7/26/2019 Memorias Jorge Arturo Vergar Enero 2014 http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 1/66 DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELIS SANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD Calle 10 B N° 88 A  – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular 3182096245 [email protected]  – Bogotá D.C - Colombia MEMORIA DE CALCULOS ESTUDIO ESTRUCTURAL ANALISIS Y DISEÑO PROYECTO CONTRUCCION EDIFICACION JORGE ARTURO VERGARA ALFONSO SANTA ROSA DEL SUR, BOLIVAR Calculo Ing. JAIR PINEDA CELIS ENERO 2014 BOGOTA D.C

Transcript of Memorias Jorge Arturo Vergar Enero 2014

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 1/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

MEMORIA DE CALCULOS

ESTUDIO ESTRUCTURAL

ANALISIS Y DISEÑO

PROYECTO

CONTRUCCION EDIFICACION JORGE ARTURO VERGARA ALFONSO

SANTA ROSA DEL SUR, BOLIVAR

Calculo

Ing. JAIR PINEDA CELIS

ENERO 2014

BOGOTA D.C

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 2/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

NOMBRE DEL PROYECTO HOTEL JORGE ARTUTO VERGARA

DIRECCION CARRERA 13 N° 11 -56 BARRIO CENTRO

USO VIVIENDA COMERCIAL

PROPIETARIO HOTEL JORGE ARTUTO VERGARA

NUMERO DE NIVELES : Tres Pisos

 AREA DE CONSTRUCCION : 900 metros cuadrados ( aproximadamente)

SISTEMA DE CALCULO : SISMICO : Fuerza Horizontal Equivalente

: ESTRUCTURAL : Elementos finitos Etabs V.8

INGENIERO CALCULISTA : JAIR PINEDA CELIS

MATRICULA : 60202-106123 STD

NORMA : NSR - 10 ( Norma Colombiana)

ESPECIFICACIONES : CONCRETO :f̀ c = 21 Mpa ( Cimientos,placas, vigas)

f`c = 21 Mpa ( Columnas)

: ACERO :f̀ y = 420 Mpa>= Nº4 o mayor  

f`y = 240 Mpa = Nº2 o Nº 3

SISTEMA ESTRUCTURAL : Porticos en concreto reforzado

MATERIAL ESTRUCTURAL : Concreto reforzado

DISIPACION DE ENERGIA : Moderada ( DMO)

CONSTRUCCION CUBIERTA : Placa teja eternit

PORTICO : En concreto reforzado

CIMENTACION

GRADO DE IRREGULARIDAD DE LA ESTRUCTURA

5,0

1,0

0,9

B

1,0

I

Intermedia

F.H.E.

TIPO DE PERFIL DE SUELO

COEFICCINETE DE SITIO (S)

GRUPO DE USO

ZONA DE AMENAZA SISMICA

PROCEDIMIENTO DE ANALISIS SISMICO

MEMORIAS DE DISEÑO ESTRUCTURAL

: Zapatas aisladas con viga de cimentacion

COEFICIENTE DE CAPACIDAD DE DISIPACION DE ENERGIA (Ro)

IRREGULARIDAD EN PLANTA (

IRREGULARIDAD EN ALTURa (

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 3/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

Gravedad (m / s2 ) 9,8066

0,05

0,35 0,28

0,60 0,10 0,60

PESO DE LA PLACA ALIGERADA ( en kgf / m2

) DENSIDAD DE LO MATERIALES ( en kgf / m3 )

( No incluye acabados ni muros divisorios )

Loseta Superior 120 Concreto reforzado 244,73 2.400

Loseta Inferior 48 Concreto simple 244,73 2.400

Mortero de pega 244,73 2.400

Casetón 21,0

189,0000

PESO DE LA PLACA 189 kgf / m2

Weight per unit Volume (kgf /m)

0,02

CORTE TIPICO DE LA PLACA ALIGERADA DE ENTREPISO( No se indica el refuerzo )

168,000000000000

Nivel 0,00 +9,20

Nº Area Peso Longitud Base Ancho Altura Densidad W

m2 kgf/m2m b (m) a (m) h (m) kgf/m3

kgf 

Placa de entrepiso 300,00 189 56700,000

 Acabados 300,00 80 24000,000

 Acabados 0,000

Muros Divisorios 0,00 0,15 2,60 1300,00 0,000

Muros de Fachada 0,00 0,15 2,60 1300,00 0,000

Casetón 300,00 21,00 6300,000

VG20x30 2400 83,70 0,20 0,30 12052,800

VG30x30 2400 78,40 0,30 0,30 16934,400

VTA10x28 10 2400 18,44 0,10 0,28 12391,68

BORDE 15X30 1 2400 18,44 0,15 0,30 1991,520

COL20X45 16 2400 0,20 0,45 2,95 10195,200

COL20X35 4 2400 0,20 0,35 2,95 1982,400

,

TOTAL (kgf / m)

PESO TOTAL DE LA CUBIERTA

  42 548

Descripción

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 4/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

Nivel 0,00 + 6,30

Nº Area Peso Longitud Base Ancho Altura Densidad W

m2 kgf/m2m b (m) a (m) h (m) kgf/m3

kgf 

Placa de entrepiso 300,00 189,00 56700,00

 Acabados 300,00 80,00 0,03 720,00

0,00

Muros Divisorios 52,78 0,15 2,60 1300 26759,46

Muros de Fachada 75,40 0,15 2,60 1300 38227,80

Casetón 300,00 21,00 6300,00

VG20x35 2400 83,70 0,20 0,35 14061,60

VG30x35 2400 78,40 0,30 0,35 19756,80

VTA10x28 10 2400 18,44 0,10 0,33 14604,48

BORDE 15X35 1 2400 18,44 0,15 0,35 2323,44

V ESC 20X35 1 2400 23,50 0,20 0,35 3948,00

COL20X45 12 2400 0,20 0,45 2,95 7646,40

COL20X35 4 2400 0,30 0,35 2,95 2973,60

TOTAL (kgf / m)

PESO TOTAL DEL TERCER PISO

Descripción

194 22

Nivel 0,00 + 3,30

Nº Area Peso Longitud Base Ancho Altura Densidad W

m2

kgf/m2

m b (m) a (m) h (m) kgf/m3

kgf 

Placa de entrepiso 300,00 189,00 56700,00

 Acabados 300,00 80,00 0,03 720,00

0,00

Muros Divisorios 52,78 0,15 2,60 1300 26759,46

Muros de Fachada 75,40 0,15 2,60 1300 38227,80

Casetón 300,00 21,00 6300,00

VG20X35 2400 83,70 0,20 0,35 14061,60

VG30X35 2400 78,40 0,30 0,35 19756,80

VTA10x33 10 2400 18,44 0,10 0,33 14604,48

BORDE 15X35 1 2400 18,44 0,15 0,35 2323,44

V ESC 20X35 1 2400 23,50 0,20 0,35 3948,00

COL20X45 12 2400 0,20 0,45 3,30 8553,60

COL20X35 4 2400 0,30 0,35 3,30 3326,40

TOTAL (kgf / m)

PESO TOTAL DEL SEGUNDO PISO

Descripción

195 282

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 5/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

########

CUBIERTA 136.459,20 #¡REF! PISO 3 162.306,75 CUBIERTA 136.459,20

Teja Eternit 56.700,00 Placa de Entrepiso 56.700,00 Dead 353,86 kgf/m2

Muros 0,00 Muros 32.493,63 CM 101,00 kgf/m2

Casetón 6.300,00 Casetón 6.300,00 CV 180,00 kgf/m2

Impermeabilizacion 24.000,00  Acabados de piso 720,00Vigas 43.370,40 Vigas 54.694,32 PISO 2 162.306,75Columnas 6.088,80 Columnas 11.398,80 Dead 409,31 kgf/m2

Escalera Escalera CM 131,71 kgf/m2

CV 500,00 kgf/m2

PISO 2 70.436,94

Placa de Entrepiso 18.085,38 PISO 3 162.306,75Muros 17.358,67 Dead 409,31 kgf/m2

Casetón 2.301,78 CM 131,71 kgf/m2

 Acabados de piso 225,48 CV 500,00 kgf/m2

Vigas 23.800,44

Columnas 8.665,20

Escalera

298.765,95 kgf 

336.569,58 kgf 

PESO TOTAL DE EDIFICIOPESO TOTAL DE EDIFICIO PARA ETABS CARGAS APLICADAS EN LA

PLACA kg/m2

PESO TOTAL DE EDIFICIO PARA ETABS

PESO TOTAL DE EDIFICIO

Aa S I hn Ct

0,150 1,00 1,10 9,20 0,047

TC TL Ta = 0,248

0,48 2,40 Sa = 0,413

ESPECTRO DE DISE O

V = Sa * g * M = Sa * W

CORTANTE SISMICO EN LA BASE

0,0

0,1

0,1

0,2

0,2

0,3

0,3

0,4

0,4

0,5

0 1 2 3 4 5 6 7 8

     S    a     (    g     )

T (s) 

ESPECTRO ELASTICO DE DISEÑO

Series1

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 6/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

DATOS ENTRADA:

ETABS v9.7.0 File:DISEÑO JORGE ARTURO VERGARA PLACA DISEÑO Units:Kgf-m enero 21, 20140:18 PAGE 1

M A T E R I A L P R O P E R T Y D A T A

MATERIAL MATERIAL DESIGN MATERIAL MODULUS OF POISSON'S THERMALSHEARNAME TYPE TYPE DIR/PLANE ELASTICITY RATIO COEFFMODULUS

STEEL Iso Steel All 2,039E+10 0,3000 1,1700E-057841930445CONC3000PSI Iso Concrete All 1811430000,0 0,2000 9,9000E-06754762500,0OTHER Iso None All 2,039E+10 0,3000 1,1700E-057841930445

M A T E R I A L P R O P E R T Y M A S S A N D W E I G H T

MATERIAL MASS PER WEIGHT PERNAME UNIT VOL UNIT VOL

STEEL 7,9814E+02 7,8334E+03CONC3000PSI 2,4470E+02 2,4000E+03OTHER 7,9814E+02 7,8334E+03

M A T E R I A L D E S I G N D A T A F O R S T E E L M A T E R I A L S

MATERIAL STEEL STEEL STEELNAME FY FU COST ($)

STEEL 35153481,31 45699525,70 27679906,54

M A T E R I A L D E S I G N D A T A F O R C O N C R E T E M A T E R I A L S

DISEÑO SISMICO DE EDIFICIOSFUERZA HORIZONTAL EQUIVALENTE: según NSR-10

VIVIENDA HOTEL HUMBERTO TC TL F´c

0,480 2,4 210

ZONA DE AMENAZA SISMICA INTERMEDIAALTURA DEL EDIFICIO 9,20 Ta K Sa

ACELERACION PICO EFECTIVA Aa 0,15 0,423 1,000 0,413

COEFICIENTE DE IMPORTANCIA I 1,10

COEFICIENTE DE SITIO S 1,00 Vs

R 4,5 152.296,19

NIVEL AREA Hi Hi^k Wi Wi*Hi^k sum Cv Fi Vi

m^2 m m (WihI^k)

CUBIERTA 300,00 9,20 9,20 136.459,20 1.255.424,64 1.255.424,64 0,506 77.026,23 77.026,23

PISO 3 300,00 6,30 6,30 162.306,75 1.022.532,53 2.277.957,17 0,412 62.737,20 139.763,44

PISO 2 300,00 3,30 2,90 70.436,94 204.267,11 2.482.224,28 0,082 12.532,75 152.296,19

900,00 369.202,89 2.482.224,28

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 7/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

MATERIAL LIGHTWEIGHT CONCRETE REBAR REBAR LIGHTWTNAME CONCRETE FC FY FYS REDUC FACT

CONC3000PSI No 2100000,000 42000000,0024000000,000 N/A

ETABS v9.7.0 File:DISEÑO JORGE ARTURO VERGARA PLACA DISEÑO Units:Kgf-m enero 21, 20140:18 PAGE 2

F R A M E S E C T I O N P R O P E R T Y D A T A

MATERIAL SECTION SHAPE NAME OR NAME CONCCONCFRAME SECTION NAME NAME IN SECTION DATABASE FILE COLBEAM

ConcCol CONC3000PSI Rectangular YesConcBm CONC3000PSI RectangularYesCOL20X45 CONC3000PSI Rectangular YesVCUB20X30 CONC3000PSI RectangularYesVCUB30X30 CONC3000PSI RectangularYesVIG20X35 CONC3000PSI Rectangular

YesVIG30X35 CONC3000PSI RectangularYesVIGBORDE15X30 CONC3000PSI RectangularYesVIGBORDE15X35 CONC3000PSI RectangularYesVIGESC20X30 CONC3000PSI RectangularYesVESC20X35 CONC3000PSI RectangularYesVTA10X33 CONC3000PSI RectangularYesCOL20X45-2 CONC3000PSI Rectangular YesVTA10X28 CONC3000PSI RectangularYes

F R A M E S E C T I O N P R O P E R T Y D A T A

SECTION FLANGE FLANGE WEBFLANGE FLANGEFRAME SECTION NAME DEPTH WIDTH TOP THICK TOP THICK WIDTHBOT THICK BOT

ConcCol 0,4572 0,4572 0,0000 0,00000,0000 0,0000ConcBm 0,4572 0,3048 0,0000 0,00000,0000 0,0000COL20X45 0,4500 0,2000 0,0000 0,00000,0000 0,0000VCUB20X30 0,3000 0,2000 0,0000 0,00000,0000 0,0000VCUB30X30 0,3000 0,3000 0,0000 0,0000

0,0000 0,0000VIG20X35 0,3500 0,2000 0,0000 0,00000,0000 0,0000VIG30X35 0,3500 0,3000 0,0000 0,00000,0000 0,0000VIGBORDE15X30 0,3000 0,1500 0,0000 0,00000,0000 0,0000VIGBORDE15X35 0,3500 0,1500 0,0000 0,00000,0000 0,0000VIGESC20X30 0,3000 0,2000 0,0000 0,00000,0000 0,0000

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 8/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

VESC20X35 0,3500 0,2000 0,0000 0,00000,0000 0,0000VTA10X33 0,3300 0,1000 0,0000 0,00000,0000 0,0000COL20X45-2 0,4500 0,2500 0,0000 0,00000,0000 0,0000VTA10X28 0,2800 0,1000 0,0000 0,00000,0000 0,0000

F R A M E S E C T I O N P R O P E R T Y D A T A

SECTION TORSIONAL MOMENTS OF INERTIASHEAR AREASFRAME SECTION NAME AREA CONSTANT I33 I22A2 A3

ConcCol 0,2090 0,0062 0,0036 0,00360,1742 0,1742ConcBm 0,1394 0,0025 0,0024 0,00110,1161 0,1161COL20X45 0,0900 0,0009 0,0015 0,00030,0750 0,0750VCUB20X30 0,0600 0,0005 0,0005 0,00020,0500 0,0500

VCUB30X30 0,0900 0,0011 0,0007 0,00070,0750 0,0750VIG20X35 0,0700 0,0006 0,0007 0,00020,0583 0,0583VIG30X35 0,1050 0,0015 0,0011 0,00080,0875 0,0875VIGBORDE15X30 0,0450 0,0002 0,0003 0,00010,0375 0,0375VIGBORDE15X35 0,0525 0,0003 0,0005 0,00010,0438 0,0438VIGESC20X30 0,0600 0,0005 0,0005 0,00020,0500 0,0500VESC20X35 0,0700 0,0006 0,0007 0,00020,0583 0,0583VTA10X33 0,0330 0,0001 0,0003 0,00000,0275 0,0275COL20X45-2 0,1125 0,0015 0,0019 0,0006

0,0938 0,0938VTA10X28 0,0280 0,0001 0,0002 0,00000,0233 0,0233

F R A M E S E C T I O N P R O P E R T Y D A T A

SECTION MODULI PLASTIC MODULIRADIUS OF GYRATIONFRAME SECTION NAME S33 S22 Z33 Z22R33 R22

ConcCol 0,0159 0,0159 0,0239 0,02390,1320 0,1320ConcBm 0,0106 0,0071 0,0159 0,01060,1320 0,0880COL20X45 0,0068 0,0030 0,0101 0,0045

0,1299 0,0577VCUB20X30 0,0030 0,0020 0,0045 0,00300,0866 0,0577VCUB30X30 0,0045 0,0045 0,0068 0,00680,0866 0,0866VIG20X35 0,0041 0,0023 0,0061 0,00350,1010 0,0577VIG30X35 0,0061 0,0053 0,0092 0,00790,1010 0,0866VIGBORDE15X30 0,0023 0,0011 0,0034 0,00170,0866 0,0433

