RESUMEN DEL VALOR REFERENCIAL - REDES SECUNDARIAS
DISTRITO: LAMBAYEQUE, PROVINCIA: LAMBAYEQUE, DEPARTAMENTO: LAMBAYEQUE
RESUMEN GENERAL DE REDES SECUNDARIAS
ITEM DESCRIPCION
A SUMINISTROS DE MATERIALES 14,494.14
B MONTAJE ELECTROMECANICO 5,017.79
C TRANSPORTE DE MATERIALES 1,159.53
F TOTAL COSTO DIRECTO (C.D.) (S/.) 20,671.46
G GASTOS GENERALES (12%) 2,480.58
I COSTO TOTAL SIN I.G.V. (S/.) 23,152.04
F I.G.V. (S/.) 4,398.89
COSTO TOTAL INLUIDO I.G.V. (S/.) 27,550.93
REDES SECUNDARIAS 440/220V, CONEXIONES DOMICILIARIAS Y ALUMBRADO PUBLICO PARA EL CASERIO LAMBAYEQUE VIEJO
TOTAL(S/.)
RESUMEN DEL VALOR REFERENCIAL - REDES SECUNDARIAS
DISTRITO: LAMBAYEQUE, PROVINCIA: LAMBAYEQUE, DEPARTAMENTO: LAMBAYEQUE
RESUMEN GENERAL DE REDES SECUNDARIAS
ITEM DESCRIPCION
A SUMINISTROS DE MATERIALES 14,494.14
B MONTAJE ELECTROMECANICO 5,017.79
C TRANSPORTE DE MATERIALES 724.71
D TOTAL COSTO DIRECTO (C.D.) (S/.) 20,236.64
E GASTOS GENERALES (12%) 1,011.83
H COSTO TOTAL SIN I.G.V. (S/.) 21,248.47
I I.G.V. (S/.) 3,824.72
COSTO TOTAL INLUIDO I.G.V. (S/.) 25,073.19
REDES SECUNDARIAS 440/220V, CONEXIONES DOMICILIARIAS Y ALUMBRADO PUBLICO PARA EL CASERIO LAMBAYEQUE VIEJO
TOTAL(S/.)
VALOR REFERENCIALSUMINISTRO DE MATERIALES PARA REDES SECUNDARIAS
REDES SECUNDARIAS 440/220V, CONEXIONES DOMICILIARIAS Y ALUMBRADO PUBLICO PARA EL CASERIO LAMBAYEQUE VIEJO
DISTRITO: LAMBAYEQUE, PROVINCIA: LAMBAYEQUE, DEPARTAMENTO: LAMBAYEQUE
SECCION : REDES SECUNDARIASA: SUMINISTRO DE MATERIALES
METRADO COSTO
ITEM DESCRIPCIÓN DE PARTIDAS UNID. Total Unitario TOTAL
Cantidad S/. S/.
CASCAJAL
1.00 POSTES DE CONCRETO ARMADO CENTRIFUGADO
1.01 POSTE DE CAC 8m/200/120/240 u 5.00 400.00 2,000.001.02 POSTE DE CAC 8m/300/120/240 u 8.00 410.00 3,280.00
SUB-TOTAL 1: 5,280.00
2.00 CABLES Y CONDUCTORES DE ALUMINIO
2.01 CONDUCTOR AUTOPORTANTE DE ALUMINIO 2X25+16/25 mm² km 0.19 4,900.00 943.252.02 CONDUCTOR AUTOPORTANTE DE ALUMINIO 2X25/25 mm² km 0.60 4,500.00 2,697.75
SUB-TOTAL 2: 3,641.00
3.00 ACCESORIOS DE CABLES AUTOPORTANTES
3.01 GRAPA DE SUSPENSION O MORDAZA DE SUSPENSION PARA PORT. Al 25 mm2 u 10.00 9.50 95.003.02 GRAPA DE ANCLAJE O MORDAZA CONICA TERMINAL (SIMSO73) - PORT. Al-25mm2 u 12.00 12.50 150.003.03 CONECTOR DE DERIVACION TIPO CUÑA I u 10.00 3.50 35.003.04 CONECTOR DE DERIVACION TIPO CUÑA II u 2.00 3.50 7.003.05 CONECTOR DE DERIVACION TIPO CUÑA III u 12.00 3.50 42.003.06 CONECTOR DE DERIVACION TIPO CUÑA IV u 2.00 3.50 7.003.07 CORREA PLASTICA DE AMARRE u 62.00 0.15 9.303.08 MANTA ABIERTA TERMOCONTRAIBLE CRSM-RAYCHEM 34/10-1200 (1200mm/KIT) u 3.00 90.00 270.003.09 CAPUCHON TERMOCONTRAIBLE SELLADOR DE PUNTA DE CABLE 16-70mm2 rll 30.00 3.50 105.00
SUB-TOTAL 3: 720.30
4.00 CABLES Y CONDUCTORES DE COBRE
4.01 CABLE AUTOPORTANTE DE Cu, TIPO CAI, C/PORT Cu FORRADO 1x10+n10mm2 (PORT. DE Cu) m 0.00 4.10 0.004.02 CONDUCTOR DE COBRE CONCENTRICO, 2 x 4 mm² , CON AISLAMIENTO Y CUBIERTA DE PVC m 195.00 4.20 819.004.03 CONDUCTOR DE COBRE DESNUDO, TEMPLE BLANDO, 35 mm2, 7 HILOS m 40.00 10.50 420.004.04 CONDUCTOR PORTATIL DE COBRE (NLT) 2x2,5mm2 m 5.00 4.25 21.25
SUB-TOTAL 4: 1,239.00
5.00 LUMINARIAS, LAMPARAS Y ACCESORIOS
5.01 PASTORAL DE TUBO TIPO PARABOLICO A°G° PS/1.76m/1.78m/1½"ø/15° u 2.00 35.80 71.605.02 Cjto 2.00 4.80 9.605.03 Cjto 2.00 4.80 9.605.06 LUMINARIA COMPLETA CON EQUIPO PARA LAMPARA DE 70 W, INCL. EQUIPO u 2.00 140.20 280.405.07 LAMPARA DE VAPOR DE SODIO DE ALTA PRESION DE 70 W u 2.00 15.85 31.705.08 CONECTOR DE DERIVACION TIPO CUÑA II u 2.00 3.80 7.605.09 CONECTOR DE DERIVACION TIPO CUÑA III u 2.00 3.80 7.60
SUB-TOTAL 5: 418.10
6.00 RETENIDAS Y ANCLAJES
6.01 CABLE DE ACERO GRADO SIEMENS MARTIN, DE 3/8'' ø, 7 HILOS m 90.00 4.20 378.006.02 PERNO OJO ANGULAR CON GUARDACABO DE A°F°G°,5/8ø PROVISTO T/A/C u 9.00 7.50 67.506.03 VARILLA DE ANCLAJE CON OJAL GUARDAC.DE A°F°G° 5/8''Øx2,40m T/A/C u 9.00 16.00 144.006.04 ARANDELA CUADRADA A°F°G° 4''x4''x1/4'', HUECO DE 13/16''Ø u 9.00 2.20 19.806.05 AMARRE PREFORMADO DE A°G° P/CABLE DE 3/8'' u 36.00 2.80 100.806.06 ARANDELA CUADRADA CURVA DE A°F°G°, 2 1/4''x2 1/4''x3/16'' u 18.00 2.20 39.606.07 u 0.00 25.00 0.006.09 BLOQUE DE CONCRETO DE 0,40 x 0,40 x 0,15 m u 9.00 18.00 162.006.10 AISLADOR D ETRACCION ANSI 54-1 u 9.00 7.20 64.806.11 CANALETA GUARDACABLE DE A°G° 1/16''x2400mm u 9.00 17.50 157.50
SUB-TOTAL 6: 1,134.00
ABRAZADERA A°G° P' DE 3/16'' esp.1½"x120mmØ (POSTE) x 2"Ø (PASTORAL) - (RS), INCL. ARAND/PERN HEX.
ABRAZADERA A°G° P' DE 3/16'' esp.1½"x135mmØ (POSTE) x 2"Ø (PASTORAL) - (RS), INCL. ARAND/PERN HEX.
CONTRAPUNTA DE A°G° 2''Øx1,0m DE LONG, CON FLEJE DE ACERO+HEBILLA/TERM. CONTRAP.
REDES SECUNDARIAS 440/220V, CONEXIONES DOMICILIARIAS Y ALUMBRADO PUBLICO PARA EL CASERIO LAMBAYEQUE VIEJO
DISTRITO: LAMBAYEQUE, PROVINCIA: LAMBAYEQUE, DEPARTAMENTO: LAMBAYEQUE
SECCION : REDES SECUNDARIASA: SUMINISTRO DE MATERIALES
METRADO COSTO
ITEM DESCRIPCIÓN DE PARTIDAS UNID. Total Unitario TOTAL
Cantidad S/. S/.
