Transcript of TPL OGH Presentation

TPL Saipem

25th Feb 2013Reputed for its ability to execute large and complex industrial infrastructure projectsTata Projects is one of the fastest growing and highly admired Infrastructure companies in IndiaTATA Projects Limited

Safety FirstSafety KPMs in:BSCs of all SBUs KRAs of SBU Heads, PCs, PDs & RCMsOHSAS 18001 &ISO14001 implemented across all locations & project sites Lead Lag Measures all sites OCP / Method statement for critical activities Induction training for Employees & subcontractors Daily Safety Tool Box Talks at all SitesVisual displays at sites and offices Height work training and Height work pass Safety inspections Safety alerts Executive safety checklistCorporate Safety Council reviewORM-Safety review Reviews in BRMs, Board level

EHS Policy

3Safety recordProject siteSafe Million Man-hours workedKrishnapatnam power Plant32SAIL, Rourkela 7.5IPP- Jharsuguda15.6BPCL,Kochi-(Part A & B)3.3RINL,VSP, Vizag 4.0ONGC , Rajahmundry2.1NSC

Krishnapatnam

SAIL - RSPHPCL

RAK Gas4EHS Statistics for Projects executed by TPL in Oil, Gas & HydrocarbonsYEAR2007-082008-092009-102010-112011-20122012-13 (till date)TOTALNumber of employee Project man hours worked3986502764280501590356022131134271249906617414383Number of Project fatalities0000000Number of Reportable Lost Time Cases (Lost Time Cases)001*0001Number of other recordable cases0000000Incidence Rate (total recordable cases x 200,000/total work hours)000.390000.013Number of EHS Issues / Legal Notices0000000* Minor head injury suffered by worker being hit by bolt falling from height. He was equipped with safety helmet. Quality @Tata ProjectsApprovalsEmpanelmentCentral Boiler Board (CBB)Petroleum and Explosive Safety Organisation (PESO) (Formerly known as CCOE)Warehousing Development and Regulatory Authority (WDRA)

Petroleum & Natural Gas Regulatory Board (PNGRB)Rural Electrification Corporation (REC)Research Designs and Standards Organisation (RDSO)ISO 17020 TQ Services is accredited by NABCB of Quality Council of India. ISO 17021 TQ Services is accredited by NABCB to issue ISO 9001 Certification.Accreditations

ISO and OHSAS CertificationsISO 9001 : Quality AssuranceISO 14001 : Environment ManagementOHSAS 18001 : Occupational Health & Safety Management

Organizational Flow

CORPORATE OFFICEHYDERABADREGIONAL OFFICEKOLKATAREGIONAL OFFICE DELHIREGIONAL OFFICE MUMBAI76 Projects at 51 locationsDomestic Project SitesGlobal reach SBU QS

Experience of working in these countries, surveyors present there. Existing Offices

IndiaItalySpainTurkeyOmanSouth Africa (JV)BahrainChinaSaudi ArabiaAbu - DhabiSouth KoreaEgyptMauritius (JV)VietnamKuwaitSyriaTunisiaPolandFranceSwitzerlandNetherlandsDenmarkGermanySwedenBelgiumKazakhastanTaiwanThailandMalaysiaIndonesiaUSAMore than 100 surveyors are deployed outside India and we have experience of working in 32 countriesOur TeamOver 2000 + strong, carefully chosen for their knowledge, capabilities, attitude and value systemDistribution70% Technical Manpower11Growth TrajectoryAll Figures are in Rs CrsCAGR : 21 %