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 9/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

VIGBORDE15X35 0,0031 0,0013 0,0046 0,00200,1010 0,0433VIGESC20X30 0,0030 0,0020 0,0045 0,00300,0866 0,0577VESC20X35 0,0041 0,0023 0,0061 0,00350,1010 0,0577VTA10X33 0,0018 0,0006 0,0027 0,00080,0953 0,0289COL20X45-2 0,0084 0,0047 0,0127 0,00700,1299 0,0722VTA10X28 0,0013 0,0005 0,0020 0,00070,0808 0,0289

F R A M E S E C T I O N W E I G H T S A N D M A S S E S

TOTAL TOTALFRAME SECTION NAME WEIGHT MASS

ConcCol 0,0000 0,0000ConcBm 11879,6975 1211,2342COL20X45 28339,2000 2889,4176VCUB20X30 10517,0400 1072,2999VCUB30X30 15949,4400 1626,1783VIG20X35 25268,0400 2576,2872

VIG30X35 37215,3600 3794,4161VIGBORDE15X30 1045,4400 106,5913VIGBORDE15X35 3948,8400 402,6171VIGESC20X30 3332,1600 339,7415VESC20X35 5204,6400 530,6564VTA10X33 60679,0800 6186,7379COL20X45-2 17712,0000 1805,8860VTA10X28 24646,2720 2512,8928

C O N C R E T E C O L U M N D A T A

REINF CONFIGURATION REINF NUM BARS NUMBARS BARFRAME SECTION NAME LONGIT LATERAL SIZE/TYPE 3DIR/2DIRCIRCULAR COVER

ConcCol Rectangular Ties #9/Design 3/3N/A 0,0457COL20X45 Rectangular Ties #5/Design 2/4N/A 0,0400COL20X45-2 Rectangular Ties #5/Design 2/5N/A 0,0400

C O N C R E T E B E A M D A T A

TOP BOT TOP LEFT TOP RIGHT BOTLEFT BOT RIGHTFRAME SECTION NAME COVER COVER AREA AREAAREA AREA

ConcBm 0,0457 0,0457 0,000 0,0000,000 0,000VCUB20X30 0,0300 0,0300 0,000 0,0000,000 0,000VCUB30X30 0,0300 0,0300 0,000 0,0000,000 0,000VIG20X35 0,0350 0,0350 0,000 0,0000,000 0,000VIG30X35 0,0350 0,0350 0,000 0,0000,000 0,000VIGBORDE15X30 0,0300 0,0300 0,000 0,0000,000 0,000

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 10/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

VIGBORDE15X35 0,0350 0,0350 0,000 0,0000,000 0,000VIGESC20X30 0,0300 0,0300 0,000 0,0000,000 0,000VESC20X35 0,0350 0,0350 0,000 0,0000,000 0,000VTA10X33 0,0330 0,0330 0,000 0,0000,000 0,000VTA10X28 0,0280 0,0280 0,000 0,0000,000 0,000

ETABS v9.7.0 File:DISEÑO JORGE ARTURO VERGARA PLACA DISEÑO Units:Kgf-m enero 21, 20140:18 PAGE 3

S T A T I C L O A D C A S E S

STATIC CASE AUTO LAT SELF WT NOTIONAL NOTIONALCASE TYPE LOAD MULTIPLIER FACTOR DIRECTION

DEAD DEAD N/A 1,0000LIVE LIVE N/A 0,0000MUERTA SUPER DEAD N/A 0,0000DERIVAX0 QUAKE USER_COEFF 0,0000DERIVAX1 QUAKE USER_COEFF 0,0000DERIVAY0 QUAKE USER_COEFF 0,0000

DERIVAY1 QUAKE USER_COEFF 0,0000SISMOX0 QUAKE USER_COEFF 0,0000SISMOX1 QUAKE USER_COEFF 0,0000SISMOY0 QUAKE USER_COEFF 0,0000SISMOY1 QUAKE USER_COEFF 0,0000

ETABS v9.7.0 File:DISEÑO JORGE ARTURO VERGARA PLACA DISEÑO Units:Kgf-m enero 21, 20140:18 PAGE 4

L O A D I N G C O M B I N A T I O N S

COMBO CASE SCALECOMBO TYPE CASE TYPE FACTOR

CM ADD DEAD Static 1,0000MUERTA Static 1,0000

COMB1 ADD CM Combo 1,4000

LIVE Static 1,7000COMB2 ADD CM Combo 1,0500LIVE Static 1,2800SISMOX0 Static 1,0000

COMB3 ADD CM Combo 1,0500LIVE Static 1,2800SISMOX1 Static 1,0000

COMB4 ADD CM Combo 1,0500LIVE Static 1,2800SISMOY0 Static 1,0000

COMB5 ADD CM Combo 1,0500LIVE Static 1,2800SISMOY1 Static 1,0000

COMB6 ADD CM Combo 1,0500LIVE Static 1,2800SISMOX0 Static -1,0000

COMB7 ADD CM Combo 1,0500

LIVE Static 1,2800SISMOX1 Static -1,0000

COMB8 ADD CM Combo 1,0500LIVE Static 1,2800SISMOY0 Static -1,0000

COMB9 ADD CM Combo 1,0500LIVE Static 1,2800SISMOY1 Static -1,0000

COMB10 ADD CM Combo 0,9000SISMOX0 Static 1,0000

COMB11 ADD CM Combo 0,9000SISMOX1 Static 1,0000

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 11/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

COMB12 ADD CM Combo 0,9000SISMOY0 Static 1,0000

COMB13 ADD CM Combo 0,9000SISMOY1 Static 1,0000

COMB14 ADD CM Combo 0,9000SISMOX0 Static -1,0000

COMB15 ADD CM Combo 0,9000SISMOX1 Static -1,0000

COMB16 ADD CM Combo 0,9000SISMOY0 Static -1,0000

COMB17 ADD CM Combo 0,9000SISMOY1 Static -1,0000

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 12/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular [email protected] – Bogotá D.C - Colombia12

VERIFICACION DE DERIVAS

Story Point Load UX UY UZ RX RY RZ DX DY DERIVA CUMPLE

STORY3 4 DERIVAX0 0,0242 0,002 0,0003 0,00013 0,00163 -0,00016 0,0061 0,0004 0,006113101 OK

STORY2 4 DERIVAX0 0,0181 0,0016 0,0003 0,00013 0,00233 -0,00013 0,009 0,0007 0,009027181 OK

STORY1 4 DERIVAX0 0,0091 0,0009 0,0002 0,00021 0,00302 -0,00007 0,0091 0,0009 0,009144397 OK

BASE 4 DERIVAX0STORY3 5 DERIVAX0 0,0251 0,002 0,0003 -0,00005 0,00164 -0,00016 0,0063 0,0004 0,006312686 OK

STORY2 5 DERIVAX0 0,0188 0,0016 0,0003 -0,0001 0,00236 -0,00013 0,0093 0,0007 0,009326307 OK

STORY1 5 DERIVAX0 0,0095 0,0009 0,0002 -0,00015 0,00307 -0,00007 0,0095 0,0009 0,009542536 OK

BASE 5 DERIVAX0

STORY3 6 DERIVAX0 0,0257 0,002 0,0003 -0,0002 0,00169 -0,00016 0,0064 0,0004 0,006412488 OK

STORY2 6 DERIVAX0 0,0193 0,0016 0,0003 -0,0003 0,00244 -0,00013 0,0095 0,0007 0,009525755 OK

STORY1 6 DERIVAX0 0,0098 0,0009 0,0002 -0,00045 0,00322 -0,00007 0,0098 0,0009 0,00984124 OK

BASE 6 DERIVAX0

STORY3 7 DERIVAX0 0,0242 0,0015 0 -0,00008 0,00133 -0,00016 0,0061 0,0003 0,006107373 OK

STORY2 7 DERIVAX0 0,0181 0,0012 0 -0,00014 0,00199 -0,00013 0,009 0,0005 0,009013878 OK

STORY1 7 DERIVAX0 0,0091 0,0007 0 -0,00023 0,00244 -0,00007 0,0091 0,0007 0,009126883 OK

BASE 7 DERIVAX0

STORY3 8 DERIVAX0 0,0251 0,0015 -0,0001 -0,00004 0,00137 -0,00016 0,0063 0,0003 0,006307139 OKSTORY2 8 DERIVAX0 0,0188 0,0012 -0,0001 -0,00007 0,00207 -0,00013 0,0093 0,0005 0,009313431 OK

STORY1 8 DERIVAX0 0,0095 0,0007 0 -0,00011 0,00256 -0,00007 0,0095 0,0007 0,009525755 OK

BASE 8 DERIVAX0

STORY3 9 DERIVAX0 0,0257 0,0015 0 -0,00001 0,00137 -0,00016 0,0064 0,0003 0,006407027 OK

STORY2 9 DERIVAX0 0,0193 0,0012 0 -0,00003 0,00208 -0,00013 0,0095 0,0005 0,009513149 OK

STORY1 9 DERIVAX0 0,0098 0,0007 0 -0,00003 0,00257 -0,00007 0,0098 0,0007 0,009824968 OK

BASE 9 DERIVAX0

STORY3 10 DERIVAX0 0,0242 0,0009 -0,0001 -0,00008 0,00137 -0,00016 0,0061 1E-04 0,00610082 OK

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 13/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular [email protected] – Bogotá D.C - Colombia13

STORY2 10 DERIVAX0 0,0181 0,0008 -0,0001 -0,00013 0,00205 -0,00013 0,009 0,0004 0,009008885 OK

STORY1 10 DERIVAX0 0,0091 0,0004 0 -0,00019 0,00255 -0,00007 0,0091 0,0004 0,009108787 OK

BASE 10 DERIVAX0

STORY3 11 DERIVAX0 0,0251 0,0009 -0,0001 -0,00001 0,00139 -0,00016 0,0063 1E-04 0,006300794 OK

STORY2 11 DERIVAX0 0,0188 0,0008 -0,0001 -0,00005 0,00212 -0,00013 0,0093 0,0004 0,009308598 OK

STORY1 11 DERIVAX0 0,0095 0,0004 0 -0,00004 0,00264 -0,00007 0,0095 0,0004 0,009508417 OK

BASE 11 DERIVAX0

STORY3 12 DERIVAX0 0,0257 0,0009 -0,0001 0,00004 0,00145 -0,00016 0,0064 1E-04 0,006400781 OK

STORY2 12 DERIVAX0 0,0193 0,0008 -0,0001 0,00006 0,0022 -0,00013 0,0095 0,0004 0,009508417 OK

STORY1 12 DERIVAX0 0,0098 0,0004 -0,0001 0,00006 0,00277 -0,00007 0,0098 0,0004 0,00980816 OK

BASE 12 DERIVAX0

STORY3 13 DERIVAX0 0,0242 0,0003 0 -0,00001 0,00141 -0,00016 0,0061 0,0001 0,00610082 OK

STORY2 13 DERIVAX0 0,0181 0,0002 0 -0,00003 0,0021 -0,00013 0,009 0,0001 0,009000556 OK

STORY1 13 DERIVAX0 0,0091 0,0001 0 -0,00004 0,00264 -0,00007 0,0091 0,0001 0,009100549 OK

BASE 13 DERIVAX0

STORY3 14 DERIVAX0 0,0251 0,0003 0 0,00002 0,00146 -0,00016 0,0063 0,0001 0,006300794 OK

STORY2 14 DERIVAX0 0,0188 0,0002 0 0,0001 0,00208 -0,00013 0,0093 0,0001 0,009300538 OK

STORY1 14 DERIVAX0 0,0095 0,0001 0 0,00005 0,00275 -0,00007 0,0095 0,0001 0,009500526 OK

BASE 14 DERIVAX0

STORY3 15 DERIVAX0 0,0257 0,0003 0,0001 -0,00004 0,0015 -0,00016 0,0064 0,0001 0,006400781 OK

STORY2 15 DERIVAX0 0,0193 0,0002 0 -0,00017 0,0021 -0,00013 0,0095 0,0001 0,009500526 OK

STORY1 15 DERIVAX0 0,0098 0,0001 0 -0,0001 0,00284 -0,00007 0,0098 0,0001 0,00980051 OK

BASE 15 DERIVAX0

STORY3 16 DERIVAX0 0,0242 -0,0004 0 0,00001 0,0014 -0,00016 0,0061 -0,0001 0,00610082 OK

STORY2 16 DERIVAX0 0,0181 -0,0003 0 0,00004 0,00208 -0,00013 0,009 -0,0001 0,009000556 OK

STORY1 16 DERIVAX0 0,0091 -0,0002 0 0,00004 0,00261 -0,00007 0,0091 -0,0002 0,009102198 OK

BASE 16 DERIVAX0

STORY3 17 DERIVAX0 0,0251 -0,0004 0 0,00001 0,00146 -0,00016 0,0063 -0,0001 0,006300794 OK

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 14/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular [email protected] – Bogotá D.C - Colombia14

STORY2 17 DERIVAX0 0,0188 -0,0003 0 -0,00004 0,00208 -0,00013 0,0093 -0,0001 0,009300538 OK

STORY1 17 DERIVAX0 0,0095 -0,0002 0 0,00003 0,00273 -0,00007 0,0095 -0,0002 0,009502105 OK

BASE 17 DERIVAX0

STORY3 18 DERIVAX0 0,0257 -0,0004 0 -0,00001 0,00148 -0,00016 0,0064 -0,0001 0,006400781 OK

STORY2 18 DERIVAX0 0,0193 -0,0003 0 0,0001 0,0021 -0,00013 0,0095 -0,0001 0,009500526 OK

STORY1 18 DERIVAX0 0,0098 -0,0002 0 0,00002 0,00278 -0,00007 0,0098 -0,0002 0,009802041 OK

BASE 18 DERIVAX0

STORY3 19 DERIVAX0 0,0242 -0,001 0 0,00002 0,00137 -0,00016 0,0061 -0,0002 0,006103278 OK

STORY2 19 DERIVAX0 0,0181 -0,0008 0 0,00008 0,00204 -0,00013 0,009 -0,0004 0,009008885 OK

STORY1 19 DERIVAX0 0,0091 -0,0004 0 0,00012 0,00254 -0,00007 0,0091 -0,0004 0,009108787 OK

BASE 19 DERIVAX0

STORY3 20 DERIVAX0 0,0251 -0,001 0,0001 0,00008 0,00133 -0,00016 0,0063 -0,0002 0,006303174 OK

STORY2 20 DERIVAX0 0,0188 -0,0008 0,0001 0,00006 0,00214 -0,00013 0,0093 -0,0004 0,009308598 OK

STORY1 20 DERIVAX0 0,0095 -0,0004 0 0,00007 0,00266 -0,00007 0,0095 -0,0004 0,009508417 OK

BASE 20 DERIVAX0

STORY3 21 DERIVAX0 0,0257 -0,001 0,0001 0,00001 0,00141 -0,00016 0,0064 -0,0002 0,006403124 OK

STORY2 21 DERIVAX0 0,0193 -0,0008 0,0001 0,00002 0,00215 -0,00013 0,0095 -0,0004 0,009508417 OK

STORY1 21 DERIVAX0 0,0098 -0,0004 0 0,00006 0,0027 -0,00007 0,0098 -0,0004 0,00980816 OK

BASE 21 DERIVAX0

STORY3 22 DERIVAX0 0,0242 -0,0015 0 -0,00003 0,00135 -0,00016 0,0061 -0,0002 0,006103278 OK

STORY2 22 DERIVAX0 0,0181 -0,0013 0 0,00015 0,00204 -0,00013 0,009 -0,0006 0,009019978 OK

STORY1 22 DERIVAX0 0,0091 -0,0007 0 0,00023 0,00251 -0,00007 0,0091 -0,0007 0,009126883 OK

BASE 22 DERIVAX0

STORY3 23 DERIVAX0 0,0251 -0,0015 0 0,00004 0,00131 -0,00016 0,0063 -0,0002 0,006303174 OK

STORY2 23 DERIVAX0 0,0188 -0,0013 0 0,00008 0,00212 -0,00013 0,0093 -0,0006 0,009319335 OK

STORY1 23 DERIVAX0 0,0095 -0,0007 0 0,0001 0,00262 -0,00007 0,0095 -0,0007 0,009525755 OK

BASE 23 DERIVAX0

STORY3 24 DERIVAX0 0,0257 -0,0015 0 0,00003 0,00141 -0,00016 0,0064 -0,0002 0,006403124 OK

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 15/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular [email protected] – Bogotá D.C - Colombia15

