1Pgina :S10
Precios y cantidades de recursos requeridos por tipo
Obra MEJORAMIENTO DEL SERVICIO DE LA SUB GERENCIA DE TRANSPORTE PUBLICO Y
TRANSITO DE LA MPT - TACNA
0104001
Subpresupuesto 004 COSTOS DE MANTENIMIENTO PERIODICO ALT 01
23/03/2012Fecha
TACNA - TACNA - TACNALugar 230101
Cdigo CantidadUnidadRecurso Parcial S/.Precio S/.
MANO DE OBRA
12.7560 182.0314.27CAPATAZ0101010002 hh131.1120 1,645.4612.55OPERARIO0101010003 hh
1.7780 19.9311.21OFICIAL0101010004 hh
118.2220 1,212.9610.26PEON0101010005 hh
3,060.38
MATERIALES
69.4400 312.484.50TUBERIA PVC SAP PRESION PARA AGUA C-10 R. 1/2"0206010002 m
36.8000 139.843.80TUBERIA PVC SAP PRESION PARA AGUA C-10 R. 3/4"0206010003 m
110.7200 287.872.60CODO PVC SAP PARA AGUA CON ROSCA DE 3/4" X 900206020004 und
1.5000 52.5035.00PIEDRA CHANCADA 1/2"02070100010002 m3
0.2600 9.1035.00CONFITILLO0207010008 m3
0.1900 7.6040.00ARENA FINA02070200010001 m3
1.0000 35.0035.00ARENA GRUESA02070200010002 m3
1.9400 9.705.00AGUA PUESTA EN OBRA0207070001 m3
180.0000 324.001.80CABLE TW # 14 AWG 2.5 mm20208010002 m
20.0000 70.003.50INTERRUPTORES DE COMMUTACION0208010003 und20.0000 36.001.80CAJA RECTANGULAR GALVANIZADA LIVIANA DE 4" X 2 1/8"0208010004 und
30.0000 105.003.50TUBO PVC SEL ESPIGA CAMPANA 3/4" X 3.00 m0208010006 pza
60.0000 90.001.50CURVA PVC SEL 3/4"0208010007 pza
60.0000 534.008.90CONEXION A CAJA PVC SAP 3/4"0208010013 pza
16.0000 360.0022.50CEMENTO PORTLAND TIPO I (42.5 kg)0213010001 bol
0.6400 72.32113.00PEGAMENTO PARA PVC0222080012 gal
87.5000 1,400.0016.00PEGAMENTO EN POLVO PARA CERAMICO x 25kG0225060012 bol
100.0000 420.004.20FRAGUA DE COLOR P/CERAMICO0225060013 kg
25.0000 167.506.70CRUCETA PARA CERAMICO DE 3MM0225060014 cto
262.5000 10,500.0040.00PORCELANATO 50x50 CM0225090001 m2
1.2000 5.524.60REGLA DE MADERA0231010003 p2
0.8000 9.4111.76ESPONJA 1"0240180010 pln
2.0000 1.700.85CINTA AISLANTE0241020001 rll
20.0000 36.001.80CAJA OCTOGONAL FIERRO GALVANIZADO 4" X 2 1/8"02680100010004 und
14,985.54EQUIPOS
104.54HERRAMIENTAS MANUALES0301010006 %mo
1.7780 30.2317.00MEZCLADORA DE CONCRETO0301290003 hm
134.77
Total S/. 18,180.69
25/07/2012 11:41:16a.m.Fecha :