7.00 ACCESORIOS DE FERRETERIA PARA ESTRUCTURAS
7.01 u 17.00 11.50 195.507.02 u 2.00 12.50 25.007.03 TUERCA GANCHO DE A°F°G° u 5.00 5.80 29.007.04 CAJA DE DERIVACION PARA ACOMETIDAS POLIMERICA, SISTEMA 22O V u 0.00 110.00 0.007.05 PORTALINEA VERTICAL SIMPLE DE A°F°G° CON PERNO T/A/C u 7.00 7.50 52.507.06 GRASA PARA CONECTORES Kg 2.00 6.00 12.00
SUB-TOTAL 7: 314.00
8.00 PUESTA A TIERRA
8.01 ELECTRODO COPERWELD 16mmØ(5/8'') x 2,40m u 4.00 32.50 130.008.02 CONECTOR DE BRONCE PARA ELECTRODO DE 16 mm ø (5/8'') u 4.00 3.20 12.808.03 TUBO DE PLASTICO DE PVC SAP DE 3/4''Ø X 1.5m DE LONG. u 4.00 1.80 7.208.04 DOSIS DE BENTONITA Bls 4.00 12.00 48.008.05 ARANDELA CUADRADA DE 150x150x10mm C/TUERCA DE BRONCE u 4.00 4.16 16.648.06 CAJA DE CONCRETO PARA PUESTA A TIERRA CON LOGO (SEGÚN REQUERIMIENTO) u 4.00 19.50 78.00
SUB-TOTAL 8: 292.64
9.00 CONEXIONES DOMICILIARIAS
9.01 TUBO DE FºGº TIPO SAP 3/4''x3m, PROVISTO DE CODO u 10.00 45.50 455.009.02 ARMELLA TIRAFON DE 1/2''x3'' u 10.00 0.70 7.009.03 TARUGO DE MADERA u 10.00 0.20 2.009.04 TEMPLADOR DE ACOMETIDAS, TIPO SAPITO u 20.00 1.50 30.009.05 CAJA PORTAMEDIDOR TIPO "L" SEGÚN NORMAS u 10.00 20.50 205.009.06 PRECINTO DE SEGURIDAD METALICOT/FORZA u 10.00 1.00 10.009.07 SEÑALIZADOR DE ACOMETIDAS PLASTICO SLS (25,4x54mm) rll 1.00 70.10 70.109.08 CONECTOR SL211 Y CUBIERTA AISLANTE u 40.00 1.20 48.009.09 PORTAFUSIBLE DE 15A, SP u 10.00 10.30 103.009.10 MEDIDOR MONOF. DE ENERGIA ACTIVA u 10.00 52.50 525.00
SUB-TOTAL 9: 1,455.10
TOTAL SUMINISTRO DE MATERIALES S/. 14,494.14
PERNO GANCHO DE SUSPENSION DE A°F°G° 8'' CON CANOPLAS/T/A/C
PERNO GANCHO DE SUSPENSION DE A°F°G° 12'' CON CANOPLAS/T/A/C
VALOR REFERENCIAL
MONTAJE ELECTROMECANICO PARA REDES SECUNDARIAS
REDES SECUNDARIAS 440/220V, CONEXIONES DOMICILIARIAS Y ALUMBRADO PUBLICO PARA EL CASERIO LAMBAYEQUE VIEJO
DISTRITO: LAMBAYEQUE, PROVINCIA: LAMBAYEQUE, DEPARTAMENTO: LAMBAYEQUE
SECCION : REDES SECUNDARIASB: MONTAJE ELECTROMECANICO
METRADO METRADO PRECIO
ITEM DESCRIPCIÓN DE PARTIDAS UNID. TOTAL UNIT. TOTAL
CANT. S/. S/.
1.00 OBRAS PRELIMINARES
1.02 ESTUDIOS DE INGENIERIA DE LAS REDES SECUNDARIAS Loc. 1.00 500.00 500.00
SUB-TOTAL 1: 500.00
2.00 INSTALACIÓN DE POSTES DE CONCRETO
2.01 TRANSPORTE DE POSTE DE CAC 8 m DE ALMACEN A PUNTO DE IZAJE u 13.00 23.59 306.672.02 EXCAVACIÓN EN TERRENO NORMAL 11.44 28.50 326.042.03 IZAJE, IDENTIFICACIÓN Y SEÑALIZACIÓN DE POSTE DE 8 m/2000 N u 5.00 38.50 192.502.04 IZAJE, IDENTIFICACIÓN Y SEÑALIZACIÓN DE POSTE DE 8 m/3000 N u 8.00 40.20 321.602.05 CIMENTACION DE POSTE DE 8m EN TERRENO NORMAL 11.70 65.50 766.35
SUB-TOTAL 2: 1,913.16
3.00 INSTALACIÓN DE RETENIDAS
3.01 EXCAVACIÓN EN TERRENO NORMAL 10.62 28.50 302.673.02 INSTALACIÓN DE RETENIDA INCLINADA u 9.00 24.50 220.503.03 INSTALACIÓN DE RETENIDA VERTICAL u 0.00 24.50 0.003.03 RELLENO Y COMPACTACIÓN DE RETENIDA INCLINADA Y VERTICAL 10.62 27.80 295.24
SUB-TOTAL 3: 818.41
4.00 MONTAJE DE ARMADOS
4.01 ARMADO TIPO A, CON CAJA DE DERIVACIÓN u 0.00 12.57 0.004.02 ARMADO TIPO A, SIN CAJA DE DERIVACIÓN u 6.00 10.12 60.724.03 ARMADO TIPO ANG, CON CAJA DE DERIVACIÓN u 14.49 0.004.04 ARMADO TIPO ANG, SIN CAJA DE DERIVACIÓN u 2.00 12.57 25.144.05 ARMADO TIPO F, CON CAJA DE DERIVACIÓN u 13.10 0.004.06 ARMADO TIPO F, SIN CAJA DE DERIVACIÓN u 4.00 10.25 41.004.07 ARMADO TIPO VF, CON CAJA DE DERIVACIÓN u 14.49 0.004.08 ARMADO TIPO VF, SIN CAJA DE DERIVACIÓN u 12.57 0.004.09 ARMADO TIPO DVF, CON CAJA DE DERIVACIÓN u 0.00 21.75 0.004.10 ARMADO TIPO DVF, SIN CAJA DE DERIVACIÓN u 17.30 0.004.11 ARMADO TIPO DR, CON CAJA DE DERIVACIÓN u 24.07 0.004.12 ARMADO TIPO DR,SIN CAJA DE DERIVACIÓN u 1.00 19.01 19.01
SUB-TOTAL 4: 145.87
5.00 MONTAJE DE CONDUCTORES AUTOPORTANTESCOMPRENDE TENDIDO Y PUESTA EN FLECHA DE :
5.01 CONDUCTOR AUTOPORTANTE DE ALUMINIO 2X25+16/25 mm2 Km 0.19 620.00 119.355.02 CONDUCTOR AUTOPORTANTE DE ALUMINIO 2X16/25 mm2 Km 0.60 560.00 335.72
SUB-TOTAL 5: 455.07
6.00 INSTALACIÓN DE PUESTA A TIERRA
6.01 EXCAVACIÓN EN TERRENO NORMAL 8.52 28.50 242.826.02 INSTALACION DE PUESTA A TIERRA TIPO PAT-1 u 4.00 16.50 66.006.03 RELLENO Y COMPACTACIÓN DE PUESTA A TIERRA TIPO PAT-1 CON TIERRA CERNIDA 8.52 35.50 302.46
SUB-TOTAL 6: 611.28
7.00 PASTORALES, LUMINARIAS Y LAMPARAS
7.01 INSTALACIÓN DE PASTORAL DE A° G° u 2.00 16.50 33.007.02 INSTALACIÓN DE LUMINARIA, LÁMPARA Y ACCESORIOS u 2.00 29.50 59.00
SUB-TOTAL 7: 92.00
8.00 CONEXIONES DOMICILIARIAS
INSTALACIÓN DE ACOMETIDA DOMICILIARIA, QUE CONPRENDE : CONEXIÓN DE ACOMETIDA DOMICILIARIAS (NO INCLUYE MONTAJE DE MEDIDOR DE ENERGIA)
8.01 CONEXIÓN DE ACOMETIDAS DOMICILIARIAS, CONFIGURACIÓN: CORTA u 7.00 19.50 136.508.02 CONEXIÓN DE ACOMETIDA DOMICILIARIAS, CONFIGURACIÓN: LARGA u 3.00 23.50 70.508.03 CONEXIÓN DE ACOMETIDAS DOMICILIARIAS, CONFIGURACIÓN: CORTA (EN MURETE) u 0.00 0.008.04 CONEXIÓN DE ACOMETIDA DOMICILIARIAS, CONFIGURACIÓN: LARGA (EN MURETE) u 0.00 0.008.05 CONTRASTE DE MEDIDOR DE ENERGIA ACTIVA Y CAJA u 10.00 12.50 125.008.05 MONTAJE DE MEDIDOR DE ENERGIA ACTIVA Y CAJA u 10.00 15.00 150.00
SUB-TOTAL 8: 482.00
