PRESUPUESTO GENERAL
NACTIVIDADUNIDADCANTIDADPRECIO UNITARIO (Bs)PRECIO PARCIAL (Bs)
1TRAZADO Y REPLANTEO m2688.538.265688.83
2EXCAVACIN 0-1.5 M SUELO SEMIDURO m394.4631.052932.43
3HORMIGON ARMADO ZAPATAS m322.042348.2551755.50
4RELLENO Y COMPACTADO m315.0034.28514.26
5SOBRECIMIENTOS DE HA m319.202337.7744885.19
6IMPERMEABILIZACION DE SOBRECIMIENTOS m248.0042.312030.72
7HORMIGON ARMADO COLUMNAS m315.523816.6259233.99
8HORMIGON ARMADO VIGAS m329.253641.23106516.85
9MURO DE LADRILLO 6H E=0,18 CM m2886.33165.50146691.07
10HORMIGON ARMADO LOSA MACIZAm225.774089.34105382.41
11ESCALERAS DE HORMIGON ARMADO m36.044109.0224818.47
12CUB. DE CALAMINA GALV. N28 C/ESTR.METALICAm2467.001951.23911224.32
13CIELO RASO BAJO LOSA m2191.2089.0117018.67
14CIELO FALSO DE PVC (ESTR. METALICA) m2467.00116.1654246.72
15PUNTO TELEFONOpto1.0054.9754.97
16PROV. Y COLOC. DE ILUMINACIN pza48.00199.769588.44
17TOMACORRIENTE punto22.00217.234779.15
18PROV. Y COLOC. TABLERO DE DISTRIBUCINpza1.00743.91743.91
19TUBERIA DE AGUA DE 1/2ml78.6035.272772.13
20PROV. Y TENDIDO TUBERIA PVC 4"ml51.6072.693750.92
21PROV. Y TENDIDO TUBERIA PVC 2"ml3.6057.63207.47
22PROV. Y COLOC. DE INODOROpza2.00402.48804.95
23PROV. Y COLOC. DE LAVAMANOS pza2.00732.411464.82
24CONTRAPISO DE PIEDRA Y CEMENTOm2387.85104.8240652.76
25REVOQUE CAL-CEMENTO SOBRE LADRILLO m2675.0997.2865671.38
26REVOQUE INTERIOR CAL-CEMENTO-YESO m2673.33103.9870010.97
27REVESTIMINETO DE PARED DE BAOS m215.30178.302728.04
28REJILLA METALICA PARA SUMIDEROm20.50227.38113.69
29PISO CERAMICO ESMALTADOm2538.56176.8095220.21
30ZOCALO DE CERAMICA ESMALTADAml161.0090.2414527.97
31MESON DE HAm21.60575.27920.43
32PROV. Y COLOC. PUERTA TABLERO m223.741030.5824465.89
33PROV. Y COLOC. VENTANA DE ALUMINIOm2173.64496.6886243.47
34QUINCALLERIA DE PUERTASpza12.00933.8811206.56
35PROV. Y COLOC. VIDRIOS m2173.6480.1613918.90
36BARANDA METALICAml49.10262.0512866.69
37PINTURA EXTERIORm2675.0936.8324866.15
38PINTURA INTERIORm2852.5329.9425527.91
39CANALETA DE CALAMINA PLANAm1710.20124.45212842.75
40PROV. Y COLOC. DE CAMPANApza13469.4595853469.46
41PROV. Y COLOC. DE TANQUE ELEVADOpza1217.2339962217.23
42DINTEL DE HA ml19.00663.7112610.47
43PROV. Y COLOC. DE PAPEELRO, JABONERApza4.00169.13676.51
44SUMIDERO DE PISOpza2.00172.47344.95
45PROV. Y COLOC. DE LAVANDERIApza1.00378.98378.98
Total monto en Bs.=2276587.58
El rea total de construccin es de 788 m2 y el presupuesto del costo de la obra haciende a un monto total de Bs. 2276587.58 y un valor de 325226.80 en $us Americanos.Por lo tanto el costo por metro cuadrado de la construccin es de 412.72 $us/m2