TATA Projects - Engineering Capabilities3 Pole Engineering Centre (at Hyderabad, Kolkata & Mumbai)Competent engineers with relevant experienceIncorporation of Modern Software ToolsWork Flow based Engineering Document Management SystemIn house and Review Engineering capabilitiesEmbedment of Safety & Constructability in EngineeringAccess to the latest National & International standards (i.e. IS, ASME, API, AWWA, BS, PTC, IEEE, IEC etc.)Head Corporate EngineeringHyderabad PoleKolkata PoleMumbai Pole13Engineering Softwares Mechanical DisciplineAuto CAD Full version 2013.Pipenet standard version 1.40 for analysis of fluid flow networksCAESAR-II version 5.30 for Pipe stress analysisPvelite version 2012 for Vessel and Exchanger analysisCADWORX Plant version 2013 for 3D ModelingAutodesk Navisworks manage version 2013-3DSmart plant 3D review software version 2012 EngineersDraughtsmenMechanical4714Civil2910Electrical175Instrumentation112Total10631Civil DisciplineSTADD Pro V8i with IS codes for Structural analysis & designSTADD Foundation V8i for foundation analysis & designSTADD Pro Steel V8iANSYS version 13.1 for Finite Element analysisI-Towers 2.0 for Analysis & Design of TowersPLS Towers for Analysis & Design of TowersPLS CAD for Profile preparation2D Plus Plate cutting plan softwareHighbar Technologies Rebar software Electrical DisciplineETAP for Electrical System StudiesEPlan for Panel design/wiring drawing14

About our SBUs

BackgroundISO 9001, 14001 and OHSAS18001Fastest Growing Construction CompanyTop Ten Most Admired Construction CompaniesCertificationsAwards2 x 800MW BOP KrishnapatnamLargest Blast furnace - RSPLargest Blast furnace - NMDC2 x 500MW BOP Bhusawal

Figures in Rs. Cr.Well Pad Field Development Cairn EnergyEPC for Oil Terminal EMARAT#

PowerKey Projects2x500 MW BoP Thermal Power Plant for MahaGenco2x800 MW BoP Thermal Power Plant for APGenco3x67.5 MW Total EPC Gas based Power Plant for IELCustomized turnkey solutions for thermal power plantsExpertise in coal and gas based, super and subcritical technologies

17

TransmissionKey Projects194 Kms 400 kV D/C Kishenpur Transmission Line152 Kms 765 kV S/C Seoni Transmission Line313 Kms 800 kV HVDC Barabisa Transmission LineA leader in building transmission infrastructureConstruction experience in tough ,hilly and snowy terrainsCommissioned more than 10,000 Kms of transmission lines State-of-the-art Tower Manufacturing Unit

18

MetalsKey Projects4506 m3 Blast Furnace of 3 MTPA Steel Plant, Nagarnar for NMDC4060 m3 Blast Furnace of 4.2 MTPA Steel Plant, Rourkela for SAIL 1.2 MTPA pellet plant at Donimalai for NMDCEnd to end customized solutions for Ferrous and Non-Ferrous industriesExpertise in executing Blast furnaces, Ore beneficiation plants, Pelletization plants 19

RailwaysKey Projects240 TKm OHE of Chhapra section for CORE355 TKm OHE, S&T of Gooty section for RVNL350 TKm OHE of Kondapuram section for RVNLProficient in executing railway electrification, signaling & telecommunications works, bridges and earthworks.Executed over 1800 track km of projects Poised to take on large and complex Freight Corridor projects

20

WaterKey ProjectsWater System for Steel Melting Shop for RINLWater System for 3 MTPA Steel Plant at Jamshedpur for Tata Steel Water System of Hot Strip Mill at Kalinganagar for Tata Steel Expertise in Industrial water systems for steel and power Desalination and effluent treatment Collaboration with world renown technology providersManufacture RO based Water Purification plants

21

QualityInspection Services 6x800 MW Medupi Power Station for Eskom Holdings South Africa400 kV Transmission Line for Jaypee Gas Field Development Project at Turkmenistan for Petrofac InternationalProvides comprehensive inspection, certification and training services across all infrastructure sectorsLarge base of over a 1000 clients spread across 80 countriesKnown for our responsiveness and ontime completion of assignments

22

Oil & GasKey ProjectsGas Processing & Compression at Rajahmundry for ONGCOil Blending Terminal at Radhanpur for Cairn EnergyEPC for Expansion of Petroleum Product Storage at Fujairah for EMARATSolutions in Oil & Gas to the Indian and Middle East marketsExpertise in executing mid and downstream projects including refinery expansion, tank farms, terminals, on-shore oil field development and process plants

