Proyecto Formulación 2do Parcial

download Proyecto Formulación 2do Parcial

of 41

Transcript of Proyecto Formulación 2do Parcial

  • 8/16/2019 Proyecto Formulación 2do Parcial

    1/41

     1

    ESCUELA SUPERIOR POLITÉCNICADEL LITORAL

    Facultad de Ingeniería Mecánica y Ciencias de la

    ProducciónIngeniería en Alimentos

    “BEETROOT MARMALADE

    FLAVORED BLACKBERRY”

     

    Profesor: Ing. Oscar Serrano

    Materia: Formulación y Evaluación de Proyecto

    Integrantes: Brigid Borja Karla Aroca Amelia Remache

     Cristhian Meza Julio Gonzabay Nelson Castillo

    Fecha:

    Guayaquil, 25 de Febrero de 2015

  • 8/16/2019 Proyecto Formulación 2do Parcial

    2/41

     2

    INDEX

    1.  EXECUTIVE SUMMARY.......................................................................................................... 3

    1.1.  INTRODUCTION ............................................................................................................. 51.2.  VISION: .......................................................................................................................... 6

    1.3.  COMMERCIAL ADVANTAGES: ...................................................................................... 6

    1.4.  OBJECTIVES ................................................................................................................... 7

    1.4.1.  GENERAL OBJECTIVE: ............................................................................................ 7

    1.4.2.  SPECIFIC OBJECTIVES: ........................................................................................... 7 

    2.  CRITICAL SUCCESS FACTORS ................................................................................................. 7 

    3.  CHRONOLOGY PROJECT ........................................................................................................ 7 

    4.  ASSESSMENT OF TECHNICAL AND ORGANIZATIONAL PREPARATION................................ 8 

    5.  SUMMARY RISK .................................................................................................................... 8 

    6.  PROJECT GOVERNANCE ........................................................................................................ 9

    6.1.  PROPOSED PROJECT ORGANIZATION .......................................................................... 9

    6.2.  ROLE DESCRIPTIONS ..................................................................................................... 9 

    7.  PROJECT OPERATION AGREEMENT .................................................................................... 10 

    8.  PRIMARY STAKEHOLDERS ANALYSIS ................................................................................. 11 

    9.  MAKING DECISIONS ............................................................................................................ 12

    9.1.  PROCEDURE TO MAKING DECISIONS ......................................................................... 13

    9.2.  TOOLS USED TO MAKING-DECISIONS ........................................................................ 14

    9.2.1.  BRAINSTORMING ................................................................................................ 14

    9.2.2.  5 WHY .................................................................................................................. 14 

    10.  ACCOUNTING REPORT .................................................................................................... 15 

    11.  REGULATIONS ................................................................................................................. 17 

    12.  TESTING ........................................................................................................................... 18

    12.1.  TESTING LABORATORY ........................................................................................... 18

    12.2.  SENSORY TESTING – ESPOL .................................................................................... 20 

  • 8/16/2019 Proyecto Formulación 2do Parcial

    3/41

     3

    13.  TRAINING OF THE MEMBERS OF THE PROJECT ............................................................. 21 

    14.  COMMUNICATION PROJECT........................................................................................... 22 

    15.  RISK MANAGEMENT ....................................................................................................... 22 

    16.  WORK BREAKDOWN STRUCTURE .................................................................................. 25 

    17.  PROJECT ACTIVITIES (REAL TIMELINE) ........................................................................... 26 

    18.  GANTT CHART (REAL TIMELINE) ..................................................................................... 27 

    19.  CRITICAL PATH (REAL TIMELINE) .................................................................................... 28 

    20.  ESTIMATE OF REAL TIME VS. ESTIMATED ...................................................................... 29 

    21.  REVENUE BUDGET .......................................................................................................... 30 

    22.  CONCLUSIONS ................................................................................................................. 36 

    23.  REFERENCES .................................................................................................................... 37 

    24.  APPENDICES .................................................................................................................... 37

    24.1.  APPENDIX 1 – TESTING LABORATORY.................................................................... 37

    24.2.  APPENDIX 2 – FINISHED PRODUCT ........................................................................ 39

    24.3.  APPENDIX 3 – SAMPLE SURVEY .............................................................................. 39

    24.4.  APPENDIX 4 – PHOTOS OF IMPLEMENTATION ...................................................... 40

    T BLES

    TABLE 1. PRIMARY STAKEOLDERS ANALYSIS. ........................................................ 11 

    TABLE 2. RAW MATERIALS – PRICES QUOTED. ..................................................... 16 

    TABLE 3. RAW MATERIAL. ............................................................................... 16 

    TABLE 4. DIRECT MATERIALS. .......................................................................... 16 

    TABLE 5. SUPPLIES AND SERVICES. ..................................................................... 17 

  • 8/16/2019 Proyecto Formulación 2do Parcial

    4/41

     4

    TABLE 6. TINNED VEGETABLES. JAM OF FRUITS. REQUIREMENTS. .............................. 17 

    TABLE 7. POSITIVE RISKS. ................................................................................ 23 

    TABLE 8. NEGATIVE RISKS. .............................................................................. 24 

    TABLE 9. RAW MATERIAL. ............................................................................... 31 

    TABLE 10. DIRECT MATERIALS. ........................................................................ 31 

    TABLE 11. DIRECT LABOR. ............................................................................... 31 

    TABLE 12. INDIRECT MATERIAL. ....................................................................... 31 

    TABLE 13. INDIRECT LABOR. ............................................................................ 32 

    TABLE 14. SUPPLIES AND SERVICES. ................................................................... 32 

    TABLE 15. DEPRECIATION, INSURACE, REPAIR AND MANTENANCE. ........................... 32 

    TABLE 16. MANUFACTURING COST. .................................................................. 33 

    TABLE 17. DISTRIBUTION COSTS AND SALES. ....................................................... 33 TABLE 18. GENERAL AND ADMINISTRATIVE EXPENSES ............................................ 33 

