HOJA DE METRADOS ESTRUCTURA, ARQUITECTURA Y EQUI CODIGO DESCRIPCION UND CÁLCULO VECES L A H RESERVORIO V = 15 M3 1.00 TRABAJOS PRELIMINARES TRAZO Y REPLANTEO M2 1.00 1.80 1.80 1.00 1.05 1.20 LIMPIEZA DE TERRENO M2 IDEM TRAZO Y REPLANTEO 2.00 MOVIMIENTO DE TIERRAS EXCAVACION DE TERRENO M3 RESERVORIO 1.00 1.80 1.80 0.35 SOBREEXCAV RESERVORIO LADO Y 1.00 1.00 1.80 0.35 SOBREEXCAV RESERVORIO LADO Y 1.00 1.00 0.60 0.35 SOBREEXCAV RESERVORIO LADO X 2.00 3.80 1.00 0.35 CAJA DE VALVULAS 1.00 1.05 1.20 0.35 SOBREEXCAVACION CAJA DE VALVULAS 2.00 1.05 0.60 0.35 1.00 1.20 0.60 0.35 REFINE Y NIVELACION M2 1.00 1.80 1.80 1.00 1.05 1.20 RELLENO Y NIVELACION M3 SOBREEXCAV RESERVORIO LADO Y 1.00 1.00 1.80 0.35 SOBREEXCAV RESERVORIO LADO X 1.00 1.00 0.60 0.35 SOBREEXCAV RESERVORIO LADO X 1.00 3.80 1.00 0.35 SOBREEXCAVACION CAJA DE VALVULAS 2.00 1.05 0.60 0.35 1.00 1.20 0.60 0.35 ELIMINACION DE DESMONTE M3 EXCAVACION RELLENO ELIMINACION ELIMINACION 1.25% ESPONJ 3.00 CONCRETO SIMPLE CONCRETO FC 100 KG/CM2 PARA SOLADO M3 1.00 1.80 1.80 0.10 EMBOQUILLADO DE PIEDRA FC 175 KG/CM2 E= 0.20 M2 1.00 1.00 0.50 4.00 CONCRETO ARMADO CONCRETO PARA LOSA DE FONDO FC 210 KG/CM2 M3 RESERVORIO 1.00 2.40 2.40 0.15 CAJA 1.00 0.90 1.50 0.10 DADO 1.00 0.30 0.20 0.20 ENCOFRADO PARA LOSA DE FONDO M2 RESERVORIO X 2.00 2.40 0.15 RESERVORIO Y 2.00 2.40 0.15 CAJA X 2.00 0.90 0.10 CAJA Y 1.00 1.50 0.10 DADO 1.00 1.00 0.20 ACERO PARA LOSA DE FONDO KG 1.01 70.00

