    OVERSEAS BECHTEL INCORPORATED, SUCURSAL PER

    INFORME SEMANAL

    CONTRATO N 25635-220-HC1-MEEH-001

    IFS-50208-056

    Del 26 Septiembre al 03 de Octubre - 2015

    REVISADO POR:

    Edgardo Avendao S.

    .

    Supervisor del Proyecto SAEG PER S.A

    INFORMADO POR:

    Pedro Mauricio C.

    Planner SAEG PER S.A

    FECHA:

    03/10/15

    HVAC PARA SALAS ELCTRICAS Y DE CONTROLCONSTRUIDAS EN TERRENO, DUCTOS DE

    VENTILACIN Y CAPTACIN DE POLVO

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    2/35

    HVAC PARA SALAS ELCTRICAS Y DE CONTROLCONSTRUIDAS EN TERRENO, DUCTOS DE VENTILACIN Y

    CAPTACIN DE POLVO

    Revisin: 0

    Fecha:03/10/15

    Pgina: 2INFORME SEMANAL

    IFS-50208056

    NDICE

    1. INTRODUCCIN: .............................................................................................................................. 3

    2. RESUMEN DEL PROYECTO:......................................................................................................... 3

    2.1. Seguridad Salud y Medio Ambiente: .................................................................................. 3

    2.2. Control de Proyectos: ............................................................................................................. 3

    2.1.1. Horas Hombre: .................................................................................................................. 3

    2.1.1.1. Resumen de Horas Hombre .................................................................................. 4

    2.1.1.2. Dotacin semanal de personal............................................................................. 5

    2.1.2. Descripcin del Programa (Cronograma):................................................................ 5

    2.1.3. Histograma de Personal y Curva Ocupacional del Proyecto:.............................. 7

    2.1.3.1. Curva de Ingeniera: ................................................................................................ 7

    2.1.3.2. Curva de Procura: .................................................................................................... 7

    2.1.3.3. Curva de Construccin:.......................................................................................... 7

    2.1.3.4 Curva Global: ............................................................................................................ 7

    2.1.3.5. Cuadro Resumen de Avance de Proyecto:....................................................... 7

    3. CONSTRUCCIN: ........................................................................................................................... 103.1. Actividades Ejecutadas y programadas del periodo siguiente:................................ 10

    4. CUADRO DE PROCURA: .............................................................................................................. 11

    5. CUADRO DE CANTIDADES: ........................................................................................................ 11

    6. REPORTE FOTOGRFICO : ........................................................................................................ 11

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    3/35

    HVAC PARA SALAS ELCTRICAS Y DE CONTROLCONSTRUIDAS EN TERRENO, DUCTOS DE VENTILACIN Y

    CAPTACIN DE POLVO

    Revisin: 0

    Fecha:03/10/15

    Pgina: 3INFORME SEMANAL

    IFS-50208056

    1. INTRODUCCIN:

    SAEG PER S.A viene efectuando los servicios de ingeniera, procura y construccin de los sistemas de

    HVAC para las salas elctricas y de control, ductos de ventilacin y captacin de polvo, el cual est asociado a

    la ejecucin del proyecto minero Las Bambas.

    El presente reporte tiene como finalidad, dar a conocer el estado del proyecto, principales eventos y factores

    que determinen riesgos o atrasos en el proyecto.

    El proyecto ha iniciado su ejecucin con la reunin de inicio del 04 de abril del 2013, con la participacin de

    Bechtel y SAEG.

    Debido a la solicitud del cliente, las fechas de inicio de los trabajos en obra se han ido postergando de acuerdo

    a la liberacin de las reas de trabajo, teniendo como ltima actualizacin lo siguiente:

    Cuadro N01: Liberacin de reas de la CCO-03:

    Zona de TrabajoFecha de

    Liberacin

    Fecha deLiberacin

    Real

    Fecha deIngreso

    rea 210 210-ERR-0001 05-may-15 09-jun-15 09-jun-15

    Area 931-Instalacion de filtros Louver 12-may-15 21-jun-15 21-jun-15

    Sala elctrica-0220-CVB-003 22-may-15 19-agot-15 31-agot-15

    Sala elctrica-0220-CVB-004 22-may-15 19-agot-15 27-agot-15

    Sala elctrica-2132-ERR-001 22-may-15 14-oct-15

    Sala elctrica-2132-ERR-003 22-may-15 19-agot-15 03-sep-15

    Sala elctrica-2133-ERR-001 22-may-15 19-agot-15 01-sep-15

    Sala elctrica-2132-ERR-002 23-sep-15

    Sala elctrica-2134-ERR-001 09-oct-15

    Sala elctrica-552-ERR-001 09-oct-15

    Sala elctrica-552-ERR-002 26-sep-15

    Sala elctrica-552-ERR-003 01-sep-15 01-sep-15 06-sep-15

    rea 4511 ERR-001 13-sep-15 16-sep-15

    2. RESUMEN DEL PROYECTO:

    2.1. Seguridad Salud y Medio Ambiente:

    No se han reportado incidentes en los trabajos de SAEG PER hasta la fecha.

    2.2. Control de Proyectos:

    2.1.1. Horas Hombre:

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    4/35

    HVAC PARA SALAS ELCTRICAS Y DE CONTROLCONSTRUIDAS EN TERRENO, DUCTOS DE VENTILACIN Y

    CAPTACIN DE POLVO

    Revisin: 0

    Fecha:03/10/15

    Pgina: 4INFORME SEMANAL

    IFS-50208056

    2.1.1.1. Resumen de Horas Hombre

    A continuacin se presenta el resumen de HH directas programadas y reales en la

    etapa de construccin del proyecto.

    Cuadro N02: Resumen de HH Directas Construccin

    SEMANAS HH PROG HH REAL SEMANAS HH PROG HH REAL

    19-abr 25-abr 210 210 14-feb 20-feb 2310 1820

    26-abr 02-may - 0 21-feb 27-feb 1118 1540

    03-may 09-may 681 158 28-feb 06-mar 386 1400

    10-may 16-may 831 178 07-mar 14-mar 1050 1400

    17-may 23-may 176 563 14-mar 21-mar 1044 1260

    24-may 30-may 265 0 21-mar 28-mar 1044 1330

    31-may 06-jun 70 0 28-mar 04-abr 994 98007-jun 13-jun - 0 04-abr 11-abr 1044 1470

    14-jun 20-jun - 80 11-abr 18-abr 895 1190

    21-jun 27-jun - 194 18-abr 25-abr 746 1050

    28-jun 04-jul - 0 25-abr 02-may 646 1330

    05-jul 11-jul - 0 02-may 09-may 497 700

    12-jul 18-jul - 0 09-may 16-may 547 770

    19-jul 25-jul - 0 16-may 23-may 298 770

    26-jul 01-ago - 0 23-may 30-may 298 630

    02-ago 08-ago - 0 30-may 06-jun 298 700

    09-ago 15-ago - 0 06-jun 13-jun 298 700

    16-ago 22-ago 1500 50 13-jun 20-jun 298 630

    23-ago 29-ago 2139 839 20-jun 27-jun 298 700

    30-ago 05-sep 2154 990 27-jun 04-jul 298 63006-sep 12-sep 2293 920 04-jul 11-jul 298 1080

    13-sep 19-sep 1098 790 11-jul 18-jul 298 1120

    20-sep 26-sep 905 870 18-jul 25-jul 298 1260

    27-sep 03-oct 1477 900 25-jul 01-Ags 298 1680

    04-oct 10-oct 1216 1130 01-Ags 08-Ags 298 280

    11-oct 17-oct 1156 820 08-Ags 15-Ags 298 70

    18-oct 24-oct 587 760 15-Ags 22-Ags 70 7025-oct 31-oct 35 950 22-Ags 29-Ags 10 1001-nov 07-nov 18 1292 29-Ags 05-Sep 280 28008-nov 14-nov - 1550 05-Sep 12-Sep 170 17015-nov 21-nov - 1410 12-Sep 19-Sep 350 35006-dic 12-dic - 1960 19-Sep 26-Sep 320 32013-dic 19-dic - 1800 26-Sep 03-Oct 120 120

    20-dic 26-dic - 110 03-Oct 10-Oct27-dic 02-ene - 0 10-Oct 17-Oct

    03-ene 09-ene - 850

    10-ene 16-ene - 1500 TOTAL 40114 53474

    17-ene 23-ene 720 1500

    24-ene 30-ene 775 1400

    31-ene 06-feb 2098 147007-feb 13-feb 2185 1680

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    5/35

    HVAC PARA SALAS ELCTRICAS Y DE CONTROLCONSTRUIDAS EN TERRENO, DUCTOS DE VENTILACIN Y

    CAPTACIN DE POLVO

    Revisin: 0

    Fecha:03/10/15

    Pgina: 5INFORME SEMANAL

    IFS-50208056

    2.1.1.2. Dotacin semanal de personal.

    Personal contratado Real: 04 Directos y 03 indirectos.