    TABLE 19. INCOME STATEMENT........................................................................ 34 

    TABLE 20. OPERATING CAPITAL. ....................................................................... 34 

    TABLE 21. INITIAL INVESTMENT. ....................................................................... 34 

    TABLE 22. CASH FLOW. .................................................................................. 35 

    TABLE 23. VPN. ........................................................................................... 35 

    TABLE 24. PROFITABILITY INDEX. ...................................................................... 35 

    FIGURES

    FIGURE 1. CUPCAKE TASTING. ............................................................................ 6

    FIGURE 2. CHRONOLOGY PROJECT. ...................................................................... 7

    FIGURE 3. ORGANIZATION CHART. ....................................................................... 9

    FIGURE 4. RESULTS VEGETABLE CONSUMPTION IMPERCEPTIBLY. ............................... 20

    FIGURE 5. RESULTS OF PURCHASE BEETROOT MARMALADE. ..................................... 21

    FIGURE 6. WAYS OF COMMUNICATION. .............................................................. 22

    FIGURE 7. WBS ............................................................................................ 25

    FIGURE 8. CRITICAL PATH. ............................................................................... 28

  • 8/16/2019 Proyecto Formulación 2do Parcial

    5/41

     5

    1.  EXECUTIVE SUMMARY

    1.1.  INTRODUCTION

    The intention of this work is to promote the development of social projects and the

    consumption of natural products, which increasingly are taking most welcome in order

    to improve the lives of its inhabitants. For this reason we find beet jam flavored mora as

    a new opportunity to consumption of natural products with a social and nutritional

    background.

    The beet is a native Andean vegetable that is grown from about 3,000 to 5,000 years

    ago Ecuador and Peru, due to the favorable conditions that have the Andean region

    formed by the Andes.

    The laboratory studies demonstrate the nutritional benefits and failing human

    consumption, beets for being an energetic vegetable contains a large dose of iron, is rich

    in sugars, vitamins C and B, potassium and carotene.

  • 8/16/2019 Proyecto Formulación 2do Parcial

    6/41

     6

    1.2.  VISION:

    Being a company in constant growth, nonprofit and social projection, meeting the

    nutritional needs of school-age children through the development and marketing in

    schools beet jam based high quality, unique taste and high protein content.

    1.3.  COMMERCIAL ADVANTAGES:

    For purposes of measuring the acceptance of the jam in the markets, offered to a

    company producing our product cupcakes to be incorporated into their recipes. These

    were the comments of people who underwent tasting product, mentioned that jam is

    beet flavored arrears after the tasting.

      "It is an innovative product which contributes to the production and domesticconsumption of vegetables in a roundabout way children. Greatest difference

    was seen in the taste of the product compared to other existing market jams. "-

    Male, 38 years.

      "A little difference was seen in the texture of the jam, it's not like those found in

    supermarkets, but tastes good. And if consumed in desserts or other form. "-

    Female, 22 years. 

      "No one knows for beet, the cupcake is very rich." Girl, 10 years. 

    Figure 1. Cupcake Tasting.

    Finally, 70% of people who attended the tasting stated that YES acquire the jam for

    direct consumption or through desserts, as in the case of tasting. While the company

    cupcakes told us that if we buy jam for dessert with it as the main ingredient, thus havinga more "nutritious" offer that offer to their customers.

  • 8/16/2019 Proyecto Formulación 2do Parcial

    7/41

     7

    1.4.  OBJECTIVES

    1.4.1.  GENERAL OBJECTIVE:

    Encourage consumption of beet healthy and viable way to the smallest home to enjoy

    it; since it is highly recommended to consume in cases of anemia, blood diseases and

    convalescence.

    1.4.2.  SPECIFIC OBJECTIVES:

      Develop an appetizing, nutritious and affordable innovative product.

      Leverage the organoleptic and nutritional properties of beet through

    concentration process.

      Reduce the amount of added sucrose through the carbohydrate composition ofbeet.

    2.  CRITICAL SUCCESS FACTORS

      Clear Goals.

      Executive Leadership and Commitment.

      Communication and Change Leadership.

      The Common Good.

      Quality Assurance and Risk Management.

    3.  CHRONOLOGY PROJECT 

    Figure 2. Chronology project. 

  • 8/16/2019 Proyecto Formulación 2do Parcial

    8/41

     8

    The project has been divided into two phases, the first phase began on November 19

    and ended on November 27th. At this early stage we jam developed the jam and sensory

    tests to determine the product acceptance, and finally the stability tests to ensure that

    the product does not cause any toxicity or disease.

    The second phase was initiating on January 5 and she is expected to finish at the end of

    the month, but this depends on the availability of the care centers that want to take part

    in the project. This stage includes the search and the choice of the care center that

    better adjusts to the goals of the project and to the date of culmination of the project. 

