56
BALANCE DE ACERO EN OBRA (ZAPATAS Y COLUMNAS) PABELLON 1/4" 3/8" 1/2" 5/8" 3/4" 1" E 0.00 2170.77 47.74 1387.22 771.58 3189.42 FGH 0.00 3360.40 0.00 4471.95 4932.20 0.00 I 40.62 890.70 24.35 1898.72 0.00 0.00 J 185.69 1397.60 0.00 3631.65 0.00 0.00 K 76.17 607.93 110.73 1926.51 0.00 0.00 TOTAL 302.49 Kg 8427.41 Kg 182.82 Kg 13316.04 Kg 5703.78 Kg 3189.42 Kg N° DE VARILLAS 136.00 1673.00 21.00 954.00 284.00 88.00 VARILLAS RECIBIDAS 0.00 530.00 406.00 170.00 0.00 0.00 VARILLAS REQUERIDAS 136.00 1143.00 -385.00 784.00 284.00 88.00

description

Metrado de Aceros Zapatas Columnas

Transcript of Metrado de Aceros Zapatas Columnas

Page 1: Metrado de Aceros Zapatas Columnas

BALANCE DE ACERO EN OBRA (ZAPATAS Y COLUMNAS)

PABELLON 1/4" 3/8" 1/2" 5/8" 3/4" 1"

E 0.00 2170.77 47.74 1387.22 771.58 3189.42

FGH 0.00 3360.40 0.00 4471.95 4932.20 0.00

I 40.62 890.70 24.35 1898.72 0.00 0.00

J 185.69 1397.60 0.00 3631.65 0.00 0.00

K 76.17 607.93 110.73 1926.51 0.00 0.00

TOTAL 302.49 Kg 8427.41 Kg 182.82 Kg 13316.04 Kg 5703.78 Kg 3189.42 Kg

N° DE VARILLAS 136.00 1673.00 21.00 954.00 284.00 88.00

VARILLAS RECIBIDAS 0.00 530.00 406.00 170.00 0.00 0.00

VARILLAS REQUERIDAS 136.00 1143.00 -385.00 784.00 284.00 88.00

Page 2: Metrado de Aceros Zapatas Columnas

HOJA DE METRADOSACEROS

OBRA:

ACERO EN ESTRUCTURAS PABELLON E_PRIMARIA

DESCRIPCION DISEÑO DEL FIERRO Ø CANTIDAD

ZAPATA

Z-1 1

Longitudinal 1.40 5/8" 1

Transversal 0.80 5/8" 1

Z-2 1

Longitudinal 1.40 5/8" 1

Transversal 1.50 5/8" 1

Z-3 1

Longitudinal 1.40 5/8" 1

Transversal 1.50 5/8" 1

Z-4 1

Longitudinal 1.40 5/8" 1

Transversal 1.30 5/8" 1

Z-5 1

Longitudinal 1.00 5/8" 1

Transversal 1.50 5/8" 1

Z-6 3

Longitudinal 1.00 5/8" 3

Transversal 1.40 5/8" 3

Z-7 3

Longitudinal 1.00 5/8" 3

Transversal 1.00 5/8" 3

ADECUACIÓN, MEJORAMIENTO Y SUSTITUCIÓN DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. MARÍA AUXILIADORA PUNO – PUNO.