23Key Projects Oil, Gas & HydrocarbonsCairn Energy, Mangala Processing Terminal Brief Scope of WorkConstruction of 2 Nos. of crude oil storage tanks, 2 Nos. of settling tanks, new pipe rack, strengthening of existing pipe rack, equipment foundations with all Civil, Piping and Equipment erection with electrical /Instrumentation works..Extension of existing fire fighting and protection system to provide complete coverage for new facility.Design supply and installation of Electrical heat tracing. Hook up to the electrical feeders in the substation .Fabrication of off skid piping, inspection, NDT, testing, painting, erection, insulation and hook up with existing system. Hook up new instruments to local control system in and integrate with existing ICS. Modification of ICS and integration with existing YOKOGAWA systems.E&I Cable tray interfaces with other contractors.Completion Management System implementation.Conduct Geotechnical investigation survey in new tank area to verify data.Existing Plant Model updating in PDS, procurement of piping components. Extension of sleepers or addition of pipe racks/sleeper, if required. Critical Packages:Crude Oil Export Pumps (2 Mw Motor)Fiscal Oil Metering Skids.ICS/DCS. Scope Contd .U/G System design for open, closed drains, storm water systems, fire water systems etc. Statutory approvals including DGMS, PESO etc. with the help from CEIL.Pre-Commissioning and performance guarantee test runs. Design, specify, tender, evaluate, procure and review vendor drawings, etc. of packages/long lead items .

2.1 Lakh Man HrsZero LTIONGC, Revamping of Fire Water Network at Uran Brief Scope of WorkDismantling & Removal of existing fire water network. Construction of Fire station building, sub-station, fire water pump house, raw water reservoir & control room. - Substation ( 35m x 24 m x 8.7 m G + 1 ) - Fire Station Building ( 44.2m x 15m & 12.5m x 35m , Ht- 13.2m G + 2) - Fire Water Pump House ( 68m x 15m & 20m x 5m - 12m Height ) - Raw Water Reservoir ( 105m x 30.4m to 17.4m x 5 m) 8000 Cu.mRCC foundations, roads & drains, pipe pedestals & sleepers.Site grading & all associated civil & structural work.Construction of Raw Water Tank & Fire Water Steel Tanks. - Fire Water Tank 2 nos. ( 38 mm Dia x 20 mm Ht. - 18000 Cu.m each)Supply & erection of Diesel Engine Driven (5 no.s 1000m3/hr each) & Motor driven Jockey Pumps (4 no.s 1000 m3/hr).Entire fire water piping (A/G & U/G) - Piping 24.3 KM. ( Sizes- 1 to 42 - 31428 Inch Dia / 373092 IM )ONGC, Revamping of Fire Water Network at Uran Scope Contd Supply & Installation of hydrant landing valves & hydrant monitors. - HVLR Manual Monitor ( 4000 GPM) 7 Nos. - HVLR Remote Control Monitor ( 4000 GPM ) 8 nos. - Water Monitors ( 1000 GPM ) 4 Nos. - Hydrants - 386 Nos & Water Monitor- 114 Nos.All associated Electrical and Instrumentation works. - Transformers 6 Nos. ( 7.5 MVA 2nos, 1 MVA -2 nos. 50 KVA 2 nos.) - MV Switch Board & Auxiliary Switch Board 415 V - HV Switch Board - 22 KV & 6.6 KV (1 each) - PLC & DCS Modifications - Field Instruments Pressure / Level Transmitters , Pressure Gauge, Annubar - Fire Alarm System - Cables - 47 Km. - Plant Communication System - HVAC / Ventilation SystemCommissioning, Trail run Test of New System.

6 Lakh Man HrsZero LTIEmirates General Petroleum Corporation (EMARAT)Expansion of Petroleum Products Storage and Distribution Terminal at Fujairah Brief Scope of Work:Dismantling of existing truck loading gantries & pump house.Integrity up gradation of Bulk piping between 13 tanks , pumps and equipments.Supply, Fabrication & erection of Pig launcher & receivers at port and tank farm respectively.Supply, Fabrication & erection of Tank Truck Loading Rack.Supply & Installation of 3000 valves (manual & actuated)Improvement in Jetty area, head & manifolds. Supply, Fabrication & Erection of Drinking Water Distribution ,Service water line.Relocation of Weigh Bridges.Supply & Installation of 23 pumps for Gas Oil/Jet A1/MS Export/Blending etc.Fire Fighting and Fire Protection System. Supply & installation of hydrant landing valves, hydrant monitors.New hydrant network for the entire terminal.Sprinkler System, Foam tanks & foam line for entire terminal.Installation of manually operated hydrants & water -foam monitors. Substation including transformer, switchgears, DG etc.Communication system with replacement of entire terminal cables.Complete Instrumentation for control/monitoring, ESD, Data Server, MOVs, Tank gauging systemTerminal Automation Control System including PLCs, Control Panel, Rack Computer, Ethernet Switch etc. .Radar Level Transmitters with multipoint temp element.Oily water treatment package unit.One Hot Oil heater package Unit.

