUZONESVOLUMEN DE CONCRETO (M3)CANTIDAD DE MATERIALES3.1416F'c=210 kg/cm2 Prop: 1:2.5: 2.8F'c=280 kg/cm2 Prop: 1:1 1/2: 2 1/2F'c=175 kg/cm2 Prop: 1:2: 40.20Prof. Buzn (m)Di buzn (m)Dprom (m) (Di+2e)Vol.concreto pared (m3)Volumen losa fondo e=0.20m (m3)Volumen total (m3)Cemento (Bls)Arena (m3)Piedra 3/4" (m3)Agua (m3)Cemento (Bls)Arena (m3)Piedra 3/4" (m3)Agua (m3)Cemento (Bls)Arena (m3)Piedra 3/4" (m3)Agua (m3)1.000.801.200.62830.10050.72897.81360.42090.42860.14087.660.350.590.126.190.310.830.111.001.201.600.87960.22621.105811.85520.63860.65020.213611.620.530.890.189.390.471.260.161.201.201.601.05560.22621.281813.74120.74020.75370.247613.470.611.030.2010.880.541.460.191.501.201.601.31950.22621.545716.57030.89260.90890.298616.250.741.240.2513.120.661.760.221.751.201.601.53940.22621.765618.92791.01961.03820.341118.560.841.420.2814.990.752.020.262.001.201.601.75930.22621.985521.28551.14661.16750.383620.870.951.600.3216.860.842.270.292.251.201.601.97920.22622.205423.64301.27361.29680.426123.181.051.770.3518.720.932.520.322.501.201.602.19910.22622.425326.00061.40061.42610.468625.491.161.950.3920.591.032.770.352.751.201.602.41900.22622.645228.35821.52761.55540.511127.801.272.130.4222.461.123.020.383.001.201.602.63890.22622.865130.71571.65461.68470.553530.121.372.300.4624.321.213.270.423.251.201.602.85890.22623.085133.07331.78161.81400.596032.431.482.480.4926.191.313.520.453.501.201.603.07880.22623.305035.43091.90861.94330.638534.741.582.660.5328.061.403.770.483.751.501.904.00550.35344.359046.73032.51732.56310.842245.822.083.510.7037.001.854.970.634.001.501.904.27260.35344.626049.59312.67152.72010.893748.622.213.720.7439.271.965.280.674.501.501.904.80660.35345.160155.31862.97993.03410.996954.242.474.150.8243.802.195.890.755.001.501.905.34070.35345.694261.04413.28843.34821.100159.852.724.580.9148.342.416.500.835.501.802.206.91150.50897.420579.55104.28534.36321.433678.003.555.971.1962.993.158.471.086.001.802.207.53980.50898.048886.28694.64824.73271.555084.603.856.471.2968.333.419.191.176.501.802.208.16820.50898.677193.02285.01105.10211.676491.204.156.981.3973.663.689.901.267.002.002.409.67610.628310.3044110.46885.95086.05901.9908108.314.938.291.6587.484.3711.761.497.502.002.4010.36730.628310.9956117.87836.35006.46542.1243115.575.268.841.7693.344.6612.551.598.002.002.4011.05840.628311.6868125.28786.74916.87182.2579122.845.599.401.8799.214.9513.341.698.502.002.4011.74960.628312.3779132.69737.14827.27822.3914130.105.929.961.98105.085.2514.131.799.002.002.4012.44070.628313.0691140.10687.54747.68462.5249137.376.2510.512.09110.945.5414.921.899.502.002.4013.13190.628313.7602147.51637.94658.09102.6585144.636.5811.072.20116.815.8315.701.9910.002.002.4013.82300.628314.4514154.92588.34578.49742.7920151.906.9111.622.31122.686.1316.492.091.000010.210.550.560.181 bolsa de cemento es igual a 1pie3 =0.0283168466m3Factores de proporcin F'c=210Relacin agregadosFactores de proporcin F'c=175Relacin agregadoscemento52.55441.0cemento59.42391.0arena gruesa1.59421.5arena gruesa1.48372.0Piedra1.60872.5Piedra1.42664.0agua159.88agua144.89Concreto F'c=210 kg/cm21.