STORY2 24 DERIVAX0 0,0193 -0,0013 0 0,00004 0,00213 -0,00013 0,0095 -0,0006 0,009518929 OK

STORY1 24 DERIVAX0 0,0098 -0,0007 0 0,00008 0,00266 -0,00007 0,0098 -0,0007 0,009824968 OK

BASE 24 DERIVAX0

STORY3 25 DERIVAX0 0,0242 -0,0022 -0,0002 0,00007 0,00182 -0,00016 0,0061 -0,0004 0,006113101 OK

STORY2 25 DERIVAX0 0,0181 -0,0018 -0,0002 -0,00014 0,00235 -0,00013 0,009 -0,0008 0,009035486 OK

STORY1 25 DERIVAX0 0,0091 -0,001 -0,0001 -0,00004 0,00305 -0,00007 0,0091 -0,001 0,00915478 OK

BASE 25 DERIVAX0

STORY3 26 DERIVAX0 0,0251 -0,0022 -0,0003 0,00003 0,00176 -0,00016 0,0063 -0,0004 0,006312686 OK

STORY2 26 DERIVAX0 0,0188 -0,0018 -0,0002 0,00012 0,00236 -0,00013 0,0093 -0,0008 0,009334345 OK

STORY1 26 DERIVAX0 0,0095 -0,001 -0,0002 0,00021 0,00325 -0,00007 0,0095 -0,001 0,009552487 OK

BASE 26 DERIVAX0

STORY3 27 DERIVAX0 0,0257 -0,0022 -0,0002 0,00015 0,00176 -0,00016 0,0064 -0,0004 0,006412488 OK

STORY2 27 DERIVAX0 0,0193 -0,0018 -0,0002 0,0003 0,00247 -0,00013 0,0095 -0,0008 0,009533625 OK

STORY1 27 DERIVAX0 0,0098 -0,001 -0,0001 0,00034 0,00337 -0,00007 0,0098 -0,001 0,009850888 OK

BASE 27 DERIVAX0

STORY3 4 DERIVAX1 0,0268 -0,0046 0,0003 0,00035 0,00178 0,00035 0,0067 -0,0011 0,006789698 OK

STORY2 4 DERIVAX1 0,0201 -0,0035 0,0003 0,0005 0,00255 0,00027 0,0099 -0,0016 0,01002846 OK

STORY1 4 DERIVAX1 0,0102 -0,0019 0,0002 0,00072 0,00336 0,00014 0,0102 -0,0019 0,010375452 OK

BASE 4 DERIVAX1

STORY3 5 DERIVAX1 0,0249 -0,0046 0,0003 0,00014 0,00163 0,00035 0,0063 -0,0011 0,006395311 OK

STORY2 5 DERIVAX1 0,0186 -0,0035 0,0003 0,00022 0,00234 0,00027 0,0092 -0,0016 0,009338094 OK

STORY1 5 DERIVAX1 0,0094 -0,0019 0,0002 0,00027 0,00304 0,00014 0,0094 -0,0019 0,009590099 OK

BASE 5 DERIVAX1

STORY3 6 DERIVAX1 0,0234 -0,0046 0,0003 0 0,00157 0,00035 0,0059 -0,0011 0,006001666 OK

STORY2 6 DERIVAX1 0,0175 -0,0035 0,0003 0,00003 0,00225 0,00027 0,0087 -0,0016 0,008845903 OK

STORY1 6 DERIVAX1 0,0088 -0,0019 0,0002 -0,00002 0,00292 0,00014 0,0088 -0,0019 0,009002777 OK

BASE 6 DERIVAX1

STORY3 7 DERIVAX1 0,0268 -0,0034 -0,0001 0,0001 0,00145 0,00035 0,0067 -0,0008 0,006747592 OK

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 16/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular [email protected] – Bogotá D.C - Colombia16

STORY2 7 DERIVAX1 0,0201 -0,0026 -0,0001 0,00015 0,00219 0,00027 0,0099 -0,0012 0,009972462 OK

STORY1 7 DERIVAX1 0,0102 -0,0014 0 0,00017 0,00271 0,00014 0,0102 -0,0014 0,01029563 OK

BASE 7 DERIVAX1

STORY3 8 DERIVAX1 0,0249 -0,0034 -0,0001 0,00013 0,00136 0,00035 0,0063 -0,0008 0,006350591 OK

STORY2 8 DERIVAX1 0,0186 -0,0026 -0,0001 0,0002 0,00206 0,00027 0,0092 -0,0012 0,009277931 OK

STORY1 8 DERIVAX1 0,0094 -0,0014 0 0,00026 0,00254 0,00014 0,0094 -0,0014 0,009503683 OK

BASE 8 DERIVAX1

STORY3 9 DERIVAX1 0,0234 -0,0034 0 0,00015 0,00127 0,00035 0,0059 -0,0008 0,00595399 OK

STORY2 9 DERIVAX1 0,0175 -0,0026 0 0,00022 0,00191 0,00027 0,0087 -0,0012 0,008782369 OK

STORY1 9 DERIVAX1 0,0088 -0,0014 0 0,0003 0,00233 0,00014 0,0088 -0,0014 0,008910668 OK

BASE 9 DERIVAX1

STORY3 10 DERIVAX1 0,0268 -0,0022 -0,0001 0,00003 0,0015 0,00035 0,0067 -0,0005 0,006718631 OK

STORY2 10 DERIVAX1 0,0201 -0,0017 -0,0001 0,00005 0,00224 0,00027 0,0099 -0,0008 0,009932271 OK

STORY1 10 DERIVAX1 0,0102 -0,0009 -0,0001 0,00004 0,00284 0,00014 0,0102 -0,0009 0,010239629 OK

BASE 10 DERIVAX1

STORY3 11 DERIVAX1 0,0249 -0,0022 -0,0001 0,00009 0,00138 0,00035 0,0063 -0,0005 0,00631981 OK

STORY2 11 DERIVAX1 0,0186 -0,0017 -0,0001 0,00012 0,0021 0,00027 0,0092 -0,0008 0,009234717 OK

STORY1 11 DERIVAX1 0,0094 -0,0009 0 0,00018 0,00262 0,00014 0,0094 -0,0009 0,009442987 OK

BASE 11 DERIVAX1

STORY3 12 DERIVAX1 0,0234 -0,0022 -0,0001 0,00014 0,00134 0,00035 0,0059 -0,0005 0,005921149 OK

STORY2 12 DERIVAX1 0,0175 -0,0017 -0,0001 0,00022 0,00202 0,00027 0,0087 -0,0008 0,008736704 OK

STORY1 12 DERIVAX1 0,0088 -0,0009 -0,0001 0,00027 0,00251 0,00014 0,0088 -0,0009 0,008845903 OK

BASE 12 DERIVAX1

STORY3 13 DERIVAX1 0,0268 -0,0007 0 0,00003 0,00154 0,00035 0,0067 -0,0001 0,006700746 OK

STORY2 13 DERIVAX1 0,0201 -0,0006 0 0,00002 0,0023 0,00027 0,0099 -0,0003 0,009904544 OK

STORY1 13 DERIVAX1 0,0102 -0,0003 0 0,00004 0,00293 0,00014 0,0102 -0,0003 0,010204411 OK

BASE 13 DERIVAX1

STORY3 14 DERIVAX1 0,0249 -0,0007 0 0,00004 0,00145 0,00035 0,0063 -0,0001 0,006300794 OK

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 17/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular [email protected] – Bogotá D.C - Colombia17

STORY2 14 DERIVAX1 0,0186 -0,0006 0 0,00015 0,00206 0,00027 0,0092 -0,0003 0,00920489 OK

STORY1 14 DERIVAX1 0,0094 -0,0003 0 0,00011 0,00273 0,00014 0,0094 -0,0003 0,009404786 OK

BASE 14 DERIVAX1

STORY3 15 DERIVAX1 0,0234 -0,0007 0,0001 -0,00001 0,00138 0,00035 0,0059 -0,0001 0,005900847 OK

STORY2 15 DERIVAX1 0,0175 -0,0006 0,0001 -0,00011 0,00193 0,00027 0,0087 -0,0003 0,008705171 OK

STORY1 15 DERIVAX1 0,0088 -0,0003 0 -0,00004 0,00257 0,00014 0,0088 -0,0003 0,008805112 OK

BASE 15 DERIVAX1

STORY3 16 DERIVAX1 0,0268 0,0007 0 -0,00003 0,00153 0,00035 0,0067 0,0001 0,006700746 OK

STORY2 16 DERIVAX1 0,0201 0,0006 0 -0,00003 0,00228 0,00027 0,0099 0,0003 0,009904544 OK

STORY1 16 DERIVAX1 0,0102 0,0003 0 -0,00005 0,0029 0,00014 0,0102 0,0003 0,010204411 OK

BASE 16 DERIVAX1

STORY3 17 DERIVAX1 0,0249 0,0007 0 -0,00002 0,00145 0,00035 0,0063 0,0001 0,006300794 OK

STORY2 17 DERIVAX1 0,0186 0,0006 0 -0,0001 0,00207 0,00027 0,0092 0,0003 0,00920489 OK

STORY1 17 DERIVAX1 0,0094 0,0003 0 -0,00005 0,00271 0,00014 0,0094 0,0003 0,009404786 OK

BASE 17 DERIVAX1

STORY3 18 DERIVAX1 0,0234 0,0007 0 -0,00004 0,00136 0,00035 0,0059 0,0001 0,005900847 OK

STORY2 18 DERIVAX1 0,0175 0,0006 0 0,00004 0,00193 0,00027 0,0087 0,0003 0,008705171 OK

STORY1 18 DERIVAX1 0,0088 0,0003 0 -0,00006 0,00252 0,00014 0,0088 0,0003 0,008805112 OK

BASE 18 DERIVAX1

STORY3 19 DERIVAX1 0,0268 0,0021 0,0001 -0,0001 0,0015 0,00035 0,0067 0,0005 0,006718631 OK

STORY2 19 DERIVAX1 0,0201 0,0016 0,0001 -0,00011 0,00224 0,00027 0,0099 0,0007 0,009924717 OK

STORY1 19 DERIVAX1 0,0102 0,0009 0 -0,00014 0,00283 0,00014 0,0102 0,0009 0,010239629 OK

BASE 19 DERIVAX1

STORY3 20 DERIVAX1 0,0249 0,0021 0,0001 -0,00003 0,00132 0,00035 0,0063 0,0005 0,00631981 OK

STORY2 20 DERIVAX1 0,0186 0,0016 0,0001 -0,00012 0,00212 0,00027 0,0092 0,0007 0,009226592 OK

STORY1 20 DERIVAX1 0,0094 0,0009 0 -0,00016 0,00263 0,00014 0,0094 0,0009 0,009442987 OK

BASE 20 DERIVAX1

STORY3 21 DERIVAX1 0,0234 0,0021 0 -0,00009 0,0013 0,00035 0,0059 0,0005 0,005921149 OK

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 18/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular [email protected] – Bogotá D.C - Colombia18

STORY2 21 DERIVAX1 0,0175 0,0016 0 -0,00014 0,00198 0,00027 0,0087 0,0007 0,008728115 OK

STORY1 21 DERIVAX1 0,0088 0,0009 0 -0,00015 0,00244 0,00014 0,0088 0,0009 0,008845903 OK

BASE 21 DERIVAX1

STORY3 22 DERIVAX1 0,0268 0,0033 0 -0,00018 0,00147 0,00035 0,0067 0,0008 0,006747592 OK

STORY2 22 DERIVAX1 0,0201 0,0025 0 -0,00015 0,00224 0,00027 0,0099 0,0011 0,009960924 OK

STORY1 22 DERIVAX1 0,0102 0,0014 0 -0,00016 0,00279 0,00014 0,0102 0,0014 0,01029563 OK

BASE 22 DERIVAX1

STORY3 23 DERIVAX1 0,0249 0,0033 0 -0,00012 0,0013 0,00035 0,0063 0,0008 0,006350591 OK

STORY2 23 DERIVAX1 0,0186 0,0025 0 -0,00019 0,00211 0,00027 0,0092 0,0011 0,009265528 OK

STORY1 23 DERIVAX1 0,0094 0,0014 0 -0,00026 0,0026 0,00014 0,0094 0,0014 0,009503683 OK

BASE 23 DERIVAX1

STORY3 24 DERIVAX1 0,0234 0,0033 0 -0,00014 0,0013 0,00035 0,0059 0,0008 0,00595399 OK

STORY2 24 DERIVAX1 0,0175 0,0025 0 -0,00022 0,00196 0,00027 0,0087 0,0011 0,008769265 OK

STORY1 24 DERIVAX1 0,0088 0,0014 0 -0,00026 0,00241 0,00014 0,0088 0,0014 0,008910668 OK

BASE 24 DERIVAX1

STORY3 25 DERIVAX1 0,0268 0,0047 -0,0002 -0,00017 0,00198 0,00035 0,0067 0,0011 0,006789698 OK

STORY2 25 DERIVAX1 0,0201 0,0036 -0,0002 -0,00055 0,00257 0,00027 0,0099 0,0016 0,01002846 OK

STORY1 25 DERIVAX1 0,0102 0,002 -0,0001 -0,00057 0,00338 0,00014 0,0102 0,002 0,010394229 OK

BASE 25 DERIVAX1

STORY3 26 DERIVAX1 0,0249 0,0047 -0,0002 -0,00019 0,00175 0,00035 0,0063 0,0011 0,006395311 OK

STORY2 26 DERIVAX1 0,0186 0,0036 -0,0002 -0,00023 0,00234 0,00027 0,0092 0,0016 0,009338094 OK

STORY1 26 DERIVAX1 0,0094 0,002 -0,0002 -0,00028 0,00323 0,00014 0,0094 0,002 0,009610411 OK

BASE 26 DERIVAX1

STORY3 27 DERIVAX1 0,0234 0,0047 -0,0002 -0,00008 0,00163 0,00035 0,0059 0,0011 0,006001666 OK

STORY2 27 DERIVAX1 0,0175 0,0036 -0,0002 -0,00005 0,00228 0,00027 0,0087 0,0016 0,008845903 OK

STORY1 27 DERIVAX1 0,0088 0,002 -0,0002 -0,00016 0,00305 0,00014 0,0088 0,002 0,009024411 OK

BASE 27 DERIVAX1

STORY3 4 DERIVAY0 0,0036 0,0529 0,0002 -0,00171 0,00019 0,00071 0,0007 0,011 0,01102225 OK

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 19/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular [email protected] – Bogotá D.C - Colombia19

STORY2 4 DERIVAY0 0,0029 0,0419 0,0002 -0,00277 0,00031 0,00057 0,0014 0,018 0,018054362 OK

STORY1 4 DERIVAY0 0,0015 0,0239 0,0002 -0,00399 0,00049 0,0003 0,0015 0,0239 0,023947025 OK

BASE 4 DERIVAY0

STORY3 5 DERIVAY0 -0,0003 0,0529 0,0001 -0,00159 -0,00001 0,00071 0 0,011 0,011 OK

STORY2 5 DERIVAY0 -0,0003 0,0419 0,0001 -0,00258 -0,00002 0,00057 -0,0002 0,018 0,018001111 OK

STORY1 5 DERIVAY0 -0,0001 0,0239 0,0001 -0,00362 -0,00003 0,0003 -0,0001 0,0239 0,023900209 OK

BASE 5 DERIVAY0

STORY3 6 DERIVAY0 -0,0033 0,0529 -0,0003 -0,00151 -0,00017 0,00071 -0,0007 0,011 0,01102225 OK

STORY2 6 DERIVAY0 -0,0026 0,0419 -0,0003 -0,00244 -0,00029 0,00057 -0,0012 0,018 0,018039956 OK

STORY1 6 DERIVAY0 -0,0014 0,0239 -0,0002 -0,00336 -0,00046 0,0003 -0,0014 0,0239 0,023940969 OK

BASE 6 DERIVAY0

STORY3 7 DERIVAY0 0,0036 0,0553 0,0002 -0,00197 0,00015 0,00071 0,0007 0,0115 0,011521285 OK

STORY2 7 DERIVAY0 0,0029 0,0438 0,0002 -0,00318 0,00026 0,00057 0,0014 0,0189 0,018951781 OK

STORY1 7 DERIVAY0 0,0015 0,0249 0,0001 -0,00466 0,00039 0,0003 0,0015 0,0249 0,02494514 OK

BASE 7 DERIVAY0

STORY3 8 DERIVAY0 -0,0003 0,0553 0,0001 -0,0018 -0,00001 0,00071 0 0,0115 0,0115 OK

STORY2 8 DERIVAY0 -0,0003 0,0438 0,0001 -0,00292 -0,00003 0,00057 -0,0002 0,0189 0,018901058 OK

STORY1 8 DERIVAY0 -0,0001 0,0249 0,0001 -0,00415 -0,00004 0,0003 -0,0001 0,0249 0,024900201 OK

BASE 8 DERIVAY0

STORY3 9 DERIVAY0 -0,0033 0,0553 -0,0003 -0,00172 -0,00013 0,00071 -0,0007 0,0115 0,011521285 OK

STORY2 9 DERIVAY0 -0,0026 0,0438 -0,0003 -0,00277 -0,00024 0,00057 -0,0012 0,0189 0,018938057 OK

STORY1 9 DERIVAY0 -0,0014 0,0249 -0,0002 -0,00387 -0,00035 0,0003 -0,0014 0,0249 0,024939326 OK

BASE 9 DERIVAY0

STORY3 10 DERIVAY0 0,0036 0,0577 0,0002 -0,0019 0,00015 0,00071 0,0007 0,012 0,012020399 OK

STORY2 10 DERIVAY0 0,0029 0,0457 0,0002 -0,00309 0,00028 0,00057 0,0014 0,0197 0,019749684 OK

STORY1 10 DERIVAY0 0,0015 0,026 0,0001 -0,00447 0,00042 0,0003 0,0015 0,026 0,026043233 OK

BASE 10 DERIVAY0

STORY3 11 DERIVAY0 -0,0003 0,0577 0,0001 -0,00173 -0,00002 0,00071 0 0,012 0,012 OK

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 20/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular [email protected] – Bogotá D.C - Colombia20