    PROGRAMADO REAL

    tem PersonalCant. depersonas

    HHCant. depersonas

    HHOBSERVACION

    1.1 Directo en obra 4 120 4 120

    1.2 Directo de descanso 2 0 2 0

    2.1 Indirecto en obra 3 180 3 180

    2.2 Indirecto de descanso 7 0 7 0

    TOTAL 7 300 7 300

    El personal directo estar ejecutando labores de comisionamiento en las salas 0220-CVB-003,

    0220-CVB-004-ERR, 2132-ERR-003 y sala elctrica 2133-ERR-001-CC0-003 segn fechas de

    liberadas por Bechtel y el trazado, cort y doblez de ducteria galvanizadas de la sale elctrica

    rea 392 Reactivos-CCO-005.

    Descripcin del Programa (Cronograma General):

    En el anexo 1 se presenta el Programa del proyecto general considerando la inclusin

    de las Ordenes de Trabajo Adicionales CCO-003; CCO-004y CCO-005.

    CONTRACTUAL (ALCANCE INICIAL)

    Salas elctricas 0931; 310-JRM-001; 310-ERR-001; 310-ERR-002: Culminadas al

    100%.

    Tnel de recuperacin de mineral grueso - 240: Se realiz el apoyo para el

    comisionamiento.

    Tnel bajo stock pile de pebbles - 320:Se termin el montaje de toda la ducteria, est

    pendiente el comisionamiento.

    Tnel Chancador primario (Area-210): Se termin el montaje de toda la ducteria, est

    pendiente el comisionamiento.

    Fajas de transferencia 1 y 2 (Area-220): Se termin el montaje de toda la ducteria,

    est pendiente el comisionamiento.

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    6/35

    HVAC PARA SALAS ELCTRICAS Y DE CONTROLCONSTRUIDAS EN TERRENO, DUCTOS DE VENTILACIN Y

    CAPTACIN DE POLVO

    Revisin: 0

    Fecha:03/10/15

    Pgina: 6INFORME SEMANAL

    IFS-50208056

    ORDEN DE CAMBIO CCO-003

    rea 931.- Instalacin de 02 louvers, incluido cambio de filtros.

    Edificio Oficina de Administracin.- Reubicacin de equipo HVAC.

    Edificio Oficina de Administracin.- Suministro e instalacin de sistema HVAC.

    Edificio de Centro de Salud.- Suministro e instalacin de sistema HVAC.

    Sala de Capacitacin.- Suministro e instalacin de sistema HVAC.

    Sala de Capacitacin y Bomberos.- Suministro e instalacin de sistema HVAC.

    Cocina Comedor.- Cambio de motor.

    Comisionado de las siguientes reas:

    COMISIONADO 0210-ERR-0001-TERMINADO

    COMISIONADO 0220-CVB-004- EN PROCESO

    COMISIONADO 0220-CVB-003- TERMINADO

    COMISIONADO 2132-ERR-003- PRESENTA RESTRICCIONES

    COMISIONADO 2132-ERR-001

    COMISIONADO 2133-ERR-0001- PRESENTA RESTRICCIONES

    COMISIONADO 4511-ERR-0001-TERMINADO

    COMISIONADO AREA 931-TERMINADO

    COMISIONADO 2132-ERR-0002

    COMISIONADO 0552-ERR-002

    COMISIONADO 0552-ERR-0003- PRESENTA RESTRICCIONES.

    COMISIONADO 0552-ERR-001

    COMISIONADO 2134-ERR-0001

    Instalacin de Ductos y Modificacin en Salas Elctricas reas: 0240, 0310, 0320,

    0330, 0370, 0391, 0420 y 0510:Se termin la instalacin de ductos en todas las reas y

    salas antes de la fecha indicada.

    Fecha final del proyecto:

    La nueva fecha fin del proyecto planteado sera el 27.11.15 referente a la orden de

    cambio CCO-05 segn las fechas de liberacin de las salas elctricas por parte de

    Bechtel, est pendiente la fecha de liberacin de las oficinas administrativas.

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    7/35

    HVAC PARA SALAS ELCTRICAS Y DE CONTROLCONSTRUIDAS EN TERRENO, DUCTOS DE VENTILACIN Y

    CAPTACIN DE POLVO

    Revisin: 0

    Fecha:03/10/15

    Pgina: 7INFORME SEMANAL

    IFS-50208056

    2.1.2. Histograma de Personal y Curva Ocupacional del Proyecto:

    En el anexo 02 se presenta el histograma de personal del proyecto, graficando el

    nmero de personal programado semanalmente VS el nmero de personal real.

    2.1.3.1. Curva de Ingeniera:

    Se han entregado la totalidad de los planos correspondientes a la CCO5.

    Curva de Procura:

    La procura total de equipos de CC-CAMP fue enviada a la fecha del 20.07.15.

    Curva de Construccin:

    Se est ingresando a las reas segn cronograma de fechas de liberacin

    entregado por Bechtel en las salas elctricas y a la espera de fecha de ingreso

    de las reas administrativas para el ingreso del personal de Saeg.

    2.1.3.4 Curva Global:

    El avance programado para la fecha de corte 03 de Octubre del 2015 de la

    orden CCO-005 global es de 50.5% y el avance ganado es de 63.5%, tal como

    se puede apreciar en la curva global (Ver anexo N06).

    2.1.3.5. Cuadro Resumen de Avance de Proyecto.

    SISTEMA HVACLINEA-BASE-2

    (04.09.15)Real

    FORECAST

    (19.08.15)

    DIFERENCIA

    REAL-LINEA

    BASE-2

    DIFERENCIA

    FORECAST

    % AVANCE SISTEMA HVAC

    CONTRACTUAL100% 100% 100% 0% 0%

    % AVANCE SISTEMA HVAC CC0-03 100% 89.4% 96.3% -10.6% -6.9% Atrasado porque las reas presentas restricciones

    % AVANCE SISTEMA HVAC CC0-04 100% 100% 100% 0% 0% El trabajo se culmin antes de lo planeado.

    % AVANCE SISTEMA HVAC CC0-05 50.5% 63.5% 0% 13% 63.5% Presenta adelanto del 13%.

    % AVANCE RESUMEN 87.6% 88.22% 96.3% 0.6% -8.1%

    Detallado por reas:

    Contractual: Falta definir las fechas de arranque de equipos para apoyar con el comisionamiento.

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    8/35

    HVAC PARA SALAS ELCTRICAS Y DE CONTROLCONSTRUIDAS EN TERRENO, DUCTOS DE VENTILACIN Y

    CAPTACIN DE POLVO

    Revisin: 0

    Fecha:03/10/15

    Pgina: 8INFORME SEMANAL

    IFS-50208056

    FACILITIES HH PARCIALESSEMANAL % PARCIALESSEMANAL % ACUMULADO FECHAS FIN PROPUESTA VAR.FECHATERMINO

    PROPUEST

    A POR

    INTERFERE

    NCIAS

    OBS

    AREAS EPCHH

    TOTALESPROG

    GANA

    DOPROG

    GANAD

    OPROG

    GANA

    DOPROG

    FORECAST-2 -

    24.10.15

    CONST/PR

    E-OPS

    240-VENTIL. COM 0.0 0,0 0.0 100% 100% 100% 100% 04-sep-15 16-sep-15 SAEG 265Area

    liberada.

    320 - VENTIL. COM 0.0 0,0 0.0 100% 100% 100% 100% 28-ago-15 16-sep-15 SAEG 262Area

    liberada.

    210 - COL.

    POLV.COM 0.0 0,0 0.0 0% 0% 0% 0%

    15-mar-

    1504-sep-15 SAEG 139

    Area

    liberada.

    220 TR N2 COM 0.0 0,0 0.0 0% 0% 0% 0%07-mar-

    1528-ago-15 SAEG 147

    Area

    liberada.

    220 TR N1 COM 0.0 0,0 0.0 0% 0% 0% 0%06-mar-

    1528-ago-15 SAEG 148

    Area

    liberada.

    210 - VENTIL. COM 0.0 0,0 0.0 0% 0% 0% 0% 21-feb-15 04-sep-15 SAEG 161Area

    liberada.