    4.  ASSESSMENT OF TECHNICAL AND ORGANIZATIONAL PREPARATION

    Tech Preparation:

    • The beet is a vegetable used in homes for the preparation of salads but is currently

    unable to industrialize so that you take to improve their performance, that is why you

    are going to develop a beetroot marmalade flavored arrears for greater acceptability by

    consumers, especially children. The budget for the development of the jam will not be

    high because this vegetable is given throughout the year, thanks to the climatic

    conditions of the Sierra Region of Ecuador, so our suppliers correspond to that area, and

    enter a process to select providers.

    • We train staff who will be in contact with food, so that the product arrives with goodquality and consumer acceptability.

    • It is held in raise an agreement with a school in the city of Guayaquil to introduce

    beetroot marmalade flavored dwells in bars and so it can be consumed by children in

    the institution.

    5.  SUMMARY RISK

    Risks are events that could have an impact on the project and require action, as it hasan effect on the project objectives. Project risk affects any or all major aspects of the

    project scope, schedule, resources and quality. You need to manage these risks so that

    its effect on the project is nil or minimal.

    There is also a concept of risk as an opportunity, in which case we speak of positive risks.

    In this case what is meant by risk management is to influence the factors that may cause

    the occurrence of these risks:

    1.  Training for project members, as this may affect the timing and process of

    making the product.

  • 8/16/2019 Proyecto Formulación 2do Parcial

    9/41

     9

    2.  Choose to have several suppliers to avoid delays during the development of the

     jam.

    3.  Perform analysis of the finished product to verify that they are within the ranges

    asking regulations.

    4.  Ask students survey on the acceptability of the product.

    6.  PROJECT GOVERNANCE

    6.1.  PROPOSED PROJECT ORGANIZATION

    Figure 3. Organization chart. 

    6.2.  ROLE DESCRIPTIONSName of the post: General Manager.

    Sections charge: It is responsible for the Operations, Administrative, Sales and Exports

    and Financial.

    Generic description: General Manager will be responsible for the overall management

    of the company, so it should delegate tasks and responsibilities to other people who is

    responsible. The staff in this area will be responsible for designing the objectives, goals

    and policies on which the coordinated efforts of other departments will be directed.

    Name of the post: Operations Manager. 

  • 8/16/2019 Proyecto Formulación 2do Parcial

    10/41

     10

    Sections charge: It is responsible for the operations area.

    Contacts: Internally with Production Chief and operators. 

    Generic description: Manufacturing activities are directed and controlled by the

    operations manager, who is responsible for verifying that the plans and productionschedules are properly carried out according to the reports provided sales, achieving

    thereby establishing appropriate production processes to meet market demand.

    Name of the post: Administrative Manager.

    Sections charge: It is responsible for the administrative area.

    Contacts: Internally with General Manager.

    Generic description: Responsible for management of real and personal property as

    maybe assigned to perform their activities.

    Name of the post: Sales and Export Manager.

    Sections charge: It is responsible for the area of Sales.

    Contacts: Internally with sellers and General Manager. 

    Generic description: The staff of the sales and exports will be responsible for promotingand marketing the product, placing the product on time and right place to be purchased

    by end consumers. You must perform market surveys, for changes in tastes and

    preferences of consumers, and offer them a product according to your requirements.

    Name of the post: Financial Manager.

    Sections charge: It is responsible for the financial area.

    Contacts: Internally with Counter and accounting assistants. 

    Generic description: Direct and control daily activities of marketing and sales, in order

    to maintain control of the market, as regards the entry of new competitors and visualize

    opportunities to enter new markets.

    7.  PROJECT OPERATION AGREEMENT

    The model of the principles and project governance outlined above provide a framework

    in which project activities can be defined more clearly understood, and assigned to the

    appropriate groups and individuals.

  • 8/16/2019 Proyecto Formulación 2do Parcial

    11/41

     11

      Students who have knowledge about making jam qualified the other members

    to participate in drawing is and get a good working relationship during the

    project.

      Each member of the project take responsibility in the different stages of the

    process and quality: sensory, organoleptic, nutritional, technological andeconomic.

      The taste of blackberry jam to It will add, as the beet is not liked by many people,

    including children, and because beet is inexpensive and pigmentation is very

    similar to the default.

      Once the finished product is to take him to an educational institution in the city

    of Guayaquil to optimize the performance of the vegetable and children to get

    nutritional benefits when consumed.

    8.  PRIMARY STAKEHOLDERS ANALYSIS

    Project implementation beet marmalade will have a direct impact on 3 different groups

    of the population, which are: The government beet growers, and school. Therefore it is

    necessary to know the problems that are currently presented in these three sectors, and

    how we can establish means of communication to work together to eradicate it.

    Below is a table describing the current problems, interests and means of interaction with

    people who have a direct impact to performance of the project is shown.

    PRIMARY STAKEHOLDERS ANALYSIS 

    BEET GROWERS SCHOOL GOVERNMENT

    PROBLEMS

    Most crops are lost

    due to low

    marketing and sales

    They Lose all the benefits

    associated with the

    consumption of beets,

    because this product has an

    unpleasant taste

    Increasing

    production of beet

    to benefit small

    producers

    INTERESTImprove sales and

    quality of beet

    Eating well with products of

    good taste

    Promoting changes

    of the productive

    matrix in Ecuador

    INTERACTIONS

    Visiting growing

    areas and in

    dialogue with

    producers

    Visits to schools to make

    known the product and talk

    about the benefits of beet

    Meeting with zonal

    leaders

    Table 1. Primary Stakeolders Analysis. 