STORY2 11 DERIVAY0 -0,0003 0,0457 0,0001 -0,00284 -0,00004 0,00057 -0,0002 0,0197 0,019701015 OK

STORY1 11 DERIVAY0 -0,0001 0,026 0,0001 -0,00398 -0,00006 0,0003 -0,0001 0,026 0,026000192 OK

BASE 11 DERIVAY0

STORY3 12 DERIVAY0 -0,0033 0,0577 -0,0003 -0,00176 -0,00013 0,00071 -0,0007 0,012 0,012020399 OK

STORY2 12 DERIVAY0 -0,0026 0,0457 -0,0003 -0,00287 -0,00025 0,00057 -0,0012 0,0197 0,019736514 OK

STORY1 12 DERIVAY0 -0,0014 0,026 -0,0002 -0,00401 -0,00037 0,0003 -0,0014 0,026 0,026037665 OK

BASE 12 DERIVAY0

STORY3 13 DERIVAY0 0,0036 0,0607 0,0002 -0,00209 0,00016 0,00071 0,0007 0,0125 0,012519585 OK

STORY2 13 DERIVAY0 0,0029 0,0482 0,0002 -0,00342 0,00028 0,00057 0,0014 0,0209 0,020946837 OK

STORY1 13 DERIVAY0 0,0015 0,0273 0,0001 -0,00497 0,00043 0,0003 0,0015 0,0273 0,027341178 OK

BASE 13 DERIVAY0

STORY3 14 DERIVAY0 -0,0003 0,0607 0,0001 -0,00185 0 0,00071 0 0,0125 0,0125 OK

STORY2 14 DERIVAY0 -0,0003 0,0482 0,0001 -0,00304 -0,00004 0,00057 -0,0002 0,0209 0,020900957 OK

STORY1 14 DERIVAY0 -0,0001 0,0273 0,0001 -0,00427 -0,00003 0,0003 -0,0001 0,0273 0,027300183 OK

BASE 14 DERIVAY0

STORY3 15 DERIVAY0 -0,0033 0,0607 -0,0004 -0,0017 -0,00017 0,00071 -0,0007 0,0125 0,012519585 OK

STORY2 15 DERIVAY0 -0,0026 0,0482 -0,0003 -0,00282 -0,00024 0,00057 -0,0012 0,0209 0,020934421 OK

STORY1 15 DERIVAY0 -0,0014 0,0273 -0,0002 -0,00389 -0,00044 0,0003 -0,0014 0,0273 0,027335874 OK

BASE 15 DERIVAY0

STORY3 16 DERIVAY0 0,0036 0,0637 0,0002 -0,00226 0,00015 0,00071 0,0007 0,0132 0,013218548 OK

STORY2 16 DERIVAY0 0,0029 0,0505 0,0002 -0,0037 0,00028 0,00057 0,0014 0,0219 0,021944703 OK

STORY1 16 DERIVAY0 0,0015 0,0286 0,0001 -0,00541 0,00042 0,0003 0,0015 0,0286 0,028639309 OK

BASE 16 DERIVAY0

STORY3 17 DERIVAY0 -0,0003 0,0637 0,0001 -0,00206 -0,00002 0,00071 0 0,0132 0,0132 OK

STORY2 17 DERIVAY0 -0,0003 0,0505 0,0001 -0,00337 -0,00002 0,00057 -0,0002 0,0219 0,021900913 OK

STORY1 17 DERIVAY0 -0,0001 0,0286 0,0001 -0,00478 -0,00004 0,0003 -0,0001 0,0286 0,028600175 OK

BASE 17 DERIVAY0

STORY3 18 DERIVAY0 -0,0033 0,0637 -0,0003 -0,00196 -0,00014 0,00071 -0,0007 0,0132 0,013218548 OK

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 21/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular [email protected] – Bogotá D.C - Colombia21

STORY2 18 DERIVAY0 -0,0026 0,0505 -0,0003 -0,00321 -0,00024 0,00057 -0,0012 0,0219 0,021932852 OK

STORY1 18 DERIVAY0 -0,0014 0,0286 -0,0002 -0,00448 -0,00037 0,0003 -0,0014 0,0286 0,028634245 OK

BASE 18 DERIVAY0

STORY3 19 DERIVAY0 0,0036 0,0665 0,0002 -0,00234 0,00015 0,00071 0,0007 0,0137 0,013717872 OK

STORY2 19 DERIVAY0 0,0029 0,0528 0,0002 -0,00387 0,00027 0,00057 0,0014 0,023 0,023042569 OK

STORY1 19 DERIVAY0 0,0015 0,0298 0,0001 -0,00564 0,00041 0,0003 0,0015 0,0298 0,029837728 OK

BASE 19 DERIVAY0

STORY3 20 DERIVAY0 -0,0003 0,0665 0,0001 -0,00214 -0,00002 0,00071 0 0,0137 0,0137 OK

STORY2 20 DERIVAY0 -0,0003 0,0528 0,0001 -0,00353 -0,00003 0,00057 -0,0002 0,023 0,02300087 OK

STORY1 20 DERIVAY0 -0,0001 0,0298 0,0001 -0,00499 -0,00004 0,0003 -0,0001 0,0298 0,029800168 OK

BASE 20 DERIVAY0

STORY3 21 DERIVAY0 -0,0033 0,0665 -0,0004 -0,00206 -0,00014 0,00071 -0,0007 0,0137 0,013717872 OK

STORY2 21 DERIVAY0 -0,0026 0,0528 -0,0003 -0,00336 -0,00025 0,00057 -0,0012 0,023 0,023031283 OK

STORY1 21 DERIVAY0 -0,0014 0,0298 -0,0002 -0,00468 -0,00037 0,0003 -0,0014 0,0298 0,029832868 OK

BASE 21 DERIVAY0

STORY3 22 DERIVAY0 0,0036 0,069 0,0002 -0,00203 0,00012 0,00071 0,0007 0,0142 0,014217243 OK

STORY2 22 DERIVAY0 0,0029 0,0548 0,0002 -0,00407 0,00028 0,00057 0,0014 0,0239 0,023940969 OK

STORY1 22 DERIVAY0 0,0015 0,0309 0,0002 -0,00578 0,0004 0,0003 0,0015 0,0309 0,030936386 OK

BASE 22 DERIVAY0

STORY3 23 DERIVAY0 -0,0003 0,069 0,0001 -0,00206 -0,00002 0,00071 0 0,0142 0,0142 OK

STORY2 23 DERIVAY0 -0,0003 0,0548 0,0001 -0,00369 -0,00002 0,00057 -0,0002 0,0239 0,023900837 OK

STORY1 23 DERIVAY0 -0,0001 0,0309 0,0001 -0,0052 -0,00004 0,0003 -0,0001 0,0309 0,030900162 OK

BASE 23 DERIVAY0

STORY3 24 DERIVAY0 -0,0033 0,069 -0,0004 -0,00217 -0,00013 0,00071 -0,0007 0,0142 0,014217243 OK

STORY2 24 DERIVAY0 -0,0026 0,0548 -0,0003 -0,00347 -0,00025 0,00057 -0,0012 0,0239 0,023930107 OK

STORY1 24 DERIVAY0 -0,0014 0,0309 -0,0002 -0,00486 -0,00036 0,0003 -0,0014 0,0309 0,030931699 OK

BASE 24 DERIVAY0

STORY3 25 DERIVAY0 0,0036 0,0718 0,0002 -0,00237 0,00021 0,00071 0,0007 0,0147 0,014716657 OK

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 22/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular [email protected] – Bogotá D.C - Colombia22

STORY2 25 DERIVAY0 0,0029 0,0571 0,0002 -0,00397 0,0003 0,00057 0,0014 0,025 0,025039169 OK

STORY1 25 DERIVAY0 0,0015 0,0321 0,0001 -0,00557 0,00041 0,0003 0,0015 0,0321 0,032135028 OK

BASE 25 DERIVAY0

STORY3 26 DERIVAY0 -0,0003 0,0718 0,0001 -0,0022 -0,00002 0,00071 0 0,0147 0,0147 OK

STORY2 26 DERIVAY0 -0,0003 0,0571 0,0001 -0,0036 -0,00004 0,00057 -0,0002 0,025 0,0250008 OK

STORY1 26 DERIVAY0 -0,0001 0,0321 0,0001 -0,00534 -0,00004 0,0003 -0,0001 0,0321 0,032100156 OK

BASE 26 DERIVAY0

STORY3 27 DERIVAY0 -0,0033 0,0718 -0,0004 -0,00228 -0,00018 0,00071 -0,0007 0,0147 0,014716657 OK

STORY2 27 DERIVAY0 -0,0026 0,0571 -0,0003 -0,00343 -0,00024 0,00057 -0,0012 0,025 0,025028783 OK

STORY1 27 DERIVAY0 -0,0014 0,0321 -0,0002 -0,00511 -0,00047 0,0003 -0,0014 0,0321 0,032130515 OK

BASE 27 DERIVAY0

STORY3 4 DERIVAY1 -0,0038 0,0718 0,0002 -0,00235 -0,00022 -0,00074 -0,0009 0,0151 0,015126797 OK

STORY2 4 DERIVAY1 -0,0029 0,0567 0,0002 -0,00384 -0,00032 -0,00057 -0,0013 0,0247 0,024734187 OK

STORY1 4 DERIVAY1 -0,0016 0,032 0,0001 -0,00547 -0,00048 -0,00032 -0,0016 0,032 0,032039975 OK

BASE 4 DERIVAY1

STORY3 5 DERIVAY1 0,0003 0,0718 0,0001 -0,00214 0,00002 -0,00074 0,0001 0,0151 0,015100331 OK

STORY2 5 DERIVAY1 0,0002 0,0567 0,0001 -0,0035 0,00003 -0,00057 0,0001 0,0247 0,024700202 OK

STORY1 5 DERIVAY1 0,0001 0,032 0,0001 -0,00483 0,00006 -0,00032 0,0001 0,032 0,032000156 OK

BASE 5 DERIVAY1

STORY3 6 DERIVAY1 0,0033 0,0718 -0,0004 -0,00207 0,00018 -0,00074 0,0007 0,0151 0,015116216 OK

STORY2 6 DERIVAY1 0,0026 0,0567 -0,0003 -0,00337 0,00026 -0,00057 0,0012 0,0247 0,024729133 OK

STORY1 6 DERIVAY1 0,0014 0,032 -0,0002 -0,00461 0,00039 -0,00032 0,0014 0,032 0,03203061 OK

BASE 6 DERIVAY1

STORY3 7 DERIVAY1 -0,0038 0,0693 0,0002 -0,00248 -0,00019 -0,00074 -0,0009 0,0145 0,014527904 OK

STORY2 7 DERIVAY1 -0,0029 0,0548 0,0002 -0,00402 -0,00028 -0,00057 -0,0013 0,0238 0,023835478 OK

STORY1 7 DERIVAY1 -0,0016 0,031 0,0001 -0,00582 -0,0004 -0,00032 -0,0016 0,031 0,031041263 OK

BASE 7 DERIVAY1

STORY3 8 DERIVAY1 0,0003 0,0693 0,0001 -0,00228 0,00001 -0,00074 0,0001 0,0145 0,014500345 OK

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 23/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular [email protected] – Bogotá D.C - Colombia23

STORY2 8 DERIVAY1 0,0002 0,0548 0,0001 -0,0037 0,00002 -0,00057 0,0001 0,0238 0,02380021 OK

STORY1 8 DERIVAY1 0,0001 0,031 0,0001 -0,00521 0,00003 -0,00032 0,0001 0,031 0,031000161 OK

BASE 8 DERIVAY1

STORY3 9 DERIVAY1 0,0033 0,0693 -0,0004 -0,00216 0,00016 -0,00074 0,0007 0,0145 0,014516887 OK

STORY2 9 DERIVAY1 0,0026 0,0548 -0,0003 -0,0035 0,00024 -0,00057 0,0012 0,0238 0,023830233 OK

STORY1 9 DERIVAY1 0,0014 0,031 -0,0002 -0,00484 0,00035 -0,00032 0,0014 0,031 0,031031597 OK

BASE 9 DERIVAY1

STORY3 10 DERIVAY1 -0,0038 0,0668 0,0003 -0,0022 -0,0002 -0,00074 -0,0009 0,0139 0,013929106 OK

STORY2 10 DERIVAY1 -0,0029 0,0529 0,0002 -0,0036 -0,00028 -0,00057 -0,0013 0,023 0,02303671 OK

STORY1 10 DERIVAY1 -0,0016 0,0299 0,0002 -0,00515 -0,0004 -0,00032 -0,0016 0,0299 0,029942779 OK

BASE 10 DERIVAY1

STORY3 11 DERIVAY1 0,0003 0,0668 0,0001 -0,00202 0 -0,00074 0,0001 0,0139 0,01390036 OK

STORY2 11 DERIVAY1 0,0002 0,0529 0,0001 -0,00332 0,00001 -0,00057 0,0001 0,023 0,023000217 OK

STORY1 11 DERIVAY1 0,0001 0,0299 0,0001 -0,00462 0,00001 -0,00032 0,0001 0,0299 0,029900167 OK

BASE 11 DERIVAY1

STORY3 12 DERIVAY1 0,0033 0,0668 -0,0004 -0,00204 0,00018 -0,00074 0,0007 0,0139 0,013917615 OK

STORY2 12 DERIVAY1 0,0026 0,0529 -0,0003 -0,00332 0,00025 -0,00057 0,0012 0,023 0,023031283 OK

STORY1 12 DERIVAY1 0,0014 0,0299 -0,0002 -0,00461 0,00038 -0,00032 0,0014 0,0299 0,029932758 OK

BASE 12 DERIVAY1

STORY3 13 DERIVAY1 -0,0038 0,0636 0,0002 -0,00219 -0,0002 -0,00074 -0,0009 0,0132 0,013230646 OK

STORY2 13 DERIVAY1 -0,0029 0,0504 0,0002 -0,00357 -0,0003 -0,00057 -0,0013 0,0219 0,021938551 OK

STORY1 13 DERIVAY1 -0,0016 0,0285 0,0001 -0,00519 -0,00043 -0,00032 -0,0016 0,0285 0,028544877 OK

BASE 13 DERIVAY1

STORY3 14 DERIVAY1 0,0003 0,0636 0,0001 -0,00193 0,00002 -0,00074 0,0001 0,0132 0,013200379 OK

STORY2 14 DERIVAY1 0,0002 0,0504 0,0001 -0,00316 0 -0,00057 0,0001 0,0219 0,021900228 OK

STORY1 14 DERIVAY1 0,0001 0,0285 0,0001 -0,00445 0,00004 -0,00032 0,0001 0,0285 0,028500175 OK

BASE 14 DERIVAY1

STORY3 15 DERIVAY1 0,0033 0,0636 -0,0004 -0,00178 0,00015 -0,00074 0,0007 0,0132 0,013218548 OK

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 24/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular [email protected] – Bogotá D.C - Colombia24

