Horario Actividads Iss
Transcript of Horario Actividads Iss
-
7/31/2019 Horario Actividads Iss
1/3
Page 1 of 3
Radiogram No. 8784u Form 24 for 03/26/2012
ATV RENDEZVOUS AND DOCKING OBT
GMT CREW ACTIVITY
06:00-06:10CDR,FE-4,FE-5,FE-6
Morning Inspection
06:00-06:10 FE-1 Morning Inspection. SM [Caution & Warning Panel] Test
06:00-06:10 FE-2Morning Inspection. Inspection of - connector on -separator pump behind panel 139.
06:10-06:40 . Post-sleep
06:40-07:30FE-1,FE-2,FE-4,FE-5,FE-6
BREAKFAST
06:40-07:20 CDR BREAKFAST
07:20-07:50 CDR Ultrasound 2 Hardware Setup
07:30-07:50FE-2,FE-4,FE-5,FE-6
Work Prep
07:30-07:40FE-1
Work Prep07:40-07:50 FE-1 BAR TTM Charge Start
07:50-08:15 . Daily Planning Conference (S-band)
08:15-08:35 CDR Acoustic Dosimeters Hardware Setup
08:15-09:05 FE-5 EMCS Water Reservoir Replacement
08:15-10:15 FE-4 BAR Experiment Ops (A). Tagup (S-band)
08:15-08:25 FE-6 Work Prep
08:20-11:20 FE-1,FE-2 Symbolic Activity. Shilovs Paintings Ops
08:25-08:55 FE-6 BCR/RFID Reader Software Installation
08:35-08:55 CDR Work Prep
08:55-09:20 CDR Integrated Cardiovascular Echo Ultrasound Pre-Scan
09:05-09:15 FE-5 EMCS Switch Configuration
09:15-10:15 FE-5 Physical Exercise (T2)
09:20-10:20 CDR ICV Echo Scan
09:25-10:15 FE-6 ICV - Echo Scanning Assistance
10:15-11:15 FE-4,FE-5 ATV Rendezvous and Docking OBT. Tagup (S-band)
10:15-11:45 FE-6 Physical Exercise (ARED)
10:20-10:30 CDR Ultrasound 2 Data Transfer
10:50-11:35 CDR VI Scanning Ops
11:15-12:15 FE-5 Crew Quarters (CQ) Battery Changeout
11:20-12:20 FE-1 Physical Exercise (VELO), Day 3
11:30-13:00 FE-2 Physical Exercise (TVIS), Day 3
11:35-11:50 CDR Ultrasound 2 Equipment Deactivation and Stowage
11:45-11:55 FE-6 WRS Water Sample Analysis
11:45-13:00 FE-4 Physical Exercise (ARED)
11:50-12:35 CDR HRCS - gathering items to support cable routing and UBNT installation
12:10-12:40 FE-6 BASS Procedure Review
12:15-12:45 FE-5 ATV3 Transfer List Review
12:20-13:00 FE-1 Maintenance
-
7/31/2019 Horario Actividads Iss
2/3
Page 2 of 3
12:35-13:25 CDR ICV Monitoring Prep
12:40-12:55 FE-6 BASS Payload Crew Conference
12:55-13:05 FE-6 Glove Box (MSG) Activation
13:00-14:00FE-1,FE-2,FE-4,FE-5
LUNCH
13:05-14:05 FE-6 LUNCH
13:25-14:25 CDR LUNCH
14:00-16:00 FE-1,FE-2 BAR Experiment Ops. Tagup (S-band)
14:05-14:15 FE-6 BASS Video Camera Setup
14:05-14:20 FE-4,FE-5 ATV Rendezvous and Docking OBT Crew Conference. Tagup (S-band)
14:15-14:25 FE-6 TOCA 2 Data Recording
14:20-17:20 FE-4 325 #1459761746 R&R. Tagup (S-band)
14:25-14:55FE-5,FE-6,CDR
ATV3 Transfer Conference
14:55-15:20 CDR Gather items required for AL Filter R&R
14:55-16:15 FE-6 SLICE/BASS Experiment Operations15:00-15:15 FE-5 Crew Discretionary Conference
15:20-15:45 CDR Airlock (A/L) Filter Remove and Replace (R&R)
15:20-15:50 FE-5 ISSAC Software Upgrade
15:45-17:15 CDR Physical Exercise (ARED)
15:50-17:20 FE-5 PMM cleanup for unpacking ATV3 items
16:00-17:00 FE-2 Video Footage For Carousel Channel
16:00-16:20 FE-1 -4 data readout
16:15-17:15 FE-6 BASS Soot Removal
16:20-17:50 FE-1 Physical Exercise (TVIS), Day 3
17:00-18:00 FE-2 Physical Exercise (VELO), Day 317:15-18:15 CDR Physical Exercise (CEVIS)
17:15-18:15 FE-6 Physical Exercise (T2)
17:30-17:40 FE-5 Glove Box (MSG) Powerdown
17:30-18:45 FE-4 Physical Exercise (TVIS), Day 3
17:40-19:10 FE-5 Physical Exercise (ARED)
17:50-18:20 FE-1 Auxiliary Laptop Anti-Virus Update
18:00-18:30 FE-2 SEINER Ocean Observations
18:15-18:35 FE-6 PI SPRINT Private Crew Conference
18:20-19:10 CDR,FE-1 Evening Work Prep
18:30-19:10 FE-2 Evening Work Prep
18:40-19:10 FE-6 Evening Work Prep
18:45-19:10 FE-4 Evening Work Prep
19:10-19:35 . Daily Planning Conference (S-band)
19:35-21:30FE-1,FE-2,FE-5,FE-6
Pre-sleep
19:35-21:20 FE-4 Pre-sleep
19:35-19:40 CDR P/TV Playback Start
19:40-21:25 CDR Pre-sleep
-
7/31/2019 Horario Actividads Iss
3/3
Page 3 of 3
21:20-21:30 FE-4-1 [Geophysical Studies]. Relaksatsiya Experiment BatteryCharging
21:25-21:30 CDR P/TV Playback Stop
21:30-06:00 . SLEEP
Task List
FE-1,FE-2,
FE-4
Preparation of reports for Roskosmos site
URAGAN. Observations and Photography
ECON. Observations and Photography
FE-1 IMS Update
Notes:1. SM Window #9 shutter opening is at crew discretion w/ Report to MCC2. See OSTP for references to US activities3. Pre-sleep ops: daily food prep, dinner, pre-sleepEnd of Radiogram