TOTAL MONTAJE ELECTROMECÁNICO S/. 5,017.79
m3
m3
m3
m3
m3
m3
FÓRMULA POLINÓMICA
REDES SECUNDARIAS 440/220V, CONEXIONES DOMICILIARIAS Y ALUMBRADO PUBLICO PARA EL CASERIO LAMBAYEQUE VIEJO
REDES SECUNDARIAS, INCLUYE CONEXIONES DOMICILIARIAS
VALOR REFERENCIAL 23,152.04
Nº ELEMENTO REPRESENTATIVO SIMBOLO MONTO INCIDENCIA % PARCIAL COEFICIENTE
1 POSTES DE CONCRETO 062 PC PC 5,280.00 0.228 100.0% 0.228CABLES Y CONDUCTORES DE ALUMINIO 030 DI1
DI3,641.00 0.157 71.4% 0.220
CONEXIONES DOMICILIARIAS 030 DI2 1,455.10 0.063 28.6%LUMINARIAS, LAMPARAS Y ACCESORIOS 011 AE1
FE
418.10 0.018 10.2% 0.178
2 ACCESORIOS PARA CABLES AUTOPORTANTES 011 AE2 720.30 0.031 17.5%RETENIDAS Y ANCLAJES 002 FE1 1,134.00 0.049 27.5%ACCESORIOS DE FERRETERIA PARA ESTRUCTURAS 002 FE2 314.00 0.014 7.6%CABLES Y CONDUCTORES DE COBRE 006 CU 1,239.00 0.054 30.1%
3 PUESTA A TIERRA 006 PT 292.64 0.013 7.1%
4 MONTAJE ELECTROMECANICO 047 JJ
5,017.79 0.217 81.2% 0.267TRANSPORTE 032 FT 1,159.53 0.050 18.8%
5 GASTOS GENERALES Y UTILIDADES 039 GG GG 2,480.58 0.107 100.0% 0.107
K= 000 PCr/PCo + 000 DIr/DIo + 000 FEr/FEo + 000 Jr/Jo + 000 GGr/GGo
NOTAS:0,000
1.- En la fórmula los sub-indices "o" de cada símbolo corresponden al indice de precios según (CREPCO) a lafecha de Elaboración del Presupuesto (Presupuesto Base) y los sub-indices "r" al indice de precios al momento de reajuste o fecha de valorización
2.- En el caso de los monomios compuestos por varios indices se ha considerado para efecto de denominaciónel símbolo que tiene mayor porcentaje de incidencia
3.- En caso de cambios en el suministro se deberá actualizar la formula polinómica.
INDICEUNIFICADO
SIMBOLOMONOMIO
PLANILLA DE METRADOSELECTRIFICACION RURAL
REDES SECUNDARIAS 440/220V, CONEXIONES DOMICILIARIAS Y ALUMBRADO PUBLICO PARA EL CASERIO LAMBAYEQUE VIEJODISTRITO: LAMBAYEQUE, PROVINCIA: LAMBAYEQUE, DEPARTAMENTO: LAMBAYEQUE
METRADO POSTES DE C.A.C PASTORALES Y LUMINARIAS CONDUCT. AUTOP. COND.Cu ACCESORIOS DE FERRETERIA
POSTE N`
AR
MA
DO
VAN
O A
DEL
AN
TE (m
)
POST
E D
E C
AC
8/2
00
POST
E D
E C
AC
8/3
00
RET
ENID
A S
IMPL
E
RET
ENID
A C
ON
TRA
PUN
TA
PUES
TA A
TIE
RR
A
AB
RA
Z. D
E 3/
16''
esp.
1½"x
120m
mØ
AB
RA
Z. D
E 3/
16''
esp.
1½"x
135m
mØ
LUM
INA
RIA
CO
N L
AM
PAR
A
2X25
+16/
P25
2X25
/P25
CO
ND
CU
TOR
AU
TOP.
Cu
MO
RD
AZA
DE
SUSP
ENSI
ON
MO
RD
AZA
CO
NIC
A T
ERM
INA
L
PER
NO
GA
NC
HO
8''
(RS)
PER
NO
GA
NC
HO
12'
' (R
P)
TUER
CA
GA
NC
HO
DE
A°F
°G°
CO
NEC
TOR
CU
ÑA
I
CO
NEC
TOR
CU
ÑA
II
CO
NEC
TOR
CU
ÑA
III
CO
NEC
TOR
CU
ÑA
IV
MA
NTA
TER
MO
C. (
10 c
m)
CO
RR
EA P
LAST
ICA
DE
AM
AR
RE
CA
PUC
HO
N T
ERM
OC
ON
TRA
IBLE
CA
JA D
E D
ERIV
AC
ION
POR
TALI
NEA
VER
ICA
L SI
MPL
E
SAM 01 - CIRCUITO 1SAM 5.00 5.50 0.00 2.00 2.00 2.00 2.00 1.00 0.00 3.00 4.00 0.00 1.00
1.00 A 25.00 1.00 1.00 1.00 1.00 1.00 1.00 27.50 0.00 1.00 1.00 0.00 1.00 1.00 2.00 4.00 0.002.00 D 45.00 1.00 1.00 0.00 0.00 0.00 49.50 0.00 1.00 2.00 2.00 1.00 5.00 0.00 0.00 0.00 5.00 6.00 5.00 0.003.00 A 45.00 1.00 0.00 0.00 0.00 49.50 0.00 1.00 1.00 0.00 0.00 0.00 0.00 4.00 0.004.00 F 55.00 1.00 1.00 1.00 0.00 0.00 0.00 60.50 0.00 1.00 1.00 0.00 1.00 0.00 1.00 2.00 5.00 0.00 1.005.00 D 50.00 1.00 1.00 1.00 0.00 0.00 0.00 55.00 0.00 1.00 2.00 2.00 1.00 5.00 0.00 0.00 0.00 5.00 6.00 5.00 0.006.00 F 42.00 1.00 1.00 0.00 0.00 0.00 46.20 0.00 1.00 1.00 0.00 1.00 0.00 1.00 2.00 5.00 0.00 1.007.00 A 50.00 1.00 1.00 1.00 1.00 1.00 55.00 0.00 1.00 1.00 0.00 4.00 1.00 5.00 4.00 0.00 1.008.00 DR 45.00 1.00 1.00 0.00 0.00 0.00 49.50 0.00 2.00 1.00 1.00 0.00 1.00 0.00 1.00 6.00 0.00 |9.00 A 40.00 1.00 0.00 0.00 0.00 44.00 0.00 1.00 1.00 0.00 1.00 0.00 1.00 4.00 0.00 1.0010.00 F 45.00 1.00 1.00 1.00 0.00 0.00 0.00 49.50 0.00 1.00 1.00 0.00 1.00 0.00 1.00 2.00 5.00 0.00 1.00
SAM 01 - CIRCUITO 11.00 ANG 33.00 0.00 36.30 0.00 1.00 1.00 0.00 0.00 0.00 0.00 4.00 0.002.00 A 60.00 1.00 0.00 66.00 0.00 1.00 1.00 0.00 0.00 0.00 0.00 4.00 0.003.00 A 60.00 0.00 66.00 0.00 1.00 1.00 0.00 0.00 0.00 0.00 4.00 0.004.00 ANG 65.00 1.00 1.00 0.00 71.50 0.00 1.00 1.00 0.00 0.00 0.00 0.00 4.00 0.005.00 F 55.00 1.00 1.00 1.00 0.00 60.50 0.00 1.00 1.00 0.00 1.00 0.00 1.00 2.00 5.00 0.00 1.00
TOTAL 720.00 5.00 8.00 9.00 0.00 4.00 2.00 2.00 2.00 2.00 192.50 599.50 0.00 10.00 12.00 17.00 2.00 5.00 10.00 2.00 12.00 2.00 26.00 62.00 30.00 0.00 7.00
DETALLE Y UBICACION
RETENIDAS Y PUESTA A TIERRA
PAST
OR
AL
DE
AºG
º ps
/1,7
6m/1
,78m
/1 1
/2''Ø
/15°
MUNICIPALIDAD PROVINCIAL DE LAMBAYEQUEDIVISION DE OBRAS Y ACONDICIONAMIENTO TERRITORIAL
ANALISIS DE PRECIOS UNITARIOS RED SECUNDARIA Y CONEXIONES DOMICILIARIAS
PROYECTO : ELECTRIFICACION CASERIO: "EL MEDANO"
PARTIDA : Cartel de obra Estándar
UNIDAD : Cartel de obra
RENDIMIENTO : 1 cartel/dia
DESCRIPCION Unidad Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Clavos c/c de 3" kg 1.00 2.94 2.94
Triplay Lupuna 4' x8' x9 mm pl 2.00 40.00 80.00
Pintura esmalte sintético gln 0.50 31.33 15.67
Sub-total 98.61
MANO DE OBRA
Operario 1.00 h-h 8.00 11.95 95.60
Oficial 1.00 h-h 8.00 10.69 85.52
Peón 1.00 h-h 8.00 9.66 77.28
Sub-total 258.40