  • 8/16/2019 Proyecto Formulación 2do Parcial

    12/41

     12

    9.  MAKING DECISIONS

    Decision making is the ability to choose a course of action among several alternatives. It

    assumes an analysis that requires a target and a clear understanding of the alternatives

    by which one can attain it. In addition to understanding the situation that occurs, youmust analyze, evaluate, collect alternatives and consider variables, compare various

    courses of action and finally select the action to be performed. The quality of decisions

    makes the difference between success and failure.

    Deciding means making things happen rather than just letting happen as a result of

    chance or other external factors. This ability gives people tools to assess the various

    options, taking into account, needs, values, motivations, influences and possible

    consequences present and future.

    In general, making a decision involves:

    Define the purpose: what exactly is what must be decided.

    Think about the options available: what are the possible alternatives.

    Evaluate options: what are the pros and cons of each are.

    Choose from the available options: which option is best.

    Convert the selected option in an action.

    During the development, a project may have different situations that may hinder or

    compromise its proper implementation, so it is necessary to have defined the tasks to

    be fulfilled by each of the members of the project and also have good communicationamong all members, to expose the difficulties or situations presented and to make the

    right decision.

    There are different types of events involving from quick and simple decisions, until fairly

    complex decisions that require the approval of all members of the project, these

    decisions are:

    Routine Decisions: the same recurring circumstances lead them to choose a course of

    action already known.

      Can cause setbacks

      Affect the performance of others in the group

    Emergency: faced unprecedented situations, decisions are made at the time as events

    elapse.

      must be treated immediately

      may require an additional cost for the project

      Affects equipment operations

  • 8/16/2019 Proyecto Formulación 2do Parcial

    13/41

     13

    Strategic Decisions: decide on goals and objectives, and turn them into specific plans. It

    is the most demanding type of decision.

      Affect, or are affected by, project vision, direction or objectives.

      Affect, or are affected by, project culture.

      May have an impact positive or negative in the project  Must be escalated through issue, policy, scope and/or change management.

      Affect, or are affected by, external engagement and alliances.

    Operational Decisions: Includes solving situations involved with the process of making

    marmalade; such as the distribution of the members at different stages of the process,

    decide who is responsible for working materials, among others.

      Determine the detailed steps to accomplish tasks or new processes.

      Affect team operations  Affect the project's content

    9.1.  PROCEDURE TO MAKING DECISIONS

    1.  Any member of the project is able to make necessary decisions to control routine

    problems presented in the project, without the need to consult other members

    of the teamwork. Similarly, unforeseen or emergency situations, depending onits magnitude and impact should be controlled by the member or members

    present in the moment when the unexpected occurs, in order to reduce or

    eliminate the negative impact on the project.

    2.  Bring together all the members of the project, every time it needs to takeoperational or strategic decisions in order to expose the various problems or

    opportunities for improvement and, through brainstorming choose the best

    alternative for their solution.

    3.  Choose the solution that proves to be the most appropriate for the benefit of

    the project in relation to time and cost.

    4.  If two or more members of the group are disagreeing with the decision, they may

    request a meeting with Professor Oscar Serrano to communicate the chosen

    decision and defend the decision they see fit.

    5.  The Engineer Oscar Serrano will choose which decision should be implemented

    for the benefit of the project in based on their experience, after hearing the two

    proposals.

  • 8/16/2019 Proyecto Formulación 2do Parcial

    14/41

     14

    9.2.  TOOLS USED TO MAKING-DECISIONS

    9.2.1.  BRAINSTORMINGIt’s a tool of group work that facilitates the emergence of new ideas about a topic or

    problem.

    WHEN IS IT USED?

      Brainstorming will be used when there is a need for:

      Liberate the creativity of the teams

      Generate a large number of ideas

      Involve opportunities to improve

      It allows us to pose and solve the problems

      Ask possible causes

      Suggest alternative solutions  Develop creativity

      Discuss new concepts

      Overcoming conformity and sameness

    HOW IS IT USED?

      The issue or the problem is defined.

      An exercise director is appointed

      Before starting the "brainstorming", explains the rules.

      Emit ideas freely without drawing conclusions at this stage.

      The ideas are listed

      Do not repeat

      Do not criticize

      The exercise ends when there are no more new ideas

      Analyze, evaluate and organize the ideas, to evaluate their usefulness in terms

    of the objective sought to be achieved by the use of this technique.

    9.2.2.  5 WHYThe technique of the 5 why, is a method based on asking questions to explore cause-

    effect relationships that generate a particular problem. The final objectives of the 5 Why

    is determine the root cause of a defect or problem.

    HOW IS IT USED?

      Conduct a Brainstorming session usually using the model of Cause and Effect

    Diagram. Once the likely cause has been identified, start asking "Why is it so ...?"

    Or "Why is this happening...?" Continue asking Why at least five times. This

    challenges the team to search thoroughly and not settle for reasons already"tried and true".

  • 8/16/2019 Proyecto Formulación 2do Parcial

    15/41

     15

      There will be times when you can go beyond five times asking Why, to get the

    main causes.

      During this time must be careful NOT to start asking "Who". It must be

    remembered that the team is interested in the process and not on the people

    involved.  Tips for Construction / Interpretation:

      This technique is best used in small groups (5-10 people). The facilitator must

    know the team dynamics and relationships among team members. During "Five

    Whys" there is the possibility that many questions of Why, Why, etc. could cause

    discomfort among some of the team members.

