  • PROYECTO: UBICACIN: PROPIETARIO.ESTIMACION No. 01FECHA ELABORO:

    DESCRIPCION

    PRELIMINARES(marcado y nivelado del predio)

    EXCAVACION PARA CIMIENTOS

    SOLERA INFERIOR S-I DE 15 X 15 CMS, ARMADA CON 4#3 Y #2 @15 CMS

    CASTILLO C-1 DE 15 X 20 CMS, ARMADA CON 4#4 Y # 3 @ 20 CMS

    RELLENO CON MATERIAL SELECTOPAREDES DE LADRILLO RUSTICOREPELLO DE PAREDJAMBA J-1 DE 0.15 X 0.10 M, ARMADO CON 2#3 Y #2 @ 15 CMSVIGA PERIMETRAL VB DE 20 X20, ARMADA CON 4#3 Y #2 @ 15 CMS

    BATIENTES EN PUERTASBATIENTES EN VENTANASRELLENO CON MATERIAL SELECTOPISO DE CERAMICA TIPO PIEDRAMOLDURA DE CERAMICAFIRME PARA PISOS ESPESOR 8 CMSPULIDO DE PAREDCERAMICA EN PAREDESTALLADO DE MOCHETASREPELLO Y PULIDO DE LOSA

    ZAPATA CORRIDA DE 0.60 M X 0.20 M, ARMADA CON 4#3 CORRIDAS Y 1#3 @ 20 CMS

    SOBRE ELEVACION CON BLOQUE DE 6" SOBRE ZAPATA Z-C, ARMADA CON BASTONES L 1#4 @ 0.20 MTS, Y UNA HORIZONTAL #3 @0.40 MT.

    CARGADORES DE PUERTAS Y VENTANAS,ARMADA CON 2#3 Y # 2 @ 15 CMSLOSA DE 20 CMS DE ESPESOR CON BLOQUE DE CONCRETO DE 6" Y NERVIOS DE 15 X 20 CMS , ARMADOS CON VARILLA 3#3 Y ANILLOS #2 @ 15 CM, ACERO DE TEMPERATURA #2 @ 20 CMS A/S, ESPESOR DE CONCRET DE 5 CMSVIGA DE CARGA V-C DE 15 X 30 CMS ARMADA ARRIBA 2#4 Y ABAJO 2#5 Y 1#4, ANILLOS #2 @15 CMS EN LOS 50CM DE LOS EXTRIMOS Y EL RESTO 32 @20CM.

  • PINTURA EN LOSAPINTURA EN PAREDESPUERTAS P-1 (2.10 X 1.00), DE MADERA DE PINOPUERTAS P-2 (2.10 X 0.80), DE MADERA DE PINOVENTANAS DE CELOCIAS Y MARCO DE ALUMINIO SERVICIOS SANITARIOSLAVAMANOSREGADERASCAJAS DE REGISTRO A.N.TUBERIA PARA A.N. PVC 4"TUBERIA PARA A.N. PVC 2" PARA VENTILATUBERIA PARA A.N. PVC 2"TUBERIA A.P. PVC 1/2"PILA DE 1.30 X 0.60 MTSLAVATRASTOSTOMAS CORRIENTES DOBLE POLARIZADO (120V, 15 A)TOMAS CORRIENTES DOBLE POLARIZADO PARA DUCHASALIDA ELECTRICA PARA ESTUFAPANEL ELECTRICO DE DISTRIBUCIONBASE DE MEDIDOR PARA CONTADORSALIDA DE LAMPARA EN TECHOSALIDA DE LAMPARAS EXTERIORES EN PAREDINTERRUPTOR DOBLE INTERRUPTOR SENCILLOINTERRUPTOR VAIVEN DOBLE

    GRAN TOTAL

  • Casa de HabitacionTegucigalpa

    DEL 2 DE MAYO AL 16 DE MAYO DE 20146 DE MAYO DE 2014

    PRECIO TOTAL AVANCE EJECUTADO UNIDAD CANT. UNITARIO LPS. ACUMULADO

    CANT.M2 69.72 23.15 1,614.02 0.00

    M3 23.20 130.00 3,016.00 0.00ML 52.40 491.39 25,748.84 0.00ML 52.40 241.40 12,649.36 0.00

    M2 31.40 590.58 18,544.21 0.00

    ML 57.75 272.87 15,758.24 0.00

    M3 12.19 306.92 3,741.35 0.00M2 127.60 455.13 58,074.59 0.00M2 209.28 76.04 15,913.65 0.00ML 16.50 145.90 2,407.35 0.00ML 32.80 365.25 11,980.20

