PRUEVA HIDRAULICA
-
Upload
edwards-ballon-cardenas -
Category
Documents
-
view
246 -
download
0
description
Transcript of PRUEVA HIDRAULICA
GORE ICA
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUB GERENCIA DE OBRAS
OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE
SECTOR HORNO VIEJO
FECHA: 15 DE AGOSTO DEL 2,003.
RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ
__________________________________________________________________________________________________________________________________
PRUEBA HIDRAULICA N01
403.745
404.20
1.35
2.08
402.395
402.12
L = 45.80
B8A
PVC 8
B9
Ho =16.50cm to=3:40 pm
Hf = 16.50cmTf =3:52 pm
Perdida Real =0.00 cm
Perdida admisible =
GORE ICA
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUB GERENCIA DE OBRAS
OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE
SECTOR HORNO VIEJO
FECHA: 15 DE AGOSTO DEL 2,003.
RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ
__________________________________________________________________________________________________________________________________
PRUEBA HIDRAULICA N02
403.749403.345
1.30
1.35
402.449402.395
L=10.87M
PVC 8
B 8B8 A
Ho = 10.00cm to =3:42pm
Hf =10.00cm
tf=3:54pm
Perdida Real = 0.00cm
Perdida admisible =
GORE ICA
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUB GERENCIA DE OBRAS
OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE
SECTOR HORNO VIEJO
FECHA: 15 DE AGOSTO DEL 2,003.
RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ
__________________________________________________________________________________________________________________________________
PRUEBA HIDRAULICA N03
403.853
1.00403.749
402.853 1.30
402.449
L =50.50
PVC 6B 8
Bz01
Ho =14.50 cm to =3:44pm
Hf = 14.50 cm tf = 3:55pm
Perdida real
= 0.00 cm
Perdida admisible=
GORE ICA
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUB GERENCIA DE OBRAS
OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE
SECTOR HORNO VIEJO
FECHA: 15 DE AGOSTO DEL 2,003.
RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ
__________________________________________________________________________________________________________________________________
PRUEBA HIDRAULICA N04
404.327404.123
1.00 1.38
403.327
402.743
L = 47.0 m
PVC 6B 6
Bz 03
Ho = 23.80 cm to = 3:46 pm
Hf = 23.80 cm tf = 4:01 pm
Perdida real
= 0.00cm
Perdida admisible =
GORE ICA
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUB GERENCIA DE OBRAS
OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE
SECTOR HORNO VIEJO
FECHA: 15 DE AGOSTO DEL 2,003.
RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ
__________________________________________________________________________________________________________________________________
PRUEBA HIDRAULICA N05
B6
404.123
h=1.38
402.743
L=33.90ml.
405.15 h=1.84
404.015
PVC 8
404.40
h=1.25
403.31
402.765
L=60.60ml.
PVC 8
B3
B4
ho = 10.00cm to = 3.48pm
hf = 10.00cm tf = 4.05 pm
Perdida Real = 0.00 cm
Perdida admisible =
GORE ICA
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUB GERENCIA DE OBRAS
OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE
SECTOR HORNO VIEJO
FECHA: 20 DE AGOSTO DEL 2,003.
RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ
__________________________________________________________________________________________________________________________________
PRUEBA HIDRAULICA N06
.
403.745h=1.35
403.655
402.395
h=1.00
402.655
L=51.10ml.
PVC 6
B8A
Bz 01A
ho = 40.00cm to = 3.44pm
hf = 40.00cm tf = 4.25 pm
Perdida Real = 0.00 cm
Perdida admisible =
GORE ICA
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUB GERENCIA DE OBRAS
OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE
SECTOR HORNO VIEJO
FECHA: 20 DE AGOSTO DEL 2,003.
RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ
__________________________________________________________________________________________________________________________________
PRUEBA HIDRAULICA N07
.
403.997 h=1.50
405.749
402.497
h=1.30
402.449
L=9.50 ml.
PVC 8
B7
B8
ho = 35.00cm to = 3:46pm
hf = 35.00cm tf = 4:20 pm
Perdida Real = 0.00 cm
Perdida admisible =
GORE ICA
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUB GERENCIA DE OBRAS
OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE
SECTOR HORNO VIEJO
FECHA: 20 DE AGOSTO DEL 2,003.
RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ
__________________________________________________________________________________________________________________________________
PRUEBA HIDRAULICA N08
.
403.997 h=1.50
403.682
402.497
h=1.00
402.682
L=37.00 ml.
PVC 6
B7
Bz 02
ho = 23.00cm to = 3:49pm
hf = 23.00cm tf = 4:15 pm
Perdida Real = 0.00 cm
Perdida admisible =
GORE ICA
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUB GERENCIA DE OBRAS
OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE
SECTOR HORNO VIEJO
FECHA: 20 DE AGOSTO DEL 2,003.
RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ
__________________________________________________________________________________________________________________________________
PRUEBA HIDRAULICA N09
.
404.123 h=1.38
403.997
402.743
h=1.50
402.497
L=30.70 ml.
PVC 8
B6
B7
ho = 70.00cm to = 3:50pm
hf = 70.00cm tf = 4:19 pm
Perdida Real = 0.00 cm
Perdida admisible =
GORE ICA
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUB GERENCIA DE OBRAS
OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE
SECTOR HORNO VIEJO
FECHA: 20 DE AGOSTO DEL 2,003.
RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ
__________________________________________________________________________________________________________________________________
PRUEBA HIDRAULICA N10
.
404.015 h=1.25
403.203
402.765
h=1.35
401.853
L=61.70 ml.
PVC 8
B4
BE
ho = 17.00cm to = 3:51pm
hf = 17.00cm tf = 4:17 pm
Perdida Real = 0.00 cm
Perdida admisible =
GORE ICA
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUB GERENCIA DE OBRAS
OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE
SECTOR HORNO VIEJO
FECHA: 20 DE AGOSTO DEL 2,003.
RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ
__________________________________________________________________________________________________________________________________
PRUEBA HIDRAULICA N11
.
405.901 h=1.40
405.15
404.501
h=1.84
404.40
403.31
L=61.70 ml.
PVC 8
B2
B3
ho = 23.00cm to = 3:54pm
hf = 23.00cm tf = 4:13 pm
Perdida Real = 0.00 cm
Perdida admisible =
GORE ICA
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUB GERENCIA DE OBRAS
OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE
SECTOR HORNO VIEJO
FECHA: 20 DE AGOSTO DEL 2,003.
RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ
__________________________________________________________________________________________________________________________________
PRUEBA HIDRAULICA N12
.
405.901 h=1.40
405.661
404.501
h=1.00
404.661
L=32.00 ml.
PVC 6
B2
Bz 04
ho = 22.00cm to = 3:56pm
hf = 22.00cm tf = 4:11 pm
Perdida Real = 0.00 cm
Perdida admisible =
GORE ICA
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUB GERENCIA DE OBRAS
OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE
SECTOR HORNO VIEJO
FECHA: 20 DE AGOSTO DEL 2,003.
RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ
__________________________________________________________________________________________________________________________________
PRUEBA HIDRAULICA N13
.
407.720 h=1.20
405.901
406.520
h=1.40
404.501
L=65.00 ml.
PVC 8
B1
B2
ho = 23.00cm to = 3:59pm
hf = 23.00cm tf = 4:10 pm
Perdida Real = 0.00 cm
Perdida admisible =
GORE ICA
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUB GERENCIA DE OBRAS
OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE
SECTOR HORNO VIEJO
FECHA: 09 DE SEPTIEMBRE DEL 2,003.
RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ
__________________________________________________________________________________________________________________________________
PRUEBA HIDRAULICA N14
.
407.717 h=2.45
407.507
405.267
h=2.00
405.507
L=48.00 ml.
PVC 8
B2
B3
ho = 57.00 cm to = 11:14 a.m.
hf = 57.00 cm tf = 11:45 a.m.
Perdida Real = 0.00 cm
Perdida Admisible = 1.00 cm.
GORE ICA
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUB GERENCIA DE OBRAS
OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE
SECTOR HORNO VIEJO
FECHA: 09 DE SEPTIEMBRE DEL 2,003.
RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ
__________________________________________________________________________________________________________________________________
PRUEBA HIDRAULICA N15
.
407.400 h=1.65
407.507
405.750
h=2.00
405.507
L=50.00 ml.
