COSTO DE MATERIALES: NOTAS:

CEMENTO ARENA GRAVA AGUA 1 ESTA TABLA ES ÚTIL PA

PRECIO x TON: PRECIO x CAMIÓN PRECIO x CAMIÓN PRECIO x PIPA 2 LLENAR SÓLO LOS CAM

20 Bultos de 50 Kg. DE 7M3 DE 7M3 DE 4000 LTS 3 LOS COSTOS OBTENID

$130.00 $65.00 $65.00 $3.00 4 CADA QUIEN DEBERÁ A

PRECIO x BULTO: 5 ESTA TABLA DE COSTODE 50 KG PRECIO x M3: PRECIO x M3: PRECIO x M3: 6 LAS PROPORCIONES D

$6.50 $9.29 $9.29 $0.75 "COSTO Y TI

DESPERDICIO: DESPERDICIO: DESPERDICIO: DESPERDICIO: CARLOS SU

3% 8% 8% 30% LIMUSA - N

1.03 1.08 1.08 1.30 TERCERA E

COSTO CON DESP. COSTO CON DESP. COSTO CON DESP. COSTO CON DESP.

$133.90 $10.03 $10.03 $0.98 ELABORÓ: Arq. Alfonso

 AGREGADO CEMENTO BULTOS  ARENA GRAVAF´C= REVENIMIENTO MÁXIMO TONELADA DE 50 KG M3 M3

100 kg/cm2 8 A 10 CM 3/4" 0.260 5.20  0.500 0.680

1 1/2" 0.254 5.08  0.470 0.700FIRMES Y 12 A 15 CM 3/4" 0.286 5.72  0.500 0.680

PLANTILLAS 1 1/2" 0.280 5.60  0.470 0.700

150 kg/cm2 8 A 10 CM 3/4" 0.323 6.46  0.480 0.6701 1/2" 0.308 6.16  0.450 0.700

FIRMES, DALAS 12 A 15 CM 3/4" 0.354 7.08  0.480 0.670

Y CASTILLOS 1 1/2" 0.338 6.76  0.450 0.700

200 kg/cm28 A 10 CM 3/4" 0.355 7.10  0.470 0.650

1 1/2" 0.337 6.74 0.440 0.680LOSAS DE 12 A 15 CM 3/4" 0.391 7.82  0.470 0.650

ENTREPISO 1 1/2" 0.373 7.46  0.440 0.680

250 kg/cm2 8 A 10 CM 3/4" 0.423 8.46  0.465 0.640PISOS ESTRUCTURALES, 1 1/2" 0.400 8.00  0.435 0.670

COLUMNAS, DADOS, 12 A 15 CM 3/4" 0.467 9.34 0.465 0.640ZAPATAS Y TRABES 1 1/2" 0.445 8.90  0.435 0.670

CLASIFICACIÓN

Page 2: Tabla de concretos-costos.xls

8/13/2019 Tabla de concretos-costos.xls

http://slidepdf.com/reader/full/tabla-de-concretos-costosxls 2/3

RA OBRAS PEQUEÑAS DONDE HAY QUE ELABORAR EL CONCRETO EN OBRA

OS EN COLOR AMARILLO

S SON SÓLO DE MATERIALES

REGAR SUS COSTOS DE OPERACIÓN E INDIRECTOS

PUEDE USARSE PARA FINES DE PLANEACIÓN DE COMPRA DE MATERIALES Y ANÁLISIS  LA TABLA FUERON TOMADAS DE:

  IEMPO EN EDIFICACIÓN"

  REZ SALAZAR

  RIEGA EDITORES MÉXICO 1997

  ICIÓN

laceres Y Aguirre [email protected]

 AGUA $$$ x M3 CON M3 CONCRETO COSTO AL CANTIDAD DE CANTIDAD DE CEM CANTIDAD DE

M3 DESPERDICIO REQUERIDOS: CONSTRUCTOR CEMENTO TON. BULTOS DE 50 KG  ARENA EN M3

0.195   $46.84 0.00   $0.00 0.00 0.00  0.00

0.190   $45.93 0.00   $0.00 0.00 0.00  0.000.215   $50.34 0.00   $0.00 0.00 0.00  0.000.210   $49.43 0.00   $0.00 0.00 0.00  0.00

0.210   $54.99 0.00   $0.00 0.00 0.00  0.000.200   $52.97 0.00   $0.00 0.00 0.00  0.000.230   $59.16 0.00   $0.00 0.00 0.00  0.00

0.220   $57.01 0.00   $0.00 0.00 0.00  0.00

0.195   $58.96 0.00   $0.00 0.00 0.00  0.000.185   $56.54 0.00   $0.00 0.00 0.00  0.000.215   $63.80 0.00   $0.00 0.00 0.00  0.000.205   $61.38 0.00   $0.00 0.00 0.00  0.00

0.190   $67.91 0.00   $0.00 0.00 0.00  0.000.180   $64.82 0.00   $0.00 0.00 0.00  0.000.210   $73.82 0.00   $0.00 0.00 0.00  0.000.200   $70.86 0.00   $0.00 0.00 0.00  0.00

Page 3: Tabla de concretos-costos.xls

8/13/2019 Tabla de concretos-costos.xls

http://slidepdf.com/reader/full/tabla-de-concretos-costosxls 3/3

CANTIDAD DE CANTIDAD DE

GRAVA EN M3 AGUA EN M3

0.00 0.00

0.00 0.000.00 0.000.00 0.00

0.00 0.000.00 0.000.00 0.00

0.00 0.00

0.00 0.000.00 0.000.00 0.000.00 0.00

0.00 0.000.00 0.000.00 0.000.00 0.00