    Orden de Cambio-003:

    Item Facility DescripcinEspeciali

    dad%

    Avance

    Fechade

    Liberacin

    Fechade

    Trmino

    SAEG

    Restriccin Responsable

    1

    Sala-220-CVB-003

    Comisionamiento HVAC 100% 19-ago 01-sepEntrada de Saeg al rea el

    31-08-15.SAEG/Pre-Ops

    2 Entrega de rea HVAC 100% 01-sep 01-sep

    02 equipos daados, seenvi informe tcnico, Saeg

    est reparando lossistemas de refrigeracin a

    pedido de Bechtel.

    SAEG/Pre-Ops

    Item Facility DescripcinEspeciali

    dad%

    Avance

    Fechade

    Liberacin

    Fechade

    Trmino

    SAEG

    Restriccin Responsable

    1Sala-220-

    CVB-004

    Comisionamiento HVAC 95% 19-ago 31-agoEntrada de Saeg al rea el

    28-08-15.Bechtel/Pre-Ops

    2 Entrega de rea HVAC 0% 31-ago 31-ago Bechtel debe rebobinar elmotor del ventilador.

    Bechtel/Pre-Ops

    Item Facility DescripcinEspeciali

    dad%

    Avance

    Fechade

    Liberacin

    Fechade

    Trmino

    SAEG

    Restriccin Responsable

    1Sala-2132-ERR-001

    Comisionamiento HVAC 0% 14-oct 24-octPendiente liberacin por

    Pre- Ops P. CardozaCoordinara

    Bechtel/Pre-Ops

    2 Entrega de rea HVAC 0% 24-oct 24-octDepende de la liberacin

    de Area por parte deBechtel

    Bechtel/Pre-Ops

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    9/35

    HVAC PARA SALAS ELCTRICAS Y DE CONTROLCONSTRUIDAS EN TERRENO, DUCTOS DE VENTILACIN Y

    CAPTACIN DE POLVO

    Revisin: 0

    Fecha:03/10/15

    Pgina: 9INFORME SEMANAL

    IFS-50208056

    Item Facility Descripcin Especialidad

    %Avance

    Fecha

    deLiberac

    in

    Fecha

    deTrmino

    SAEG

    Restriccin Responsable

    1Sala-2132-ERR-003

    Comisionamiento HVAC 0% 19-ago 29-agoEntrada de Saeg al rea el

    28-08-15.SAEG/Pre-Ops

    2 Entrega de rea HVAC 0% 29-ago 29-agoFalta el sistema de

    control(Termostatos)Bechtel/Pre-Ops

    Item Facility DescripcinEspeciali

    dad%

    Avance

    Fechade

    Liberacin

    Fechade

    Trmino

    SAEG

    Restriccin Responsable

    1

    Sala-2133-ERR-001

    Comisionamiento HVAC 67% 19-ago 29-agoEntrada de Saeg al rea el

    04-09-15.SAEG/Pre-Ops

    2 Entrega de rea HVAC 0% 29-ago 29-ago 01 equipo bloqueado. Bechtel/Pre-Ops

    Item Facility DescripcinEspeciali

    dad%

    Avance

    Fechade

    Liberacin

    Fechade

    Trmino

    SAEG

    Restriccin Responsable

    1Sala-0552-ERR-003

    Comisionamiento HVAC 75% 01-sep 07-sepEntrada de Saeg al rea el

    06-09-15.SAEG/Pre-Ops

    2 Entrega de rea HVAC 0% 07-sep 07-sepEl transformador del motor

    est roto, Bechtel derepararlo.

    Bechtel/Pre-Ops

    Item Facility DescripcinEspeciali

    dad%

    Avance

    Fechade

    Liberacin

    Fechade

    TrminoSAEG

    Restriccin Responsable

    1Sala-4511-ERR-001

    Comisionamiento HVAC 100% 13-sep 19-sepPendiente liberacin por

    Pre-Ops P. CardozaCoordinara

    Bechtel/Pre-Ops

    2 Entrega de rea HVAC 100% 19-sep 19-sepDepende de la liberacin

    de rea por parte deBechtel.

    Bechtel/Pre-Ops

    Item Facility DescripcinEspeciali

    dad%

    Avance

    Fechade

    Liberacin

    Fechade

    Trmino

    SAEG

    Restriccin Responsable

    1

    Sala-2132-ERR-002

    Comisionamiento HVAC 0% 23-sep 29-sepPendiente liberacin por

    Pre-Ops P. Cardoza

    Coordinara

    Bechtel/Pre-Ops

    2 Entrega de rea HVAC 0% 29-sep 29-sepDepende de la liberacin

    de rea por parte deBechtel

    Bechtel/Pre-Ops

    Item Facility DescripcinEspeciali

    dad%

    Avance

    Fechade

    Liberacin

    Fechade

    Trmino

    SAEG

    Restriccin Responsable

    1Sala-0552-ERR-001

    Comisionamiento HVAC 0% 09-oct 15-octPendiente liberacin por

    Pre-Ops P. CardozaCoordinara

    Bechtel/Pre-Ops

    2 Entrega de rea HVAC 0% 15-oct 15-octDepende de la liberacin

    de rea por parte deBechtel

    Bechtel/Pre-Ops

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    10/35

    HVAC PARA SALAS ELCTRICAS Y DE CONTROLCONSTRUIDAS EN TERRENO, DUCTOS DE VENTILACIN Y

    CAPTACIN DE POLVO

    Revisin: 0

    Fecha:03/10/15

    Pgina: 10INFORME SEMANAL

    IFS-50208056

    Item Facility Descripcin Especialidad

    %Avance

    Fecha

    deLiberac

    in

    Fecha

    deTrmino

    SAEG

    Restriccin Responsable

    1Sala-0552-ERR-002

    Comisionamiento HVAC 0% 26-sep 02-octPendiente liberacin por

    Pre-Ops P. CardozaCoordinara

    Bechtel/Pre-Ops

    2 Entrega de rea HVAC 0% 02-oct 02-octDepende de la liberacin

    de rea por parte deBechtel

    Bechtel/Pre-Ops

    Item Facility DescripcinEspeciali

    dad%

    Avance

    Fechade

    Liberacin

    Fechade

    Trmino

    SAEG

    Restriccin Responsable

    1Sala-2134-ERR-001

    Comisionamiento HVAC 0% 09-oct 15-octPendiente liberacin por

    Pre-Ops P. CardozaCoordinara

    Bechtel/Pre-Ops

    2 Entrega de rea HVAC 0% 15-oct 15-octDepende de la liberacin

    de rea por parte deBechtel

    Bechtel/Pre-Ops

    3. CONSTRUCCIN:

    3.1. Actividades Ejecutadas y programadas del periodo siguiente:

    A continuacin se detalla las tareas ejecutadas en la semana que paso y las actividades

    programadas para la siguiente semana del 03 de Octubre al 10de Octubre del 2015

    4.1.1. Actividades ejecutadas en la semana pasada (26/09/15 al 03/10/15):

    Tnel 210 ventilacin; Tnel 210 coleccin de polvo; Torre de Transferencia 1 y 2:

    - Trabajos culminados de montaje, pendiente fechas de arranque de equipos para

    realizar el apoyo del comisionamiento a dichos equipos.

    Actividades programadas para la siguiente semana (03/10/15 10/10/15):

    RESTRICCIONES:

    Area 210, rea 220:Comisionamiento depende de las fechas de arranque de equipos

    por parte de BECHTEL.

    Orden de Cambio CCO-03:

    Las salas elctricas 0220-CVB-ERR-003 y 0220-CVB-ERR-004 presentan averas en

    parte de sus sistemas de enfriamiento ya se envi los respectivos informes tcnicos, a

    solicitud de Bechtel, Saeg est ejecutando la reparacin de esos equipos. La sala

    elctrica 2132-ERR-003 falta el sistema de control, sala elctrica 2133-ERR-001 falta

    desbloquear un equipo y la sala 552-ERR-003 el transformador del motor est roto

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    11/35

    HVAC PARA SALAS ELCTRICAS Y DE CONTROLCONSTRUIDAS EN TERRENO, DUCTOS DE VENTILACIN Y

    CAPTACIN DE POLVO

    Revisin: 0

    Fecha:03/10/15

    Pgina: 11INFORME SEMANAL

    IFS-50208056

    Bechtel debe repararlo. Se avanzara el comisionado segn las fechas de liberacin

    entregadas por Bechtel. Tambin se empez con el trazado, corte y doblez de ductos

    galvanizados del rea 0430- y rea 392 Reactivos referente a la CCO-005.