STORY2 15 DERIVAY1 0,0026 0,0504 -0,0003 -0,00298 0,00024 -0,00057 0,0012 0,0219 0,021932852 OK

STORY1 15 DERIVAY1 0,0014 0,0285 -0,0002 -0,00408 0,00031 -0,00032 0,0014 0,0285 0,028534365 OK

BASE 15 DERIVAY1

STORY3 16 DERIVAY1 -0,0038 0,0605 0,0002 -0,00215 -0,0002 -0,00074 -0,0009 0,0125 0,012532358 OK

STORY2 16 DERIVAY1 -0,0029 0,048 0,0002 -0,0035 -0,0003 -0,00057 -0,0013 0,0208 0,020840585 OK

STORY1 16 DERIVAY1 -0,0016 0,0272 0,0001 -0,00514 -0,00043 -0,00032 -0,0016 0,0272 0,027247018 OK

BASE 16 DERIVAY1

STORY3 17 DERIVAY1 0,0003 0,0605 0,0001 -0,00195 0,00001 -0,00074 0,0001 0,0125 0,0125004 OK

STORY2 17 DERIVAY1 0,0002 0,048 0,0001 -0,0032 0,00002 -0,00057 0,0001 0,0208 0,02080024 OK

STORY1 17 DERIVAY1 0,0001 0,0272 0,0001 -0,00454 0,00003 -0,00032 0,0001 0,0272 0,027200184 OK

BASE 17 DERIVAY1

STORY3 18 DERIVAY1 0,0033 0,0605 -0,0003 -0,00186 0,00018 -0,00074 0,0007 0,0125 0,012519585 OK

STORY2 18 DERIVAY1 0,0026 0,048 -0,0003 -0,00304 0,00024 -0,00057 0,0012 0,0208 0,020834587 OK

STORY1 18 DERIVAY1 0,0014 0,0272 -0,0002 -0,00426 0,00038 -0,00032 0,0014 0,0272 0,027236006 OK

BASE 18 DERIVAY1

STORY3 19 DERIVAY1 -0,0038 0,0576 0,0002 -0,00201 -0,0002 -0,00074 -0,0009 0,0118 0,011834272 OK

STORY2 19 DERIVAY1 -0,0029 0,0458 0,0002 -0,00333 -0,00029 -0,00057 -0,0013 0,0198 0,019842631 OK

STORY1 19 DERIVAY1 -0,0016 0,026 0,0001 -0,00489 -0,00041 -0,00032 -0,0016 0,026 0,026049184 OK

BASE 19 DERIVAY1

STORY3 20 DERIVAY1 0,0003 0,0576 0,0001 -0,00184 0,00001 -0,00074 0,0001 0,0118 0,011800424 OK

STORY2 20 DERIVAY1 0,0002 0,0458 0,0001 -0,00303 0,00002 -0,00057 0,0001 0,0198 0,019800253 OK

STORY1 20 DERIVAY1 0,0001 0,026 0,0001 -0,00432 0,00003 -0,00032 0,0001 0,026 0,026000192 OK

BASE 20 DERIVAY1

STORY3 21 DERIVAY1 0,0033 0,0576 -0,0003 -0,00177 0,00017 -0,00074 0,0007 0,0118 0,011820744 OK

STORY2 21 DERIVAY1 0,0026 0,0458 -0,0003 -0,00289 0,00025 -0,00057 0,0012 0,0198 0,01983633 OK

STORY1 21 DERIVAY1 0,0014 0,026 -0,0002 -0,00406 0,00036 -0,00032 0,0014 0,026 0,026037665 OK

BASE 21 DERIVAY1

STORY3 22 DERIVAY1 -0,0038 0,055 0,0002 -0,00159 -0,00021 -0,00074 -0,0009 0,0112 0,011236103 OK

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 25/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular [email protected] – Bogotá D.C - Colombia25

STORY2 22 DERIVAY1 -0,0029 0,0438 0,0002 -0,00321 -0,00029 -0,00057 -0,0013 0,0189 0,018944656 OK

STORY1 22 DERIVAY1 -0,0016 0,0249 0,0001 -0,00464 -0,00041 -0,00032 -0,0016 0,0249 0,024951353 OK

BASE 22 DERIVAY1

STORY3 23 DERIVAY1 0,0003 0,055 0,0001 -0,00163 0,00001 -0,00074 0,0001 0,0112 0,011200446 OK

STORY2 23 DERIVAY1 0,0002 0,0438 0,0001 -0,0029 0,00002 -0,00057 0,0001 0,0189 0,018900265 OK

STORY1 23 DERIVAY1 0,0001 0,0249 0,0001 -0,00414 0,00003 -0,00032 0,0001 0,0249 0,024900201 OK

BASE 23 DERIVAY1

STORY3 24 DERIVAY1 0,0033 0,055 -0,0003 -0,00171 0,00017 -0,00074 0,0007 0,0112 0,011221854 OK

STORY2 24 DERIVAY1 0,0026 0,0438 -0,0003 -0,00275 0,00025 -0,00057 0,0012 0,0189 0,018938057 OK

STORY1 24 DERIVAY1 0,0014 0,0249 -0,0002 -0,00389 0,00035 -0,00032 0,0014 0,0249 0,024939326 OK

BASE 24 DERIVAY1

STORY3 25 DERIVAY1 -0,0038 0,052 0,0002 -0,00169 -0,00024 -0,00074 -0,0009 0,0105 0,010538501 OK

STORY2 25 DERIVAY1 -0,0029 0,0415 0,0002 -0,00281 -0,00034 -0,00057 -0,0013 0,0179 0,017947145 OK

STORY1 25 DERIVAY1 -0,0016 0,0236 0,0001 -0,00403 -0,00055 -0,00032 -0,0016 0,0236 0,023654175 OK

BASE 25 DERIVAY1

STORY3 26 DERIVAY1 0,0003 0,052 0,0001 -0,00157 0,00001 -0,00074 0,0001 0,0105 0,010500476 OK

STORY2 26 DERIVAY1 0,0002 0,0415 0,0001 -0,0026 0,00001 -0,00057 0,0001 0,0179 0,017900279 OK

STORY1 26 DERIVAY1 0,0001 0,0236 0 -0,00392 0,00004 -0,00032 0,0001 0,0236 0,023600212 OK

BASE 26 DERIVAY1

STORY3 27 DERIVAY1 0,0033 0,052 -0,0003 -0,00162 0,0002 -0,00074 0,0007 0,0105 0,010523307 OK

STORY2 27 DERIVAY1 0,0026 0,0415 -0,0003 -0,00244 0,00031 -0,00057 0,0012 0,0179 0,017940178 OK

STORY1 27 DERIVAY1 0,0014 0,0236 -0,0002 -0,00369 0,00044 -0,00032 0,0014 0,0236 0,023641489 OK

BASE 27 DERIVAY1

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 26/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

26

ANALISIS

ETABS v9.7.0 File:DISEÑO JORGE ARTURO VERGARA PLACA DISEÑO Units:Kgf-m enero 21, 2014 0:19 PAGE 1

L O A D I N G C O M B I N A T I O N S

COMBO CASE SCALECOMBO TYPE CASE TYPE FACTOR

CM ADD DEAD Static 1,0000MUERTA Static 1,0000

COMB1 ADD CM Combo 1,4000LIVE Static 1,7000

COMB2 ADD CM Combo 1,0500LIVE Static 1,2800SISMOX0 Static 1,0000

COMB3 ADD CM Combo 1,0500LIVE Static 1,2800SISMOX1 Static 1,0000

COMB4 ADD CM Combo 1,0500LIVE Static 1,2800SISMOY0 Static 1,0000

COMB5 ADD CM Combo 1,0500

LIVE Static 1,2800SISMOY1 Static 1,0000

COMB6 ADD CM Combo 1,0500LIVE Static 1,2800SISMOX0 Static -1,0000

COMB7 ADD CM Combo 1,0500LIVE Static 1,2800SISMOX1 Static -1,0000

COMB8 ADD CM Combo 1,0500LIVE Static 1,2800SISMOY0 Static -1,0000

COMB9 ADD CM Combo 1,0500LIVE Static 1,2800SISMOY1 Static -1,0000

COMB10 ADD CM Combo 0,9000SISMOX0 Static 1,0000

COMB11 ADD CM Combo 0,9000SISMOX1 Static 1,0000

COMB12 ADD CM Combo 0,9000SISMOY0 Static 1,0000

COMB13 ADD CM Combo 0,9000SISMOY1 Static 1,0000

COMB14 ADD CM Combo 0,9000SISMOX0 Static -1,0000

COMB15 ADD CM Combo 0,9000SISMOX1 Static -1,0000

COMB16 ADD CM Combo 0,9000SISMOY0 Static -1,0000

COMB17 ADD CM Combo 0,9000SISMOY1 Static -1,0000

ETABS v9.7.0 File:DISEÑO JORGE ARTURO VERGARA PLACA DISEÑO Units:Kgf-m enero 21, 2014 0:19 PAGE 2

S U P P O R T R E A C T I O N S

STORY POINT LOAD FX FY FZ MX MY MZ

BASE 4 CM 71,76 555,12 19167,81 -543,003 64,356 -1,404BASE 4 COMB1 212,29 1324,79 40406,77 -1292,369 189,276 -3,049BASE 4 COMB2 -982,72 932,24 28103,15 -884,626 -2174,966 1,017BASE 4 COMB3 -1130,57 1038,07 28081,59 -1063,590 -2463,798 -9,150BASE 4 COMB4 -41,89 62,70 28546,50 585,337 -258,319 -16,755BASE 4 COMB5 386,89 -243,98 28608,40 1103,800 578,669 12,685BASE 4 COMB6 1301,82 1058,16 32586,84 -1057,058 2459,464 -5,597BASE 4 COMB7 1449,67 952,33 32608,40 -878,094 2748,296 4,570

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 27/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

27

BASE 4 COMB8 360,99 1927,70 32143,49 -2527,021 542,816 12,175BASE 4 COMB9 -67,80 2234,38 32081,59 -3045,484 -294,171 -17,265BASE 4 COMB10 -1077,69 436,65 15009,19 -402,487 -2259,294 2,043BASE 4 COMB11 -1225,53 542,48 14987,62 -581,451 -2548,126 -8,124BASE 4 COMB12 -136,85 -432,89 15452,54 1067,476 -342,647 -15,728BASE 4 COMB13 291,93 -739,57 15514,44 1585,939 494,341 13,711BASE 4 COMB14 1206,86 562,57 19492,87 -574,919 2375,136 -4,571BASE 4 COMB15 1354,70 456,75 19514,44 -395,955 2663,968 5,596

BASE 4 COMB16 266,02 1432,11 19049,52 -2044,882 458,488 13,201BASE 4 COMB17 -162,76 1738,79 18987,62 -2563,345 -378,499 -16,239

BASE 5 CM -41,69 -242,16 40883,75 256,478 -19,419 -2,483BASE 5 COMB1 50,77 -643,76 85521,72 684,080 88,147 -5,392BASE 5 COMB2 -1487,14 -552,21 61159,27 628,033 -2988,813 1,799BASE 5 COMB3 -1472,63 -333,03 61283,80 266,876 -2959,582 -16,182BASE 5 COMB4 69,06 -2347,76 63468,72 3589,199 119,910 -29,631BASE 5 COMB5 26,99 -2982,87 63111,66 4635,418 35,196 22,434BASE 5 COMB6 1563,93 -415,23 67289,68 400,000 3121,711 -9,898BASE 5 COMB7 1549,43 -634,41 67165,16 761,156 3092,480 8,083BASE 5 COMB8 7,73 1380,32 64980,24 -2561,167 12,988 21,532BASE 5 COMB9 49,80 2015,43 65337,30 -3607,386 97,702 -30,533BASE 5 COMB10 -1563,05 -286,44 33730,17 344,847 -3072,739 3,614BASE 5 COMB11 -1548,55 -67,26 33854,70 -16,310 -3043,508 -14,367BASE 5 COMB12 -6,85 -2081,99 36039,62 3306,013 35,984 -27,816BASE 5 COMB13 -48,92 -2717,09 35682,56 4352,232 -48,730 24,249

BASE 5 COMB14 1488,02 -149,46 39860,58 116,814 3037,785 -8,084BASE 5 COMB15 1473,51 -368,63 39736,06 477,971 3008,554 9,898BASE 5 COMB16 -68,18 1646,09 37551,14 -2844,353 -70,938 23,347BASE 5 COMB17 -26,11 2281,20 37908,20 -3890,572 13,776 -28,719

BASE 6 CM 38,47 -296,85 16882,07 303,518 70,324 -1,404BASE 6 COMB1 181,62 -661,43 33110,67 681,134 242,496 -3,049BASE 6 COMB2 -1100,81 -508,15 22617,38 546,546 -2316,888 1,017BASE 6 COMB3 -966,26 -396,02 22516,28 361,315 -2056,021 -9,150BASE 6 COMB4 314,76 -1478,21 27435,70 2116,389 542,340 -16,755BASE 6 COMB5 -75,43 -1803,14 27725,45 2652,977 -213,596 12,685BASE 6 COMB6 1373,99 -485,44 27104,37 476,662 2681,478 -5,597BASE 6 COMB7 1239,45 -597,57 27205,47 661,892 2420,612 4,570BASE 6 COMB8 -41,58 484,62 22286,05 -1093,181 -177,749 12,175BASE 6 COMB9 348,61 809,55 21996,31 -1629,770 578,186 -17,265BASE 6 COMB10 -1202,78 -278,52 12950,37 308,108 -2435,892 2,043BASE 6 COMB11 -1068,23 -166,39 12849,27 122,878 -2175,025 -8,124BASE 6 COMB12 212,79 -1248,58 17768,69 1877,951 423,336 -15,728BASE 6 COMB13 -177,40 -1573,51 18058,44 2414,540 -332,600 13,711BASE 6 COMB14 1272,02 -255,81 17437,36 238,224 2562,474 -4,571BASE 6 COMB15 1137,48 -367,94 17538,46 423,455 2301,608 5,596BASE 6 COMB16 -143,55 714,25 12619,04 -1331,619 -296,753 13,201BASE 6 COMB17 246,64 1039,18 12329,30 -1868,208 459,182 -16,239

BASE 7 CM 15,36 759,88 22851,16 -743,835 9,782 -1,404BASE 7 COMB1 33,25 1868,03 49913,68 -1826,473 16,035 -3,049BASE 7 COMB2 -1337,05 1386,71 37782,90 -1338,078 -2517,818 1,017BASE 7 COMB3 -1508,56 1464,01 37935,65 -1469,802 -2829,541 -9,150BASE 7 COMB4 -215,34 470,42 36159,09 211,371 -426,154 -16,755BASE 7 COMB5 281,88 246,38 35721,09 592,997 477,062 12,685BASE 7 COMB6 1387,00 1420,07 37193,05 -1406,249 2541,884 -5,597BASE 7 COMB7 1558,50 1342,77 37040,29 -1274,526 2853,607 4,570BASE 7 COMB8 265,29 2336,36 38816,86 -2955,699 450,220 12,175

BASE 7 COMB9 -231,94 2560,40 39254,86 -3337,325 -452,996 -17,265BASE 7 COMB10 -1348,21 667,21 20860,97 -635,366 -2521,047 2,043BASE 7 COMB11 -1519,71 744,51 21013,72 -767,090 -2832,770 -8,124BASE 7 COMB12 -226,49 -249,08 19237,15 914,083 -429,383 -15,728BASE 7 COMB13 270,73 -473,12 18799,15 1295,709 473,833 13,711BASE 7 COMB14 1375,85 700,57 20271,11 -703,538 2538,655 -4,571BASE 7 COMB15 1547,35 623,27 20118,36 -571,814 2850,378 5,596BASE 7 COMB16 254,14 1616,86 21894,93 -2252,987 446,991 13,201BASE 7 COMB17 -243,09 1840,90 22332,93 -2634,613 -456,225 -16,239

BASE 8 CM 37,32 -392,57 43656,98 410,481 57,024 -2,483BASE 8 COMB1 77,28 -968,19 97318,07 1016,336 113,801 -5,392

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 28/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

28

BASE 8 COMB2 -1707,50 -777,85 73654,59 847,723 -3202,035 1,799BASE 8 COMB3 -1689,53 -623,11 73726,07 587,270 -3169,450 -16,182BASE 8 COMB4 85,45 -2614,42 72247,39 3914,014 135,770 -29,631BASE 8 COMB5 33,35 -3062,86 72042,46 4668,565 41,354 22,434BASE 8 COMB6 1823,57 -676,91 72535,45 679,379 3372,936 -9,898BASE 8 COMB7 1805,60 -831,65 72463,97 939,832 3340,352 8,083BASE 8 COMB8 30,62 1159,66 73942,64 -2386,913 35,132 21,532BASE 8 COMB9 82,72 1608,11 74147,58 -3141,463 129,548 -30,533