    9.2.3.  ISHIKAWA

    The diagram cause - effect is also known as the "chart of fish bones" for the way he has,

    or the name of Ishikawa by its creator, was developed to facilitate the analysis of

    problems by representing the relationship between an effect and all causes or factors

    that cause this effect, for this reason is called "diagram cause - effect" or causal diagram.

    In order to properly the perform Diagram Cause - Effect, then outlines the steps to

    follow:

    Define clearly the effect whose causes will be identified and put it in writing

    Draw a long horizontal arrow and place on top the effect defined above.

    Identify the primary factors through brainstorming. Place them around the

    horizontal arrow and unite them by slanted lines.

    Write the secondary, tertiary, etc., also through brainstorming factors.

    To help determine possible causes can answer the following questions Who?

    What? Where? When? How Come? How much?

    Analyze and select the real causes.

    Test the validity of the causal sequence, ie, starting from the major cause to

    follow the reasoning investigated effect and verify that makes logical sense.

    10. ACCOUNTING REPORT

    Calculating production costs is performed based on the following expression:

    Production Costs = IIPP Costs manufacturing - IFPP

    For this situation, consider the IIPP and IFPP inventories as equals, so the cost of

    production responds to the cost of manufacture:

    Production Costs Cost Manufacturing

  • 8/16/2019 Proyecto Formulación 2do Parcial

    16/41

     16

    RAW MATERIALSPRICES

    QUOTED $UNIT

    BEET 0,25 KG

    BLACKBERRY 1,80 KG

    WHITE SUGAR 0,80 KGGLUCOSE 0,30 KG

    PECTIN 8,00 KG

    CITRIC ACID 6,00 KG

    POTASSIUM SORBATE 3,15 KG

    BLACKBERRY FLAVOR 0,79 Lt

    Table 2. Raw Materials –  Prices quoted.

    Table 3. Raw Material.

    Table 4. Direct Materials.

  • 8/16/2019 Proyecto Formulación 2do Parcial

    17/41

     17

    Table 5. Supplies and Services.

    11. REGULATIONS

    Our product will be made subject to compliance with the following standards:

      PROCEDURE OF GOOD PRACTICES OF MANUFACTURE: This norm is applicable

    to the operations of food manufacture and his aim is to reduce the

    microbiological risks to give guarantee of which the product is made of form

    uniform and controlled of agreement to the quality procedure adapted to the

    use that is tried to give to the food product.

      NTE INEN 0419 (1988): TINNED VEGETABLES. JAM OF FRUITS. REQUIREMENTS. 

    This norm refers to the jams of fruits but it can be applied to our product,because there are defined some important concepts, the basic requirements

    that there must fulfill the raw material, the product and the packing, the

    additives and substances allowed to assure not only the quality but also the

    innocuousness of the product. The characteristics that the jam of beet must

    fulfill are:

    Table 6. Tinned vegetables. Jam of fruits. Requirements.

    CHARACTERISTICS UNIT MINIMUM MAXIMUM

    Soluble solids % m/m 65 -

    pH 2,8 3,5

    citric acid mg/kg - 500

    Potassium sorbate mg/kg - 1000

    Molds % campos positivos - 30

  • 8/16/2019 Proyecto Formulación 2do Parcial

    18/41

     18

      NTE INEN 2074 (2012): FOOD ADDITIVES ALLOWED FOR HUMAN

    CONSUMPTION. POSITIVE LISTS. REQUIREMENTS. This norm includes a list of

    the food additives or chemical natural or artificial substances that are allowed to

    use in the food destined for the human consumption. For each of these additives

    there has been established a daily admissible ingestion, the innocuousness andthe limits proposed by the FDA and the WHO. Due to the nature of our product

    the sorbato of sodium will be in use as preservative which will be able to be

    added in a maximum quantity of 0,7 grams by a kilo of final product.

      NATIONAL STANDARD OF GOOD LIVING CENTERS FOR CHILDREN: This standard

    is relatively new and includes all the aspects that must meet any person or

    organization that wants to introduce a food or a full menu in care centers for

    children 1 to 5 years.

    12. TESTING 

    12.1.  TESTING LABORATORY

    Initially the total beet pulp weighed to be used to determine the proportion of arrears

    to be used. In our case the blackberry is added in the ratio 1: 3, is three parts beetroot

    and blackberry.

    These weights will be the basis for determining the amount of sugar used in the

    manufacture of jam considering that wish to develop a quality jam 50:50.

    Once known quantities of beet pulp and mora, will be passed to the kettle with stirring

    which was initially mingle to homogenize the mixture and to take the values of pH and

    brix degrees to determine the amount of citric acid needed for proper gelation.

    To determine the amount of potassium sorbate is necessary to use one component mass

    balance to determine the amount of product to the end.

    The calculations are as follows:

    NOTE: Calculations were performed using the example of the pilot test.

    Starting with 2 kg of beet:

    Beet pulp mass (mr)= 1.86 kg

    Blackberry pulp mass necessary (mm)=

    =

    .

    = 0.62  

    Total mass of fruit pulp (mt) = mr + mm = 1.86 + 0.62 = 2.48 kg

  • 8/16/2019 Proyecto Formulación 2do Parcial

    19/41

     19

    CALCULATION OF NEED SUGAR

    As beet has a relatively large proportion of sugar is added alone in the same amount

    equal to 80% by weight of the fruit pulp.

    Sugar mass (ma) = mt*0.8 = 2.48*0.8 = 1.98 kg ---> corresponds to 80% by weight of mt.