    Los trabajos se paralizaron el lunes 28.09.15 a las 4 p.m hasta el viernes 02.10.15 por el

    pro que organizo la comunidad.

    4. CUADRO DE PROCURA:

    Ver anexo 7.5. CUADRO DE CANTIDADES:

    Ver anexo 8.

    6. REPORTE FOTOGRFICO :

    Ver anexo 9.

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    12/35

    HVAC PARA SALAS ELCTRICAS Y DE CONTROLCONSTRUIDAS EN TERRENO, DUCTOS DE VENTILACIN Y

    CAPTACIN DE POLVO

    Revisin: 0

    Fecha:03/10/15

    Pgina: 12INFORME SEMANAL

    IFS-50208056

    ANEXO 1

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    13/35

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    14/35

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    15/35

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    16/35

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    17/35

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    18/35

    HVAC PARA SALAS ELCTRICAS Y DE CONTROLCONSTRUIDAS EN TERRENO, DUCTOS DE VENTILACIN Y

    CAPTACIN DE POLVO

    Revisin: 0

    Fecha:03/10/15

    Pgina: 13INFORME SEMANAL

    IFS-50208056

    ANEXO 2

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    19/35

    03-

    Jan

    10-

    Jan

    17-

    Jan

    24-

    Jan

    31-

    Jan 07-feb 14-feb 21-feb 28-feb 07-mar 14-mar 21-mar 28-mar 04-abr 11-abr 18-abr 25-abr 02-may 09-may 16-may 23-may 30-may 06-jun 13-jun 20-jun 27-jun 04-jul 11-ju l 18-ju l 25-ju l 01-ago 08-ago 15-ago 22-ago 29-ago 05-sep 12-sep 19-sep 26-sep 03-oct 10-oc t 17-oc t 24-oc t

    HH PROG. 0 0 0 11 12 34 45 34 15 15 15 15 15 15 13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    HH ACTUAL 15 25 29 29 21 2 1 24 26 2 2 14 1 8 1 4 2 0 1 5 1 7 14 1 4 19 10 11 11 9 1 0 5 9 1 0 9 1 7 1 6 1 8 1 4 3 1 1 1 3 6 5 4 4 0 0 0

    FORECAST 0 0 0 0 0 0 0 0 0 0 0 18 18 19 15 15 17 1 5 1 2 8 6 9 9 9 12 16 16 14 16 14 20 3 1 1 1 3 6 3 3 3 3 3 3

    SE HAN CONSIDERADOS LOS DATOS A PARTIR DEL 2015

    MARZO 15

    HISTOGRAMA DE PERSONAL - CONSTRUCCION

    PROYECTO SISTEMA HVAC, DUCTOS DE VENTILACIN Y COLECCIN DE POLVO

    MAYO 16 JUNIO15ABRIL15ENERO 15 FEBRERO 15CIEMBRE 1 JULIO 15 AGOSTO 15 SEPTIEMBRE 15 OCTUBRE 15

    0

    5

    10

    15

    20

    25

    30

    35

    40

    45

    50

    0 3- Ja n 1 0- Ja n 1 7- Ja n 2 4- Ja n 3 1- Ja n 0 7- fe b 1 4- fe b 2 1- fe b 2 8- fe b 0 7- ma r 1 4- ma r 2 1- ma r 2 8- ma r 0 4- ab r 1 1- ab r 1 8- ab r 2 5- ab r 0 2- ma y 0 9- ma y 1 6- ma y 2 3- ma y 3 0- ma y 0 6- ju n 1 3- ju n 2 0- ju n 2 7- ju n 0 4- ju l 1 1- ju l 1 8- ju l 2 5- ju l 0 1- ag o 0 8- ag o 1 5- ag o 2 2- ag o 2 9- ag o 0 5- se p 1 2- se p 1 9- se p 2 6- se p 0 3- oc t 1 0- oc t 1 7- oc t 2 4- oc t

    NUMERODEPERSONAL-MOD

    SEMANAS 2015

    HH PROG. HH ACTUAL FORECAST

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    20/35

    HVAC PARA SALAS ELCTRICAS Y DE CONTROLCONSTRUIDAS EN TERRENO, DUCTOS DE VENTILACIN Y

    CAPTACIN DE POLVO

    Revisin: 0

    Fecha:03/10/15

    Pgina: 14INFORME SEMANAL

    IFS-50208056

    ANEXO 3

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    21/35

    DEL 24/08/2015

    AL 03/10/2015

    ING

    22-ago 29-ago 05-sep 12-sep 19-sep 26-sep 03-oct 10-oct 17-oct 24-oct 31-oct 07-nov 14-nov 21-nov 28-nov

    S1 S2 S3 S4 S5 S6 S7 S8 S9 S10 S11 S12 S13 S14 S15

    HH PROG. 66 80 80 60 30 0 0 0 0 0 0 0 0 0 0 316

    HH PROG. ACUM. 66 146 226 286 316 316 316 316 316 316 316 316 316 316 316

    % PROG. 21% 25% 25% 19% 9% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

    % PROG. ACUM. 20.9% 46.2% 71.5% 90.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%

    HH ACTUAL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    HH ACTUAL ACUM. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    % ACTUAL 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

    % ACTUAL ACUM. 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

    HH GANADAS 66 80 80 55 20 0 0 0 0 0 0 0 0 0 0

    HH GANADAS ACUM. 66 146 226 281 301 301 301 301 301 301 301 301 301 301 301

    % GANADAS 21% 25% 25% 17% 6% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

    % GANADAS ACUM. 20.9% 46.2% 71.5% 88.9% 95.3% 95.3% 95.3% 95.3% 95.3% 95.3% 95.3% 95.3% 95.3% 95.3% 95.3%

    FORECAST 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    HH GANADAS ACUM. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    % FORECAST 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

    % FORECAST ACUM. 0 .0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

    NOVIEMBRE 2015

    Location: Cusco

    Country: Per

    AGOSTO 2015 SEPTIEMBRE 2015 OCTUBRE 2015

    PROYECTO LAS BAMBAS Client: Bechtel

    HVAC SISTEMA DE VENTILACIN - COLECCIN DE POLVO CCO-05 Project: Las Bambas

    CURVA INGENIERIA - HH CCO-005 Proj. No.: 25635-220-HC1-MEEH-00001

    20.9%

    46.2%

    71.5%

    90.5%

    100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%

    20.9%

    46.2%

    71.5%

    88.9%

    95.3% 95.3% 95.3% 95.3% 95.3% 95.3% 95.3% 95.3% 95.3% 95.3% 95.3%

    0.0%

    10.0%

    20.0%

    30.0%

    40.0%

    50.0%

    60.0%

    70.0%

    80.0%

    90.0%

    100.0%

    22/08/15

    29/08/15

    05/09/15

    12/09/15

    19/09/15

    26/09/15

    03/10/15

    10/10/15

    17/10/15

    24/10/15

    31/10/15

    07/11/15

    14/11/15

    21/11/15

    28/11/15

    %A

    VANCE

    SEMANAS

    HH PROG HH GAN

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    22/35

    HVAC PARA SALAS ELCTRICAS Y DE CONTROLCONSTRUIDAS EN TERRENO, DUCTOS DE VENTILACIN Y

    CAPTACIN DE POLVO

    Revisin: 0

    Fecha:03/10/15

    Pgina: 15INFORME SEMANAL

    IFS-50208056

    ANEXO 4

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    23/35

    DEL 24/08/2015AL 03/10/2015

    PRO

    22-ago 29-ago 05-sep 12-sep 19-sep 26-sep 03-oct 10-oct 17-oct 24-oct 31-oct 07-nov 14-nov 21-nov 28-nov

    S1 S2 S3 S4 S5 S6 S7 S8 S9 S10 S11 S12 S13 S14 S15HH PROG. 20 52 52 112 112 102 52 52 52 52 52 52 0 0 0 762HH PROG. ACUM. 20 72 124 236 348 450 502 554 606 658 710 762 762 762 762