Page 3: Metrado de Aceros Zapatas Columnas

Z-8 1

Longitudinal 1.5 5/8" 1

Transversal 1.4 5/8" 1

Z-9 2

Longitudinal 1.00 5/8" 2

Transversal 1.40 5/8" 2

Z-10 2

Longitudinal 1.50 5/8" 2

Transversal 1.00 5/8" 2

Z-11 1

Longitudinal 0.95 5/8" 1

Transversal 1.30 5/8" 1

Z-12 1

Longitudinal 1.50 5/8" 1

Transversal 1.50 5/8" 1

Z-eje B/2 1

Longitudinal 1.64 5/8" 1

Transversal 1.62 5/8" 1

COLUMNA Y ESTRIBO 3

C -1 1,2

Longitudinal 5.0 5/8" 3

3/4" 3

Estribos 0.81 3/8" 3

0.81 3/8" 3

C -1 A-A 1

Longitudinal 4.1 5/8" 1

3/4" 1

Estribos 0.81 3/8" 1

Page 4: Metrado de Aceros Zapatas Columnas

C -2 1,2 1

Longitudinal

9.97 5/8" 1

Estribos 0.81 3/8" 1

Estribos 0.81 3/8" 1

C -3 1,2

Longitudinal

9.97 1" 1

Estribos 1.44 3/8" 1

Estribos 1.44 3/8" 1

C -3

Longitudinal

7.75 1" 1

Estribos 1.44 3/8" 1

Estribos 1.44 3/8" 1

C -4 1,2

Longitudinal

7.75 1" 2

Estribos 1.6 3/8" 2

Estribos 1.6 3/8" 2

C -5 1,2

Longitudinal

12.2 1" 1

8.55 1" 1

Estribos 1.23 3/8" 1

Estribos 1.23 3/8" 1

Estribos 1.23 3/8" 1

Estribos 1.45 3/8" 1

Page 5: Metrado de Aceros Zapatas Columnas

Estribos 1.45 3/8" 1

C -5 Pta. baja,1,2

Longitudinal 13.82 1" 1

8.5 1" 1

Estribos 1.23 3/8" 1

Estribos 1.23 3/8" 1

Estribos 1.23 3/8" 1

Estribos 1.45 3/8" 1

Estribos 1.45 3/8" 1

C -6 Pta. baja,1

Longitudinal 8.45 5/8" 1

Estribos 0.95 3/8" 1

C -7 Pta. Baja

Longitudinal 4.9 1" 2

Estribos 1.23 3/8" 2

Estribos 1.23 3/8" 2

Estribos 1.23 3/8" 2

1,2

Longitudinal 6.82 3/4" 2

Estribos 1.23 3/8" 2

Estribos 1.23 3/8" 2

Estribos 1.23 3/8" 2

C -7 Pta. Baja

Longitudinal 4.9 1" 1

Page 6: Metrado de Aceros Zapatas Columnas

Estribos 1.23 3/8" 1

Estribos 1.23 3/8" 1

Estribos 1.23 3/8" 1

1,2

Longitudinal 8.45 3/4" 1

Estribos 1.23 3/8" 1

Estribos 1.23 3/8" 1

Estribos 1.23 3/8" 1

C -8 Pta. Baja

Longitudinal 5.1 1" 1

Estribos 1.1 3/8" 1

Estribos 1.1 3/8" 1

Estribos 1.1 3/8" 1

1

Longitudinal 3.9 1/2" 1

3.9 3/8" 1

Estribos 0.8 3/8" 1

Estribos 0.8 3/8" 1

CA-1 1

Eje 1

Longitudinal 5 3/8" 2

Estribos 0.85 3/8" 2

CA-1 1,2,3

Eje 1

Longitudinal 15.2 3/8" 2

Estribos 0.85 3/8" 2

CA-1 1

Page 7: Metrado de Aceros Zapatas Columnas

Eje 9

Longitudinal 8.64 3/8" 1

Estribos 0.85 3/8" 1

CA-1 0,1,2,3

Eje 9

Longitudinal 15.2 3/8" 4

Estribos 0.85 3/8" 4

CA-1 A-A

Eje 9

Longitudinal 4.72 3/8" 4

Estribos 0.85 3/8" 2

FALSA COLUMNA

Eje B 7.72 3/8" 1

Eje D 7.72 3/8" 1

PLACAS

P-1 1,2

Longitudinal 7.8 5/8" 1

Longitudinal 7.8 3/8" 1

Transversal 0.86 3/8" 1

Transversal 1.15 3/8" 1

Transversal 0.86 3/8" 1

Transversal 0.20 3/8" 1

Transversal 1.08 3/8" 1

P-2 1,2

Page 8: Metrado de Aceros Zapatas Columnas

Longitudinal 7.8 5/8" 1

Longitudinal 7.8 1/2" 1

Transversal 2.76 3/8" 1

Transversal 1.23 3/8" 1

Transversal 1.42 3/8" 1

P-3 1,2

Longitudinal 7.8 5/8" 1

Longitudinal 7.8 3/8" 1

Transversal 1.8 3/8" 1

Transversal 1.1 3/8" 1

Transversal 2.2 3/8" 1

P-4 Pta. Baja 1,2

Longitudinal 11.85 5/8" 1

Longitudinal 11.85 3/8" 1

Estribo 1.8 3/8" 1

Transversal 1.94 3/8" 1

Transversal 1.00 3/8" 1

Transversal 0.2 3/8" 1

Peso en Kilogramos por metro lineal

Longitud Total por Ø en metros lineales

Total en Kilogramos por Ø

I277
Full name: 3*0.92
I290
Full name: 2*0.90
I303
Full name: 2*0.90
I305
Full name: 2*0.97
Page 9: Metrado de Aceros Zapatas Columnas

Porcentaje de desperdicio (%)

Incremento

Total en Kilogramos por Ø

Page 10: Metrado de Aceros Zapatas Columnas

HOJA DE METRADOSACEROS FECHA: 17/09/2013

MODERNIZACION INSTITUCIONAL MARIA AUXILIADORA

ACERO EN ESTRUCTURAS PABELLON E_PRIMARIA

LONGITUD POR Ø (en m.)

1/4" 8 mm 3/8" 1/2" 5/8" 3/4" 1"

