DATOS GENERALES DE OBRA -2 VALORIZACION

OBRA:MEJORAMIENTO DE REDES DE AGUA POTABLE EN EL AA.HH. MORANA BAJA

ENTIDAD:MUNICIPALIDAD DE CHEPEN

UBICACIN:DIST. : CHEPEN, PROV. : CHEPEN, DPTO : LA LIBERTAD

SISTEMA DE CONTRATACION: SUMA ALZADA

VALOR REFERENCIAL:S/40,186.0833769.8151260504

FECHA DE VALOR REFERENCIAL:30.Oct.11

MONTO CONTRATADO:S/36,167.47

FACTOR DE RELACION0.900000.040.04

FECHA FIRMA DE CONTRATO:19.Apr.12

MONTO ADELANTO PARA MATERIALES (2):0.00.00%

FECHA ENTREGA DEL TERRENO:15.Apr.12

FECHA DE INICIO CONTRACTUAL DE OBRA:01.May.12

PLAZO DE EJECUCION :60 Dias Calendario

FECHA DE TERMINO CONTRACTUAL DE OBRA:29.Jun.12

ADELANTO DIRECTO ( 20%MC) - MARZO:S/7,233.49

ADELANTO MAXIMO PARA COMPRA DE TUBERIA DE PVC- DESDE JUNIO:S/3,052.66

VALORIZACION DE OBRA No. 02:31/06/2012

AMPLIACION DE PLAZO:

NUEVA FECHA DE TERMINO PREVISTO:

ACTA DE RECEPCION DE OBRA:

Pag. 1

RVM(PRINT)

RESUMEN VALORIZACION PRINCIPAL N 02VALORIZACION N 02- JUNIO 2012

OBRA:MEJORAMIENTO DE REDES DE AGUA POTABLE EN EL AA.HH. MORANA BAJA

ENTIDAD:MUNICIPALIDAD DE CHEPEN

UBICACIN:DIST. : CHEPEN, PROV. : CHEPEN, DPTO : LA LIBERTAD

1. VALORIZACION DEL MES (SIN IGV 18%) ( V )Ver Pagina 214,230.21

2. REINTEGROS ( R )Ver Pagina 9-42.69

3. DEDUCCION DEL MONTO (D)..............S/.17.233.1 ADELANTO DIRECTOVer Pagina 917.233.2 ADELANTO DE MATERIALVer Pagina 80.004. VALORIZACION BRUTA ( VB )..............S/.14,204.75

5. AMORTIZACIONES (SIN IGV 18%)S/.5,898.70

6.1 ADELANTO DIRECTOVer Pagina 9..............S/.2,846.04 6.2 ADELANTO DE MATERIALVer Pagina 8S/.3,052.66

6. VALORIZACION NETA ( 4 - 5 ) ( VN )..............S/.8,306.05

7. IGV(18%)..............S/.1,495.09

8. MONTO A PAGAR..............S/.9,801.14

Pag. 10

* MONTOS A FACTURAR Y A RECIBIR POR EL CONTRATISTA POR CONTRATO PRINCIPAL

PARCIALIGVMONTO 18%TOTALFORMULAS VARIAS8,331.511,499.679,831.18OTROS0.000.000.009831.18

* MONTOS A FACTURAR Y A RECIBIR POR EL CONTRATISTA POR REAJUSTE

PARCIALIGVMONTO 18%TOTALFORMULAS VARIASERROR:#REF!ERROR:#REF!ERROR:#REF!OTROS 0.000.000.00ERROR:#REF!

VALORIZAC(PRINT)VALORIZACION N 02- JUNIO 2012

OBRA:MEJORAMIENTO DE REDES DE AGUA POTABLE EN EL AA.HH. MORANA BAJAENTIDAD:MUNICIPALIDAD DE CHEPENPRESUPUESTO REFERENCIAL (IGV 18%):40,186.08PRESUPUESTO CONTRATADO SIN IGV:36,167.47PRESUPUESTO RESULTANTE SIN IGV:ERROR:#REF!ERROR:#REF!FACTOR DE RELACION:0.90PLAZO DE EJECUCION :60 Dias Calendario