-Requisitos:Se quiere disear una mezcla de F'c a ser empleado en el vaceado de la zapata ,losa de fondo y cpula del reservorio.2.-Anlisis en Laboratorio:Del estudio hecho por laboratorio de transportes se obtiene los siguientes resultados de los anlisis de agregados de las muestrasN1 y N4 que encajan con las especificaciones para concreto y la N3 y N 2DESCRIPCIONCEMENTOAgregado FinoAgregado GruesoAguaa.-Peso especfico3.152.702.631.00b.-Peso seco compactado (kg/m3)1,250.001,567.001,597.001,000.00c.-Tamao Mximo3/4"d.-Mdulo de fuerza3.00e.-Porcentaje de absorcin1.00%2.00%f.-Contenido de humedad0.00%0.00%3.-Asentamiento.-Segn la tabla N1 y las condiciones de colocacin a ser empleados, permiten recomendar el empleo de un asentamiento de 1" -3"4.-Tamao mximo del agregado grueso.-El agregado grueso es graduado de la malla de 3/4" a la N 4 y es adecuada por lo quese considera para entrar a las tablas un tamao mximo de 3/4"5.- Contenido de aire.-Desde que la estructura a ser localizada no va a estar expuesta a condiciones de intemperismo severoa la probabilidad de ataque por sulfatos, no ser necesario incorporar aire a la mezcla.6.-Contenido de agua.-La tabla N2 nos indica que el volumen aproximado de agua de la mezcla necesario para obtener un asentamientode 1" a 3" con un concreto sin aire incorporado en el cual se va a utilizar un agregado grueso de 3/4" de tamao mximo es de 185 lts/m37.-Contenido de aire.-De acuerdo con la tabla N2 el contenido de aire que probablemente quede atrapado con la mezcla cuando secon un agregado grueso de 3/4" de tamao mximo es de 2%8.-Relacin agua cemento.-La table N3 nos indica que la relacin agua -cemento para obtener una resistencia a los 28 dias conconcreto sin aire incorporado es 0.53.9.-Factor Cemento.-Conociendo el contenido total de agua de la mezcla y la relacin agua-cemento de la misma se puede calcularel factor cemento dividiendo el primero entre el segundo.Factor cemento: 185/0.53 = 349 kg/m310.-Contenido de agregado grueso.-Para un agregadoi fino de mdulo de finura de 3.00 y un agregado grueso de tamao mximo3/4" la tabla N5 indica que puede emplearse para cada metro cbico de concreto 0.64 m3 de agregado grueso seco y compactado.Agregado grueso: 0.60*1,597=958 kg.11.-Contenido de agregado fino.-Conocidas las cantidades de cemento agua y agregado que interviene en la mezcla,el material necesario para completar el m3 consistir en agregado fino y aire atrapado.Volumen slido de cemento = 0.111m3Volumen de agua: 185/1000 = 0.185 m3Volumen de aire atrapado: 2% =0.020 m3Volmen slido de agregado grueso: (958/(2.63*1000)) = 0.364Volumen Parcial =0.680 m3Volumen slido de agregado fino: 1-0.68=0.32 m3Peso de agrgado fino seco: 0.320*2,700=864 kg.12.-Correccin por humedad del agregadoLos porcentajes de humedad de los agregados son:0%Los aportes de humedad sern:Agregado fino: 864*0.01=8.6 ltsAgregado grueso: 958*0.02=19.20 kg.Total: 28 lts= 8.60+19.20Agua efectiva: 185+28=213 ltsPesos estimados de materiales ya corregidos por humedad del agregado:Cemento: 349 kg433.925Agua efectiva: 213 lts184Agregado fino: 864 kg861.85Agregado grueso: 958 kg894.32Peso Total: 2,384 kgs./m313.