description

reservorio

Transcript of RAP=02

Page 1: RAP=02

HOJA DE METRADOS

ESTRUCTURA, ARQUITECTURA Y EQUIPAMIENTO

CODIGO DESCRIPCION UND N° CÁLCULO METRADO METRADO

VECES L A H PARCIAL TOTAL

RESERVORIO V = 15 M3

1.00 TRABAJOS PRELIMINARES

TRAZO Y REPLANTEO M2 4.50

1.00 1.80 1.80 3.24

1.00 1.05 1.20 1.26

LIMPIEZA DE TERRENO M2 4.50

IDEM TRAZO Y REPLANTEO

2.00 MOVIMIENTO DE TIERRAS

EXCAVACION DE TERRENO M3 5.77

RESERVORIO 1.00 1.80 1.80 0.35 1.13

SOBREEXCAV RESERVORIO LADO Y 1.00 1.00 1.80 0.35 0.63

SOBREEXCAV RESERVORIO LADO Y 1.00 1.00 0.60 0.35 0.21

SOBREEXCAV RESERVORIO LADO X 2.00 3.80 1.00 0.35 2.66

CAJA DE VALVULAS 1.00 1.05 1.20 0.35 0.44

SOBREEXCAVACION CAJA DE VALVULAS 2.00 1.05 0.60 0.35 0.44

1.00 1.20 0.60 0.35 0.25

REFINE Y NIVELACION M2 4.50

1.00 1.80 1.80 3.24

1.00 1.05 1.20 1.26

RELLENO Y NIVELACION M3 2.86

SOBREEXCAV RESERVORIO LADO Y 1.00 1.00 1.80 0.35 0.63

SOBREEXCAV RESERVORIO LADO X 1.00 1.00 0.60 0.35 0.21

SOBREEXCAV RESERVORIO LADO X 1.00 3.80 1.00 0.35 1.33

SOBREEXCAVACION CAJA DE VALVULAS 2.00 1.05 0.60 0.35 0.44

1.00 1.20 0.60 0.35 0.25

ELIMINACION DE DESMONTE M3 3.63

EXCAVACION 5.77

RELLENO 2.86

ELIMINACION 2.91

ELIMINACION 1.25% ESPONJ 3.63

3.00 CONCRETO SIMPLE

CONCRETO FC 100 KG/CM2 PARA SOLADO M3 0.32

1.00 1.80 1.80 0.10 0.32

EMBOQUILLADO DE PIEDRA FC 175 KG/CM2 E= 0.20 M2 1.00 1.00 0.50 0.50 0.50

4.00 CONCRETO ARMADO

CONCRETO PARA LOSA DE FONDO FC 210 KG/CM2 M3 1.01

RESERVORIO 1.00 2.40 2.40 0.15 0.86

CAJA 1.00 0.90 1.50 0.10 0.14

DADO 1.00 0.30 0.20 0.20 0.01

ENCOFRADO PARA LOSA DE FONDO M2 1.97

RESERVORIO X 2.00 2.40 0.15 0.72

RESERVORIO Y 2.00 2.40 0.15 0.72

CAJA X 2.00 0.90 0.10 0.18

CAJA Y 1.00 1.50 0.10 0.15

DADO 1.00 1.00 0.20 0.20

ACERO PARA LOSA DE FONDO KG 1.01 70.00 70.77

Page 2: RAP=02

CONCRETO PARA MUROS FC 210 KG/CM2 M3 1.53

RESERV EJE X 2.00 1.80 1.15 0.15 0.62

RESERV EJE Y 2.00 1.50 1.15 0.15 0.52

CAMARA MUROS X 2.00 1.20 0.80 0.15 0.29

CAMARA MUROS Y 1.00 0.90 0.80 0.15 0.11

ENCOFRADO PARA MUROS M2 17.82

RESERV INT 2.00 1.15 1.50 3.45

RESERV INT 2.00 1.15 1.50 3.45

RESERV EXT 2.00 1.15 1.80 4.14

RESERV EXT 2.00 1.15 1.80 4.14

CAMARA MUROS 2.00 1.05 0.80 1.68

CAMARA MUROS 1.00 1.20 0.80 0.96

ACERO PARA MUROS KG 1.53 70.00 107.42

CONCRETO FC 210 KG/CM2 PARA LOSA MACIZA M3 0.54

RESERV 1.00 2.00 2.00 0.10 0.40

INGRESO -1.00 0.60 0.60 0.10 -0.04

CAJA 1.00 1.20 1.05 0.10 0.13

INGRESO -1.00 0.60 0.60 0.10 -0.04

BOCA INGRESO RESERVORIO 1.00 2.80 0.15 0.10 0.04

BOCA INGRESO CAJA 1.00 2.80 0.15 0.10 0.04

ENCOFRADO PARA LOSA MACIZA M2 5.67

RESERV 1.00 1.50 1.50 2.25

INGRESO -1.00 0.60 0.60 -0.36

FRISOS TECHO 1.00 8.00 0.10 0.80

VOLADO TECHO 1.00 8.00 0.20 1.60

FRISO INGRESO 1.00 2.40 0.10 0.24

CAMARA 1.00 0.90 0.90 0.81