0.25 0.40 0.56 1.02 1.60 2.26 4.04

4 1.40 5.60

7 0.80 5.60

8 1.40 11.20

7 1.50 10.50

8 1.40 11.20

7 1.50 10.50

7 1.40 9.80

7 1.30 9.10

8 1.00 8.00

5 1.50 7.50

7 1.00 21.00

5 1.40 21.00

5 1.00 15.00

5 1.00 15.00

N° DE ELEMENTOS

LONG. DEL ELEMENTO

Page 11: Metrado de Aceros Zapatas Columnas

7 1.50 10.50

8 1.40 11.20

7 1.00 14.00

5 1.40 14.00

5 1.50 15.00

8 1.00 16.00

7 0.95 6.65

5 1.30 6.50

8 1.50 12.00

8 1.50 12.00

9 1.64 14.76

9 1.62 14.58

2 4.98 29.88

4 4.98 59.76

26 0.81 63.18

26 0.81 63.18

2 4.14 8.28

4 4.14 16.57

21 0.81 17.01

Page 12: Metrado de Aceros Zapatas Columnas

8 9.97 79.76

58 0.81 46.98

58 0.81 46.98

10 9.97 99.70

58 1.44 83.52

58 1.44 83.52

8 7.75 62.00

49 1.44 70.56

49 1.44 70.56

8 7.75 124.00

49 0.00

49 1.60 156.80

8 12.20 97.60

4 8.55 34.20

46 1.23 56.58

46 1.23 56.58

46 1.23 56.58

22 1.45 31.90

Page 13: Metrado de Aceros Zapatas Columnas

22 1.45 31.90

8 13.82 110.56

4 8.50 34.00

46 1.23 56.58

46 1.23 56.58

46 1.23 56.58

32 1.45 46.40

32 1.45 46.40

4 8.45 33.80

46 0.95 43.70

12 4.90 117.60

22 1.23 54.12

22 1.23 54.12

22 1.23 54.12

12 6.82 163.68

44 1.23 108.24

44 1.23 108.24

44 1.23 108.24

12 4.90 58.80

Page 14: Metrado de Aceros Zapatas Columnas

22 1.23 27.06

22 1.23 27.06

22 1.23 27.06

12 8.45 101.40

55 1.23 67.65

55 1.23 67.65

55 1.23 67.65

10 5.10 51.00

20 1.10 22.00

20 1.10 22.00

20 1.10 22.00

4 3.90 15.60

2 3.90 7.80

20 0.80 16.00

20 0.80 16.00

4 5.00 40.00

28 0.85 47.60

4 15.20 121.60

68 0.85 115.60

Page 15: Metrado de Aceros Zapatas Columnas

4 8.64 34.56

52 0.85 44.20

4 15.20 243.20

91 0.85 309.40

4 4.72 75.52

21 0.85 35.70

4 7.72 30.88

4 7.72 30.88

12 7.80 93.60

3 7.80 23.40

35 0.00

35 0.00

35 0.86 30.10

35 0.20 7.00

35 1.08 37.80

Page 16: Metrado de Aceros Zapatas Columnas

12 7.80 93.60

4 7.80 31.20

35 2.76 96.60

35 1.23 43.05

35 1.42 49.70

13 7.80 101.40

7 7.80 54.60

35 1.80 63.00

35 1.10 38.50

35 2.20 77.00

10 11.85 118.50

4 11.85 47.40

50 0.00

40 0.00

50 1.00 50.00

50 0.20 10.00

Peso en Kilogramos por metro lineal 0.25 0.40 0.56 1.02 1.60 2.26 4.04

Longitud Total por Ø en metros lineales 0.00 0.00 3876.37 46.80 867.01 341.41 789.46

Total en Kilogramos por Ø 0.00 0.00 2170.77 47.74 1387.22 771.58 3189.42

Page 17: Metrado de Aceros Zapatas Columnas

Porcentaje de desperdicio (%) 0 0 3 5 7 8 10

Incremento 0 0 65.123016 2.3868 97.10546 61.7262 318.9418

Total en Kilogramos por Ø 0.00 0.00 2235.89 50.12 1484.33 833.30 3508.36

Page 18: Metrado de Aceros Zapatas Columnas

METRADO DE ACEROPROYECTO CONSTRUCCION DE I.E. MARIA AUXILIADORAEMPRESA CONSORCIO AGUAYMANTOPABELLON F,G;H

Descripcion Diseño Ø Nº de Nº de long.elemet. piezas x corte xiguales elemet. pieza

Acero en Zapatas fy = 4,200 Kg/cm2

Z-1 As. Longitudinal 5/8" 1 5 1.35As. Transversal 5/8" 1 8 0.75Z-2As. Longitudinal 5/8" 1 7 1.35As. Transversal 5/8" 1 8 1.15Z-3As. Longitudinal 5/8" 1 5 1.35As. Transversal 5/8" 1 8 0.85Z-4As. Longitudinal 5/8" 1 7 1.35As. Transversal 5/8" 1 8 1.25Z-5As. Longitudinal 5/8" 4 6 1.25As. Transversal 5/8" 4 7 0.9Z-6As. Longitudinal 3/8" 4 10 0.95As. Transversal 3/8" 4 10 0.95Z-7As. Longitudinal 5/8" 1 7 1.6As. Transversal 5/8" 1 9 1.25Z-8As. Longitudinal 5/8" 4 6 1.45As. Transversal 5/8" 4 8 0.9Z-9As. Longitudinal 5/8" 1 6 1.35As. Transversal 5/8" 1 8 0.9Z-10As. Longitudinal 5/8" 4 6 0.9As. Transversal 5/8" 4 6 0.9

Acero en Columnas fy = 4,200 Kg/cm2

C-1 25x28 ( 1º piso)Acero longt. Eje A-A trm. 1,2,3,4 5/8" 4 4 5.07estribos 3/8" 4 25 0.94