BASE 8 COMB10 -1731,95 -403,79 39850,85 453,605 -3236,164 3,614BASE 8 COMB11 -1713,98 -249,05 39922,33 193,151 -3203,579 -14,367BASE 8 COMB12 61,00 -2240,35 38443,66 3519,896 101,640 -27,816BASE 8 COMB13 8,90 -2688,80 38238,72 4274,446 7,224 24,249BASE 8 COMB14 1799,12 -302,85 38731,72 285,260 3338,807 -8,084BASE 8 COMB15 1781,15 -457,58 38660,23 545,714 3306,223 9,898BASE 8 COMB16 6,17 1533,72 40138,91 -2781,031 1,003 23,347BASE 8 COMB17 58,27 1982,17 40343,84 -3535,581 95,419 -28,719

BASE 9 CM 44,23 -352,05 17668,81 360,973 75,899 -1,404BASE 9 COMB1 96,10 -870,01 38036,79 894,046 159,743 -3,049BASE 9 COMB2 -1408,01 -685,55 28932,48 720,918 -2614,135 1,017BASE 9 COMB3 -1252,84 -603,12 28711,19 584,106 -2333,317 -9,150BASE 9 COMB4 293,35 -1648,15 30751,29 2316,377 521,623 -16,755BASE 9 COMB5 -156,50 -1887,00 31385,77 2712,721 -292,037 12,685BASE 9 COMB6 1552,36 -621,69 28200,95 622,437 2854,064 -5,597BASE 9 COMB7 1397,19 -704,11 28422,24 759,250 2573,247 4,570

BASE 9 COMB8 -149,00 340,91 26382,14 -973,022 -281,693 12,175BASE 9 COMB9 300,85 579,77 25747,66 -1369,365 531,966 -17,265BASE 9 COMB10 -1440,38 -348,77 16267,70 374,116 -2665,791 2,043BASE 9 COMB11 -1285,21 -266,35 16046,41 237,304 -2384,973 -8,124BASE 9 COMB12 260,98 -1311,37 18086,51 1969,575 469,967 -15,728BASE 9 COMB13 -188,86 -1550,22 18720,99 2365,919 -343,692 13,711BASE 9 COMB14 1519,99 -284,91 15536,17 275,636 2802,408 -4,571BASE 9 COMB15 1364,82 -367,33 15757,45 412,448 2521,591 5,596BASE 9 COMB16 -181,37 677,69 13717,36 -1319,824 -333,349 13,201BASE 9 COMB17 268,48 916,54 13082,87 -1716,167 480,310 -16,239

BASE 10 CM 202,94 775,80 26874,66 -756,972 191,290 -1,404BASE 10 COMB1 471,13 1891,96 58501,12 -1844,409 439,728 -3,049BASE 10 COMB2 -964,79 1414,37 44473,67 -1367,511 -2157,611 1,017BASE 10 COMB3 -1131,53 1465,88 44615,57 -1454,140 -2464,731 -9,150BASE 10 COMB4 126,02 418,39 42407,89 295,136 -95,849 -16,755BASE 10 COMB5 609,47 269,13 42001,07 546,110 794,034 12,685BASE 10 COMB6 1672,59 1428,30 43400,81 -1403,718 2818,215 -5,597BASE 10 COMB7 1839,33 1376,80 43258,91 -1317,089 3125,335 4,570BASE 10 COMB8 581,78 2424,29 45466,59 -3066,365 756,453 12,175BASE 10 COMB9 98,33 2573,55 45873,41 -3317,339 -133,430 -17,265BASE 10 COMB10 -1136,04 691,26 24723,62 -663,171 -2315,753 2,043BASE 10 COMB11 -1302,78 742,76 24865,52 -749,800 -2622,872 -8,124BASE 10 COMB12 -45,23 -304,72 22657,84 999,476 -253,991 -15,728BASE 10 COMB13 438,22 -453,99 22251,02 1250,449 635,892 13,711BASE 10 COMB14 1501,33 705,19 23650,76 -699,378 2660,074 -4,571BASE 10 COMB15 1668,08 653,68 23508,86 -612,749 2967,193 5,596BASE 10 COMB16 410,53 1701,17 25716,54 -2362,025 598,312 13,201BASE 10 COMB17 -72,92 1850,43 26123,37 -2612,999 -291,571 -16,239

BASE 11 CM 424,16 -494,23 51789,33 516,371 431,337 -2,483BASE 11 COMB1 973,31 -1228,62 113574,99 1285,551 980,794 -5,392BASE 11 COMB2 -995,38 -959,51 85973,92 1023,764 -2512,983 1,799

BASE 11 COMB3 -977,84 -857,22 86011,64 853,250 -2480,823 -16,182BASE 11 COMB4 746,72 -2941,69 84495,93 4300,655 775,613 -29,631BASE 11 COMB5 695,89 -3238,12 84387,75 4794,638 682,428 22,434BASE 11 COMB6 2457,57 -886,57 84630,16 907,871 3986,391 -9,898BASE 11 COMB7 2440,03 -988,86 84592,43 1078,386 3954,231 8,083BASE 11 COMB8 715,47 1095,61 86108,15 -2369,019 697,795 21,532BASE 11 COMB9 766,30 1392,04 86216,32 -2863,003 790,980 -30,533BASE 11 COMB10 -1344,72 -481,28 47282,28 522,680 -2861,483 3,614BASE 11 COMB11 -1327,19 -378,99 47320,00 352,166 -2829,323 -14,367BASE 11 COMB12 397,37 -2463,46 45804,28 3799,571 427,112 -27,816BASE 11 COMB13 346,55 -2759,88 45696,11 4293,554 333,927 24,249BASE 11 COMB14 2108,22 -408,34 45938,51 406,787 3637,891 -8,084

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 29/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

29

BASE 11 COMB15 2090,69 -510,63 45900,79 577,302 3605,730 9,898BASE 11 COMB16 366,12 1573,84 47416,51 -2870,103 349,295 23,347BASE 11 COMB17 416,95 1870,27 47524,68 -3364,087 442,480 -28,719

BASE 12 CM -22,56 -249,35 13107,45 261,622 11,270 -1,404BASE 12 COMB1 -120,50 -588,66 25946,83 620,334 -49,837 -3,049BASE 12 COMB2 -1495,13 -468,75 20361,16 503,565 -2698,432 1,017BASE 12 COMB3 -1346,85 -415,04 20164,29 414,744 -2424,281 -9,150

BASE 12 COMB4 123,52 -1481,01 21714,68 2182,387 357,296 -16,755BASE 12 COMB5 -306,38 -1636,66 22279,13 2439,702 -437,059 12,685BASE 12 COMB6 1313,86 -415,65 18603,76 428,430 2623,290 -5,597BASE 12 COMB7 1165,58 -469,36 18800,63 517,252 2349,139 4,570BASE 12 COMB8 -304,79 596,61 17250,24 -1250,391 -432,438 12,175BASE 12 COMB9 125,10 752,26 16685,79 -1507,707 361,917 -17,265BASE 12 COMB10 -1424,80 -250,97 12675,41 273,027 -2650,717 2,043BASE 12 COMB11 -1276,52 -197,26 12478,54 184,206 -2376,567 -8,124BASE 12 COMB12 193,85 -1263,23 14028,93 1951,849 405,011 -15,728BASE 12 COMB13 -236,04 -1418,88 14593,38 2209,165 -389,344 13,711BASE 12 COMB14 1384,19 -197,86 10918,01 197,893 2671,004 -4,571BASE 12 COMB15 1235,91 -251,57 11114,88 286,714 2396,854 5,596BASE 12 COMB16 -234,46 814,40 9564,49 -1480,929 -384,724 13,201BASE 12 COMB17 195,43 970,04 9000,04 -1738,244 409,631 -16,239

BASE 13 CM -61,09 894,26 27957,11 -871,318 -64,190 -1,404BASE 13 COMB1 -138,57 2198,79 61416,14 -2142,007 -150,221 -3,049

BASE 13 COMB2 -1390,13 1648,40 46072,13 -1602,462 -2569,170 1,017BASE 13 COMB3 -1553,00 1664,56 46094,05 -1629,716 -2872,547 -9,150BASE 13 COMB4 -330,23 620,04 44501,01 134,754 -537,323 -16,755BASE 13 COMB5 142,03 573,21 44438,19 213,715 341,736 12,685BASE 13 COMB6 1181,96 1655,37 46183,12 -1615,973 2343,483 -5,597BASE 13 COMB7 1344,84 1639,21 46161,20 -1588,719 2646,861 4,570BASE 13 COMB8 122,07 2683,72 47754,23 -3353,189 311,637 12,175BASE 13 COMB9 -350,20 2730,56 47817,06 -3432,150 -567,422 -17,265BASE 13 COMB10 -1341,02 801,35 25105,90 -777,431 -2514,098 2,043BASE 13 COMB11 -1503,90 817,51 25127,82 -804,684 -2817,475 -8,124BASE 13 COMB12 -281,13 -227,01 23534,79 959,786 -482,251 -15,728BASE 13 COMB13 191,13 -273,84 23471,96 1038,746 396,808 13,711BASE 13 COMB14 1231,06 808,32 25216,89 -790,942 2398,555 -4,571BASE 13 COMB15 1393,94 792,16 25194,97 -763,688 2701,933 5,596BASE 13 COMB16 171,17 1836,67 26788,01 -2528,158 366,709 13,201BASE 13 COMB17 -301,09 1883,51 26850,83 -2607,118 -512,350 -16,239

BASE 14 CM -162,76 -509,11 56671,75 537,646 -136,574 -2,483BASE 14 COMB1 -356,25 -1249,97 124148,02 1320,901 -305,684 -5,392BASE 14 COMB2 -1942,41 -959,56 92935,86 1019,076 -3429,336 1,799BASE 14 COMB3 -1925,60 -925,93 92962,44 963,915 -3397,869 -16,182BASE 14 COMB4 -237,70 -3046,05 92167,32 4482,042 -176,913 -29,631BASE 14 COMB5 -286,46 -3143,50 92091,16 4641,850 -268,097 22,434BASE 14 COMB6 1407,28 -918,56 93549,75 965,618 2970,136 -9,898BASE 14 COMB7 1390,47 -952,18 93523,16 1020,779 2938,669 8,083BASE 14 COMB8 -297,43 1167,93 94318,29 -2497,348 -282,287 21,532BASE 14 COMB9 -248,67 1265,38 94394,45 -2657,156 -191,103 -30,533BASE 14 COMB10 -1821,33 -478,70 50697,63 510,611 -3322,652 3,614BASE 14 COMB11 -1804,52 -445,08 50724,22 455,450 -3291,186 -14,367BASE 14 COMB12 -116,62 -2565,19 49929,09 3973,577 -70,230 -27,816BASE 14 COMB13 -165,38 -2662,64 49852,93 4133,385 -161,414 24,249BASE 14 COMB14 1528,36 -437,70 51311,52 457,152 3076,819 -8,084BASE 14 COMB15 1511,54 -471,33 51284,94 512,314 3045,353 9,898

BASE 14 COMB16 -176,35 1648,79 52080,06 -3005,813 -175,603 23,347BASE 14 COMB17 -127,59 1746,24 52156,22 -3165,622 -84,419 -28,719

BASE 15 CM 56,89 -340,27 21483,69 355,304 88,145 -1,404BASE 15 COMB1 187,43 -839,41 43395,03 876,757 248,120 -3,049BASE 15 COMB2 -1240,17 -629,24 32230,06 660,600 -2451,730 1,017BASE 15 COMB3 -1093,29 -612,29 32208,21 632,554 -2178,929 -9,150BASE 15 COMB4 326,58 -1746,65 35401,72 2486,298 553,780 -16,755BASE 15 COMB5 -99,30 -1795,79 35464,42 2567,550 -236,691 12,685BASE 15 COMB6 1521,95 -632,01 32940,83 656,767 2824,643 -5,597BASE 15 COMB7 1375,07 -648,97 32962,67 684,813 2551,842 4,570BASE 15 COMB8 -44,80 485,39 29769,16 -1168,931 -180,867 12,175

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 30/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

30

BASE 15 COMB9 381,08 534,53 29706,46 -1250,182 609,603 -17,265BASE 15 COMB10 -1329,86 -304,85 18979,94 321,690 -2558,856 2,043BASE 15 COMB11 -1182,98 -287,90 18958,09 293,644 -2286,055 -8,124BASE 15 COMB12 236,89 -1422,26 22151,60 2147,389 446,654 -15,728BASE 15 COMB13 -188,99 -1471,40 22214,30 2228,640 -343,817 13,711BASE 15 COMB14 1432,26 -307,62 19690,71 317,857 2717,517 -4,571BASE 15 COMB15 1285,38 -324,58 19712,55 345,903 2444,716 5,596BASE 15 COMB16 -134,49 809,78 16519,04 -1507,841 -287,993 13,201

BASE 15 COMB17 291,39 858,92 16456,34 -1589,092 502,477 -16,239BASE 16 CM -6,09 921,80 27119,29 -895,454 -10,969 -1,404BASE 16 COMB1 -17,39 2280,05 59834,53 -2215,726 -32,966 -3,049BASE 16 COMB2 -1310,10 1718,51 44867,20 -1674,468 -2491,741 1,017BASE 16 COMB3 -1474,14 1701,50 44829,51 -1645,358 -2796,237 -9,150BASE 16 COMB4 -242,63 649,35 43317,85 144,214 -452,554 -16,755BASE 16 COMB5 232,98 698,63 43425,90 59,885 429,741 12,685BASE 16 COMB6 1283,97 1707,39 45013,23 -1654,780 2442,188 -5,597BASE 16 COMB7 1448,00 1724,40 45050,92 -1683,890 2746,684 4,570BASE 16 COMB8 216,49 2776,55 46562,58 -3473,463 403,001 12,175BASE 16 COMB9 -259,12 2727,27 46454,53 -3389,134 -479,294 -17,265BASE 16 COMB10 -1302,52 835,18 24334,34 -815,752 -2476,837 2,043BASE 16 COMB11 -1466,55 818,18 24296,66 -786,642 -2781,333 -8,124BASE 16 COMB12 -235,04 -233,98 22785,00 1002,930 -437,650 -15,728BASE 16 COMB13 240,57 -184,70 22893,05 918,601 444,645 13,711BASE 16 COMB14 1291,56 824,06 24480,38 -796,064 2457,093 -4,571

BASE 16 COMB15 1455,59 841,07 24518,07 -825,174 2761,589 5,596BASE 16 COMB16 224,08 1893,23 26029,73 -2614,747 417,906 13,201BASE 16 COMB17 -251,53 1843,94 25921,68 -2530,418 -464,389 -16,239

BASE 17 CM 23,02 -533,61 53579,04 568,215 43,191 -2,483BASE 17 COMB1 38,81 -1284,53 118958,65 1368,821 76,576 -5,392BASE 17 COMB2 -1654,67 -953,24 89444,19 1008,246 -3150,915 1,799BASE 17 COMB3 -1637,66 -987,64 89422,90 1066,152 -3119,260 -16,182BASE 17 COMB4 54,32 -3123,16 88396,76 4633,739 105,642 -29,631BASE 17 COMB5 5,00 -3023,49 88457,75 4465,998 13,916 22,434BASE 17 COMB6 1712,92 -976,71 89252,30 1048,357 3265,873 -9,898BASE 17 COMB7 1695,91 -942,31 89273,59 990,451 3234,219 8,083BASE 17 COMB8 3,94 1193,21 90299,73 -2577,135 9,316 21,532BASE 17 COMB9 53,26 1093,54 90238,74 -2409,394 101,043 -30,533BASE 17 COMB10 -1663,08 -468,52 48317,09 491,338 -3169,522 3,614BASE 17 COMB11 -1646,07 -502,91 48295,79 549,244 -3137,868 -14,367BASE 17 COMB12 45,91 -2638,44 47269,65 4116,831 87,034 -27,816BASE 17 COMB13 -3,41 -2538,77 47330,65 3949,090 -4,692 24,249BASE 17 COMB14 1704,51 -491,98 48125,19 531,449 3247,266 -8,084BASE 17 COMB15 1687,50 -457,59 48146,48 473,543 3215,611 9,898BASE 17 COMB16 -4,47 1677,94 49172,62 -3094,044 -9,291 23,347BASE 17 COMB17 44,85 1578,27 49111,63 -2926,303 82,435 -28,719