    Glucose mass (mg) = ma*0.2 = 1.98*0.2 = 0.396kg---> corresponds to 20% by weight of

    sugar mass (ma)

    Sugar total mass (mta)= ma + mg = 1.98 + 0.396 = 2.38 kg

    FEATURES PULP FRUIT

    initial pH = 6.08

    Initial ° Brix = 8.6

    CALCULATION OF REQUIRED PECTIN

    It is known that pectin gels of grade 150 kg of sugar per 150 kilogram of pectin. 

    mp=1  

    = 1 ×

    .

    = 0.0158 kg = 15.86 g 

    CALCULATION OF CITRIC ACID NEEDED

    A 100 g sample of pulp is added dropwise a solution of citric acid (50% citric acid-50%distilled water) to obtain the desired pH in this case is adjusted to 3.2 to meet the limits

    required by the INEN419 standard.

    With spending obtained (g) perform necessary calculation, knowing that 1 ml of citric

    acid solution containing 0.605 grams of citric acid crystals.

    . í =

    0.605× 1 =

    7

    0.605× 1 = 11.57

    CALCULATION OF THE MASS OF THE MIXTURE

    Mass balance in grams is performed, considering that 1 liter of water to obtain beet

    pulp.

    MM= mt + mat+ H20 + mp + m Ac. Cítrico

    MM = 2480 + 2380 + 15.86 + 11.57

    MM= 4887.43 gr

    CALCULATION OF MASS PRODUCT

  • 8/16/2019 Proyecto Formulación 2do Parcial

    20/41

     20

    mt (x) + mta(x) = H20(x) + MF (x)

    Where MF (x) is the final product mass times the final concentration is given in ° Brix and

    is equal to 65 because it is the concentration required by law.

    Replacing data in the formula are:

    2480 (0.086) + 2380 (1) = A6 (0) + M (0.65)

    M= 3989.66 gr =3.98 kg

    CALCULATION OF THE MASS OF PRESERVATIVE

    0.7 gr benzoate is needed per kilo of product, therefore:

    0.70 3.98

    1 = 2.79  

    12.2.  SENSORY TESTING – ESPOL

    In the city of Guayaquil, a survey was conducted to collect data on eating habits that has

    the population, and thus achieve a better acceptance of our product in the market based

    on the needs of individuals. A population sample of 200 people who regularly attend

    classes and work at ESPOL was taken.

    Among the results obtained in the following graph (Figure 4) reflects that the population

    in a 73.94% would like to consume vegetables almost imperceptibly your palate by these

    secrete juices; while a 24.93% said they would not want to eat vegetables differently

    because they are vegetarians and prefer things more organically.

    Figure 4. Results vegetable consumption imperceptibly.

  • 8/16/2019 Proyecto Formulación 2do Parcial

    21/41

     21

    However, the results on the acquisition of "Jam Beetroot - flavored Mora" (Figure 5)

    shows that the population if she would consume this innovative product as a source of

    vegetable intake of each individual. The 74.71% answered yes consume the product,

    while 22.99% reported not buy it because "it sounds strange".

    Figure 5. Results of Purchase beetroot marmalade.

    13. TRAINING OF THE MEMBERS OF THE PROJECT

    All members involved in the development of this project must have basic knowledge in:

      Good Manufacturing Practices (GMP).

      Handling of food.

    In our case two members of the project are not of the Engineering in foods for which an

    internal training will be needed for them to learn the basic concepts and practices that

    are necessary when preparing a food product to ensure not only quality but also product

    safety that will offer children the choice for school project implementation.

    The training will have a better and faster production management. The topics are:

      Standards compliant laboratory R & D.

      Standards of hygiene in food handling.

      Minimum requirements to be met during processing.

      Technical Standard jam.  Principles of food preservation.

      Detailed drawing of beetroot jam flavored blackberry Process.

    This training will last two hours and will be based on issues that relate to our product

    and found in the training manual for food handlers proposed by the Pan American

    Health Organization.

    Although the two members will not be directly responsible for the manufacture and

    assurance of the product, if you need to know the implications of preparing a food

    product even more for a group of people considered vulnerable to the objectives of who

    are familiar with the product, collaborate on their development and contribute to thediffusion in school.

  • 8/16/2019 Proyecto Formulación 2do Parcial

    22/41

     22

    14. COMMUNICATION PROJECT

    The communication system to be used to publicize this project would be implemented

    through two distribution channels:

    1.  Social Networks, promoting the consumption of beet and forming part of thedaily diet of every citizen.

    2.  Leaflets, posters and visual material that promotes and indicate the benefits of

    consumption of beet as tubercle and which properties are preserved in jam are.

    Figure 6. Ways of communication.

    15. RISK MANAGEMENT

    Risk management will allow us to identify what are the possible risks associated with the

    implementation of our project. These risks can be positive or negative and for each of

    them have established action plans to reduce or eliminate the impact in case of a

    negative risk, or to use it in case concerned a positive risk.

    Positive risks are:

      Previous experience in the development of beetroot marmalade 3 by project

    members.

      The availability of equipment and instruments within the premises of the

    university.

      The number of members that are part of the team.

  • 8/16/2019 Proyecto Formulación 2do Parcial

    23/41

     23

    RISK IMPACT ACTIONS TO TAKE

    ADVANTAGE OF THE RISK

    Previous experience in the

    development of beetrootmarmalade 3 by project

    members.