5/8" 1 4 4.2Acero longt. Eje A-A trm. 6 (nace) 1º

Page 19: Metrado de Aceros Zapatas Columnas

estribos 3/8" 1 21 4.825/8" 1 4 4.17

estribos 3/8" 1 21 0.94C-2 25x25 ( 1º, 2º piso)Acero longt. Eje C-C trm. 1,3 5/8" 2 4 10.27estribos 3/8" 2 53 0.88Acero longt. Eje D-D trm. 1,3 5/8" 2 2 7.3Acero longt. Eje D-D trm. 1,3 5/8" 2 2 7.6estribos 3/8" 2 40 0.88C-3 25x80 ( 1º, 2º piso)Acero longt. Eje D-D trm. 1,3 3/4" 2 10 7.63 estribos 3/8" 2 120 1.26Acero longt. Eje B-B trm. 1,3 3/4" 2 10 8.053 estribos 3/8" 2 120 1.26C-4 25x28 ( planta baja, 1º piso)Acero longt. Eje A-A trm. 4 5/8" 1 4 8.62estribos 3/8" 1 46 0.94C-5 25x60 ( planta baja, 1º,2º piso)Acero longt. Eje B-B trm. 7 3/4" 1 10 12.22 estribos 3/8" 1 120 1.08Acero longt. Eje C-C trm. 7 3/4" 1 10 13.42 estribos 3/8" 1 148 1.08Acero longt. Eje D,D trm. 7 3/4" 1 10 11.82 estribos 3/8" 1 120 1.08C-6 25x60 ( planta baja)Acero longt. Eje A-A trm. 7 3/4" 1 10 4.862 estribos 3/8" 1 25 1.08C-7 25x25 ( planta baja, 1º,2º piso)Acero longt. Eje D-D trm. 5 5/8" 1 4 11.72estribos 3/8" 1 40 0.88Acero longt. Eje C-C trm. 5 5/8" 1 4 13.4estribos 3/8" 1 71 0.88C-8 25x68 ( planta baja, 1º,2º piso)Acero longt. Eje B-B trm. 3,5 5/8" 2 7 12.2estribos 3/8" 2 71 0.88estribos tipo S 3/8" 2 71 0.82Placa P-01As longt Eje 1-1 tram. B 5/8" 1 11 12.2As longt Eje 1-1 tram. B 3/8" 1 5 12.2As de Anclaje 3/8" 1 18 1.28

Ca-01 40x13 As longt Eje B-B tram. 7 3/8" 1 2 6.5estribos tipo S 3/8" 1 35 0.44

Acero longt. Eje A-A trm. 7 (nace de C-6) 1º

Page 20: Metrado de Aceros Zapatas Columnas

Ø

Kg./m

longitud total / Ø en metro lineal

peso total / Ø en Kg.

longitud total en (m)

peso total en (Kg.)

CANTIDAD REAL VARILLAS

% DE DESPERDICIOS

CANTTIDAD REQUERIDA VARILLAS

ALAMBRE N 16

CANTIDAD VARILLAS FGH

ALAMBRE N 16 (KG)

Page 21: Metrado de Aceros Zapatas Columnas

METRADO DE ACERO

longitud (m) por Ø peso1/4" 3/8" 1/2" 5/8" 3/4" PARCIAL

0.248 0.56 0.994 1.552 2.235 kg. 452.521

- - - 6.8 - 10.476 - - - 6.0 - 9.312 - - - - - - - - - 9.5 - 14.666 - - - 9.2 - 14.278 - - - - - - - - - 6.8 - 10.476 - - - 6.8 - 10.554 - - - - - - - - - 9.5 - 14.666 - - - 10.0 - 15.520 - - - - - - - - - 30.0 - 46.560 - - - 25.2 - 39.110 - - - - - - - 38.0 - - - 21.280 - 38.0 - - - 21.280 - - - - - - - - - 11.2 - 17.382 - - - 11.3 - 17.460 - - - - - - - - - 34.8 - 54.010 - - - 28.8 - 44.698 - - - - - - - - - 8.1 - 12.571 - - - 7.2 - 11.174 - - - - - - - - - 21.6 - 33.523 - - - 21.6 - 33.523 - - - - - - - - - - - - 3,802.329

- - - - - - - - - 81.1 - 125.898 - 94.0 - - - 52.640 - - - 16.8 - 26.074

Page 22: Metrado de Aceros Zapatas Columnas

- 101.2 - - - 56.683 - - - 16.7 - 25.887 - 19.7 - - - 11.054 - - - - - - - - - 82.2 - 127.512 - 93.3 - - - 52.237 - - - 29.2 - 45.318 - - - 30.4 - 47.181 - 70.4 - - - 39.424 - - - - - - - - - - 152.0 339.720 - 302.4 - - - 169.344 - - - - 161.0 359.835 - 302.4 - - - 169.344 - - - - - - - - - 34.5 - 53.513 - 43.2 - - - 24.214 - - - - - - - - - - 122.0 272.670 - 129.6 - - - 72.576 - - - - 134.0 299.490 - 159.8 - - - 89.510 - - - - 118.0 263.730 - 129.6 - - - 72.576 - - - - - - - - - - 48.6 108.621 - 27.0 - - - 15.120 - - - - - - - - - 46.9 - 72.758 - 35.2 - - - 19.712 - - - 53.6 - 83.187 - 62.5 - - - 34.989 - - - - - - - - - 170.8 - 265.082 - 125.0 - - - 69.978 - 116.4 - - - 65.206 - - - - - - - - - 134.2 - 208.278 - 61.0 - - - 34.160 - 23.0 - - - 12.902 - - - - - - - - - - - - - 13.0 - - - 7.280 - 15.4 - - - 8.624