EQUIPOS Y HERRAMIENTAS
Herramientas 5% M.O % 5.00 258.40 12.92
Sub-total 12.92
TOTAL S/. 369.93
MINISTERIO DE ENERGIA Y MINAS DIRECCION EJECUTIVA DE PROYECTOS
ANALISIS DE PRECIOS UNITARIOS RED SECUNDARIA Y CONEXIONES DOMICILIARIAS
PROYECTO : PEQUEÑO SISTEMA ELECTRICO
PARTIDA : Replanteo topografico, ubicación de estructuras e
Ingeniería de Detalle por Localidad
UNIDAD : Localidad
RENDIMIENTO : 1 Localidad/dia
DESCRIPCION Und. Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Material varios (Estaca,wincha metálica de 50 m., yeso, %MO 5.00 315.08 15.75
cordel, pintura, etc., útilies y equipos de gabinete)
Sub-total 15.75
MANO DE OBRA
Ingeniero Especialista en Redes Secundarias 0.50 h-h 4.00 18.75 75.00
Oficial 1.00 h-h 8.00 10.69 85.52
Peón 2.00 h-h 16.00 9.66 154.56
Sub-total 315.08
EQUIPOS Y HERRAMIENTAS
Herramientas 5% mano de obra % 5.00 315.08 15.75
Sub-total 15.75
TOTAL S/. 346.58
MINISTERIO DE ENERGIA Y MINAS DIRECCION EJECUTIVA DE PROYECTOS
ANALISIS DE PRECIOS UNITARIOS RED SECUNDARIA Y CONEXIONES DOMICILIARIAS
PROYECTO : PEQUEÑO SISTEMA ELECTRICO
PARTIDA : Excavacion en terreno normal
UNIDAD : m3
RENDIMIENTO : 8 m3/día
DESCRIPCION Und. Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Material varios (Yeso,estacas,cordel,etc) % 5.00 20.99 1.05
Sub-total 1.05
MANO DE OBRA
Capataz 0.1 h-h 0.10 16.73 1.67
Peón 2 h-h 2.00 9.66 19.32
Sub-total 20.99
EQUIPOS Y HERRAMIENTAS
Herramientas 5% mano de obra % 5.00 20.99 1.05
Sub-total 1.05
TOTAL S/. 23.09
MINISTERIO DE ENERGIA Y MINAS DIRECCION EJECUTIVA DE PROYECTOS
ANALISIS DE PRECIOS UNITARIOS RED SECUNDARIA Y CONEXIONES DOMICILIARIAS
PROYECTO : PEQUEÑO SISTEMA ELECTRICO
PARTIDA : Relleno y compactación para cimentación de poste
UNIDAD : m3
RENDIMIENTO : 10 m3/dia
DESCRIPCION Und. Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Piedra Mediana de Cantera m³ 0.35 35.00 12.25
Agua m3 0.20 3.15 0.63
Sub-total 12.88
MANO DE OBRA
Capataz 0.10 h-h 0.08 16.73 1.34
Oficial 1.00 h-h 0.80 10.69 8.55
Peón 2.00 h-h 1.60 9.66 15.46
Sub-total 25.35
EQUIPOS Y HERRAMIENTAS
Herramientas 5% mano de obra % 5.00 25.35 1.27
Sub-total 1.27
TOTAL S/. 39.50
MINISTERIO DE ENERGIA Y MINAS DIRECCION EJECUTIVA DE PROYECTOS
ANALISIS DE PRECIOS UNITARIOS RED SECUNDARIA Y CONEXIONES DOMICILIARIAS
PROYECTO : PEQUEÑO SISTEMA ELECTRICO
PARTIDA : Relleno y compactación para instalación bloque de anclaje
UNIDAD : m3
RENDIMIENTO : 12 m3/dia
DESCRIPCION Und. Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Piedra Grande de Cantera m³ 0.20 35.00 7.00
Agua m3 0.20 3.15 0.63
Sub-total 7.63
MANO DE OBRA
Capataz 0.10 h-h 0.07 16.73 1.17
Oficial 1.00 h-h 0.67 10.69 7.16
Peón 2.00 h-h 1.33 9.66 12.85
Sub-total 21.18
EQUIPOS Y HERRAMIENTAS
Herramientas 5% mano de obra % 5.00 21.18 1.06
Sub-total 1.06
TOTAL S/. 29.87
MINISTERIO DE ENERGIA Y MINAS DIRECCION EJECUTIVA DE PROYECTOS
ANALISIS DE PRECIOS UNITARIOS RED SECUNDARIA Y CONEXIONES DOMICILIARIAS
PROYECTO : PEQUEÑO SISTEMA ELECTRICO
PARTIDA : Relleno y compactación para puesta a tierra
UNIDAD : m3
RENDIMIENTO : 8 m3/dia
DESCRIPCION Und. Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Agua m3 0.20 3.15 0.63
Sub-total 0.63
MANO DE OBRA
Capataz 0.10 h-h 0.10 16.73 1.67
Oficial 1.00 h-h 1.00 10.69 10.69
Peón 2.00 h-h 2.00 9.66 19.32
Sub-total 31.68
EQUIPOS Y HERRAMIENTAS
Herramientas 5% mano de obra % 5.00 31.68 1.58
Sub-total 1.58
TOTAL S/. 33.89
MINISTERIO DE ENERGIA Y MINAS DIRECCION EJECUTIVA DE PROYECTOS
ANALISIS DE PRECIOS UNITARIOS RED SECUNDARIA Y CONEXIONES DOMICILIARIAS
PROYECTO : PEQUEÑO SISTEMA ELECTRICO
PARTIDA : Transporte de poste de concreto de almacen a punto de izaje
UNIDAD : Un.
RENDIMIENTO : 30 Un/dia
DESCRIPCION Und. Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Material varios (Estrobo,soga,etc) % 5.00 21.45 1.07
Sub-total 1.07
MANO DE OBRA
Capataz 0.10 h-h 0.03 16.73 0.50
Oficial 1.00 h-h 0.27 10.69 2.89
Peón 7.00 h-h 1.87 9.66 18.06
Sub-total 21.45
EQUIPOS Y HERRAMIENTAS
Herramientas 5% mano de obra % 5.00 21.45 1.07
Sub-total 1.07
TOTAL S/. 23.59
MINISTERIO DE ENERGIA Y MINAS DIRECCION EJECUTIVA DE PROYECTOS
ANALISIS DE PRECIOS UNITARIOS RED SECUNDARIA Y CONEXIONES DOMICILIARIAS
PROYECTO : PEQUEÑO SISTEMA ELECTRICO
PARTIDA : Izado de poste de CAC 8 m / 2000 N. Incluye numeración
UNIDAD : Un.
RENDIMIENTO : 22 Un/dia
DESCRIPCION Und. Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Material varios (estribo,soga,pintura, brochas, etc) % MO 5.00 28.74 1.44
Sub-total 1.44
MANO DE OBRA
Capataz 0.50 h-h 0.18 16.73 3.01
Operario 1.00 h-h 0.36 11.95 4.30
Oficial 1.00 h-h 0.36 10.69 3.85
Peón 5.00 h-h 1.82 9.66 17.58
Sub-total 28.74
EQUIPOS Y HERRAMIENTAS
Pluma de Izaje 1 h-m 0.36 18.36 6.61
Herramientas 5% de mano de obra 1 % 5.00 28.74 1.44
Sub-total 8.05
TOTAL S/. 38.23
MINISTERIO DE ENERGIA Y MINAS DIRECCION EJECUTIVA DE PROYECTOS
ANALISIS DE PRECIOS UNITARIOS RED SECUNDARIA Y CONEXIONES DOMICILIARIAS
PROYECTO : PEQUEÑO SISTEMA ELECTRICO
PARTIDA : Izado de poste de CAC de 8 m / 3000 N. Incluye numeración
UNIDAD : Un.