BASE 18 CM 30,57 -402,24 21896,51 420,111 62,680 -1,404BASE 18 COMB1 55,00 -1021,31 46443,88 1064,513 119,973 -3,049BASE 18 COMB2 -1358,93 -760,15 34956,35 788,325 -2566,647 1,017BASE 18 COMB3 -1211,09 -778,33 34998,93 818,609 -2292,921 -9,150BASE 18 COMB4 253,19 -1903,06 37422,38 2680,284 482,760 -16,755BASE 18 COMB5 -175,46 -1850,36 37300,19 2592,562 -310,387 12,685BASE 18 COMB6 1441,50 -774,52 34802,34 811,246 2746,797 -5,597BASE 18 COMB7 1293,66 -756,33 34759,76 780,962 2473,070 4,570BASE 18 COMB8 -170,62 368,39 32336,31 -1080,712 -302,610 12,175BASE 18 COMB9 258,03 315,70 32458,51 -992,990 490,537 -17,265

BASE 18 COMB10 -1372,70 -354,83 19783,87 366,639 -2600,310 2,043BASE 18 COMB11 -1224,87 -373,01 19826,45 396,923 -2326,584 -8,124BASE 18 COMB12 239,41 -1497,74 22249,90 2258,598 449,097 -15,728BASE 18 COMB13 -189,23 -1445,04 22127,70 2170,876 -344,050 13,711BASE 18 COMB14 1427,73 -369,20 19629,86 389,561 2713,133 -4,571BASE 18 COMB15 1279,89 -351,01 19587,27 359,277 2439,407 5,596BASE 18 COMB16 -184,39 773,71 17163,83 -1502,398 -336,273 13,201BASE 18 COMB17 244,26 721,02 17286,02 -1414,676 456,874 -16,239

BASE 19 CM -41,06 853,99 25137,98 -824,961 -44,810 -1,404BASE 19 COMB1 -102,18 2106,51 55170,04 -2036,526 -115,007 -3,049BASE 19 COMB2 -1399,48 1596,39 41116,78 -1555,394 -2578,221 1,017

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 31/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

31

BASE 19 COMB3 -1566,50 1547,77 41000,91 -1472,305 -2885,609 -9,150BASE 19 COMB4 -310,22 473,37 39683,87 356,255 -517,957 -16,755BASE 19 COMB5 174,03 614,28 40016,14 115,544 372,705 12,685BASE 19 COMB6 1245,95 1568,73 41755,80 -1504,582 2405,404 -5,597BASE 19 COMB7 1412,97 1617,35 41871,67 -1587,671 2712,792 4,570BASE 19 COMB8 156,69 2691,76 43188,70 -3416,231 345,139 12,175BASE 19 COMB9 -327,56 2550,85 42856,43 -3175,519 -545,522 -17,265BASE 19 COMB10 -1359,67 782,43 22304,67 -767,871 -2532,141 2,043

BASE 19 COMB11 -1526,70 733,81 22188,80 -684,782 -2839,529 -8,124BASE 19 COMB12 -270,41 -340,60 20871,77 1143,778 -471,877 -15,728BASE 19 COMB13 213,84 -199,69 21204,04 903,067 418,785 13,711BASE 19 COMB14 1285,76 754,76 22943,69 -717,059 2451,484 -4,571BASE 19 COMB15 1452,78 803,38 23059,56 -800,148 2758,871 5,596BASE 19 COMB16 196,50 1877,79 24376,60 -2628,708 391,219 13,201BASE 19 COMB17 -287,75 1736,88 24044,33 -2387,997 -499,443 -16,239

BASE 20 CM -46,70 -499,49 48437,24 540,526 -24,275 -2,483BASE 20 COMB1 -128,34 -1216,77 107801,33 1314,960 -85,158 -5,392BASE 20 COMB2 -1816,35 -879,94 80444,97 931,268 -3307,357 1,799BASE 20 COMB3 -1799,05 -978,00 80400,37 1096,270 -3275,423 -16,182BASE 20 COMB4 -70,07 -3162,06 79965,44 4744,873 -14,715 -29,631BASE 20 COMB5 -120,22 -2877,90 80093,37 4266,877 -107,244 22,434BASE 20 COMB6 1623,47 -948,26 81492,25 1044,455 3179,319 -9,898BASE 20 COMB7 1606,17 -850,21 81536,85 879,454 3147,385 8,083BASE 20 COMB8 -122,81 1333,86 81971,79 -2769,150 -113,323 21,532

BASE 20 COMB9 -72,66 1049,70 81843,86 -2291,154 -20,794 -30,533BASE 20 COMB10 -1761,94 -415,39 43069,88 429,879 -3265,185 3,614BASE 20 COMB11 -1744,64 -513,44 43025,28 594,881 -3233,251 -14,367BASE 20 COMB12 -15,66 -2697,50 42590,34 4243,485 27,457 -27,816BASE 20 COMB13 -65,81 -2413,35 42718,28 3765,489 -65,072 24,249BASE 20 COMB14 1677,87 -483,70 44117,16 543,067 3221,490 -8,084BASE 20 COMB15 1660,58 -385,65 44161,76 378,065 3189,557 9,898BASE 20 COMB16 -68,40 1798,41 44596,69 -3270,539 -71,151 23,347BASE 20 COMB17 -18,25 1514,26 44468,76 -2792,543 21,378 -28,719

BASE 21 CM -3,67 -387,73 18856,96 408,818 29,555 -1,404BASE 21 COMB1 -18,96 -959,52 40529,70 1009,885 48,417 -3,049BASE 21 COMB2 -1447,27 -702,80 30010,63 729,083 -2652,122 1,017BASE 21 COMB3 -1296,37 -754,69 30173,00 815,425 -2375,432 -9,150BASE 21 COMB4 199,38 -1904,42 33193,23 2718,819 430,694 -16,755BASE 21 COMB5 -238,11 -1754,03 32727,72 2468,697 -371,007 12,685BASE 21 COMB6 1418,75 -738,94 30867,03 788,318 2724,788 -5,597BASE 21 COMB7 1267,85 -687,04 30704,67 701,976 2448,099 4,570BASE 21 COMB8 -227,89 462,68 27684,44 -1201,418 -358,028 12,175BASE 21 COMB9 209,60 312,30 28149,95 -951,296 443,673 -17,265BASE 21 COMB10 -1436,31 -330,89 16543,07 338,319 -2661,855 2,043BASE 21 COMB11 -1285,41 -382,78 16705,43 424,661 -2385,166 -8,124BASE 21 COMB12 210,34 -1532,51 19725,66 2328,054 420,960 -15,728BASE 21 COMB13 -227,15 -1382,13 19260,15 2077,933 -380,741 13,711BASE 21 COMB14 1429,71 -367,03 17399,47 397,553 2715,054 -4,571BASE 21 COMB15 1278,81 -315,14 17237,10 311,211 2438,365 5,596BASE 21 COMB16 -216,93 834,59 14216,87 -1592,182 -367,761 13,201BASE 21 COMB17 220,56 684,21 14682,38 -1342,061 433,940 -16,239

BASE 22 CM 49,55 851,78 25778,80 -820,040 42,868 -1,404BASE 22 COMB1 108,35 2074,69 56124,44 -1998,989 88,704 -3,049BASE 22 COMB2 -1252,52 1576,26 42337,59 -1537,365 -2436,027 1,017BASE 22 COMB3 -1420,79 1499,17 42223,60 -1406,240 -2744,616 -9,150

BASE 22 COMB4 -153,38 405,05 40358,04 456,670 -366,201 -16,755BASE 22 COMB5 334,47 628,47 40684,85 76,802 527,940 12,685BASE 22 COMB6 1415,29 1540,96 41966,91 -1466,124 2569,251 -5,597BASE 22 COMB7 1583,55 1618,06 42080,91 -1597,249 2877,840 4,570BASE 22 COMB8 316,14 2712,17 43946,46 -3460,160 499,425 12,175BASE 22 COMB9 -171,71 2488,75 43619,66 -3080,291 -394,715 -17,265BASE 22 COMB10 -1289,31 784,26 23386,26 -773,656 -2464,058 2,043BASE 22 COMB11 -1457,57 707,16 23272,26 -642,532 -2772,647 -8,124BASE 22 COMB12 -190,17 -386,96 21406,71 1220,379 -394,232 -15,728BASE 22 COMB13 297,68 -163,53 21733,52 840,510 499,908 13,711BASE 22 COMB14 1378,50 748,96 23015,58 -702,416 2541,220 -4,571BASE 22 COMB15 1546,77 826,05 23129,58 -833,541 2849,809 5,596

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 32/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

32

BASE 22 COMB16 279,36 1920,17 24995,13 -2696,451 471,394 13,201BASE 22 COMB17 -208,49 1696,74 24668,33 -2316,583 -422,747 -16,239

BASE 23 CM 159,10 -495,78 49968,90 542,178 174,865 -2,483BASE 23 COMB1 375,44 -1183,41 110748,95 1293,500 402,301 -5,392BASE 23 COMB2 -1453,85 -835,21 83313,92 883,124 -2956,602 1,799BASE 23 COMB3 -1436,37 -988,64 83238,26 1141,515 -2924,495 -16,182BASE 23 COMB4 308,32 -3213,62 82166,10 4859,466 351,411 -29,631

BASE 23 COMB5 257,64 -2768,98 82383,27 4110,923 258,376 22,434BASE 23 COMB6 2017,91 -942,79 83049,46 1060,270 3560,980 -9,898BASE 23 COMB7 2000,43 -789,36 83125,12 801,880 3528,873 8,083BASE 23 COMB8 255,74 1435,62 84197,28 -2916,071 252,967 21,532BASE 23 COMB9 306,42 990,97 83980,11 -2167,528 346,001 -30,533BASE 23 COMB10 -1592,69 -392,41 45104,24 399,388 -3101,413 3,614BASE 23 COMB11 -1575,21 -545,85 45028,58 657,778 -3069,306 -14,367BASE 23 COMB12 169,48 -2770,82 43956,41 4375,729 206,600 -27,816BASE 23 COMB13 118,81 -2326,18 44173,59 3627,186 113,566 24,249BASE 23 COMB14 1879,07 -499,99 44839,78 576,533 3416,169 -8,084BASE 23 COMB15 1861,60 -346,56 44915,44 318,143 3384,062 9,898BASE 23 COMB16 116,91 1878,41 45987,60 -3399,808 108,156 23,347BASE 23 COMB17 167,58 1433,77 45770,43 -2651,265 201,191 -28,719

BASE 24 CM 113,16 -408,25 19190,71 431,932 142,598 -1,404BASE 24 COMB1 261,04 -1009,89 41430,49 1065,848 319,339 -3,049BASE 24 COMB2 -1251,06 -729,00 31197,25 753,139 -2462,271 1,017

BASE 24 COMB3 -1098,83 -810,50 31382,48 888,646 -2184,294 -9,150BASE 24 COMB4 412,35 -1984,05 33888,41 2830,476 636,766 -16,755BASE 24 COMB5 -29,00 -1747,86 33357,27 2437,930 -168,670 12,685BASE 24 COMB6 1643,22 -788,41 31034,15 848,345 2941,984 -5,597BASE 24 COMB7 1490,99 -706,91 30848,92 712,839 2664,007 4,570BASE 24 COMB8 -20,19 466,64 28342,99 -1228,992 -157,053 12,175BASE 24 COMB9 421,16 230,45 28874,13 -836,445 648,383 -17,265BASE 24 COMB10 -1345,29 -337,72 17353,19 341,136 -2573,789 2,043BASE 24 COMB11 -1193,06 -419,22 17538,42 476,642 -2295,812 -8,124BASE 24 COMB12 318,12 -1592,77 20044,35 2418,473 525,248 -15,728BASE 24 COMB13 -123,23 -1356,58 19513,21 2025,926 -280,188 13,711BASE 24 COMB14 1548,99 -397,14 17190,09 436,342 2830,466 -4,571BASE 24 COMB15 1396,76 -315,63 17004,86 300,835 2552,489 5,596BASE 24 COMB16 -114,42 857,91 14498,93 -1640,995 -268,571 13,201BASE 24 COMB17 326,93 621,73 15030,07 -1248,449 536,865 -16,239

BASE 25 CM 15,49 681,42 20626,97 -647,651 9,909 -1,404BASE 25 COMB1 -51,59 1589,10 45113,01 -1509,738 -66,053 -3,049BASE 25 COMB2 -1171,09 1246,98 35580,05 -1212,451 -2357,226 1,017BASE 25 COMB3 -1319,84 1136,45 35549,77 -1025,535 -2646,940 -9,150BASE 25 COMB4 -271,19 -39,17 32153,06 935,229 -480,191 -16,755BASE 25 COMB5 160,23 281,16 32239,68 393,743 359,345 12,685BASE 25 COMB6 1093,28 1140,40 32184,97 -1055,703 2257,676 -5,597BASE 25 COMB7 1242,03 1250,93 32215,25 -1242,619 2547,390 4,570BASE 25 COMB8 193,38 2426,55 35611,96 -3203,383 380,640 12,175BASE 25 COMB9 -238,03 2106,23 35525,34 -2661,897 -458,895 -17,265BASE 25 COMB10 -1118,24 666,57 20261,81 -661,260 -2298,533 2,043BASE 25 COMB11 -1267,00 556,04 20231,54 -474,344 -2588,247 -8,124BASE 25 COMB12 -218,34 -619,58 16834,82 1486,420 -421,497 -15,728BASE 25 COMB13 213,07 -299,25 16921,45 944,934 418,038 13,711BASE 25 COMB14 1146,12 559,99 16866,74 -504,512 2316,369 -4,571BASE 25 COMB15 1294,88 670,52 16897,01 -691,428 2606,083 5,596BASE 25 COMB16 246,22 1846,14 20293,73 -2652,192 439,333 13,201

BASE 25 COMB17 -185,19 1525,81 20207,10 -2110,706 -400,202 -16,239

BASE 26 CM -593,41 -485,33 35356,66 537,917 -553,268 -2,483BASE 26 COMB1 -1456,56 -1116,91 78288,15 1240,875 -1370,342 -5,392BASE 26 COMB2 -2533,34 -773,41 61176,44 817,530 -4001,116 1,799BASE 26 COMB3 -2517,86 -994,71 61067,35 1187,182 -3970,941 -16,182BASE 26 COMB4 -1067,39 -3265,70 57806,02 4983,658 -979,718 -29,631BASE 26 COMB5 -1112,27 -2624,40 58118,73 3912,802 -1067,151 22,434BASE 26 COMB6 344,82 -904,53 56425,13 1046,652 1942,099 -9,898BASE 26 COMB7 329,34 -683,23 56534,23 676,999 1911,924 8,083BASE 26 COMB8 -1121,13 1587,77 59795,56 -3119,477 -1079,299 21,532BASE 26 COMB9 -1076,25 946,46 59482,84 -2048,621 -991,866 -30,533

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 33/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

33

BASE 26 COMB10 -1973,15 -371,24 34196,65 369,565 -3469,549 3,614BASE 26 COMB11 -1957,67 -592,54 34087,55 739,217 -3439,374 -14,367BASE 26 COMB12 -507,20 -2863,53 30826,22 4535,693 -448,151 -27,816BASE 26 COMB13 -552,08 -2222,23 31138,93 3464,837 -535,584 24,249BASE 26 COMB14 905,01 -502,36 29445,33 598,686 2473,665 -8,084BASE 26 COMB15 889,53 -281,06 29554,43 229,034 2443,491 9,898BASE 26 COMB16 -560,94 1989,94 32815,76 -3567,442 -547,732 23,347BASE 26 COMB17 -516,06 1348,63 32503,05 -2496,586 -460,299 -28,719

BASE 27 CM -303,05 -205,04 13820,92 233,134 -260,134 -1,404BASE 27 COMB1 -731,51 -491,52 29322,52 557,567 -641,051 -3,049BASE 27 COMB2 -1731,31 -345,31 23681,42 369,650 -2926,956 1,017BASE 27 COMB3 -1604,09 -459,13 23825,51 559,833 -2673,181 -9,150BASE 27 COMB4 -372,88 -1638,09 24774,97 2523,916 -123,022 -16,755BASE 27 COMB5 -741,89 -1308,24 24361,95 1972,970 -858,459 12,685BASE 27 COMB6 632,23 -393,18 20361,02 468,060 1963,752 -5,597BASE 27 COMB7 505,01 -279,36 20216,93 277,878 1709,977 4,570BASE 27 COMB8 -726,19 899,60 19267,47 -1686,206 -840,183 12,175BASE 27 COMB9 -357,19 569,76 19680,49 -1135,260 -104,745 -17,265BASE 27 COMB10 -1454,52 -160,60 14099,03 160,616 -2679,474 2,043BASE 27 COMB11 -1327,30 -274,42 14243,11 350,798 -2425,699 -8,124BASE 27 COMB12 -96,09 -1453,38 15192,57 2314,881 124,460 -15,728BASE 27 COMB13 -465,10 -1123,53 14779,55 1763,936 -610,977 13,711BASE 27 COMB14 909,02 -208,47 10778,62 259,025 2211,234 -4,571BASE 27 COMB15 781,80 -94,65 10634,54 68,843 1957,458 5,596