Page 23: Metrado de Aceros Zapatas Columnas

- - - - - -

1/4" 3/8" 1/2" 5/8" 3/4"0.248 0.56 0.994 1.552 2.235

- 2,000.2 - 960.5 735.6 - 1,120.1 - 1,490.6 1,644.1

3,696.310

4,254.850

0.00 222.25 0.00 106.72 81.73

3 3 5 7 8

0.00 228.00 0.00 114.00 88.00

0.00 33.60 0.00 44.72 49.32 78.32

0 1149.12 0 1592.352 1770.12

0 684 0 342 264

0.00 100.81 0.00 134.16 147.97 382.94

Page 24: Metrado de Aceros Zapatas Columnas

METRADO DE ACERO

Descripcion Diseño Ø Nº de Nº de long.elemet. piezas x corte x 1/4"iguales elemet. pieza 0.248

Acero en Zapatas fy = 4,200 Kg/cm2Z-1 As Eje B,D Trm. 2,4 5/8" 4 5 1.05 - Z-1 As Eje B,D Trm. 2,4 5/8" 4 7 0.65 - Z-2 As Eje 5-5 Trm. C 5/8" 1 6 1.35 - Z-2 As Eje 5-5 Trm. C 5/8" 1 8 1.05 - Z-3 As Eje 5-5 Trm. D 5/8" 1 6 1.35 - Z-3 As Eje 5-5 Trm. D 5/8" 1 8 0.85 - Z-4 As Eje 5-5 Trm. B 5/8" 1 6 1.35 - Z-4 As Eje 5-5 Trm. B 5/8" 1 8 0.85 - Z-5 As Eje 1,3 Trm. C 5/8" 2 5 0.55 - Z-5 As Eje 1,3 Trm. C 5/8" 2 4 0.75 - Z-6 As Eje 1,3 Trm. B,D 5/8" 4 5 0.6 - Z-6 As Eje 1,3 Trm. B,D 5/8" 4 4 0.7 - Z-7 As Eje A-A Trm. 1 a 5 1/2" 5 5 0.5 - Z-7 As Eje A-A Trm. 1 a 5 1/2" 5 4 0.6 -

- Acero en Columas primer piso fy = 4,200 Kg/cm2 - C-1 25x25 - As. longt. Eje 5-5 tram. A al D 5/8" 4 4 9 - estribos 3/8" 4 43 0.95 - As. longt. Eje A,A tram. 1 al 4 5/8" 4 4 8 - As. longt. Eje D-D tram. 1, 3 5/8" 2 4 8 - estribos 3/8" 6 18 0.95 - C-2 25x80 - As. longt. Eje 2,4 tram. B,D 5/8" 4 10 8 - estribos 3/8" 4 54 1.98 - C-3 25x25 - As. longt. Eje C-C tram. 1,4 5/8" 2 4 8 - estribos 3/8" 2 18 0.95 - CA-01 20x24 columneta - As. longt. Eje D-D tram. 1 al 5 3/8" 8 4 4 - estribos 1/4" 8 18 0.8 115.2 CA-02 15x13 columneta - As. longt. Eje B-B tram. 2 al 5 3/8" 7 2 4 - estribos S 1/4" 7 18 0.2 25.2 CA-02 15x13 columneta - As. longt. Eje B-B tram. 3,5 3/8" 2 3 4 -

Page 25: Metrado de Aceros Zapatas Columnas

estribos 1/4" 2 18 0.45 16.2 Placa - As. longt. Eje B-B tram. 1 5/8" 1 13 8 - As. longt. Eje B-B tram. 1 3/8" 1 5 4.6 - As. Anclaje Eje B-B tram. 1 3/8" 1 11 2.29 -

- Acero en colunmas segundo piso fy = 4,200 Kg/cm2 - C-1 25x25 - As. longt. Eje D-D tram. 1,3,5 5/8" 3 2 2.98 - As. longt. Eje D-D tram. 1,3,5 5/8" 3 2 2.58 - As. longt. Eje 5-5 tram. C 5/8" 1 4 4.47 - As. longt. Eje B-B tram. 3,5 5/8" 2 4 3.25 - estribos C-1 25x25 3/8" 3 17 0.92 - estribos C-1 25x25 3/8" 1 29 0.92 - estribos C-1 25x25 3/8" 2 18 0.92 - C-2 25x80 - As. longt. Eje D-D tram. 2,4 5/8" 2 10 2.98 - As. longt. Eje B-B tram. 2,4 5/8" 2 10 3.25 - estribos C-1 25x80 3/8" 2 51 1.98 - estribos C-1 25x80 3/8" 2 54 1.98 - C-3 25x25 - As. longt. Eje C-C tram. 1,3 5/8" 2 4 4.47 - estribos C-31 25x25 3/8" 2 18 0.95 - CA-3 Columnetas - As. longt. Eje B-B tram. 3,5 3/8" 2 3 2.7 - estribos CA-3 1/4" 2 9 0.4 7.2 PLACA - As. longt. Eje 1-1 tram. B 5/8" 1 13 3.2 - As. longt. Eje 1-1 tram. B 3/8" 1 5 3.2 - As. Anclaje. Eje 1-1 tram. B 3/8" 1 9 1.95 -

- - -

Ø 1/4"Kg./m 0.248longitud total / Ø 163.800 peso total / Ø en Kg. 40.622

longitud total en (m)peso total en (Kg.)