    % PROG. 3% 7% 7% 15% 15% 13% 7% 7% 7% 7% 7% 7% 0% 0% 0%

    % PROG. ACUM. 2.6% 9.4% 16.3% 31.0% 45.7% 59.1% 65.9% 72.7% 79.5% 86.4% 93.2% 100.0% 100.0% 100.0% 100.0%

    HH ACTUAL 20 52 52 92 102 92 0 0 0 0 0 0 0 0 0

    HH ACTUAL ACUM. 20 72 124 216 318 410 410 410 410 410 410 410 410 410 410

    % ACTUAL 3% 7% 7% 12% 13% 12% 0% 0% 0% 0% 0% 0% 0% 0% 0%

    % ACTUAL ACUM. 2.6% 9.4% 16.3% 28.3% 41.7% 53.8% 53.8% 53.8% 53.8% 53.8% 53.8% 53.8% 53.8% 53.8% 53.8%

    HH GANADAS 20 52 52 92 102 92 0 0 0 0 0 0 0 0 0

    HH GANADAS ACUM. 20 72 124 216 318 410 410 410 410 410 410 410 410 410 410

    % GANADAS 3% 7% 7% 12% 13% 12% 0% 0% 0% 0% 0% 0% 0% 0% 0%

    % GANADAS ACUM. 2.6% 9.4% 16.3% 28.3% 41.7% 53.8% 53.8% 53.8% 53.8% 53.8% 53.8% 53.8% 53.8% 53.8% 53.8%

    FORECAST 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    HH GANADAS ACUM. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    % FORECAST 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

    % FORECAST ACUM. 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

    Location: CuscoCountry: Per

    AGOSTO 2015 SEPTIEMBRE 2015 OCTUBRE 2015 NOVIEMBRE 2015

    PROYECTO LAS BAMBAS Client: BechtelHVAC SI STEM A DE VENTI LACI N - COLECCI N DE POLVO CCO- 05 Pr oj ect: Las Bam bas

    CURVA PROCURA - HH CCO-005 Proj. No.: 25635-220-HC1-MEEH-00001

    2.6%

    9.4%

    16.3%

    31.0%

    45.7%

    59.1%

    65.9%

    72.7%

    79.5%

    86.4%

    93.2%

    100.0% 100.0% 100.0% 100.0%

    2.6%

    9.4%

    16.3%

    28.3%

    41.7%

    53.8% 53.8% 53.8% 53.8% 53.8% 53.8% 53.8% 53.8% 53.8% 53.8%

    0.0%

    10.0%

    20.0%

    30.0%

    40.0%

    50.0%

    60.0%

    70.0%

    80.0%

    90.0%

    100.0%

    22/08/15

    29/08/15

    05/09/15

    12/09/15

    19/09/15

    26/09/15

    03/10/15

    10/10/15

    17/10/15

    24/10/15

    31/10/15

    07/11/15

    14/11/15

    21/11/15

    28/11/15

    %A

    VANCE

    SEMANAS

    HH PRO

    HH GAN

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    24/35

    HVAC PARA SALAS ELCTRICAS Y DE CONTROLCONSTRUIDAS EN TERRENO, DUCTOS DE VENTILACIN Y

    CAPTACIN DE POLVO

    Revisin: 0

    Fecha:03/10/15

    Pgina: 16INFORME SEMANAL

    IFS-50208056

    ANEXO 5

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    25/35

    DEL 24/08/2015

    AL 03/10/2015

    CONS

    22-ago 29-ago 05-sep 12-sep 19-sep 26-sep 03-oct 10-oct 17-oct 24-oct 31-oct 07-nov 14-nov 21-nov 28-nov

    S1 S2 S3 S4 S5 S6 S7 S8 S9 S10 S11 S12 S13 S14 S15

    HH PROG. 0 0 0 0 0 80 440 420 100 0 0 30 200 100 0 1370

    HH PROG. ACUM. 0 0 0 0 0 80 520 940 1040 1040 1040 1070 1270 1370 1370

    % PROG. 0% 0% 0% 0% 0% 6% 32% 31% 7% 0% 0% 2% 15% 7% 0%

    % PROG. ACUM. 0.0% 0.0% 0.0% 0.0% 0.0% 5.8% 38.0% 68.6% 75.9% 75.9% 75.9% 78.1% 92.7% 100.0% 100.0%

    HH ACTUAL 0 0 0 160 200 290 120 0 0 0 0 0 0 0 0

    HH ACTUAL ACUM. 0 0 0 160 360 650 770 770 770 770 770 770 770 770 770

    % ACTUAL 0% 0% 0% 12% 15% 21% 9% 0% 0% 0% 0% 0% 0% 0% 0%

    % ACTUAL ACUM. 0.0% 0.0% 0.0% 11.7% 26.3% 47.4% 56.2% 56.2% 56.2% 56.2% 56.2% 56.2% 56.2% 56.2% 56.2%

    HH GANADAS 0 0 0 160 200 290 320 0 0 0 0 0 0 0 0

    HH GANADAS ACUM. 0 0 0 160 360 650 970 970 970 970 970 970 970 970 970

    % GANADAS 0% 0% 0% 12% 15% 21% 23% 0% 0% 0% 0% 0% 0% 0% 0%

    % GANADAS ACUM. 0 .0% 0.0% 0.0% 11.7% 26.3% 47.4% 70.8% 70.8% 70.8% 70.8% 70.8% 70.8% 70.8% 70.8% 70.8%

    FORECAST 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    HH GANADAS ACUM. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    % FORECAST 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

    % FORECAST ACUM. 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

    PROYECTO LAS BAMBAS Client: Bechtel

    H VAC S IS TE MA DE V EN TI LACI N - CO LE CCI N D E P OLV O C CO -0 5 P ro je ct : L as B am ba s

    CURVA CONSTRUCCION - HH CCO-005 Proj. No.: 25635-220-HC1-MEEH-00001

    Location: Cusco

    Country: Per

    AGOSTO 2015 SEPTIEMBRE 2015 OCTUBRE 2015 NOVIEMBRE 2015

    0.0% 0.0% 0.0% 0.0% 0.0%

    5.8%

    38.0%

    68.6%

    75.9% 75.9% 75.9%

    78.1%

    92.7%

    100.0% 100.0%

    0.0% 0.0% 0.0%

    11.7%

    26.3%

    47.4%

    70.8% 70.8% 70.8% 70.8% 70.8% 70.8% 70.8% 70.8% 70.8%

    0.0%

    10.0%

    20.0%

    30.0%

    40.0%

    50.0%

    60.0%

    70.0%

    80.0%

    90.0%

    100.0%

    22/08/15

    29/08/15

    05/09/15

    12/09/15

    19/09/15

    26/09/15

    03/10/15

    10/10/15

    17/10/15

    24/10/15

    31/10/15

    07/11/15

    14/11/15

    21/11/15

    28/11/15

    %A

    VANCE

    SEMANAS

    HH PRO

    HH GAN

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    26/35

    HVAC PARA SALAS ELCTRICAS Y DE CONTROLCONSTRUIDAS EN TERRENO, DUCTOS DE VENTILACIN Y

    CAPTACIN DE POLVO

    Revisin: 0

    Fecha:03/10/15

    Pgina: 17INFORME SEMANAL

    IFS-50208056

    ANEXO 6

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    27/35

    Proj. No.: 25635-220-HC1-MEEH-00001

    DEL 24/08/2015AL 03/10/2015

    22-ago 29-ago 05-sep 12-sep 19-sep 26-sep 03-oct 10-oct 17-oct 24-oct 31-oct 07-nov 14-nov 21-nov 28-nov

    S1 S2 S3 S4 S5 S6 S7 S8 S9 S10 S11 S12 S13 S14 S15

    HH PROG. 86 132 132 172 142 182 492 502 2 22 52 52 82 200 150 50 2648HH PROG. ACUM. 86 218 350 522 664 846 1338 1840 2062 2114 2166 2248 2448 2598 2648

    % PROG. 3% 5% 5% 6% 5% 7% 19% 19% 8% 2% 2% 3% 8% 6% 2%

    % PROG. ACUM. 3.2% 8.2% 13.2% 19.7% 25.1% 31.9% 50.5% 69.5% 77.9% 79.8% 81.8% 84.9% 9 2.4% 98.1% 100.0%

    HH ACTUAL 46 112 152 312 322 382 120 0 0 0 0 0 0 0 0

    HH ACTUAL ACUM. 46 158 310 622 944 1326 1446 1446 1446 1446 1446 1446 1446 1446 1446

    % ACTUAL 2% 4% 6% 12% 12% 14% 5% 0% 0% 0% 0% 0% 0 % 0% 0%

    % ACTUAL ACUM. 1.7% 6.0% 11.7% 23.5% 35.6% 50.1% 54.6% 54.6% 54.6% 54.6% 54.6% 54.6% 5 4.6% 54.6% 54.6%

    HH GANADAS 86 132 132 307 322 382 320 0 0 0 0 0 0 0 0

    HH GANADAS ACUM. 86 218 350 657 979 1361 1681 1681 1681 1681 1681 1681 1 681 1681 1681

    % GANADAS 3% 5% 5% 12% 12% 14% 12% 0% 0% 0% 0% 0% 0 % 0% 0%

    % GANADAS ACUM. 3.2% 8.2% 13.2% 24.8% 37.0% 51.4% 63.5% 63.5% 63.5% 63.5% 63.5% 63.5% 6 3.5% 63.5% 63.5%

    FORECAST 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    HH GANADAS ACUM. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    % FORECAST 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