BASE 27 COMB16 -449,40 1084,31 9685,08 -1895,240 -592,701 13,201BASE 27 COMB17 -80,40 754,47 10098,10 -1344,295 142,737 -16,239

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 34/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular [email protected] – Bogotá D.C - Colombia34

DIAGRAMAS ESTRUCTURA

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 35/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular [email protected] – Bogotá D.C - Colombia35

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 36/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular [email protected] – Bogotá D.C - Colombia36

DISEÑO ESTRUCTURAL

CUBIERTA

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 37/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular [email protected] – Bogotá D.C - Colombia37

TERCER PISO

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 38/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular [email protected] – Bogotá D.C - Colombia38

SEGUNDO PISO

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 39/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular [email protected] – Bogotá D.C - Colombia39

PORTICO 2 PORTICO 3

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 40/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular [email protected] – Bogotá D.C - Colombia40

PORTICO 4 PORTICO 5

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 41/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular [email protected] – Bogotá D.C - Colombia41

PORTICO 6 PORTICO 7

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 42/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular [email protected] – Bogotá D.C - Colombia42

PORTICO 8 PORTICO 9

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 43/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular [email protected] – Bogotá D.C - Colombia43

PORTICO A

PORTICO B

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 44/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular [email protected] – Bogotá D.C - Colombia44

PORTICO C

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 45/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

45

VIGA 202 VIGA 203

VIGA 205 VIGA 206

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 46/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

46

VIGA 208

VIGA 209

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 47/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

CALCULO CIMENTACION

Columna b= 20 h= 45 Pu= 126 Ton

Presion Adm 24 Ton/m2

F`c 280 Kg/cm2

Fy 4200 Kg/cm2

ф 0,7

ф 0,85

Fs 1,5

Sep. Columnas 5

Profundidad 60 cmb 1

Revision de la presion en contacto

Pumax<   ф*0.85*F´c*Ag

Pumax Col 149,94 Ton

NO REQUIERE PEDESTAL

Calculo del area de la zapata y la presion ultima del suelo σutil

Se asume d = 24 cms

h = 30 cms

Reacciones del Suelo

N piso

0,6

L

h

L

σutil

0,2

ZAPATA Z1

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 48/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

Carga de servicio = 82

 Area de la zapata = 3,41 m2

Lado de la zapata = 1,85 m

Se asume = 1,9 m Area = 3,61 m2

Presion ult. del suelo = 34,9 Ton/m2

Revision del espesor asumido para la zapata

Cortante en dos direcciones, punzonamiento

Pu

  h+dd/2 d/2

b+d

d

d = 21 cms

bo = 214 cms

Vu = 116,56 Ton

d > 35 cm

d > 24 cm

Cortante en una direccion, flexion

51,5 cm

Pu

d

d d

d h

1,9

La fuerza cortante critica

b

σutil

1,9

b

σutil

b

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 49/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

Vu =   σutil * B * (H/2-h/2-d)

Vu = 34,90 * 1,9 * 0,515

Vu = 34,15 Ton

d =

0.53*ф*√F`c*B

d =

d = 23,8450 cm < 21 cm

Diseño a flexion

0,725 m

Pu

d h

1,9

Mu =   σutil * B * (H/2-h/2) 2̂/2

Mu = 34,90 * 1,9 * 0,263

Mu = 17,43 Ton-m

Para

b = 190

d = 21

k = 0,0208

Cuantia = 0,0033

 As = 82,99 cm2 65,09

Se colocaran 13 Nº 9 cada 15 cm en ambas direcciones

1,9 b

σutil

H-h/2

Seccion critica

Vu

34153

1432,28

  b

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 50/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

,

Columna b= 20 h= 45 Pu= 109 Ton

Presion Adm 24 Ton/m2

F`c 280 Kg/cm2

Fy 4200 Kg/cm2

ф 0,7

ф 0,85

Fs 1,5

Sep. Columnas 5

Profundidad 60 cm

b 1

Revision de la presion en contacto

Pumax<   ф*0.85*F´c*Ag

Pumax Col 149,94 Ton

NO REQUIERE PEDESTAL

Calculo del area de la zapata y la presion ultima del suelo σutil

Se asume d = 24 cms

h = 30 cms

Reacciones del Suelo

N piso

0,6

L

h

L

ZAPATA Z2

0,2

σutil

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 51/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

Carga de servicio = 71

 Area de la zapata = 2,95 m2

Lado de la zapata = 1,72 m

Se asume = 1,7 m Area = 2,89 m2

Presion ult. del suelo = 37,72 Ton/m2

Revision del espesor asumido para la zapata

Cortante en dos direcciones, punzonamiento

Pu

  h+dd/2 d/2

b+d

d

d = 21 cms

bo = 214 cms

Vu = 98,79 Ton

d > 30 cm

d > 20 cm CUMPLE

Cortante en una direccion, flexion

41,5 cm

Pu

d

d d

d h

1,7

La fuerza cortante critica

b

σutil

b

1,7 b

σutil

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 52/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

Vu =   σutil * B * (H/2-h/2-d)

Vu = 37,72 * 1,7 * 0,415

Vu = 26,61 Ton

d =0.53*ф*√F`c*B

d =

d = 20,7636 cm < 21 cm CUMPLE

Diseño a flexion

0,625 m

Pu

d h

1,7

Mu =   σutil * B * (H/2-h/2) 2̂/2

Mu = 37,72 * 1,7 * 0,195

Mu = 12,52 Ton-m

Para

b = 170

d = 21

k = 0,0167

Cuantia = 0,0033

 As = 59,63 cm2 46,78

Se colocaran 12 Nº 8 cada 15 cm en ambas direcciones

Vu

26609

1281,51

  b

H-h/2

1,7 b

Seccion critica

σutil

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 53/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

Columna b= 20 h= 45 Pu= 55 Ton

Donde Pu = 1,2 * Rmax

Rmax= 24 Ton/cm2

Presion Adm 24 Ton/m2

F`c 210 Kg/cm2

Fy 4200 Kg/cm2

ф 0,7

ф 0,85

Fs 1,5

Sep. Column 3,5

Revision de la presion en contacto

Pumax<   ф*0.85*F´c*Ag

Pumax Col 112 Ton

Calculo del area de la zapata y la presion ultima del suelo σutil

Se asume d = 34 cms

H = 40 cms

Reacciones del Suelo

P= 55 Ton

0,225 0,225

20 B

e= 0,575

45

c.g. h

σmax

0,225 1,375

ZAPATA MEDIANERA Z3

L

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 54/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

Col 36,67 Ton

σsuelo = Presion Ad * Fs

σsuelo = 24 * 1,5

σsuelo = 36 Ton / m2

 Area de la Zapata 36,67 = 1,53 m2

24

Para que exista un equilibrio estatico se requiere una dimension L = 1,6

B > 1,0 m

Valor de B para σ util del suelo

B = 1,9 m

Revision del espesor asumido para la zapata

Se analiza la direccion mas larga, la cual es la critica

Vu = 1/2 * σutil * L * Zo

0,34

0,2 B = 1,9 0,34 0,51

0,450,85

0,2 0,855

1,6

Vu = 14,8 Ton/m

фVc = 0.53* ф * √F`c * L* d=

фVc = 35,51 Ton < Vu

Diseño a flexion en la direccion larga

La seccion critica corresponde al borde de la zapata en la cual,

Mu = σutil * 1,6 0,85 2̂

*

2 2

0,51

0,855

ais, la resultante de la reaccion del terreno cae en el tercio medio y es colineal y opuesta a

la carga Pu.

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 55/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

Mu = 10,52 ton-m

b = 160 cm

d = 34 cm

K = 0,00569

cuatia = 0,0033

 As = 31,0 cm2

Colocar 8 Nº 7 cada 26 cms

Diseño a flexion en la direccion Corta

0,45 1,15

h

σmaxσ= 28,8

Mborde = 0,46 Ton-m

b = 191,0

d = 34,00

K = 0,0000

cuantia = 0,0033

 As = 21,4 cm2

Colocar 8 Nº 6 cada 21 cms

1,60

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 56/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

Columna b= 20 h= 45 Pu= 45 Ton

Donde Pu = 1,2 * Rmax

Rmax= 24 Ton/cm2

Presion Adm 24 Ton/m2

F`c 210 Kg/cm2

Fy 4200 Kg/cm2

ф 0,7

ф 0,85

Fs 1,5

Sep. Column 3,5

Revision de la presion en contacto

Pumax<   ф*0.85*F´c*Ag

Pumax Col 112 Ton

Calculo del area de la zapata y la presion ultima del suelo σutil

Se asume d = 24 cms

H = 30 cms

Reacciones del Suelo

P= 45 Ton

0,225 0,225

20 B

e= 0,475

45

c.g. h

σmax

0,225 1,175

ZAPATA MEDIANERA Z4

L

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 57/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

Col 30,00 Ton

σsuelo = Presion Ad * Fs

σsuelo = 24 * 1,5

σsuelo = 36 Ton / m2

 Area de la Zapata 30,00 = 1,25 m2

24

Para que exista un equilibrio estatico se requiere una dimension L = 1,4

B > 0,9 m

Valor de B para σ util del suelo

B = 1,8 m

Revision del espesor asumido para la zapata

Se analiza la direccion mas larga, la cual es la critica

Vu = 1/2 * σutil * L * Zo

0,24

0,2 B = 1,8 0,24 0,55

0,450,79

0,2 0,793

1,4

Vu = 13,9 Ton/m

фVc = 0.53* ф * √F`c * L* d=

фVc = 21,94 Ton < Vu

Diseño a flexion en la direccion larga

La seccion critica corresponde al borde de la zapata en la cual,

Mu = σutil * 1,4 0,79 2̂

*

2 2

0,55

0,793

ais, la resultante de la reaccion del terreno cae en el tercio medio y es colineal y opuesta a

la carga Pu.

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 58/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

Mu = 7,92 ton-m

b = 140 cm

d = 24 cm

K = 0,00982

cuatia = 0,0033

 As = 33,0 cm2

Colocar 9 Nº 7 cada 21 cms

Diseño a flexion en la direccion Corta

0,45 0,95

h

σmaxσ= 25,2

Mborde = 0,38 Ton-m

b = 178,6

d = 24,00

K = 0,0000

cuantia = 0,0033

 As = 14,1 cm2

Colocar 8 Nº 5 cada 18,5 cms

1,40

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 59/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

Columna b= 20 h= 45 Pu= 40 Ton

Donde Pu = 1,2 * Rmax

Rmax= 24 Ton/cm2

Presion Adm 24 Ton/m2

F`c 210 Kg/cm2

Fy 4200 Kg/cm2

ф 0,7

ф 0,85

Fs 1,5

Sep. Column 3,5

Revision de la presion en contacto

Pumax<   ф*0.85*F´c*Ag

Pumax Col 112 Ton

Calculo del area de la zapata y la presion ultima del suelo σutil

Se asume d = 24 cms

H = 30 cms

Reacciones del Suelo

P= 40 Ton

0,225 0,225

20 B

e= 0,475

45

c.g. h

σmax

0,225 1,175

ZAPATA MEDIANERA Z5

L

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 60/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

Col 26,67 Ton

σsuelo = Presion Ad * Fs

σsuelo = 24 * 1,5

σsuelo = 36 Ton / m2

 Area de la Zapata 26,67 = 1,11 m2

24

Para que exista un equilibrio estatico se requiere una dimension L = 1,4

B > 0,8 m

Valor de B para σ util del suelo

B = 1,6 m

Revision del espesor asumido para la zapata

Se analiza la direccion mas larga, la cual es la critica

Vu = 1/2 * σutil * L * Zo

0,24

0,2 B = 1,6 0,24 0,45

0,450,69

0,2 0,694

1,4

Vu = 11,4 Ton/m

фVc = 0.53* ф * √F`c * L* d=

фVc = 21,94 Ton < Vu

Diseño a flexion en la direccion larga

La seccion critica corresponde al borde de la zapata en la cual,

Mu = σutil * 1,4 0,69 2̂

*

2 2

0,45

0,694

ais, la resultante de la reaccion del terreno cae en el tercio medio y es colineal y opuesta a

la carga Pu.

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 61/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

Mu = 6,06 ton-m

b = 140 cm

d = 24 cm

K = 0,00752

cuatia = 0,0033

 As = 25,3 cm2

Colocar 9 Nº 6 cada 19 cms

Diseño a flexion en la direccion Corta

0,45 0,95

h

σmaxσ= 25,2

Mborde = 0,34 Ton-m

b = 158,7

d = 24,00

K = 0,0000

cuantia = 0,0033

 As = 12,6 cm2

Colocar 7 Nº 5 cada 22 cms

1,40

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 62/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

Columna b= 20 h= 45 Pu= 35 Ton

Presion Adm 24 Ton/m2

F`c 210 Kg/cm2

Fy 4200 Kg/cm2

ф 0,7

ф 0,85

Fs 1,5

Sep. Columnas 3,5

Profundidad 80 cm

b 1

Revision de la presion en contacto

Pumax<   ф*0.85*F´c*Ag

Pumax Col 112,46 Ton

NO REQUIERE PEDESTAL

Calculo del area de la zapata y la presion ultima del suelo σutil

Se asume d = 24 cms

h = 30 cms

Reacciones del Sue lo

N piso

0,8

L

h

L

Carga de servicio = 23

 Area requerida de la zapata = 0,9 m2

Lado de la zapata = 0,97 m

Se asume = 1,2 m Area = 1,44 m2

CUMPLE

ZAPATA Z6

0,2

σutil

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 63/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

Presion ult. del suelo = 24,31 Ton/m2

Revision del espesor asumido para la zapata

Cortante en dos direcciones, punzonamiento

Pu

  h+d

d/2 d/2

b+d

d

d = 21 cms

bo = 214 cms

Vu = 28,42 Ton

d > 10 cm CUMPLE

d > 7 cm CUMPLE

Cortante en una direccion, flexion

16,5 cm

Pu

d

d

d

1,2

La fuerza cortante critica

Vu = σutil * B * (H/2-h/2-d)

Vu = 24,31 * 1,2 * 0,165

Vu = 4,81 Ton

d =

0.53*ф*√F`c*B

d =

b

σutil

b

1,2

σutil

Vu

4813

783,40

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 64/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

d = 6,1431 cm < 21 cm CUMPLE

Diseño a flexion

0,375 m

Pu Pu

d h

1,2

Mu = σutil * B * (H/2-h/2) 2̂/2

Mu = 24,31 * 1,2 * 0,07

Mu = 2,05 Ton-m

Para

b = 120

d = 21

k = 0,0039

Cuantia = 0,0033

 As = 8,316 cm2

Se colocaran 7 Nº 4 cada 18.5 cm en ambas direcciones

  b

H-h/2

1,2 b

Seccion critica

σutil

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 65/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245

[email protected] – Bogotá D.C - Colombia

MEMORIA DE RESPONSABILIDAD

SeñoresOFICINA DE PLANEACIONMUNICIPIO DE SANTA ROSA

BOLIVAR

 Yo, JAIR PINEDA CELIS  ,  ingeniero civil con Matrícula Profesional Nº 68202-106123 STD, debidamente registrado en el Consejo Profesional de Ingeniería de

Cundinamarca, presento los cálculos y Diseños Estructurales elaborados de

acuerdo a los requerimientos de la NORMA COLOMBIANA DE DISEÑO YCONSTRUCCIÓN SISMO RESISTENTE LEY 400 DE 1997 (MODIFICA LEY1229 DE 2008, DECRETO 926 DE 2010 Y DECRETO 092 DE ENERO DE2011, para el proyecto CONSTRUCCION DE EDIFICACION JORGE ARTURO

 VERGARA ALFONSO ubicado en el municipio de   SANTA ROSA DEL SUR,BOLIVAR. Declaro que asumo la responsabilidad por los perjuicios que causa de

ellos puedan deducirse, exonerando a esta Curaduría Urbana de cualquier

responsabilidad. 

 Acepto y reconozco que la revisión efectuada por esta oficina no constituye una

aprobación al Diseño Estructural, sino una verificación del cumplimiento de la

NORMA COLOMBIANA DE DISEÑO Y CONSTRUCCIÓN SISMO

RESISTENTE NSR-10.

 Atentamente,

JAIR PINEDA CELISING. CIVIL U.I.SMP No. 68202-106123 STD

7/26/2019 Memorias Jorge Arturo Vergar Enero 2014

http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 66/66

DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD

DISE O JORGE ARTUROVERGARA ALFONSO