    0.00

    ML 24.40 230.16 5,615.90 0.00

    M2 69.72 1,167.29 81,383.46

    0.00

    ML 25.05 541.42 13,562.57 0.00

    ML 2.00 250.55 501.10 0.00ML 8.70 250.55 2,179.79 0.00M3 9.35 305.41 2,854.06 0.00M2 62.30 516.44 32,174.21 0.00ML 52.61 97.02 5,104.22 0.00M2 62.30 224.70 13,998.81 0.00M2 117.35 38.91 4,566.09 0.00M2 10.66 634.91 6,764.97 0.00ML 53.70 63.45 3,407.27 0.00M2 69.72 76.04 5,301.51 0.00

  • M2 69.72 151.69 10,575.83 0.00M3 117.35 131.69 15,453.82 0.00

    UNID 4.00 1,300.00 5,200.00 0.00UNID 1.00 1,300.00 1,300.00 0.00M2 6.42 600.00 3,852.00 0.00

    UNID 1.00 1,350.00 1,350.00 0.00UNID 1.00 1,000.00 1,000.00 0.00UNID 1.00 500.00 500.00 0.00UNID 1.00 1,015.00 1,015.00 0.00ML 8.92 35.00 312.20 0.00ML 3.25 13.50 43.88 0.00ML 10.79 13.50 145.67 0.00ML 16.10 16.50 265.65 0.00

    UNID 1.00 950.00 950.00 0.00UNID 1.00 1,000.00 1,000.00 0.00UNID 17.00 1,008.87 17,150.79 0.00UNID 1.00 1,008.87 1,008.87 0.00UNID 1.00 1,342.68 1,342.68 0.00UNID 1.00 4,500.00 4,500.00 0.00UNID 1.00 3,823.57 3,823.57 0.00UNID 8.00 635.00 5,080.00 0.00UNID 4.00 635.00 2,540.00 0.00UNID 1.00 365.25 365.25 0.00UNID 6.00 395.30 2,371.80 0.00UNID 2.00 375.50 751.00 0.00

    409.477.39

  • AVANCE EJECUTADO AVANCE EJECUTADO ACUMULADO % PERIODO 2 AL 16 MAYO %

    TOTAL CANT. TOTAL - - 69.72 1,614.02 100.00

    - - 23.20 3,016.00 100.00

    - - 52.40 25,748.84 100.00

    - - 52.40 12,649.36 100.00

    - - 31.40 18,567.84 100.00

    - - - - - - - - - - - - - - - - - - - -

    - - - -

    - - - -

    - - - -

    - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

  • - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

    0.00 61,596.07

  • Pagina 01

    POR EJECUTAREJECUTADO FINAL %

    CANT TOTAL0.00 -

    0.00 -

    0.00 -

    0.00 -

    0.00 -

    57.75 15,758.24 100.00

    12.19 3,741.35 100.00 127.60 58,074.59 100.00 209.28 15,913.65 100.00 16.50 2,407.35 100.00 32.80 11,980.20

    100.00

    24.40 5,615.90 100.00

    69.72 81,383.46

    100.00

    25.05 13,562.57 100.00

    2.00 501.10 100.00 8.70 2,179.79 100.00 9.35 2,854.06 100.00

    62.30 32,174.21 100.00 52.61 5,104.22 100.00 62.30 13,998.81 100.00

    117.35 4,566.09 100.00 10.66 6,764.97 100.00 53.70 3,407.27 100.00 69.72 5,301.51 100.00

  • 69.72 10,575.83 100.00 117.35 15,453.82 100.00

    4.00 5,200.00 100.00 1.00 1,300.00 100.00 6.42 3,852.00 100.00 1.00 1,350.00 100.00 1.00 1,000.00 100.00 1.00 500.00 100.00 1.00 1,015.00 100.00 8.92 312.20 100.00 3.25 43.88 100.00

    10.79 145.67 100.00 16.10 265.65 100.00 1.00 950.00 100.00 1.00 1,000.00 100.00

    17.00 17,150.79 100.00 1.00 1,008.87 100.00 1.00 1,342.68 100.00 1.00 4,500.00 100.00 1.00 3,823.57 100.00 8.00 5,080.00 100.00 4.00 2,540.00 100.00 1.00 365.25 100.00 6.00 2,371.80 100.00 2.00 751.00 100.00

    347.881.33 84.96