    % FORECAST ACUM. 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

    PROYECTO LAS BAMBASHVAC SISTEMA DE VENTILACIN - COLECCIN DE POLVO

    CURVA GLOBAL - HH CCO-005Location: Cusco

    Client: BechtelProject: Las Bambas

    Country: Per

    AGOSTO 2015 SEPTIEMBRE 2015 OCTUBRE 2015 NOVIEMBRE 2015

    3.2%

    8.2%

    13.2%

    19.7%

    25.1%

    31.9%

    50.5%

    69.5%

    77.9%79.8%

    81.8%84.9%

    92.4%

    98.1%100.0%

    3.2%

    8.2%

    13.2%

    24.8%

    37.0%

    51.4%

    63.5% 63.5% 63.5% 63.5% 63.5% 63.5% 63.5% 63.5% 63.5%

    0.0%

    10.0%

    20.0%

    30.0%

    40.0%

    50.0%

    60.0%

    70.0%

    80.0%

    90.0%

    100.0%

    22/08/15

    29/08/15

    05/09/15

    12/09/15

    19/09/15

    26/09/15

    03/10/15

    10/10/15

    17/10/15

    24/10/15

    31/10/15

    07/11/15

    14/11/15

    21/11/15

    28/11/15

    %A

    VANCE

    SEMANAS

    HH PROHH GAN

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    28/35

    DEL 29-agoAL 03-oct

    2 1- ma r 2 8- ma r 0 4- ab r 1 1- ab r 1 8- ab r 2 5 - ab r 0 2 -m ay 0 9 -m ay 1 6 -m ay 2 3 -m ay 3 0 -m ay 0 6 - ju n 1 3- ju n 2 0 -j un 2 7- ju n 0 4 -j ul 1 1- ju l 1 8- ju l 2 5- ju l 0 1- ag o 0 8 - ag o 1 5- ag o 2 2 -a go 2 9- ag o 0 5- se p 1 2 -s e p 1 9- se p 2 6 -s e p 0 3- oc t 1 0 -o ct 1 7- oc t 2 4 -o ct 3 1- oc t 0 7- no v 1 4 -n ov 2 1- no v 2 8 -n ov

    S1 S2 S3 S4 S5 S6 S7 S8 S9 S10 S11 S 12 S 13 S14 S15 S16 S17 S18 S19 S20 S21 S22 S23 S24 S25 S26 S27 S28 S29 S30 S31 S32 S33 S34 S35 S36 S37HHPROG. 0 330 330 330 330 1050 1050 900 1120 1230 920 2100 1280 1530 1470 630 700 540 420 420 420 360 210 210 0 100 0 0 0 0 0 0 0 0 0 0 0 17980HHPROG. ACUM. 0 330 660 990 1320 2370 3420 4320 5440 6670 7590 9690 10970 12500 13970 14600 15300 15840 16260 16680 17100 17460 17670 17880 17880 17980 17980 17980 17980 17980 17980 17980 17980 17980 17980 17980 17980

    %PROG. 0% 2% 2% 2% 2% 6% 6% 5% 6% 7% 5% 12% 7% 9% 8% 4% 4% 3% 2% 2% 2% 2% 1% 1% 0% 0.6% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

    %PROG. ACUM. 0 .0 % 1 .8 % 3 .7 % 5 .5 % 7 .3 % 1 3. 2% 1 9. 0% 2 4. 0% 3 0. 3% 3 7. 1% 4 2. 2% 5 3. 9% 6 1. 0% 6 9. 5% 7 7. 7% 8 1. 2% 8 5. 1% 8 8. 1% 9 0. 4% 9 2. 8% 9 5. 1% 9 7. 1% 9 8. 3% 9 9. 4% 9 9. 4% 1 00 .0 % 1 00 .0 % 1 00 .0 % 1 00 .0 % 1 00 .0 % 1 00 .0 % 1 00 .0 % 1 00 .0 % 1 00 .0 % 1 00 .0 % 1 00 .0 % 1 00 .0 %

    HHACTUAL 0 0 0 0 0 1140 1140 990 1210 1260 1330 1500 1500 1320 1470 610 490 330 210 210 210 150 70 10 74 100 0 0 0 0 0 0 0 0 0 0 0

    HHACTUALACUM. 0 0 0 0 0 1140 2280 3270 4480 5740 7070 8570 10070 11390 12860 13470 13960 14290 14500 14710 14920 15070 15140 15150 15224 15324 15324 15324 15324 15324 15324 15324 15324 15324 15324 15324 15324

    %ACTUAL 0% 0% 0% 0% 0% 6% 6% 6% 7% 7% 7% 8% 8% 7% 8% 3% 3% 2% 1% 1% 1% 1% 0% 0.1% 0% 0.6% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

    %ACTUALACUM. 0 .0 % 0 .0 % 0 .0 % 0 .0 % 0 .0 % 6 .3 % 1 2 .7 % 1 8. 2% 2 4 .9 % 3 1. 9% 3 9. 3% 4 7 .7 % 5 6. 0% 6 3. 3% 7 1. 5% 7 4. 9% 7 7. 6% 7 9. 5% 8 0. 6% 8 1. 8% 8 3. 0% 8 3. 8% 8 4. 2% 8 4. 3% 8 4. 7% 8 5. 2% 8 5. 2% 8 5. 2% 8 5. 2% 8 5. 2% 8 5. 2% 8 5. 2% 8 5. 2% 8 5. 2% 8 5. 2% 8 5. 2% 8 5. 2%

    HHGANADAS 0 0 0 0 0 1140 1140 990 1210 1260 1331 1500 1500 1320 1470 610 490 450 330 330 0 0 0 43 299 350 295 15 0 0 0 0 0 0 0 0 0

    HHGANADAS ACUM. 0 0 0 0 0 1140 2280 3270 4480 5740 7071 8571 10071 11391 12861 13471 13961 14411 14741 15071 15071 15071 15071 15114 15413 15763 16058 16073 16073 16073 16073 16073 16073 16073 16073 16073 16073

    %GANADAS 0% 0% 0% 0% 0% 6% 6% 6% 7% 7% 7% 8% 8% 7% 8% 3% 3% 3% 2% 2% 0% 0% 0% 0.2% 2% 1.9% 2% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

    %GANADAS ACUM. 0 .0 % 0 .0 % 0 .0 % 0 .0 % 0 .0 % 6 .3 % 1 2 .7 % 1 8. 2% 2 4 .9 % 3 1. 9% 3 9. 3% 4 7 .7 % 5 6. 0% 6 3. 4% 7 1. 5% 7 4. 9% 7 7. 6% 8 0. 2% 8 2. 0% 8 3. 8% 8 3. 8% 8 3. 8% 8 3. 8% 8 4. 1% 8 5. 7% 8 7. 7% 8 9. 3% 8 9. 4% 8 9. 4% 8 9. 4% 8 9. 4% 8 9. 4% 8 9. 4% 8 9. 4% 8 9. 4% 8 9. 4% 8 9. 4%

    FORECAST 0 830 200 250 480 360 130 0 220 210 210 210 0 0 0 0

    HHGANADAS ACUM. 0 830 1030 1280 1760 2120 2250 2250 2470 2680 2890 2680 2680 2890 2680 2680

    %FORECAST 0% 5% 1% 1% 3% 2% 1% 0% 1% 1% 1% 1% 0% 0% 0% 0%

    %FORECASTACUM. 8 3. 8% 8 8. 4% 8 9. 5% 9 0. 9% 9 3. 6% 9 5. 6% 9 6. 3% 9 6. 3% 9 7. 6% 9 8. 7% 9 9. 9% 1 01 .1 % 1 01 .1 % 1 01 .1 % 1 01 .1 % 1 01 .1 %

    PROYECTO LAS BAMBASHVAC SISTEMA DE VENTILACIN - COLECCIN DE POLVO CCO-003

    CURVA GLOBAL - HH Proj.No.: 25635-220-HC1-MEEH-00001Project: Las BambasClient: Bechtel