PRESUPUESTOVALORIZ. ANTERIORVALORIZ. ACTUALACUMULADOSALDO POR VALORIZARITEMDESCRIPCIONUNDMETRADOP.UNIT.PRESUP.METRADOVALORIZ.%METRADOVALORIZ.%METRADOVALORIZ.%METRADOVALORIZ.%S/.S/.S/.S/.S/.S/.RELANTEO01OBRAS PRELIMINARES01.01CARTEL DE OBRAglb1.00400.00400.001.00400.00100.000.000.000.001.00400.001000.000.000.00ERROR:#REF!1.001.02MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MATERIALES A OBRAglb1.00500.00500.001.00500.00100.000.000.000.001.00500.001000.000.000.00ERROR:#REF!01.03TRAZO Y REPLANTEOm1,477.300.52768.201,255.00652.6084.95222.30115.6015.051,477.30768.201000.000.000.00ERROR:#REF!244.502MOVIMIENTO DE TIERRAS0.00ERROR:#REF!337.702.01EXCAVACION DE ZANJAS PARA TUBERIA DE AGUAm1,462.304.336,331.76750.503,249.6751.32711.803,082.0948.681,462.306,331.761000.000.000.00ERROR:#REF!69.602.02REFINE Y NIVELACION EN TERRENO NORMALm1,462.300.931,359.94750.50697.9751.32711.80661.9748.681,462.301,359.941000.000.000.00ERROR:#REF!1033.51146.1702.03RELLENO DE ZANJA COMPACTADO MATERIAL SELECCIONADOm1,462.304.276,244.02750.503,204.6451.32711.803,039.3948.681,462.306,244.021000.000.000.00ERROR:#REF!36.9002.04ELIMINACION DE DESMONTEm3416.939.103,794.06220.602,007.4652.91196.331,786.6047.09416.933,794.061000.000.000.00ERROR:#REF!17.3203SUMINISTRO E INSTALACION DE TUBERIA0.00ERROR:#REF!252.95149.5303.01TUBERIA DE PVC SAL 2 1/2"m1,477.306.179,114.94750.504,630.5950.80726.804,484.3649.201,477.309,114.941000.000.000.00ERROR:#REF!ERROR:#REF!03.02PRUEBA HIDRAULICA + DESINFECCION TUBERIA 2 1/2"m1,477.301.412,082.99750.501,058.2150.80726.801,024.7949.201,477.302,082.991000.000.000.00ERROR:#REF!107.220.6303.03EMPALME DE TUBERIA A TANQUE ELEVADOu1.0071.6371.631.0071.63100.000.000.000.001.0071.631000.000.000.0004VALVULAS Y ACCESORIOS0.00ERROR:#REF!18.504.01VALVULA DE COMPUERTA 2 1/2"u4.00150.00600.002.00300.0050.002.00300.0050.004.00600.001000.000.000.0004.02CODO DE PVC SAL SP DE 2 1/2"X45u2.008.5417.081.008.5450.001.008.5450.002.0017.081000.000.000.00ERROR:#REF!153.030.4704.03TAPON DE PVC PARA RED AGUA POTABLE TUBERIA DE 2 1/2"u1.007.707.701.007.70100.000.000.000.001.007.701000.000.000.0005COLOCACION DE VALVULA Y ACCESORIO0.00ERROR:#REF!237.8204.405.01COLOCACION DE VALVULASu4.0035.82143.282.0071.6450.002.0071.6450.004.00143.281000.000.000.0005.02COLOCACION DE ACCESORIOSu3.0032.5897.741.0032.5833.332.0065.1666.673.0097.741000.000.000.00ERROR:#REF!281.0161.67ERROR:#REF!52.031,533.3416,893.2114,640.1431,533.340.00FORM. N1.00ESTRUCTURASS/.31,533.3416,893.2114,640.1431,533.340.00TOTAL COSTO DIRECTO:S/.31,533.3416,893.2114,640.1431,533.340.00GASTOS GENERALES Y UTILIDADES (8%)S/.2,522.661,351.461,171.212,522.670.00SUB TOTAL PRECIOS DEL VALOR REFERENCIALS/.34,056.0018,244.6715,811.3534,056.010.00SUB TOTAL PRECIOS DEL CONTRATO0.9030,650.4016,420.2014,230.2130,650.410.00

AVANCE REAL =VALORIZACION ACTUAL / PRESUPUESTO CONTRATADO

AVANCE REAL =46.43%

AVANCE REAL EN %46.43%AVANCE PROGRAMADO EN %43.15%ESTADO: ADELANTO / ATRAZO3.28%ADELANTADO

Pag.2

Pag. 5

177599.48171190.57348790.0543,463.47

140023.54550607.88190631.431,199.9837575.93100808.26138384.1927,087.63011525.8111525.810.0008248.628248.620.0000015,175.86177599.48171190.57348790.0543,463.4717759.9517119.0634879.0054,346.358879.978559.5317439.52,173.17204239.4196869.16401108.55549,982.99204239.4196869.16401108.5649,982.9936763.09235436.44972199.5418,996.94241,002.49232,305.61473,308.1058,979.930.45276707050.4364280.88919546250.110.45276707050.88919507050.88919546250.46910.48410.95320.050.46910.95320.95320.96518241420.93285257080.932852982

ESTADO DE LA OBRA RESPECTO AL CRONOGRAMA...VER PAGINA 6(14230.21 / 30650.40) X 100

CAO_ACTUALIZADO_INICIO_CTTOCALENDARIO DE AVANCE DE OBRA PROGRAMADO

ObraMEJORAMIENTO DE REDES DE AGUA POTABLE EN EL AA.HH. MORANA BAJAERROR:#REF! ERROR:#REF!DepartamentoLA LIBERTADProv.CHEPENDistritoCHEPENERROR:#REF!Plazo60 DIAS CALE+NDARIO ERROR:#REF! ERROR:#REF!