18.20

198

Page 26: Metrado de Aceros Zapatas Columnas

METRADO DE ACERO

longitud (m) por Ø peso3/8" 1/2" 5/8" 3/4"0.56 0.994 1.552 2.235 kg.

2,854.395 - - 21.0 - 32.592 - - 18.2 - 28.246 - - 8.1 - 12.571 - - 8.4 - 13.037 - - 8.1 - 12.571 - - 6.8 - 10.554 - - 8.1 - 12.571 - - 6.8 - 10.554 - - 5.5 - 8.536 - - 6.0 - 9.312 - - 12.0 - 18.624 - - 11.2 - 17.382 - 12.5 - - 12.425 - 12.0 - - 11.928 - - - - - - - - - - - - - - - - - 144.0 - 223.488 163.4 - - - 91.504 - - 128.0 - 198.656 - - 64.0 - 99.328 102.6 - - - 57.456 - - - - - - - 320.0 - 496.640 427.7 - - - 239.501 - - - - - - - 64.0 - 99.328 34.2 - - - 19.152 - - - - - 128.0 - - - 71.680 - - - - 28.570 - - - - - 56.0 - - - 31.360 - - - - 6.250 - - - - - 24.0 - - - 13.440

Page 27: Metrado de Aceros Zapatas Columnas

- - - - 4.018 - - - - - - - 104.0 - 161.408 23.0 - - - 12.880 25.2 - - - 14.106 - - - - - - - - - - - - - - - - - 17.9 - 27.750 - - 15.5 - 24.025 - - 17.9 - 27.750 - - 26.0 - 40.352 46.9 - - - 26.275 26.7 - - - 14.941 33.1 - - - 18.547 - - - - - - - 59.6 - 92.499 - - 65.0 - 100.880 202.0 - - - 113.098 213.8 - - - 119.750 - - - - - - - 35.8 - 55.500 34.2 - - - 19.152 - - - - - 16.2 - - - 9.072 - - - - 1.786 - - - - - - - 41.6 - 64.563 16.0 - - - 8.960 17.6 - - - 9.828 - - - - - - - - - - - - - - -

3/8" 1/2" 5/8" 3/4"0.56 0.994 1.552 2.235

1,590.5 24.5 1,223.4 - 890.7 24.4 1,898.7 -

longitud total en (m) 3,002.240 peso total en (Kg.) 2,854.395

176.73 2.72 135.93 -

485 142 209 13

Page 28: Metrado de Aceros Zapatas Columnas

HOJA DE METRADOSACEROS

OBRA:

ACERO EN ESTRUCTURAS PRIMARIA PABELLON E- J

DESCRIPCION DISEÑO DEL FIERRO Ø

ZAPATA

Z-1

Transversal 1.10 5/8"

Longitudinal 1.65 5/8"

Z-2

Transversal 1.10 5/8"

Longitudinal 1.10 5/8"

Z-3

Transversal 1.10 5/8"

Longitudinal 1.53 5/8"

Z-4

Transversal 1.10 5/8"

Longitudinal 1.10 5/8"

Z-5

Transversal 1.10 5/8"

Longitudinal 1.13 5/8"

COLUMNA Y ESTRIBO

C -1 1,2

Longitudinal 9 5/8"

Estribos 0.94 3/8"

C -2 1,2

Longitudinal

9 5/8"

Estribos 1.98 3/8"

ADECUACIÓN, MEJORAMIENTO Y SUSTITUCIÓN DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. MARÍA AUXILIADORA PUNO – PUNO.

Page 29: Metrado de Aceros Zapatas Columnas

C -3 1,2

Longitudinal

9 5/8"

Estribos 1.58 3/8"

C -3 1,2

EJE 7 Y 8 /C Longitudinal

11 5/8"

Estribos 1.58 3/8"

C -4 1,2

EJE 1,4,6/C Longitudinal

11 5/8"

Estribos 0.88 3/8"

C -4 1,2

Longitudinal

9 5/8"

Estribos 0.88 3/8"

C -5 1,2

Longitudinal

9 5/8"

Estribos 0.88 3/8"

0.86 3/8"

C A1 1,2

Longitudinal

9 3/8"

Estribos 0.76 1/4"

C A2 1,2

longitudinal9 3/8"

Estribos

0.23 1/4"

Page 30: Metrado de Aceros Zapatas Columnas

Placa 1 1,2

Longitudinal

9 5/8"

Longitudinal 9 3/8"

Estribos 1.86 3/8"

DETALLE 1

Longitudinal 9 3/8"

0.36 3/8"

Peso en Kilogramos por metro lineal

Longitud Total por Ø en metros lineales

Total en Kilogramos por Ø

CANTIDAD REAL POR VARILLAS% DE DESPERDICIOCANTIDAD REQUERIDA POR VARILLASALAMBRE Nº16

CANTIDAD VARILLAS J

ALAMBRE N 16 (KG)

Page 31: Metrado de Aceros Zapatas Columnas

HOJA DE METRADOSACEROS FECHA: 05/09/2013

OBRA:

ACERO EN ESTRUCTURAS PRIMARIA PABELLON E- J

CANTIDAD N° DE LONG. DEL LONGITUD POR Ø (en m.)