    OCTUBRE 2015 NOVIEM BRE 2015

    Location: CuscoCountry: Per

    AGOST O2015 SETIEM BRE 2015MARZO 2015 ABRIL 2015 MAYO 2015 JUNIO 2015 JULIO 2015

    0.0%1.8%

    3.7%5.5%

    7.3%

    13.2%

    19.0%

    24.0%

    30.3%

    37.1%

    42.2%

    53.9%

    61.0%

    69.5%

    77.7%

    81.2%

    85.1%

    88.1%90.4%

    92.8%95.1%

    97.1%98.3%

    9 9. 4% 9 9. 4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%

    0. 0% 0 .0% 0. 0% 0. 0% 0 .0%

    6.3%

    12.7%

    18.2%

    24.9%

    31.9%

    39.3%

    47.7%

    56.0%

    63.4%

    71.5%

    74.9%

    77.6%80.2%

    82.0%83.8% 83.8% 83.8% 83.8% 84.1%

    85.7%87.7%

    89.3% 8 9 .4 % 8 9.4 % 8 9 .4 % 8 9 .4 % 8 9 .4 % 8 9 .4 % 8 9 .4 % 8 9.4 % 8 9 .4 % 8 9 .4 %

    83.8%

    88.4% 89.5%90.9%

    93.6%

    95.6% 96.3% 96.3%97.6% 98.7% 99.9%

    0.0%

    10.0%

    20.0%

    30.0%

    40.0%

    50.0%

    60.0%

    70.0%

    80.0%

    90.0%

    100.0%

    21/03/15

    28/03/15

    04/04/15

    11/04/15

    18/04/15

    25/04/15

    02/05/15

    09/05/15

    16/05/15

    23/05/15

    30/05/15

    06/06/15

    13/06/15

    20/06/15

    27/06/15

    04/07/15

    11/07/15

    18/07/15

    25/07/15

    01/08/15

    08/08/15

    15/08/15

    22/08/15

    29/08/15

    05/09/15

    12/09/15

    19/09/15

    26/09/15

    03/10/15

    10/10/15

    17/10/15

    24/10/15

    31/10/15

    07/11/15

    14/11/15

    21/11/15

    28/11/15

    %A

    VANCE

    SEMANAS

    HHPRO

    HH GAN

    FORECAST

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    29/35

    HVAC PARA SALAS ELCTRICAS Y DE CONTROLCONSTRUIDAS EN TERRENO, DUCTOS DE VENTILACIN Y

    CAPTACIN DE POLVO

    Revisin: 0

    Fecha:03/10/15

    Pgina: 18INFORME SEMANAL

    IFS-50208056

    ANEXO 7

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    30/35

    SISTEMA HVAC, DUCTOS DE VENTILACIN Y COLECCIN DE POLVO

    FECHA: 03/10/15

    1.0 AREA 4511 - CENTRO DE SALUD 1 100%

    1.01 Equipo de Aire Acondicionado 1 unid BARD (USA) W24A1-C04 13/07/2015 EN OBRA 1.00 15/08/2015 100%

    Equipos en obra,

    falta fecha de

    liberacion de area.

    2.0 AREA 4511 - OFICINAS ADMINISTRATIVAS 1 100%

    2.01 Equipo de aire acondicionado de Presicion 1 unid DATA AIRE (USA)DAPA-0512-

    CO/DRCU-051213/07/2015 EN OBRA 1.00 15/08/2015 100%

    Equipos en obra,

    falta fecha de

    liberacion de area.

    3.0 AREA 4511 - SALA DE CAPACITACION Y BOMBEROS 9919 100.00%

    3.01 Equipo de Aire Acondicionado 2 unid YORK BHQ-060 13/07/2015 EN OBRA 2.00 15/08/2015 100%

    Equipos en obra,

    falta fecha de

    liberacion de area.

    3.02 Equipo de Aire Acondicionado 1 unid BARD (USA) W24A1-C0Z 13/07/2015 EN OBRA 1.00 15/08/2015 100%

    Equipos en obra,

    falta fecha de

    liberacion de area.

    3.03 Extractor Centrifugo de Servicios Higenicos 1 2 unid GREENHECK (USA) CW-085-D 13/07/2015 EN OBRA 2.00 15/08/2015 100%

    Equipos en obra,

    falta fecha de

    liberacion de area.

    3.04 ExtractoreCentrifugo de Servicios Higenicos 2 4 unid GREENHECK (USA) CW-065-D 13/07/2015 EN OBRA 4.00 15/08/2015 100%

    Equipos en obra,

    falta fecha de

    liberacion de area.

    3.05 Ductos de plancha Galvanizada de F G 5350 kg 29/06/2015 EN OBRA 5350.00 15/08/2015 100%

    Material en obra,

    falta fecha de

    liberacion de area.

    3.06 Rejillas (suministro, pared, retorno, aire fresco,extraccion) 4560 in2 29/06/2015 EN OBRA 4560.00 15/08/2015 100%

    Material en obra,

    falta fecha de

    liberacion de area.

    4.0 SALA DE CAPACITACION CAMPAMENTO CRUSHER CONVEYOR 100.00%

    4.01 Equipo de Aire Acondicionado Paquete - Heat Pump 2 unidBARD (USA) o

    similar YORKPH13602-B 13/07/2015 EN OBRA 2.00 15/08/2015 100%

    Equipos en obra,

    falta fecha de

    liberacion de area.

    4.04 Ductos de plancha Galvanizada de F G 6700 kg 29/06/2015 EN OBRA 6700.00 15/08/2015 100%

    Material en obra,

    falta fecha de

    liberacion de area.

    4.05 Rejillas (suministro, pared, retorno, aire fresco,extraccion) 3962 in2 29/06/2015 EN OBRA 3962.00 15/08/2015 100%

    Material en obra,

    falta fecha de

    liberacion de area.

    5.0 AREA DE REACTIVOS-392 95.00%

    5.01 Fabricacion de ductos y soportes en ASTM-A36 50 kg SAEG PERU 28/09/2015 50.00 28/09/2015 90%Materiales en

    camino.

    5.02 Fabricacion de ductos galvanizados 100 kg SAEG PERU 28/09/2015 100.00 28/09/2015 100% Materiales en obra.

    6.0 SALA ELECTRICA-430 45.00%

    6.01 Fabricacion de ductos galvanizados 100 kg SAEG PERU 25/09/2015 1.00 13/09/2015 90% Materiales en obra.

    6.02 Fabricacion de soportes de ASTM-A36 y accesorios 20 kg SAEG PERU 25/09/2015 1.00 28/09/2015 90%

    Materiales en

    camino.

    6.03 Fabricacion de tablero electico de fuerza y control 1 und SAEG PERU 03/10/2015 1.00 03/10/2015 0%Materiales en

    camino.

    6.04 Equipo colector de polvo 1 und GREENHECK (USA) 06/11/2015 1.00 06/11/2015 0%Materiales en

    camino.

    N Item Cant. Unid. EstatusProveedor ModeloFecha

    en Lima

    FechaRequeridaen Obra

    Fecha enobra

    % Complete

    ESTATUS DE COMPRA Y ENTREGA DE EQUIPOS Y MATERIALES

    ComentariosCant en

    Obra

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    31/35

    HVAC PARA SALAS ELCTRICAS Y DE CONTROLCONSTRUIDAS EN TERRENO, DUCTOS DE VENTILACIN Y

    CAPTACIN DE POLVO

    Revisin: 0

    Fecha:03/10/15

    Pgina: 19INFORME SEMANAL

    IFS-50208056

    ANEXO 8

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    32/35

    CUADRO DE AVANCE - REPORTE DE CANTIDADES

    OBRA: HVACSistema de Venti lacin&Coleccinde polvo

    F EC HA : s b ad o, 0 3 de o ct ub re d e 20 15

    ITEM DESCRIPCION UNID QTY. TOTALMaterial en

    Obra

    Instalacionde

    SoporteriaPre Armado Montaje

    Ajustede

    pernos

    ForradoyEnchaquetad

    oProtocolizado PunchList

    Equipos enObra

    Trazadoyubicacinde

    anclajes

    Trasladoa lazona demontaje

    Colocacinenposicinfinal

    Instalaciondetuberia conduity

    cableado

    ConexionadoElectrico

    Pruebas defuncionamiento

    Protocolos

    PunchList

    SISTEMADE HVAC, DUCTOS DE VENTILACIONY COLECCIONDE POLVO 20% 10% 20% 30% 8% 5% 5.0% 2.5% 20% 10% 10% 5% 23% 20% 5% 5.0% 2.5% % Kg o und % Kg o und % Kg o und