PVC 8
B4
B3
ho = 47.00 cm to = 11:15 a.m.
hf = 47.00 cm tf = 11:44 a.m.
Perdida Real = 0.00 cm
Perdida Admisible = 1.00 cm.
GORE ICA
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUB GERENCIA DE OBRAS
OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE
SECTOR HORNO VIEJO
FECHA: 09 DE SEPTIEMBRE DEL 2,003.
RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ
__________________________________________________________________________________________________________________________________
PRUEBA HIDRAULICA N16
.
407.250 h=1.20
407.400
406.05
h=1.65
405.7500
L=60.00 ml.
PVC 8
B5
B4
ho = 29.00 cm to = 11:16 a.m.
hf = 29.00 cm tf = 11:41 a.m.
Perdida Real = 0.00 cm
Perdida Admisible = 1.50 cm.
GORE ICA
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUB GERENCIA DE OBRAS
OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE
SECTOR HORNO VIEJO
FECHA: 09 DE SEPTIEMBRE DEL 2,003.
RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ
__________________________________________________________________________________________________________________________________
PRUEBA HIDRAULICA N17
.
407.590 h=1.20
407.250
406.39
h=1.20
406.050
L=60.00 ml.
PVC 8
B6
B5
ho = 20.00 cm to = 11:19 a.m.
hf = 20.00 cm tf = 11:39 a.m.
Perdida Real = 0.00 cm
Perdida Admisible = 1.50 cm.
GORE ICA
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUB GERENCIA DE OBRAS
OBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRE
SECTOR HORNO VIEJO
FECHA: 09 DE SEPTIEMBRE DEL 2,003.
RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ
__________________________________________________________________________________________________________________________________
PRUEBA HIDRAULICA N18
.
407.765 h=1.10
407.590
406.665
h=1.20
406.390
L=54.10 ml.
PVC 8
B7
B6
ho = 23.50 cm to = 11:21 a.m.
hf = 23.50 cm tf = 11:37 a.m.
Perdida Real = 0.00 cm
Perdida Admisible = 1.20 cm.
GORE ICA
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUB GERENCIA DE OBRASOBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRESECTOR HORNO VIEJO
FECHA: 13 DE SEPTIEMBRE DEL 2,003.
RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ
__________________________________________________________________________________________________________________________________
PRUEBA HIDRAULICA N 19
.
406.900 h=1.00
406.506
405.900
h=1.47
405.436
405.036
L=49.00 ml.
PVC 8
B10
BE
ho = 9.00 cm to = 11:54 a.m.
hf = 9.00 cm tf = 12:30 m.
Perdida Real = 0.00 cm
Perdida Admisible = 1.00 cm.
GORE ICA
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUB GERENCIA DE OBRASOBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRESECTOR HORNO VIEJO
FECHA: 13 DE SEPTIEMBRE DEL 2,003.
RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ
__________________________________________________________________________________________________________________________________
PRUEBA HIDRAULICA N 20
.
407.717 h=2.45
407.717
405.267
h=2.70
405.017
L=36.00 ml.
PVC 8
S=6.9%o
B2
B1
ho = 65.00 cm to = 12:15 p.m.
hf = 65.00 cm tf = 12:30 p.m.
Perdida Real = 0.00 cm
Perdida Admisible = 0.60 cm.
GORE ICA
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUB GERENCIA DE OBRASOBRA: CONSTRUCCIN SIST. DE DESAGE EN EL SECTOR HORNO VIEJO, SEBASTIN BARRANCA Y VISTA ALEGRESECTOR HORNO VIEJO
FECHA: 13 DE SEPTIEMBRE DEL 2,003.
RESIDENTE DE OBRA: ING. GUSTAVO GARCA DAZ
__________________________________________________________________________________________________________________________________
PRUEBA HIDRAULICA N 21
.
407.717 h=2.70
407.810
405.017
h=4.50
405.017
403.310
L=12.25 ml.
PVC 8
S=26.40%o
B1
BE
ho = 67.50 cm to = 12:14 p.m.
hf = 67.50 cm tf = 12:31 p.m.
Perdida Real = 0.00 cm
Perdida Admisible = 0.25 cm.