ELEMENTOS ELEMENTO 1/4" 3/8" 1/2" 5/8" 3/4" 1"

66 8 1.1 52.8

6 6 1.65 59.4

5

5 6 1.10 33

5 6 1.10 33

5

5 8 1.1 44

5 6 1.53 45.9

5

5 6 1.1 33

5 6 1.1 33

8

8 8 1.1 70.4

8 7 1.13 63.28

8

8 4 9 288

8 38 0.94 285.76

8

8 10 9 720

8 38 1.98 601.92

ADECUACION ,MEJORAMIENTO Y SUSTITUCION DELA INFRAESTRUCTURA EDUCATIVA DE LA I.E. MARIA AUXILIADORA PUNO-PUNO

Page 32: Metrado de Aceros Zapatas Columnas

1 8 9 72

1 38 1.58 60.04

2 8 11 176

2 48 1.58 151.68

3 4 11 132

3 48 0.88 126.72

3 4 9 108

3 38 0.88 100.32

3 7 9 189

3 44 0.88 116.16

3 44 0.86 113.52

18 4 9 648

18 49 0.76 670.32

9 2 9 162

9 35 0.23 72.45

Page 33: Metrado de Aceros Zapatas Columnas

1 13 9 117

1 5 9 45

1 30 1.86 55.8

1 2 9 18

1 30 0.36 10.8

Peso en Kilogramos por metro lineal 0.25 0.56 1.02 1.60 2.26 4.04

Longitud Total por Ø en metros lineales 742.77 2495.72 0.00 2269.78 0.00 0.00

Total en Kilogramos por Ø 185.69 1397.60 0.00 3631.65 0.00 0.00

82.53 277.30 0.00 252.20 0.00 0.00

3 3 5 7 8 10

85.00 285.00 0.00 269.00 0.00 0.00

5.57 41.93 0.00 108.95 0.00 0.00

16.71 125.78 0.00 326.85 0.00

Page 34: Metrado de Aceros Zapatas Columnas

HOJA DE METRADOS

OBRA : 0

OBRAS DE CONCRETO ARMADO

ZAPATAS:

ZAPATA TIPO C - 1

EJE A-A TRAMO EJE 1-6 6 1.25 1.28 0.60 5.76

ZAPATA TIPO C - 2

EJE B-B TRAMO EJE 1-6 2 1.25 1.80 0.60 2.70

EJE D-D TRAMO EJE 1-6 3 1.25 1.80 0.60 4.05

ZAPATA TIPO C - 3

EJE C-C TRAMO EJE 6-6 1 1.25 1.60 0.60 1.20

ZAPATA TIPO C - 4

EJE C-C TRAMO EJE 1-6 3 1.25 1.25 0.60 2.81

EJE D-D TRAMO EJE 1-6 3 1.25 1.25 0.60 2.81

ZAPATA TIPO C - 5

EJE B-B TRAMO EJE 1-6 2 1.25 1.68 0.60 2.52

ZAPATA TIPO C - 6

EJE B-B TRAMO EJE 1-6 1 1.15 1.80 0.60 1.24

ELEMENTO Y/O DESCRIPCIÓNCONCRETO (m3)

# Base Largo Alto Parcial

ENCOFRADO (m2)

# Largo Alto

Código

OBRA : Pabellón K - COLEGIO MARIA AUXILIADORAUBICACIÓN : Puno.FECHA : 2013

ELEMENTO Y/O DESCRIPCIÓNCONCRETO (m3)

# Base Largo Alto Parcial

ENCOFRADO (m2)

# Largo Alto

Código

OBRA : Pabellón K - COLEGIO MARIA AUXILIADORAUBICACIÓN : Puno.FECHA : 2013

Page 35: Metrado de Aceros Zapatas Columnas

ZAPATA TIPO P-1

EJE B-B TRAMO EJE 5-5 1 1.58 2.71 0.60 2.57

TOTAL 25.67

COLUMNAS

C-1 (1er,2do, NIVEL)

EJE A-A TRAMO EJE 1-6 6 0.25 0.28 5.24 2.20

C-2 (1er,2do, NIVEL)

EJE B-B TRAMO EJE 1-6 2 0.25 0.80 5.24 2.10

EJE D-D TRAMO EJE 1-6 3 0.25 0.80 5.24 3.14

C-3 (1er,2do, NIVEL)

EJE C-C TRAMO EJE 6-6 1 0.25 0.60 5.24 0.79

C-4 (1er,2do, NIVEL)

EJE C-C TRAMO EJE 1-6 3 0.25 0.25 5.24 0.98

EJE D-D TRAMO EJE 1-6 3 0.25 0.25 5.24 0.98

C-5 (1er,2do, NIVEL)

EJE B-B TRAMO EJE 1-6 2 0.25 0.25 5.24 0.66

2 0.14 0.43 5.24 0.63

C-6 (1er,2do, NIVEL)

EJE B-B TRAMO EJE 1-6 1 0.15 0.80 5.24 0.63

COBERTURA.