RENDIMIENTO : 20 Un/dia
DESCRIPCION Und. Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Material varios (estribo,soga,pintura, brochas, etc) % MO 5.00 31.73 1.59
Sub-total 1.59
MANO DE OBRA
Capataz 0.50 h-h 0.20 16.73 3.35
Operario 1.00 h-h 0.40 11.95 4.78
Oficial 1.00 h-h 0.40 10.69 4.28
Peón 5.00 h-h 2.00 9.66 19.32
Sub-total 31.73
EQUIPOS Y HERRAMIENTAS
Pluma de Izaje 1 h-m 0.40 18.36 7.34
Herramientas 5% de mano de obra 1 % 5.00 31.73 1.59
Sub-total 8.93
TOTAL S/. 42.25
MINISTERIO DE ENERGIA Y MINAS DIRECCION EJECUTIVA DE PROYECTOS
ANALISIS DE PRECIOS UNITARIOS RED SECUNDARIA Y CONEXIONES DOMICILIARIAS
PROYECTO : PEQUEÑO SISTEMA ELECTRICO
PARTIDA : Instalacion de retenida inclinada
UNIDAD : Un.
RENDIMIENTO : 15 Un/dia
DESCRIPCION Und. Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Material varios (soga,estrobo,etc) % M.O. 5.00 23.18 1.16
Sub-total 1.16
MANO DE OBRA
Capataz 0.10 h-h 0.05 16.73 0.84
Operario 1.00 h-h 0.53 11.95 6.33
Oficial 1.00 h-h 0.53 10.69 5.67
Peón 2.00 h-h 1.07 9.66 10.34
Sub-total 23.18
EQUIPOS Y HERRAMIENTAS
Tirfor 3 ton. 1.00 h-m 0.53 3.00 1.59
Escalera 1.00 h-m 0.53 1.50 0.80
Caja de herramientas 2.00 h-m 1.07 1.50 1.61
Herramientas 5% mano de obra % 5.00 23.18 1.16
Sub-total 5.16
TOTAL S/. 29.50
MINISTERIO DE ENERGIA Y MINAS DIRECCION EJECUTIVA DE PROYECTOS
ANALISIS DE PRECIOS UNITARIOS RED SECUNDARIA Y CONEXIONES DOMICILIARIAS
PROYECTO : PEQUEÑO SISTEMA ELECTRICO
PARTIDA : Instalacion de retenida vertical
UNIDAD : Un.
RENDIMIENTO : 14 Un/dia
DESCRIPCION Und. Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Material varios (soga,estrobo,etc) % 5.00 24.91 1.25
Sub-total 1.25
MANO DE OBRA
Capataz 0.10 h-h 0.06 16.73 1.00
Operario 1.00 h-h 0.57 11.95 6.81
Oficial 1.00 h-h 0.57 10.69 6.09
Peón 2.00 h-h 1.14 9.66 11.01
Sub-total 24.91
EQUIPOS Y HERRAMIENTAS
Tirfor 3 ton. 1.00 h-m 0.57 3.00 1.71
Escalera 1.00 h-m 0.57 1.50 0.86
Caja de herramientas 2.00 h-m 1.14 1.50 1.71
Herramientas 5% mano de obra % 5.00 24.91 1.25
Sub-total 5.53
TOTAL S/. 31.69
MINISTERIO DE ENERGIA Y MINAS DIRECCION EJECUTIVA DE PROYECTOS
ANALISIS DE PRECIOS UNITARIOS REDES SECUNDARIAS Y CONEXIONES DOMICILIARIAS
PROYECTO : PEQUEÑO SISTEMA ELECTRICO
PARTIDA : Armado TIPO A Alineamiento - Cond. Autoportante
con caja de derivación
UNIDAD : Und.
RENDIMIENTO : 35 Un/dia
DESCRIPCION Unidad Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Material varios (Soga,estrobo,etc) % 5.00 10.49 0.52
Sub-total 0.52
MANO DE OBRA
Capataz 0.20 h-h 0.05 16.73 0.84
Operario 1.00 h-h 0.23 11.95 2.75
Oficial 1.00 h-h 0.23 10.69 2.46
Peón 2.00 h-h 0.46 9.66 4.44
Sub-total 10.49
EQUIPOS Y HERRAMIENTAS
Caja de herramientas 2.00 h-m 0.46 1.50 0.69
Escalera 1.00 h-m 0.23 1.50 0.35
Herramientas 5% mano de obra % 5.00 10.49 0.52
Sub-total 1.56
TOTAL S/. 12.57
MINISTERIO DE ENERGIA Y MINAS DIRECCION EJECUTIVA DE PROYECTOS
ANALISIS DE PRECIOS UNITARIOS REDES SECUNDARIAS Y CONEXIONES DOMICILIARIAS
PROYECTO : PEQUEÑO SISTEMA ELECTRICO
PARTIDA : Armado TIPO A Alineamiento - Cond. Autoportante
Sin Caja de Derivación
UNIDAD : Un.
RENDIMIENTO : 45 Un/dia
DESCRIPCION Unidad Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Material varios (Soga,estrobo,etc) % 5.00 8.22 0.41
Sub-total 0.41
MANO DE OBRA
Capataz 0.20 h-h 0.04 16.73 0.67
Operario 1.00 h-h 0.18 11.95 2.15
Oficial 1.00 h-h 0.18 10.69 1.92
Peón 2.00 h-h 0.36 9.66 3.48
Sub-total 8.22
EQUIPOS Y HERRAMIENTAS
Caja de herramientas 2.00 h-m 0.36 1.50 0.54
Escalera 2.00 h-m 0.36 1.50 0.54
Herramientas 5% mano de obra % 5.00 8.22 0.41
Sub-total 1.49
TOTAL S/. 10.12
MINISTERIO DE ENERGIA Y MINAS DIRECCION EJECUTIVA DE PROYECTOS
ANALISIS DE PRECIOS UNITARIOS REDES SECUNDARIAS Y CONEXIONES DOMICILIARIAS
PROYECTO : PEQUEÑO SISTEMA ELECTRICO
PARTIDA : Armado TIPO ANG ANGULO - Cond. Autoport.
Con Caja de Derivación
UNIDAD : Un.
RENDIMIENTO : 30 Un/dia
DESCRIPCION Unidad Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Material varios (Soga,estrobo,etc) % 5.00 12.08 0.60
Sub-total 0.60
MANO DE OBRA
Capataz 0.20 h-h 0.05 16.73 0.84
Operario 1.00 h-h 0.27 11.95 3.23
Oficial 1.00 h-h 0.27 10.69 2.89
Peón 2.00 h-h 0.53 9.66 5.12
Sub-total 12.08
EQUIPOS Y HERRAMIENTAS
Caja de herramientas 2.00 h-m 0.53 1.50 0.80
Escalera 1.00 h-m 0.27 1.50 0.41
Herramientas 5% mano de obra % 5.00 12.08 0.60
Sub-total 1.81
TOTAL S/. 14.49
MINISTERIO DE ENERGIA Y MINAS DIRECCION EJECUTIVA DE PROYECTOS
ANALISIS DE PRECIOS UNITARIOS REDES SECUNDARIAS Y CONEXIONES DOMICILIARIAS
PROYECTO : PEQUEÑO SISTEMA ELECTRICO
PARTIDA : Armado TIPO ANG ANGULO -Cond. Autoórt.
Sin Caja de Derivación
UNIDAD : Un.
RENDIMIENTO : 35 Un/dia
DESCRIPCION Unidad Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Material varios (Soga,estrobo,etc) % 5.00 10.49 0.52
Sub-total 0.52
MANO DE OBRA
Capataz 0.20 h-h 0.05 16.73 0.84
Operario 1.00 h-h 0.23 11.95 2.75
Oficial 1.00 h-h 0.23 10.69 2.46
Peón 2.00 h-h 0.46 9.66 4.44
Sub-total 10.49
EQUIPOS Y HERRAMIENTAS
Caja de herramientas 2.00 h-m 0.46 1.50 0.69
Escalera 1.00 h-m 0.23 1.50 0.35
Herramientas 5% mano de obra % 5.00 10.49 0.52
Sub-total 1.56
TOTAL S/. 12.57
MINISTERIO DE ENERGIA Y MINAS DIRECCION EJECUTIVA DE PROYECTOS
ANALISIS DE PRECIOS UNITARIOS REDES SECUNDARIAS Y CONEXIONES DOMICILIARIAS
PROYECTO : PEQUEÑO SISTEMA ELECTRICO
PARTIDA : Armado TIPO F FIN DE LINEA - Conductor Autoportante
Con Caja de Derivación
UNIDAD : Un.