    We will be able to advance

    more rapid in the stage ofproduction of the product

    and evaluation of the same

    one

    To use the experience acquired for:

      To qualify the members of the

    equipment that they do not

    know of the process.

      To improve the production of

    the jam.

      To reduce times of

    manufacture

      To eliminate or to reduce the

    faults or faults in the

    production.

    The availability of equipment

    and instruments within the

    premises of the university.

    we can better organize

    assignments and are

    related product

    manufacturing

    Equipment and instruments used in

    those hours when the laboratory is

    available.

    Harnessing the available materials and

    experience of the teachers in charge

    when doubt arises or danger during

    processing

    The number of members that

    are part of the team.

    Easy coordination during

    the planning and

    implementation of the

    project

    Harnessing the number of members to

    meet regularly and coordinate tasks.

    Facilitate communication and

    collaboration among members in case

    of failures, delays or unforeseen.

    Table 7. Positive Risks.

    Negative risks are:

      Lack of availability of raw material.  Jam with poor quality or does not comply with the microbiological requirements.

      Delay in planned activities due to the holiday of Christmas and New Year.

      Difficulty to enter the product to any of the childcare centers.

    RISK IMPACT ACTIONS TO REDUCE OR TO ELIMINATE

    THE RISK

    Lack of availability of raw

    material

    Delay project. Having a database of points of additional sales

    if the original supplier does not have the raw

    materials when needed.

  • 8/16/2019 Proyecto Formulación 2do Parcial

    24/41

     24

    Jam with poor quality or

    does not comply with the

    microbiological

    requirements.

    Discard the product or

    modify the process.

    To use qualit raw material though it means a

    major initial investment. In case of not

    expiring with the pH and solid total it will have

    increase the time of concentration

    approximately 10 to 15 additional minutes to

    the planned. Citric acid will be added to reach

    the needed level.

    Delay in planned activities

    due to the holiday of

    Christmas and New Year.

    In case of excessive delay

    the project risks not run

    100%.

    Hold a meeting with all members before the

    holiday to coordinate tasks and pending

    items.

    Making the product before the holiday to

    have enough time to evaluate the stability

    and safety.

    Share responsibilities and tasks from the start.

    Difficulty to enter the

    product to any of the

    childcare centers.

    The project is not finished

    by the deadline.

    To establish a database of the possible centers

    which the project will be directed.

    To communicate with each of them for

    telephone or in person to reject those centers

    that could not take part of the activity.

    To fix a date previously as well as the time that

    will take the final diffusion of the product notto interrupt own activities of the institution or

    not to have unforeseen the day of the

    execution.

    Table 8. Negative Risks.

  • 8/16/2019 Proyecto Formulación 2do Parcial

    25/41

      25

    16. WORK BREAKDOWN STRUCTURE

    Figure 7. WBS

  • 8/16/2019 Proyecto Formulación 2do Parcial

    26/41

  • 8/16/2019 Proyecto Formulación 2do Parcial

    27/41

     27

    18. GANTT CHART (REAL TIMELINE)

    The Gantt chart was made considering that only worked on weekdays and not

    weekends. Furthermore execution was halted during exam week, Christmas holidays

    and New Year (15 days), 4y5 December due to other non-project activities and from

    January 5th to Tuesday 13 (7 days) because the date given by the school.

  • 8/16/2019 Proyecto Formulación 2do Parcial

    28/41

     28

    19. CRITICAL PATH (REAL TIMELINE)

    The critical path has a duration of 19 working days without dates which it was necessary

    to make a stop of activities.

    Figure 8. Critical Path.

    All activities on the critical path cannot be delayed (with zero slack) that produce a delay

    in the delivery date. The clearance of the other activities was:

    ACTIVITIES SLACK3 17 DAYS

    8 9 DAYS

    9 9 DAYS

    10 9 DAYS

    These days slack allow us to postpone these activities without running the risk that the

    whole project is delayed in delivery.

  • 8/16/2019 Proyecto Formulación 2do Parcial

    29/41

     29

    20. ESTIMATE OF REAL TIME VS. ESTIMATED

    The Starting of the project established an estimated time of 24 days, starting the day

    Wednesday, November 19, 2014 and ending on January 16, 2015, activities were

    distributed as follows.

    The previously mentioned activities were carried out one by one, respecting the order

    and exercise them responsibly to get a quality product.

    The time q activities performed was a little different to that proposed in advance, as

    some of them were complicated and others provided, giving us a total of 29 days.

    STAR DURATION STARTING ENDING

    Meeting of project members 1 19/11/14 19/11/14

    traning 0 19/11/14 19/11/14

    Quote of raw material and

    supplies

    2 21/11/14 21/11/14

    request authorization for the use

    of laboratory R/h

    3 24/11/14 26/11/14

    Purchase of raw material and

    supplies

    0 24/11/14 24/11/14

    Elaboration 10 bottles of jam 2 26/11/14 27/11/14labeled 2 27/11/14 28/11/14

  • 8/16/2019 Proyecto Formulación 2do Parcial

    30/41

     30

    Sensory testing in the university 2 01/12/14 02/12/14

    Analysis of results 1 03/12/14 03/12/14

    Products stability test 2 03/12/14 04/12/14

    Search database of schools or day

    care centers

    2 04/12/14 05/12/14

    Contact chidcare centers anddefinition of date and time

    6 06/12/14 13/12/14

    Metting with project members to

    define logistcs

    0 13/12/14 13/12/14

    Tasting ar school and accptabilitu

    trial

    2 15/12/14 16/12/14

    Analysis of result 2 16/12/14 17/12/14

    Completion of the written

    document

    2 17/12/14 18/12/14

    The reason that the project was delayed, basically arose from the unexpected comingwith each of the procedures.