C-1

EJE C-C CON EJE 1,3,5,6 3 0.25 0.25 1.46 0.27

1 0.25 0.6 1.46 0.22

Page 36: Metrado de Aceros Zapatas Columnas

TOTAL 10.40

COLUMNETAS

Columneta de Amarre - CA1

EJE C-C : CON EJE 6-6 1 0.20 0.24 2.65 0.13

EJE D-D : CON EJE 1-6 10 0.20 0.24 2.65 1.27

Columneta de Amarre - CA2

EJE B-B : CON EJE 1-6 7 0.13 0.15 2.65 0.36

Columneta-Canaleta Aguas Pluviales

EJE A,D : EJES 1,2,3,4,5,6,7,8,9 4 0.25 0.15 12.70 1.90

TOTALES 3.67

PLACA

PRIMERA PLANTA

EJE B-B CON EJE 5-5 1 0.25 0.56 6.55 0.92 2 0.25 6.55

1 0.15 1.32 6.55 8.65 1 0.56 6.55

1 0.14 0.45 6.55 0.41 1 1.32 6.55

1 0.41 6.55

1 1.46 6.55

1 0.87 6.55

TOTALES 9.98

Page 37: Metrado de Aceros Zapatas Columnas

HOJA DE METRADOS

0.25 0.56 1.02 1.55 2.24 3.97

0.00 6 1/2" 8 1.18 54.28

6 1/2" 8 1.15 54.28

0.00 2 5/8" 6 1.18 13.57

2 5/8" 9 1.70 28.90

0.00 3 5/8" 6 1.15 19.84

3 5/8" 9 1.70 43.35

0.00 1 5/8" 6 1.15 6.61

1 5/8" 8 1.50 11.25

0.00 3 5/8" 6 1.15 20.88

3 5/8" 6 1.15 20.88

0.00 3 5/8" 6 1.15 20.88

3 5/8" 6 1.15 20.88

0.00 2 5/8" 6 1.15 13.22

2 5/8" 8 1.58 24.96

0.00 1 5/8" 5 1.05 5.51

1 5/8" 9 1.70 14.45

ENCOFRADO (m2)

Alto Parcial

FIERRO (Kgr)

# Ø Cant Long.

0.25

Ø 1/4"

0.40

0.56 1.02 1.55 2.24 3.97Ø 8mm

Ø 3/8" Ø 1/2" Ø 5/8" Ø 3/4" Ø 1"

HOJA Nº : EstructurasHECHO POR : ING. E.A.CH.CH.REV. POR :

01

ENCOFRADO (m2)

Alto Parcial

FIERRO (Kgr)

# Ø Cant Long.

0.25

Ø 1/4"

0.40

0.56 1.02 1.55 2.24 3.97Ø 8mm

Ø 3/8" Ø 1/2" Ø 5/8" Ø 3/4" Ø 1"

HOJA Nº : EstructurasHECHO POR : ING. E.A.CH.CH.REV. POR :

01

Page 38: Metrado de Aceros Zapatas Columnas

0.00 1 5/8" 7 1.48 10.95

1 5/8" 13 2.61 34.06

110.73 480.83

0.00 591.6

0.00 6 5/8" 4 5.84 140.16

6 3/8" 20.96 1.12 140.85

0.00 2 5/8" 10 5.84 116.80

2 3/8" 20.96 2.14 89.71

0.00 3 5/8" 10 5.84 175.20

3 3/8" 20.96 2.14 134.56

0.00 1 5/8" 8 5.84 46.72

1 3/8" 20.96 1.74 36.47

0.00 3 5/8" 4 5.84 70.08

3 3/8" 20.96 1.04 65.40

0.00 3 5/8" 4 5.84 70.08

3 3/8" 20.96 1.04 65.40

0.00 2 5/8" 7 5.84 81.76

2 3/8" 35 0.86 60.20

2 3/8" 35 1.04 72.80

0.00 1 5/8" 10 5.84 58.40

1 3/8" 20.96 1.94 40.66

0.00 3 5/8" 4 2.06 24.72

3 3/8" 20.96 1.04 65.40

1 5/8" 8 2.06 16.48

Page 39: Metrado de Aceros Zapatas Columnas

1 3/8" 20.96 1.74 36.47

452.43 1,240.62

0.00 1,693.1

0.00 1 3/8" 4 3.39 13.56

1 1/4" 16 0.92 14.72

0.00 10 3/8" 4 3.39 135.60

10 1/4" 16 0.92 147.20

0.00 7 3/8" 2 3.27 45.78

7 1/4" 10.6 0.24 17.81

0.00 4 3/8" 2 6.15 49.20

4 1/4" 24.6 0.77 75.77

4 1/4" 24.6 0.5 49.20

76.17 136.72

0.00 212.89

3.28 1 5/8" 18 7.35 132.30

3.67 1 3/8" 26.2 1.28 33.54

8.65

2.69

9.56

5.70

18.78016 205.065

33.54 223.8

MENOS MURO DE CONTENCION 76.1740 607.9293 110.7312 1,926.5110 0.0000 0.0000

2,721.35

Ø 1/4" Ø 8mm Ø 3/8" Ø 1/2" Ø 5/8" Ø 3/4" Ø 1"Ø 1/4" Ø 8mm Ø 3/8" Ø 1/2" Ø 5/8" Ø 3/4" Ø 1"