Partidas TotalMes 01 - MAYO 2012 Mes 02 - JUNIO 2012 S/.%%01 ESTRUCTURAS 31,533.3417,928.0956.85%13,605.2543.15%36263.3401 Obras Preliminares 1,668.201,668.20100.00%0.00.00%1,668.2002 Movimiento de Tierras 17,729.7810,637.8760.00%7,091.9140.00%17,729.7803 Suministro e Instalacion de Tuberia 11,269.565,071.3045.00%6,198.2655.00%11,269.5604 Valvulas Y Accesorios 624.78406.1165.00%218.6735.00%624.7805 Colocacion de Valvula y Accesorio241.02144.6160.00%96.4140.00%Costo Directo 31,533.3417,928.0913,605.2536,263.34Gastos Generales 4% 1,261.33717.12544.21Utilidad 4% 1,261.33717.12544.21Sub Total Precios del Valor Referencial 34,056.0019,362.330.014,693.670.0Sub Total Precios del Contrato (0.90) 30,650.4017,426.100.013,224.310.0 PORCENTAJE DE AVANCE PARCIAL DE OBRA100.00%56.85%ERROR:#REF!43.15%ERROR:#REF!PORCENTAJE DE AVANCE ACUMULADO DE OBRA56.85%ERROR:#REF!100.00%ERROR:#REF!

21867.30%0.00%0.00%0.00%9640.80%MAYO26.90%56.85%3.00%ERROR:#REF!MAYOJUNIOTOTALJUNIO43.15%100.00%100.00%16,420.2014,230.2130,650.41 JULIOERROR:#REF!ERROR:#REF!60.00%PORCENTAJE DE AVANCE PARCIAL DE OBRA53.57%46.43%100.00%45.00%PORCENTAJE DE AVANCE ACUMULADO DE OBRA53.57%100.00%Pag. 3

CALENDARIO DE AVANCE DE OBRA REAL

Kr

K =0.266Jr+0.263DVTr+0.329MMHr+0.142GGrJoDVToMMHoGGo

DESC.SIMB.COD.COEF. INC.PORCENT.IND. BASEI U rI U aKV2Kad%Oct. 11Apr-12Mar-12Apr-12Mar-12MANO DE OBRAJ0.2660.2660.26647100.00%448.29448.25448.25

DLARDTV300.26310.61%361.12357.90354.390.2600.256TUBERIA DE PVC7282.69%351.77346.99340.98VALVULA DE BRONCE NACIONAL776.70%276.18275.39274.69HERRAMIENTAS MANUALESMMH370.3294.11%278.94290.26286.860.3260.325Maquinaria y Equipo Nacional4817.70%330.64329.22327.49Maquinaria y Equipo Importado4978.19%238.25234.59234.24GASTOS GENERALESGG390.142100.00%0.1450.144368.88377.30375.16

1.0000.9970.991K

Kr : Coeficiente Reajuste Valorizacion

Pag. 4

MANO DE OBRA

KV =0.266

DOLAR -TUBERIA DE PVC - VALVULA DE BRONCE NACIONAL KV = =0.260

HERRAMIENTAS MANUALES - MAQUINARIA Y EQUIPO NACIONAL - MAQUINARIA Y EQUIPO IMPORTADOKV0.326 =

47448.25

GASTOS GENERALES30357.972346.9977275.3937290.2648329.22KV0.14549234.59 =39377.30

Pag. 5MANO DE OBRAKV =0.266DOLAR -TUBERIA DE PVC - VALVULA DE BRONCE NACIONAL KV = =0.256

HERRAMIENTAS MANUALES - MAQUINARIA Y EQUIPO NACIONAL - MAQUINARIA Y EQUIPO IMPORTADOKV0.325 =

GASTOS GENERALESKV0.144 =

Pag. 6

CALCULO DE LOS COEFICIENTES DE REINTEGROCALCULO DEL K DE LA VALORIZACION 2 (KV2)0.266 x 100% x (448.25/448.29) =0.263 x (4.11% x 290.26) + (17.70% x 329.22) + (78.19% x 234.59)(4.11% x 278.94) + (17.70% x 330.64) + (78.19% x 238.25)0.142 x 100% x (377.30/368.88) =CALCULO DEL K DEL ADELANTO (Kad)ver pagina 9ver pagina 100.329 x (10.61% x 361.12) + (82.69% x 351.77) + (6.70% x 276.18)(10.61% x 357.90) + (82.69% x 346.99) + (6.70% x 275.39)0.266 x 100% x (448.25/448.29) =0.263 x (10.61% x 286.86) + (17.70% x 327.49) + (78.19% x 234.24)(10.61% x 278.94) + (17.70% x 330.64) + (78.19% x 238.25)0.142 x 100% x (375.16/368.88) =0.329 x (4.11% x 361.12) + (82.69% x 351.77) + (6.70% x 276.18)(4.11% x 354.39) + (82.69% x 340.98) + (6.