    1 REA 931

    1.1 Ductos

    1.1.1 Ductos, Dampers, Piezas Especiales Kg 5250 0% 0% 0% 0% 0% 0% 0% 0% 100% 5250 0% 0 100% 5250

    1.2 Equipos

    1.2.1 Unidad de aire acondicionado und 1 0% 0% 0% 0% 0% 0% 0% 0% 0% 100% 1 0 % 0 100% 1

    1.2.2 Colector de Polvo und 2 0% 0% 0% 0% 0% 0% 0% 0% 0% 100% 2 0% 0 100% 2

    1.2.3 Ventilador Centrifugo und 2 0% 0% 0% 0% 0% 0% 0% 0% 0% 100% 2 0% 0 100% 2

    1.2.4 Compresor und 2 0% 0% 0 % 0% 0% 0% 0% 0% 0% 100% 2 0% 0 100% 2

    1.2.5 Calefactores und 4 0% 0% 0% 0% 0% 0% 0% 0% 0% 100% 4 0% 0 100% 4

    2 ARE A31 0-E RR- 00 1

    2.1 Ductos

    2.1.1 Ductos, Dampers, Piezas Especiales Kg 22500 0% 0 % 0 % 0% 0% 0% 0% 0% 100% 22500 0% 0 100% 22500

    2.2 Equipos

    2.2.1 Unidad de aire acondicionado und 3 0% 0% 0% 0% 0% 0% 0% 0% 0% 100% 3.0 0% 0.0 100% 3.0

    2.2.2 Colector de Polvo und 1 0% 0% 0% 0 % 0% 0% 0% 0% 0% 100% 1.0 0% 0 100% 1.0

    2.2.3 Ventilador Centrifugo und 1 0% 0% 0% 0 % 0% 0% 0% 0% 0% 100% 1.0 0% 0 100% 1.0

    3 ARE A31 0-E RR- 00 2

    3.1 Ductos

    3.1.1 Ductos, Dampers, Piezas Especiales Kg 7750 0% 0% 0% 0% 0% 0% 0% 0% 100% 7750 0% 0 100% 7750

    3.2 Equipos

    3.2.1 Unidad de aire acondicionado und 3 0% 0% 0% 0% 0% 0% 0% 0% 0% 100% 3.00 0% 0.0 100% 3.0

    3.2.2 Colector de Polvo und 1 0% 0% 0% 0 % 0% 0% 0% 0% 0% 100% 1 0% 0 100% 1.0

    3.3.3 Ventilador Centrifugo und 1 0% 0% 0% 0 % 0% 0% 0% 0% 0% 100% 1 0% 0 100% 1.0

    4 ARE A31 0-J RM- 00 1

    4.1 Ductos

    4.1.1 Ductos, Dampers, Piezas Especiales Kg 3250 0% 0% 0% 0% 0% 0% 0% 0% 100% 3250 0% 0 100% 3250

    4.2 Equipos

    4.2.1 Unidad de aire acondicionado und 2 0% 0% 0% 0% 0% 0% 0% 0% 0% 100% 2 0% 0 100% 2.0

    4.2.2 Colector de Polvo und 1 0% 0% 0% 0% 0% 0% 0% 0% 0% 100% 1.0 0% 0.0 100% 1.0

    4.2.3 Ventilador Centrifugo und 3 0% 0% 0% 0 % 0% 0% 0% 0% 0% 100% 3.0 0% 0.0 100% 3.0

    5 TUNEL 240

    5.1 Ductos, Piezas Especiales Kg 15200 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% 15200 0% 0 100% 15200

    6 TUNEL 320

    6.1 Ductos, Piezas Especiales Kg 1610 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 1610 0% 0 100% 1610

    7 T UN EL 2 1 0 C OL EC CI N P OL VO

    7.1 Ductos, Piezas Especiales Kg 8000 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% 8000.0 0% 0 100% 8000

    8 TUNEL210 DUCTOS DE VENTILACION

    8.1 Ductos, Piezas Especiales Kg 8100 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% 8100 0% 0 100% 8100

    9 TUNEL 220

    9.1 Ductos, Piezas Especiales Kg 2450 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% 2450.0 0% 0 100% 2450

    10 CCO-0310.1 Comisionado-Sala 210 -ERR-001 und 10 0.0% 100% 10.0 0% 0 100% 10

    10.2 Comisionado-Sala 220 CVB-003 und 10 0.0% 95% 9.5 0% 0 95% 10

    10.3 Comisionado-Sala 220 CVB-004 und 10 0.0% 95% 9.5 0% 0 95% 10

    10.4 Comisionado-Sala 2132-ERR-001 und 10 0.0% 0% 0.0 0% 0 0% 0

    10.5 Comisionado-Sala 2132-ERR-002 und 10 0.0% 0% 0.0 0% 0 0% 0

    10.6 Comisionado-Sala 2132-ERR-003 und 10 0.0% 0% 0.0 0% 0 0% 0

    10.7 Comisionado-Sala 2133-ERR-001 und 10 0.0% 67% 6.7 0% 0 67% 7

    10.8 Comisionado-Sala 2134-ERR-001 und 10 0.0% 0% 0.0 0% 0 0% 0

    10.9 Comisionado-Sala 552-ERR-001 und 10 0.0% 0% 0.0 0% 0 0% 0

    10.10 Comisionado-Sala 552-ERR-002 und 10 0.0% 0% 0.0 0% 0 0% 0

    10.11 Comisionado-Sala 552-ERR-003 und 10 0.0% 75% 7.5 0% 0 75% 8

    10.12 Comisionado-Sala 4511-ERR-003 und 10 0.0% 95% 0.0 0% 0 95% 0

    11 CCO-05

    1 1. 1 D uc to s- Ar ea 3 92

    11.1.1 Ductos -ASTM-A36 Kg 290 0% 0% 0% 0% 0% 0% 0% 0% 0% 0 0% 0 0% 0

    11.1.2 Ductos -Galvanizados Kg 150 50% 0% 50% 100% 50% 0% 0% 0% 20% 30 54% 81 74% 111

    1 1. 2 D uc to s- Ar ea 4 30

    1 1.2 .1 Du ct os

    11.2.1.1 Ductos galvanizados, Dampers, Piezas Especiales Kg 150 0 % 0% 0% 0% 0% 0% 0% 0% 62% 92.25 0% 0 6 2% 92

    1 1. 2. 2 E qu ip os

    11.2.2.1 Colector de Polvo und 1 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0 0% 0 0% 0

    TOTALDE AVANCEACUMULADO

    TOTALDE AVANCESEMANAL

    DUCTOS EQUIPOS

    TOTALDE AVANCEANTERIORACUMULADO

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    33/35

    HVAC PARA SALAS ELCTRICAS Y DE CONTROLCONSTRUIDAS EN TERRENO, DUCTOS DE VENTILACIN Y

    CAPTACIN DE POLVO

    Revisin: 0

    Fecha:03/10/15

    Pgina: 20INFORME SEMANAL

    IFS-50208056

    ANEXO 9

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    34/35

    HVAC PARA SALAS ELCTRICAS Y DE CONTROLCONSTRUIDAS EN TERRENO, DUCTOS DE VENTILACIN Y

    CAPTACIN DE POLVO

    Revisin: 0

    Fecha: 03/10/15

    Pgina: 31INFORME SEMANALIFS-50208 - 056

    REPORTE FOTOGRFICO

    Imagen N1. Equipos de la CCO-03 Equipos esperando liberacin de reas desde el 20-07-15.

    Imagen N1

    Imagen N2. Ducteria de la CCO-03 Ductos terminados, esperando liberacin de reas desde el 17-07-15 para instalacin.

    Imagen N2

  • 7/25/2019 Saeg Peru - Ifs-50208-056 - Informe Semanal

    35/35

    HVAC PARA SALAS ELCTRICAS Y DE CONTROLCONSTRUIDAS EN TERRENO, DUCTOS DE VENTILACIN Y

    CAPTACIN DE POLVO

    Revisin: 0

    Fecha: 03/10/15

    Pgina: 31INFORME SEMANALIFS-50208 - 056

    Imagen N3, Area 0392-Reactivos-La ducteria de galvanizado al interior est montada en su totalidad,pendiente ductos y soportes de A-36,los cuales se encuentran en Cusco pero por problemassuscitados por el paro no se pueden trasladar a Chalhuahuacho.

    Imagen N3

    Imagen N4, Area-0392-Reactivos-Se instal la malla anti pjaro al exterior de la cobertura.

    Imagen N4