RENDIMIENTO : 33 Un/dia
DESCRIPCION Unidad Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Material varios (Soga,estrobo,etc) % 5.00 10.92 0.55
Sub-total 0.55
MANO DE OBRA
Capataz 0.20 h-h 0.05 16.73 0.84
Operario 1.00 h-h 0.24 11.95 2.87
Oficial 1.00 h-h 0.24 10.69 2.57
Peón 2.00 h-h 0.48 9.66 4.64
Sub-total 10.92
EQUIPOS Y HERRAMIENTAS
Caja de herramientas 2.00 h-m 0.48 1.50 0.72
Escalera 1.00 h-m 0.24 1.50 0.36
Herramientas 5% mano de obra % 5.00 10.92 0.55
Sub-total 1.63
TOTAL S/. 13.10
MINISTERIO DE ENERGIA Y MINAS DIRECCION EJECUTIVA DE PROYECTOS
ANALISIS DE PRECIOS UNITARIOS REDES SECUNDARIAS Y CONEXIONES DOMICILIARIAS
PROYECTO : PEQUEÑO SISTEMA ELECTRICO
PARTIDA : Armado TIPO F FIN DE LINEA - Conductor Autoportante
Sin Caja de Derivación
UNIDAD : Un.
RENDIMIENTO : 43 Un/dia
DESCRIPCION Unidad Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Material varios (Soga,estrobo,etc) % 5.00 8.54 0.43
Sub-total 0.43
MANO DE OBRA
Capataz 0.20 h-h 0.04 16.73 0.67
Operario 1.00 h-h 0.19 11.95 2.27
Oficial 1.00 h-h 0.19 10.69 2.03
Peón 2.00 h-h 0.37 9.66 3.57
Sub-total 8.54
EQUIPOS Y HERRAMIENTAS
Caja de herramientas 2.00 h-m 0.37 1.50 0.56
Escalera 1.00 h-m 0.19 1.50 0.29
Herramientas 5% mano de obra % 5.00 8.54 0.43
Sub-total 1.28
TOTAL S/. 10.25
MINISTERIO DE ENERGIA Y MINAS DIRECCION EJECUTIVA DE PROYECTOS
ANALISIS DE PRECIOS UNITARIOS REDES SECUNDARIAS Y CONEXIONES DOMICILIARIAS
PROYECTO : PEQUEÑO SISTEMA ELECTRICO
PARTIDA : Armado TIPO VF VANO FLOJO - Cond. Autoport.
con Caja de Derivación
UNIDAD : Un.
RENDIMIENTO : 30 Un/dia
DESCRIPCION Unidad Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Material varios (Soga,estrobo,etc) % 5.00 12.08 0.60
Sub-total 0.60
MANO DE OBRA
Capataz 0.20 h-h 0.05 16.73 0.84
Operario 1.00 h-h 0.27 11.95 3.23
Oficial 1.00 h-h 0.27 10.69 2.89
Peón 2.00 h-h 0.53 9.66 5.12
Sub-total 12.08
EQUIPOS Y HERRAMIENTAS
Caja de herramientas 2.00 h-m 0.53 1.50 0.80
Escalera 1.00 h-m 0.27 1.50 0.41
Herramientas 5% mano de obra % 5.00 12.08 0.60
Sub-total 1.81
TOTAL S/. 14.49
MINISTERIO DE ENERGIA Y MINAS DIRECCION EJECUTIVA DE PROYECTOS
ANALISIS DE PRECIOS UNITARIOS REDES SECUNDARIAS Y CONEXIONES DOMICILIARIAS
PROYECTO : PEQUEÑO SISTEMA ELECTRICO
PARTIDA : Armado TIPO VF VANO FLOJO - Cond. Autoport.
Sin Caja de Derivación
UNIDAD : Un.
RENDIMIENTO : 35 Un/dia
DESCRIPCION Unidad Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Material varios (Soga,estrobo,etc) % 5.00 10.49 0.52
Sub-total 0.52
MANO DE OBRA
Capataz 0.20 h-h 0.05 16.73 0.84
Operario 1.00 h-h 0.23 11.95 2.75
Oficial 1.00 h-h 0.23 10.69 2.46
Peón 2.00 h-h 0.46 9.66 4.44
Sub-total 10.49
EQUIPOS Y HERRAMIENTAS
Caja de herramientas 2.00 h-m 0.46 1.50 0.69
Escalera 1.00 h-m 0.23 1.50 0.35
Herramientas 5% mano de obra % 5.00 10.49 0.52
Sub-total 1.56
TOTAL S/. 12.57
MINISTERIO DE ENERGIA Y MINAS DIRECCION EJECUTIVA DE PROYECTOS
ANALISIS DE PRECIOS UNITARIOS REDES SECUNDARIAS Y CONEXIONES DOMICILIARIAS
PROYECTO : PEQUEÑO SISTEMA ELECTRICO
PARTIDA : Armado TIPO DVF DERIVACION VANO FLOJO - Cond. Autoport.
Con Caja de Derivación
UNIDAD : Un.
RENDIMIENTO : 20 Un/dia
DESCRIPCION Unidad Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Material varios (Soga,estrobo,etc) % 5.00 18.13 0.91
Sub-total 0.91
MANO DE OBRA
Capataz 0.20 h-h 0.08 16.73 1.34
Operario 1.00 h-h 0.40 11.95 4.78
Oficial 1.00 h-h 0.40 10.69 4.28
Peón 2.00 h-h 0.80 9.66 7.73
Sub-total 18.13
EQUIPOS Y HERRAMIENTAS
Caja de herramientas 2.00 h-m 0.80 1.50 1.20
Escalera 1.00 h-m 0.40 1.50 0.60
Herramientas 5% mano de obra % 5.00 18.13 0.91
Sub-total 2.71
TOTAL S/. 21.75
MINISTERIO DE ENERGIA Y MINAS DIRECCION EJECUTIVA DE PROYECTOS
ANALISIS DE PRECIOS UNITARIOS REDES SECUNDARIAS Y CONEXIONES DOMICILIARIAS
PROYECTO : PEQUEÑO SISTEMA ELECTRICO
PARTIDA : Armado TIPO DVF DERIVACION VANO FLOJO - Cond. Autoport.
Sin Caja de Derivación
UNIDAD : Un.
RENDIMIENTO : 25 Un/dia
DESCRIPCION Unidad Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Material varios (Soga,estrobo,etc) % 5.00 14.42 0.72
Sub-total 0.72
MANO DE OBRA
Capataz 0.20 h-h 0.06 16.73 1.00
Operario 1.00 h-h 0.32 11.95 3.82
Oficial 1.00 h-h 0.32 10.69 3.42
Peón 2.00 h-h 0.64 9.66 6.18
Sub-total 14.42
EQUIPOS Y HERRAMIENTAS
Caja de herramientas 2.00 h-m 0.64 1.50 0.96
Escalera 1.00 h-m 0.32 1.50 0.48
Herramientas 5% mano de obra % 5.00 14.42 0.72
Sub-total 2.16
TOTAL S/. 17.30
MINISTERIO DE ENERGIA Y MINAS DIRECCION EJECUTIVA DE PROYECTOS
ANALISIS DE PRECIOS UNITARIOS REDES SECUNDARIAS Y CONEXIONES DOMICILIARIAS
PROYECTO : PEQUEÑO SISTEMA ELECTRICO
PARTIDA : Armado TIPO DR DERIVACION RECTA (90°) - Cond. Autoport.
Con Caja de Derivación
UNIDAD : Un.
RENDIMIENTO : 18 Un/dia
DESCRIPCION Unidad Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Material varios (Soga,estrobo,etc) % 5.00 20.07 1.00
Sub-total 1.00
MANO DE OBRA
Capataz 0.20 h-h 0.09 16.73 1.51
Operario 1.00 h-h 0.44 11.95 5.26
Oficial 1.00 h-h 0.44 10.69 4.70
Peón 2.00 h-h 0.89 9.66 8.60
Sub-total 20.07
EQUIPOS Y HERRAMIENTAS
Caja de herramientas 2.00 h-m 0.89 1.50 1.34
Escalera 1.00 h-m 0.44 1.50 0.66
Herramientas 5% mano de obra % 5.00 20.07 1.00
Sub-total 3.00
TOTAL S/. 24.07
MINISTERIO DE ENERGIA Y MINAS DIRECCION EJECUTIVA DE PROYECTOS
ANALISIS DE PRECIOS UNITARIOS REDES SECUNDARIAS Y CONEXIONES DOMICILIARIAS
PROYECTO : PEQUEÑO SISTEMA ELECTRICO
PARTIDA : Armado TIPO DR DERIVACION RECTA (90°) - Cond. Autoport.