-Proporciones en peso349/349 : 864/349 : 958/349 :213/349 = 1: 2.5 : 2.8: 0.61c: f:g:a14.-Peso por tanda de un saco:Cemento: 1*42.5=42.5 kg/saco42.5Agua efectiva: 0.61*42.5 =26 kg/sacoAgregado fino: 2.5*42.5=106 kg/sacoAgregado grueso: 2.8*42.5=119 kg/saco15.-Conversin a Proporcin por volumenLos pesos unitarios (de los agregados) secos son:P.U.S.F: 1567/35 = 44.77 kg/pie3P.U.S.G: 1597/35 = 45.63 kg/pie31: 2.5: 2.8: 0.61Por tanto:Cemento: 1 bls =1 pie31Agua: 2626Agregado fino: 106/44.77kg/p32.4Agregado grueso: 119/45.63kg/p32.61Nota 1p3=2 latasCemento: 1 bls=1 pie3=1.85 latas2latasAgua:26 lts26ltsArena gruesa: 2.4*2latas =4.44latasPiedra chancada =2.6*2latas =4.81latasTotal9.25latasConcreto F'c=280 kg/cm21.-Requisitos:Se quiere disear una mezcla de F'c para la cuba2.-Caracteristicas de los materialesSimilara a las usadas para F'c=210 kg/cm2N1 y N4 que encajan con las especificaciones para concreto y la N3 y N 2DESCRIPCIONCEMENTOAgregado FinoAgregado GruesoAguaa.-Peso especfico3.152.702.631.00b.-Peso seco compactado (kg/m3)1,250.001,567.001,597.001,000.00c.-Tamao Mximo3/4"d.-Mdulo de fuerza3.00e.-Porcentaje de absorcin1.00%2.00%f.-Contenido de humedad0.00%0.00%3.-Asentamiento.-Segn la tabla N1 de 1" -2"4.-Tamao mximo del agregado grueso.-El agregado grueso es graduado de la malla de 3/4" a la N 4 y es adecuada por lo quese considera para entrar a las tablas un tamao mximo de 3/4"5.- Contenido de aire.-No necesita6.-Contenido de agua.-La tabla N2 nos indica que el volumen aproximado de agua de la mezcla necesario para obtener un asentamientode 1" a 3" con un concreto sin aire incorporado en el cual se va a utilizar un agregado grueso de 3/4" de tamao mximo es de 185 lts/m37.-Contenido de aire atrapado.-De acuerdo con la tabla N2 el contenido de aire que probablemente quede atrapado con la mezcla cuando secon un agregado grueso de 3/4" de tamao mximo es de 2%8.-Relacin agua cemento.-La table N3 nos indica que la relacin agua -cemento para obtener una resistencia a los 28 dias conconcreto sin aire incorporado es W/C =0.499.-Factor Cemento.-Conociendo el contenido total de agua de la mezcla y la relacin agua-cemento de la misma se puede calcularel factor cemento dividiendo el primero entre el segundo.Factor cemento: 185/0.49 =378 kg10.-Contenido de agregado grueso.-Para un agregadoi fino de mdulo de finura de 3.00 y un agregado grueso de tamao mximo3/4" la tabla N5 indica que puede emplearse para cada metro cbico de concreto 0.64 m3 de agregado grueso seco y compactado.Agregado grueso: 0.64*1,597=1022 kg.1022.08kg11.-Contenido de agregado fino.-Conocidas las cantidades de cemento agua y agregado que interviene en la mezcla,el material necesario para completar el m3 consistir en agregado fino y aire atrapado.Volumen slido de cemento = 0.120m3=378/3150Volumen de agua: 185/1000 = 0.185 m3Volumen de aire atrapado: 2% =0.020 m3Volmen slido de agrgado grueso: (1022/(2.63*1000)) = 0.389Volumen Parcial =0.714 m32630Volumen slido de agrgado fino: 1-0.714=0.286 m3Peso de agrgado fino seco: 0.286*2,700=772 kg.12.