2.8 Mn Man HrsZero LTIEmirates National Oil Company, Dubai, UAEEngineering, Procurement & Construction of Oil Terminal Facilities inside Fujairah Port, UAE.

Brief Scope of Work:Design, Engineering, Supply & Construction of Administrative Building (G+1), Switchgear & transformer Building, Ship loading Pump House/ shed & fire water pump, Pigging station, Security cabin, Car Parking.All associated structural pipe racks, columns, supports, bridges, walk away platforms, construction of OWS, Terminal Roads & Drainage System, Foundations for various equipments, pumps, tanks & vessels, valve etc.Flush tanks, Fresh Water Tanks, Diesel Storage Tanks, Slop Tanks, Pig Launchers & Receivers Installation, Testing & commissioning of 6 Nos 1450m3/hr centrifugal pumps with electric motor & 3 Nos 900m3/hr diesel driven.Piping from jetty to terminal & terminal product piping.Valves, Radar gauges, Temperature elements, Actuators for all tanks .Fire Protection system with all mainlines & Interconnection pipes, main fire water pumps, fire monitors, fire alarm system.

1.2 Mn Man HrsZero LTICairn Energy, Aishwarya Field Development Brief Scope of Work:Nine (9) Well Pad facilities for Aishwarya cluster of Well Pads and In-field road corridors with manifold, flow meters, utilities and other infrastructural development.Production fluid, fuel gas and water pipeline for other purposes from MPT to Well Pads. 33 KVA Overhead power transmission lines from MPT to Well Pads.Instrumentation, Fire Alarm system, IT (Data & Voice), PAGA, CCTV, Access Control and other E&I packages. Other Mechanical, Piping, Electrical, Instrumentation, Civil & Structural Works for all 9 well pads including infield & trunk pipelines for oil/gas/water and integration. Tie-in and seamless integration of the new facilities with existing facilities at MPT and other locations.Concurrent Commitments Cairn India

2.5 Mn Man HrsZero LTIOther Significant ProjectsOil & Natural Gas Corporation (ONGC) Low Pressure Gas Processing and Compression Facilities Gas Collection Station Expansion Project at ONGC Olpad, Gujarat. Steam Heater In CSU Train 15 At CPF, Ankleshwar, Gujarat. Additional Condensate Recovery Unit for LPG Augmentation at CPF, Gandhar, Gujarat. Revamp & Expansion of Gas Gathering Station-VI (GGS-VI) at Ankleshwar, Gujarat. Gas Lift Compressors at CPF, Gandhar, Gujarat.Cairn Energy EPC for Radhanpur Blending Terminal.

Rak Gas LLC, Ras Al Khaimah Bukha Control Reconstruction (BCR), Revamping of all the Pneumatic Instruments.

ADNOC - Abu Dhabi Ruwais Oil Refinery Project - Electrical and Instrumentation Works.

Special Projects Defence Research & Development Organisation (DRDO), Compressed Air Facility at Research Centre, Hyderabad. Indian Space Research Organisation (ISRO), Shriharikota, Design, Manufacturing, Supply, Installation, Testing & Commissioning of Casting Facility Equipment.LongReliableWarrantyTotal SolutionHigh Quality ControlSystemWorldWideNetworkFinancialStrengthLongReliability

Good bankability. Zero Debt company. Internal funding capability through cash reserves. Capital funding availability through TATA Capital. Wide Global Presence. Presence in 32 countries through SBU QS. Group companies presence in 85 countries. Highest safety standards. Prime importance to safety. Continuous safety training. Intense safety practices monitoring through support safety dept. Dedicated SBU QS for Quality Control. Rarest construction companies to have all three certifications of ISO 9001, ISO14001 & OHSAS 18001 Our StrengthsWhy TATA Projects ?Client Appreciation