Sin Caja de Derivación
UNIDAD : Un.
RENDIMIENTO : 23 Un/dia
DESCRIPCION Unidad Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Material varios (Soga,estrobo,etc) % 5.00 15.85 0.79
Sub-total 0.79
MANO DE OBRA
Capataz 0.20 h-h 0.07 16.73 1.17
Operario 1.00 h-h 0.35 11.95 4.18
Oficial 1.00 h-h 0.35 10.69 3.74
Peón 2.00 h-h 0.70 9.66 6.76
Sub-total 15.85
EQUIPOS Y HERRAMIENTAS
Caja de herramientas 2.00 h-m 0.70 1.50 1.05
Escalera 1.00 h-m 0.35 1.50 0.53
Herramientas 5% mano de obra % 5.00 15.85 0.79
Sub-total 2.37
TOTAL S/. 19.01
MINISTERIO DE ENERGIA Y MINAS DIRECCION EJECUTIVA DE PROYECTOS
ANALISIS DE PRECIOS UNITARIOS RED SECUNDARIA Y CONEXIONES DOMICILIARIAS
PROYECTO : PEQUEÑO SISTEMA ELECTRICO
PARTIDA : Tendido y Puesta en Flecha de Conductor Autoportante
De Aluminio de 2x25+16/25 mm²
UNIDAD : km
RENDIMIENTO : 2.5 km/dia
DESCRIPCION Unidad Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Soga de manila kg 0.50 15.00 7.50
Soga de nylon kg 0.50 35.00 17.50
Materiales varios % 5.00 318.79 15.94
Sub-total 40.94
MANO DE OBRA
Capataz 1.00 h-h 3.20 16.73 53.54
Operario 2.00 h-h 6.40 11.95 76.48
Oficial 1.00 h-h 3.20 10.69 34.21
Peón 5.00 h-h 16.00 9.66 154.56
Sub-total 318.79
EQUIPOS Y HERRAMIENTAS
Tirfor 3 ton. 2.00 h-m 6.40 3.00 19.20
Escalera 2.00 h-m 6.40 1.50 9.60
Equipo de comunicación 4.00 h-m 12.80 2.50 32.00
Caja de herramientas 4.00 h-m 12.80 1.50 19.20
Herramientas 5% mano de obra % 5.00 318.79 15.94
Sub-total 95.94
TOTAL S/. 455.67
MINISTERIO DE ENERGIA Y MINAS DIRECCION EJECUTIVA DE PROYECTOS
ANALISIS DE PRECIOS UNITARIOS RED SECUNDARIA Y CONEXIONES DOMICILIARIAS
PROYECTO : PEQUEÑO SISTEMA ELECTRICO
PARTIDA : Tendido y Puesta en Flecha de Conductor Autoportante
De Aluminio de 2x25/25 mm²
UNIDAD : km
RENDIMIENTO : 3 km/dia
DESCRIPCION Unidad Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Soga de manila kg 0.50 15.00 7.50
Soga de nylon kg 0.50 35.00 17.50
Materiales varios % 5.00 265.67 13.28
Sub-total 38.28
MANO DE OBRA
Capataz 1.00 h-h 2.67 16.73 44.67
Operario 2.00 h-h 5.33 11.95 63.69
Oficial 1.00 h-h 2.67 10.69 28.54
Peón 5.00 h-h 13.33 9.66 128.77
Sub-total 265.67
EQUIPOS Y HERRAMIENTAS
Tirfor 3 ton. 2.00 h-m 5.33 3.00 15.99
Escalera 2.00 h-m 5.33 1.50 8.00
Equipo de comunicación 4.00 h-m 10.67 2.50 26.68
Caja de herramientas 4.00 h-m 10.67 1.50 16.01
Herramientas 5% mano de obra % 5.00 265.67 13.28
Sub-total 79.96
TOTAL S/. 383.91
MINISTERIO DE ENERGIA Y MINAS DIRECCION EJECUTIVA DE PROYECTOS
ANALISIS DE PRECIOS UNITARIOS RED SECUNDARIA Y CONEXIONES DOMICILIARIAS
PROYECTO : PEQUEÑO SISTEMA ELECTRICO
PARTIDA : Armado PAT-1 (con un electrodo) para puesta a tierra
instalación en poste de concreto armado centrifugado
UNIDAD : Un.
RENDIMIENTO : 25 Un/dia
DESCRIPCION Unidad Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Material varios (Soga,estrobo,etc) % 5.00 11.33 0.57
Sub-total 0.57
MANO DE OBRA
Capataz 0.20 h-h 0.06 16.73 1.00
Operario 1.00 h-h 0.32 11.95 3.82
Oficial 1.00 h-h 0.32 10.69 3.42
Peón 1.00 h-h 0.32 9.66 3.09
Sub-total 11.33
EQUIPOS Y HERRAMIENTAS
Caja de herramientas 2.00 h-m 0.64 1.50 0.96
Herramientas 5% mano de obra % 5.00 11.33 0.57
Sub-total 1.53
TOTAL S/. 13.43
MINISTERIO DE ENERGIA Y MINAS DIRECCION EJECUTIVA DE PROYECTOS
ANALISIS DE PRECIOS UNITARIOS REDES SECUNDARIAS Y CONEXIONES DOMICILIARIAS
PROYECTO : PEQUEÑO SISTEMA ELECTRICO
PARTIDA : Instalación de Pastoral de A°G°
UNIDAD : Un.
RENDIMIENTO : 25 Un/dia
DESCRIPCION Unidad Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Material varios (Soga,estrobo,etc) % 5.00 10.60 0.53
Sub-total 0.53
MANO DE OBRA
Capataz 0.20 h-h 0.06 16.73 1.00
Oficial 1.00 h-h 0.32 10.69 3.42
Peón 2.00 h-h 0.64 9.66 6.18
Sub-total 10.60
EQUIPOS Y HERRAMIENTAS
Caja de herramientas 1.00 h-m 0.32 1.50 0.48
Escalera 1.00 h-m 0.32 1.50 0.48
Herramientas 5% mano de obra % 5.00 10.60 0.53
Sub-total 1.49
TOTAL S/. 12.62
MINISTERIO DE ENERGIA Y MINAS DIRECCION EJECUTIVA DE PROYECTOS
ANALISIS DE PRECIOS UNITARIOS REDES SECUNDARIAS Y CONEXIONES DOMICILIARIAS
PROYECTO : PEQUEÑO SISTEMA ELECTRICO
PARTIDA : Instalación de Luminaria, Lámpara y Accesorios
UNIDAD : Un.
RENDIMIENTO : 18 Un/dia
DESCRIPCION Unidad Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Material varios (Soga,estrobo,etc) % 5.00 20.07 1.00
Sub-total 1.00
MANO DE OBRA
Capataz 0.20 h-h 0.09 16.73 1.51
Operario 1.00 h-h 0.44 11.95 5.26
Oficial 1.00 h-h 0.44 10.69 4.70
Peón 2.00 h-h 0.89 9.66 8.60
Sub-total 20.07
EQUIPOS Y HERRAMIENTAS
Caja de herramientas 2.00 h-m 0.89 1.50 1.34
Escalera 1.00 h-m 0.44 1.50 0.66
Herramientas 5% mano de obra % 5.00 20.07 1.00
Sub-total 3.00
TOTAL S/. 24.07
MINISTERIO DE ENERGIA Y MINAS DIRECCION EJECUTIVA DE PROYECTOS
ANALISIS DE PRECIOS UNITARIOS RED SECUNDARIA Y CONEXIONES DOMICILIARIAS
PROYECTO : PEQUEÑO SISTEMA ELECTRICO
PARTIDA : Conexión de Acometida Domiciliaria Configuración CORTA
(No Incluye medidor de energía activa)
UNIDAD : Un.
RENDIMIENTO : 18 Un/dia
DESCRIPCION Unidad Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Material varios (Soga,estrobo,etc) % 5.00 20.07 1.00
Sub-total 1.00
MANO DE OBRA
Capataz 0.20 h-h 0.09 16.73 1.51
Operario 1.00 h-h 0.44 11.95 5.26
Oficial 1.00 h-h 0.44 10.69 4.70
Peón 2.00 h-h 0.89 9.66 8.60
Sub-total 20.07
EQUIPOS Y HERRAMIENTAS
Caja de herramientas 2.00 h-m 0.89 1.50 1.34
Escalera 2.00 h-m 0.89 1.50 1.34
Herramientas 5% mano de obra % 5.00 20.07 1.00
Sub-total 3.68
TOTAL S/. 24.75
MINISTERIO DE ENERGIA Y MINAS DIRECCION EJECUTIVA DE PROYECTOS
ANALISIS DE PRECIOS UNITARIOS RED SECUNDARIA Y CONEXIONES DOMICILIARIAS
PROYECTO : PEQUEÑO SISTEMA ELECTRICO
PARTIDA : Conexión de Acometida Domiciliaria Configuración LARGA
(No Iincluye medidor de energía activa)
UNIDAD : Un.