-Correccin por humedad del agregadoLos porcentajes de humedad de los agregados son:0%Los aportes de humedad sern:Agregado fino hmedo: 772 kg/m3Agregado grueso hmedo: 1,032 kg/m3Aportes de Humedad:Agregado fino: 772x0.01=7.70 lts7.72Agregado grueso: 1022x0.02=20.40 lts20.44Sub Tot=28 lts28.16Agua efectiva: 185+28=213 lts13.-Pesos estimados de materiales ya corregidos por humedad del agregado:Cemento: 378 kg378Agua efectiva: 213 lts213Agregado fino: 772 kg772Agregado grueso: 1022 kg1022Peso Total: 2,384 kgs./m3238514.-Proporciones en peso378/378 : 772/378 : 1022/349 :213/378 = 1: 2 : 2.7: 0.5615.-Peso por tanda de un saco:Cemento: 1*42.5=42.5 kg/saco42.5Agua efectiva: 0.56*42.5 =24 kg/sacoAgregado fino: 2.0*42.5=85 kg/sacoAgregado grueso: 2.7*42.5=115 kg/saco16.-Conversin a Proporcin por volumenLos pesos unitarios (de los agregados) secos son:10850P.U.S.F: 11567kg/35p3 = 44.77 kg/pie332550P.U.S.G: 1597/35 = 45.63 kg/pie31: 2.5: 2.8: 0.61Por tanto:Cemento: 1 bls =1 pie31Agua efectiva:24ltsAgregado fino: 85/44.77kg/p31.9p3Agregado grueso: 115/45.63kg/p32.5p3Nota 1p3=2 latasCemento: 1 bls=1 pie3=1.85 latas2latasAgua:26 lts26ltsArena gruesa: 2.4*2latas =4.44latasfalta acondicionarPiedra chancada =2.6*2latas =4.81latasTotal9.25latasConcreto F'c=140 kg/cm21.-Relacin Agua:Tabla N1: Por durabilidad---sin lmiteTabla N2: Para F'c=140 kg/cm2 de resistencia a la compresin por resistencia: 8.5 gls/saco2.-AsentamientoTabla N3Para zapatas 1" - 4" usaremos 4"3.-Requisitos de Agua.-Tabla N5 Piedra 1 1/2" -49 glns agua/m3 de concreto.4.-Factor Cemento.-Dividiendo 49/8.5 = 5.8 sacos/m3 de concreto5.- Relacin Agua- Cemento.-A/C = (49*3.785)/(5.8*42.5) = 0.7526.-Porcentaje de Arena.-La tabla N6 con mdulo de fineza 2.53, y factor cemento 5 sacos/m3El porcentaje de arena necesario es 44%7.-Volumenes absolutos.-Volumen absoluto cemento: (5.8*42.5)/(3.15*1000) = 0.078Volumen absoluto agua: (49*3.785)/(1000) = 0.185 ; 0.185/0.263 = 0.7038.-Pesos de los materiales.-Cemento: 5.8*42.5 =247 kgAgua: 49*3.785 = 185 ltArena: 0.324*2.65*1000 = 859 kgPiedra: 0.413*2.70*1000 =1115 kg9.-Correccin por Humedad.-Peso arena hmeda: 859*1.0033=862 kgPeso piedra hmeda: 1115*1.0025 = 1115kg10.-Mayor Cantidad de Agua.-Porcentaje agua faltante en arena =0.66-0.33 = 0.33%Porcentaje agua faltante en piedra = 1.00-0.25 = 0.75%Agua necesaria en arena: 8.62*0.0033 =3 ltsAgua necesaria en piedra: 1118*0.0075 =9 ltsAgua necesaria en agregados: 3+9 = 12 ltsCantidad real de agua = 185+12 = 197 lts11.-Pesos finales-Cemento = 247 kg247kg6blsAgua = 197 lts197ltsArena = 862 kg862kgPiedra = 1118 kg1118kgTotal2424kg/m3Referencia: Recomendaciones del Comit 613-ACI-54

CANTUNITPARA PRUEBAS HIDRAULICASAGUA POTABLE3.1416DESCRIPCIONDNA(m2)V(m3)/mlTuberia500.00200.0020630.00310.0031750.00440.0044900.00640.00641100.00950.00951600.02010.02012000.03140.03142500.04910.04913150.07790.07793550.09900.09904000.12570.12574500.15900.15905000.19640.19645500.23760.23766000.28270.28277000.38480.38487500.44180.44188000.50270.50279000.63620.636210000.78540.785412001.13101.131013001.32731.3273