INGRESO -1.00 0.60 0.60 -0.36

VOLADO TECHO CAMARA 1.00 3.45 0.10 0.35

FRISO TECHO CAMARA 1.00 3.45 0.10 0.35

ACERO PARA LOSA MACIZA KG 70.00 0.54 37.66

5.00 REVOQUES Y ENLUCIDOS

TARRAJEO DE LOSA PISO CON IMPERMEABILIZANTE M2 2.25

1.00 1.50 1.50 2.25

TARRAJEO DE MUROS CON IMPERMEABILIZANTE M2 6.90

2.00 1.50 1.15 3.45

2.00 1.50 1.15 3.45

TARRAJEO INTERIOR DE MUROS M2 3.69

CAMARA PARED 4.00 0.90 0.80 2.88

CAMARA PISO 1.00 0.90 0.90 0.81

TARRAJEO EXTERIOR DE MUROS M2 14.74

RESERVORIO 2.00 1.80 1.15 4.14

2.00 1.80 1.15 4.14

-1.00 1.05 1.20 -1.26

CAMARA 2.00 1.20 0.80 1.92

1.00 1.05 1.20 1.26

TECHO RESERV 1.00 2.00 2.00 4.00

-1.00 0.60 0.60 -0.36

TECHO CASETA 1.00 1.20 1.05 1.26

-1.00 0.60 0.60 -0.36

DERRAMES M2 25.85

FRISOS RESERV 2.00 2.20 4.40

Page 3: RAP=02

FRISOS RESERV 2.00 2.20 4.40

VOLADO RESERV 2.00 2.20 4.40

VOLADO RESERV 2.00 2.20 4.40

FRISO INGRESO RESERV 4.00 0.60 2.40

FRISO CAMARA 2.00 1.20 2.40

1.00 1.05 1.05

2.00 0.60 1.20

2.00 0.60 1.20

6.00 PINTURA

PINTADO DE MURO EXTERIOR M2 15.34

2.00 1.80 1.15 4.14

2.00 1.80 1.15 4.14

2.00 1.20 0.80 1.92

1.00 1.05 1.20 1.26

2.00 2.20 0.15 0.66

2.00 2.20 0.15 0.66

2.00 2.20 0.15 0.66

2.00 2.20 0.15 0.66

4.00 0.60 0.15 0.36

2.00 1.20 0.15 0.36

1.00 1.05 0.15 0.16

2.00 0.60 0.15 0.18

2.00 0.60 0.15 0.18

7.00 CERCO PERIMÉTRICO

CERCO DE ALAMBRE DE PUAS M 4.00 8.00 32.00

PRUEBAS Y LIMPIEZA

PRUEBA HIDRAULICA M3 1.00 2.00 2.00

LIMPIEZA Y DESINFECCIÓN M2 2.00 1.50 1.15 3.45 11.70

2.00 1.50 2.00 6.00

1.00 1.50 1.50 2.25

EVACUACION DE AGUA M3 1.00 2.00 2.00

PRUEBA DE CALIDAD DE CONCRETO UND 9.00

LOSA 3.00 3.00

MURO 3.00 3.00

TECHO 3.00 3.00

PRUEBA DE COMPACTACION UND 1.00 1.00 1.00

6.00 EQUIPAMIENTO

TAPA METALICA SANITARIA 60 X 60 e = 1/8" UND 2.00 2.00

ESCALINES DE FOGO 1" UND 1.15 3.33 3.00

TUBO DE VENTILACION 2" UND 2.00 2.00

LINEA DE INGRESO

TEE FOGO D1 UND 1.00 1.00

CODO FOGO 90º D1 UND 3.00 3.00

VALVULA COMPUERTA DE BRONCE ROSCADO D1 UND 2.00 2.00

UNION UNIVERSAL DE FOGO D1 UND 4.00 4.00

NIPLE DE ROSCA D1 UND 7.00 7.00

TUBO DE FOGO ROSCADO D1 M 5.00 5.00

LINEA DE SALIDA

CANASTILLA D2 UND 1.00 1.00

TEE FOGO D2 X D1 UND 1.00 1.00

Page 4: RAP=02

VALVULA COMPUERTA DE BRONCE ROSCADO D2 UND 1.00 1.00

UNION UNIVERSAL DE FOGO D2 UND 2.00 2.00

NIPLE DE ROSCA D2 UND 3.00 3.00

TUBO DE FOGO ROSCADO D2 M 2.50 2.50

LINEA DE REBOSE

NIPLE DE FOGO 3" X 0.15 M UND 1.00 1.00

REDUCCION 3" X 2" UND 1.00 1.00

CODO FOGO 90º 2" UND 4.00 4.00

TEE FOGO 2" X 2" UND 3.00 3.00

VALVULA COMPUERTA DE BRONCE ROSCADO 2" UND 1.00 1.00

UNION UNIVERSAL FOGO 2" UND 2.00 2.00

NIPLE DE GOFO 2" UND 3.00 3.00

TAPON DE FOGO 2" UND 2.00 2.00

TUBERIA DE PVC 2" M 13.00 13.00

MONTAJE DE INSTALACIONES HIDRAULICAS UND 1.00 1.00