RENDIMIENTO : 15 Un/dia
DESCRIPCION Unidad Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Material varios (Soga,estrobo,etc) % 5.00 24.18 1.21
Sub-total 1.21
MANO DE OBRA
Capataz 0.20 h-h 0.11 16.73 1.84
Operario 1.00 h-h 0.53 11.95 6.33
Oficial 1.00 h-h 0.53 10.69 5.67
Peón 2.00 h-h 1.07 9.66 10.34
Sub-total 24.18
EQUIPOS Y HERRAMIENTAS
Caja de herramientas 2.00 h-m 1.07 1.50 1.61
Escalera 2.00 h-m 1.07 1.50 1.61
Herramientas 5% mano de obra % 5.00 24.18 1.21
Sub-total 4.43
TOTAL S/. 29.82
MINISTERIO DE ENERGIA Y MINAS DIRECCION EJECUTIVA DE PROYECTOS
ANALISIS DE PRECIOS UNITARIOS RED SECUNDARIA Y CONEXIONES DOMICILIARIAS
PROYECTO : PEQUEÑO SISTEMA ELECTRICO
PARTIDA : Conexión de Acometida Domiciliaria Configuración CORTA
EN MURETE (No Incluye medidor de energía activa)
UNIDAD : Un.
RENDIMIENTO : 20 Un/dia
DESCRIPCION Unidad Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Material varios (Soga,estrobo,etc) % 5.00 18.13 0.91
Sub-total 0.91
MANO DE OBRA
Capataz 0.20 h-h 0.08 16.73 1.34
Operario 1.00 h-h 0.40 11.95 4.78
Oficial 1.00 h-h 0.40 10.69 4.28
Peón 2.00 h-h 0.80 9.66 7.73
Sub-total 18.13
EQUIPOS Y HERRAMIENTAS
Caja de herramientas 2.00 h-m 0.80 1.50 1.20
Escalera 2.00 h-m 0.80 1.50 1.20
Herramientas 5% mano de obra % 5.00 18.13 0.91
Sub-total 3.31
TOTAL S/. 22.35
MINISTERIO DE ENERGIA Y MINAS DIRECCION EJECUTIVA DE PROYECTOS
ANALISIS DE PRECIOS UNITARIOS RED SECUNDARIA Y CONEXIONES DOMICILIARIAS
PROYECTO : PEQUEÑO SISTEMA ELECTRICO
PARTIDA : Conexión de Acometida Domiciliaria Configuración LARGA
EN MURETE (No Incluye medidor de energía activa)
UNIDAD : Un.
RENDIMIENTO : 17 Un/dia
DESCRIPCION Unidad Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Material varios (Soga,estrobo,etc) % 5.00 21.23 1.06
Sub-total 1.06
MANO DE OBRA
Capataz 0.20 h-h 0.09 16.73 1.51
Operario 1.00 h-h 0.47 11.95 5.62
Oficial 1.00 h-h 0.47 10.69 5.02
Peón 2.00 h-h 0.94 9.66 9.08
Sub-total 21.23
EQUIPOS Y HERRAMIENTAS
Caja de herramientas 2.00 h-m 0.94 1.50 1.41
Escalera 2.00 h-m 0.94 1.50 1.41
Herramientas 5% mano de obra % 5.00 21.23 1.06
Sub-total 3.88
TOTAL S/. 26.17
MINISTERIO DE ENERGIA Y MINAS DIRECCION EJECUTIVA DE PROYECTOS
ANALISIS DE PRECIOS UNITARIOS RED SECUNDARIA Y CONEXIONES DOMICILIARIAS
PROYECTO : PEQUEÑO SISTEMA ELECTRICO
PARTIDA : Instalación de Medidor de Energía Activa
( Incluye conexión a cable de acometida)
UNIDAD : Un.
RENDIMIENTO : 25 Un/dia
DESCRIPCION Unidad Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Material varios (Soga,estrobo,etc) % 5.00 6.03 0.30
Sub-total 0.30
MANO DE OBRA
Capataz 0.10 h-h 0.03 16.73 0.50
Operario 1.00 h-h 0.32 11.95 3.82
Oficial 0.50 h-h 0.16 10.69 1.71
Sub-total 6.03
EQUIPOS Y HERRAMIENTAS
Caja de herramientas 1.00 h-m 0.32 1.50 0.48
Escalera 1.00 h-m 0.32 1.50 0.48
Herramientas 5% mano de obra % 5.00 6.03 0.30
Sub-total 1.26
TOTAL S/. 7.59
MINISTERIO DE ENERGIA Y MINAS DIRECCION EJECUTIVA DE PROYECTOS
ANALISIS DE PRECIOS UNITARIOS RED SECUNDARIA Y CONEXIONES DOMICILIARIAS
PROYECTO : PEQUEÑO SISTEMA ELECTRICO
PARTIDA : Prueba y puesta en servicio
UNIDAD : Localidades
RENDIMIENTO : 2 Localidades/dia
DESCRIPCION Unidad Cantidad P. Unitario Parcial
S/. S/.
MATERIALES
Material varios (Soga,estrobo,etc) % 5.00 282.56 14.13
Sub-total 14.13
MANO DE OBRA
Capataz 1.00 h-h 4.00 16.73 66.92
Operario 2.00 h-h 8.00 11.95 95.60
Oficial 1.00 h-h 4.00 10.69 42.76
Peón 2.00 h-h 8.00 9.66 77.28
Sub-total 282.56
EQUIPOS Y HERRAMIENTAS
Camioneta Rural 4x4 de 135 HP 0.25 h-m 1.00 79.40 79.40
Medidor de aislamiento eléctrico 1.00 h-m 4.00 6.00 24.00
Medidor de resistencia de puesta a tierra 1.00 h-m 4.00 6.00 24.00
Termometro de línea 1.00 h-m 4.00 3.00 12.00
Caja de herramientas 2.00 h-m 8.00 1.50 12.00
Herramientas 5% mano de obra % 5.00 282.56 14.13
Sub-total 165.53
TOTAL S/. 462.22
1
Indice
(INEI)
002
044
054
047
047
047
048
2
Indice
(INEI)
039
047
047
047
048
3
Indice
(INEI)
039
047
047
048
5
Indice
(INEI)
047
047
047
048
6
Indice
(INEI)
047
047
047
048
7
Indice
(INEI)
047
047
047
048
11
Transporte de poste de concreto de almacen a punto de izaje
Indice
(INEI)
039
047
047
047
048
12
Indice
(INEI)
039
047
047
047
047
049
048
13
Izado de poste de CAC de 8 m / 3000 N. Incluye numeración
Indice
(INEI)
039
047
047
047
047
049
048
14
Indice
(INEI)
039
047
047
047
047
049
037
037
048
15
Indice
(INEI)
039
047
047
047
047
049
037
037
048
16
Indice
(INEI)
039
047
047
047
047
037
048
048
17
Indice
(INEI)
039
047
047
047
047
037
048
048
18
Indice
(INEI)
039
047
047
047
047
037
048
048
19
Indice
(INEI)
039
047
047
047
047
037
048
048
20
Indice
(INEI)
039
047
047
047
047
037
048
048
21
Indice
(INEI)
039
047
047
047
047
037
048
048
22
Indice
(INEI)
039
047
047
047
047
037
048
048
23
Indice
(INEI)
039
047
047
047
047
037
048
048
24
Indice
(INEI)
039
047
047
047
047
037
048
048
25
Indice
(INEI)
039
047
047
047
047
037
048
048
26
Indice
(INEI)
039
047
047
047
047
037
048
048
27
Indice
(INEI)
039
047
047
047
047
037
048
048
35
Indice
(INEI)
039
039
039
047
047
047
047
049
037
037
037
048
38
Indice
(INEI)
039
039
039
047
047
047
047
049
037
037
037
048
42
Indice
(INEI)
039
047
047
047
047
037
048
43
Indice
(INEI)
039
047
047
047
037
048
048
45
Indice
(INEI)
039
047
047
047
047
037
048
048
46
Indice
(INEI)
039
047
047
047
047
037
048
048
47
Indice
(INEI)
039
047
047
047
047
037
048
048
48
Indice
(INEI)
039
047
047
047
047
037
048
048
49
Indice
(INEI)
039
047
047
047
047
037
048
048
51
Indice
(INEI)
039
047
047
047
047
037
048
048
52
Indice
(INEI)
039
047
047
047
047
049
049
049
049
037
048