PRESUPUESTO GENERAL ITEM DESCRIPCION UNID CANT. PRECIO UNITARIO 1 REPLANTEO Y TRAZADO GLB 1 498.91 2 EXCAVACION M3 45 59.53 MAQUINARIA HR 3 CIMIENTO H C R=180 M3 5.4 532.51 PIEDRA (P/3 Y 4) M3 8 100 CEMENTON rc=150 kg/m3 BOLZAS 16.2 ARENA ra=0.2m3/m3H M3 1.08 GRAVA rg=0.4 m3/m3H M3 2.16 AGUA ra=170 L/m3 LT 918 CLAVOS rc=0.2 kg/m3 KG 1.08 ALAMBRE rc=0.2 kg/ m3 KG 1.08 4 GRADERIAS DE H C R=180 M3 5.67 831.3 CEMENTON rc=150 kg/m3 BOLZAS 17.01 ARENA ra=0.2m3/m3H M3 1.134 GRAVA rg=0.4 m3/m3H M3 2.268 AGUA LT 963.9 CLAVOS rc=0.2 kg/m3 KG 1.134 ALAMBRE rc=0.2 kg/ m3 KG 1.134 MADERA PIE2 113.4 5 HORMIGON ARMADO R=210 M3 7.29 3527.4 CEMENTO rc=330 kg/m3 BOLZAS 48.114 ARENA ra=0.4m3/m3H M3 2.916 GRAVA rg=0.9 m3/m3H M3 6.561 AGUA LT 1239.3 CLAVOS rc=1 kg/m3 KG 7.29 ALAMBRE rc=1 kg/ m3 KG 7.29 MADERA rm=40 pie2/m3 PIE2 291.6 FIERRO 8MM TN 0.5 6 LIMPIEZA GENERAL GLB 1 544.76 COSTO TOTAL CONST. INFRAESTRUCTURA DEPORTIVA DISTRITO D 3 (GRADERIAS CANCHA MULTIPLE DE ANDALUCIA)

description

gradas

Transcript of GRADAS

Hoja1PRESUPUESTO GENERALCONST. INFRAESTRUCTURA DEPORTIVA DISTRITO D 3 (GRADERIAS CANCHA MULTIPLE OTB COLINAS DE ANDALUCIA)

ITEMDESCRIPCIONUNIDCANT.PRECIO UNITARIOTOTALITEMDESCRIPCIONUNIDCANTPRECIOTOTAL1REPLANTEO Y TRAZADOGLB1498.91498.911REPLATEOGLB1498.91498.912EXCAVACIONM34559.532678.852EXCAVACIONM34559.532678.85MAQUINARIAHR3CIMIENTOSM35.4532.512875.5543CIMIENTO H C R=180 M35.4532.512875.5544GRADERIASM35.67831.34713.471PIEDRA (P/3 Y 4)M381005HORMIGON ARMADOM37.293527.425714.746CEMENTON rc=150 kg/m3BOLZAS16.26LIMPIEZAGLB1544.75544.75ARENA ra=0.2m3/m3HM31.08TOTAL37026.281GRAVA rg=0.4 m3/m3HM32.16AGUA ra=170 L/m3LT918CLAVOS rc=0.2 kg/m3KG1.08ALAMBRE rc=0.2 kg/ m3KG1.084GRADERIAS DE H C R=180 M35.67831.34713.471NMADERACANTCANT UNITTOTALCEMENTON rc=150 kg/m3BOLZAS17.01G2.15*0.3*0.025TABLAS DE 2.1061060ARENA ra=0.2m3/m3HM31.13414 M (0.15*3.0*0.025)TABLAS DE 3.061060GRAVA rg=0.4 m3/m3HM32.268PAGUALT963.91.8 (0.3TABLA DE 0.32CLAVOS rc=0.2 kg/m3KG1.1341.22ALAMBRE rc=0.2 kg/ m3KG1.1340.62MADERAPIE2113.45HORMIGON ARMADO R=210 M37.293527.425714.746CEMENTO rc=330 kg/m3BOLZAS48.114ARENA ra=0.4m3/m3HM32.916GRAVA rg=0.9 m3/m3HM36.561AGUALT1239.3CLAVOS rc=1 kg/m3KG7.29ALAMBRE rc=1 kg/ m3KG7.29MADERA rm=40 pie2/m3PIE2291.6FIERRO 8MMTN0.56LIMPIEZA GENERALGLB1544.76544.76COSTO TOTAL37026.291

CONST. INFRAESTRUCTURA DEPORTIVA DISTRITO D 3 (GRADERIAS CANCHA MULTIPLE OTB COLINAS DE ANDALUCIA)

RESUMEN MATERIALESITEMDESCRIPCIONUNIDTOTALPRECIOS UNITARIOTOTAL1CEMENTOBOLZAS81.324554472.822GRAVAM310.9891201318.683ARENAM35.13130666.94AGUAL3121.20.07218.4845CLAVOSKG9.50413123.5526ALAMBREKG9.50413123.5527MADERAPIE2405832408FIERROTN0.584004200TOTAL14363.988

Hoja2S1ITEMDESCRIPCIONUNIDLMMJVSREPLANTEO Y TRAZADOGLBEXCAVACIONM3CIMIENTO H C R=180 M3GRADERIAS DE H C R=180 M3HORMIGON ARMADO R=210 M3LIMPIEZA GENERALGLB