    21. REVENUE BUDGET

    To determine the income of the company, is considered a selling price of $1,75

    considering a profit margin of 62%. It is noteworthy that the sale price does not include

    VAT, because these products are recorded at a rate of 0%.

    On the subject of annual sales, is forecast that these will be increasing as time passes, ie

    every year our product will have greater market power can sell allowing a greater

    volume of jam jars. In addition, this forecasting will allow estimating our production

    costs for the first year and then calculate the NPV and IRR of the project.

    For the estimate of sales, we predict that 50% will be sold the first year and will gradually

    increase at a rate of 15% approximately in the years up to 100%, which is usually the

    fourth year when already the product is in its stage of maturity.

    Determination of Expenditures

    Project expenditures are comprised of production costs and general administrative

    expenses and sales.

    Manufacturing Costs

    The manufacturing cost is composed of the requirements of raw materials and auxiliary

    materials, direct labor and indirect labor and indirect production costs.

  • 8/16/2019 Proyecto Formulación 2do Parcial

    31/41

     31

    Administrative Expenses

    Administrative expenses include salaries and wages of personnel administration and

    overhead management area, as are telephone, electricity administrative offices,

    depreciation, amortization and so on.

    Table 9. Raw Material.

    Table 10. Direct Materials.

    Table 11. Direct Labor.

    Table 12. Indirect Material.

  • 8/16/2019 Proyecto Formulación 2do Parcial

    32/41

     32

    Table 13. Indirect Labor.

    Table 14. Supplies and Services.

    Table 15. Depreciation, Insurace, Repair and Mantenance.

  • 8/16/2019 Proyecto Formulación 2do Parcial

    33/41

     33

    Table 16. Manufacturing Cost.

    Table 17. Distribution Costs and Sales.

    Table 18. General and Administrative Expenses

  • 8/16/2019 Proyecto Formulación 2do Parcial

    34/41

     34

    Table 19. Income Statement.

    Table 20. Operating Capital.

    Table 21. Initial Investment.

  • 8/16/2019 Proyecto Formulación 2do Parcial

    35/41

     35

    Table 22. Cash Flow.

    Table 23. VPN.

    Table 24. Profitability Index.

  • 8/16/2019 Proyecto Formulación 2do Parcial

    36/41

     36

    22. CONCLUSIONS

      The successful implementation of a project is strongly related to good planning

    of it, so it is necessary to devote much effort to consider all possible situations

    that may arise during the project and could cause its failure.

      It is necessary to maintain excellent communication with all members of the

    team to streamline activities involving 2 or more members of the project, and

    also to keep informed all participants about changes or situations that arise

    during the project.

      Because the project has not been implemented, it is necessary to assign part of

    the budget any unexpected problems may arise during project implementation,

    since otherwise high risk of exceeding the budget set before development runs.

      The project presented has major fields of application, and its execution could

    expand nationally, changing its scope to not only involve the school as direct

    beneficiaries, but also, through lectures or conferences, promoting guidelines for

    farmers beet they can improve their production, thus contributing to the change

    of the productive matrix in the country.

  • 8/16/2019 Proyecto Formulación 2do Parcial

    37/41

     37

    23. REFERENCES

     La remolacha significa nutrientes.

    http://www.eldiario.ec/noticias-manabi-ecuador/198147-la-remolacha-

    significa-nutrientes/

     La sierra se colorea con la remolacha.

    http://agronegociosecuador.ning.com/notes/La_sierra_se_colorea_con_la_re

    molacha

     Proyecto de prefactibilidad para la exportación de betanina al mercado

    Estadounidense período 2007-2016.

    http://repositorio.ute.edu.ec/bitstream/123456789/6998/1/28575_1.pdf

     Proyecto de valoración financiera de la elaboración y comercialización de

    mermelada de grosella en Guayaquil.

    https://www.dspace.espol.edu.ec/bitstream/123456789/14856/1/Proyecto%2

    0de%20Valoracion%20Financiera%20de%20la%20Elaboracion%20y%20comerci

    alizacion%20de%20mermelada.pdf

     Creación de una productora de mermeladas, conservas y encurtidos envasados

    en vidrio en la ciudad de Milagro.

    http://repositorio.unemi.edu.ec/bitstream/123456789/140/1/PRODUCTORA%

    20DE%20MERMELADAS,%20CONSERVA%20Y%20ENCURTIDOS.pdf

    24. APPENDICES

    24.1.  APPENDIX 1 – TESTING LABORATORY

    Raw Beets Cooking Beet

  • 8/16/2019 Proyecto Formulación 2do Parcial

    38/41

     38

    Peeling Process Cutting and heavy beet

    Heavy ingredients Cooking the mixture

    Container sterilization Cooling the product

  • 8/16/2019 Proyecto Formulación 2do Parcial

    39/41

     39

    24.2.  APPENDIX 2 – FINISHED PRODUCT

    24.3.  APPENDIX 3 – SAMPLE SURVEY

  • 8/16/2019 Proyecto Formulación 2do Parcial

    40/41

    24.4.  APPENDIX 4 – PHOTOS OF IMPLEMENTATION

  • 8/16/2019 Proyecto Formulación 2do Parcial

    41/41