  • Obra: CONSTRUCCION DE LA PAVIMENTACION DE ASFALTO EN FRIO EN LAS CALLES DEL CIRCUITO VIAL DEL TRANSPORTE PUBLICO EN EL CENTRO POBLADO MENOR DE SALTUR, DISTRITO DE ZAA-CHICLAYO-LAMBAYEQUE

    Contratista: Constructora G. Mori S.R.L.

    Cliente: GOBIERNO REGIONAL DE LAMBAYEQUE Sede Central (REGIN LAMBAYEQUE)

    Lugar: CENTRO POBLADO MENOR DE SALTUR, DISTRITO DE ZAA-CHICLAYO-LAMBAYEQUE

    Inspector: ING JAVIER GONZALES BERNILLA

    Contrato: N 014-2014-GR.LAMB

    Presupuesto: S/. 1,625,717.22

    VALORIZACION 02 - MES OCTUBRE 2014ITEM DESCRIPCION Und.

    01 OBRAS PROVISIONALES 01.01 CARTEL DE 3.60X8.5M TIPO BARNER PARA OBRA und.01.02 CASETA PARA GUARDIAN Y/O DEPOSITO est.01.03 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIAS GLB02 PAVIMENTACIN FLEXIBLE02.01 TRABAJOS PRELIMINARES02.01.01 TRAZO Y REPLANTEO m202.02 MOVIMIENTO DE TIERRAS02.02.01 CORTE DE TERRENO NATURAL m302.02.02 PERFILADO Y COMPACTADO DE LA SUBRASANTE m202.02.03 ELIMINACION DE MATERIAL EXCEDENTE m302.03 PAVIMENTOS02.03.01 SUB BASE GRANULAR E=0.25M m202.03.02 BASE GRANULAR E=0.20M m2

  • 02.03.03 IMPRIMACIN ASFLTICA m202.03.04 CARPETA ASFLTICA EN CALIENTE DE 2" m203 VEREDAS DE CONCRETO03.01 TRABAJOS PRELIMINARES03.01.01 TRAZO NIVELES Y REPLANTEO m203.02 MOVIMIENTO DE TIERRAS03.02.01 EXCAVACION DE ZANJAS P/VEREDAS m303.02.02 DEMOLICION DE VEREDAS DE 0.10M m203.02.03 ACARREO DE MATERIAL ECXEDENTE CON CERRETILLA D=0.50M m303.02.04 NIVELACION INTERIOR APISONADO EQUIPO LIVIANO m203.02.05 ELIMINACION DE MATERIAL EXCEDENTE m303.03 VEREDAS DE CONCRETO03.03.01 CAMA DE ARENILLA E=0.10M m203.03.02 CAMA DE AFIRMADO E=0.10M m203.03.03 ENCOFRADO Y DESENCOFRADO DE VEREDAS m203.03.04 CONCRETO EN UA F'c= 175 kg/cm2 m303.03.05 CONCRETO EN LOSA F'c= 175 kg/cm2 m203.03.06 CURADO DE VEREDAS m203.03.07 JUNTAS ASFLTICAS 1" m04 SARDINELES DE CONCRETO04.01 TRABAJOS PRELIMINARES04.01.01 TRAZO NIVELES Y REPLANTEO m204.01.02 EXCAVACION DE ZANJAS SARDINALES m304.01.03 ACARREO DE MATERIAL ECXEDENTE CON CERRETILLA D=0.50M m304.01.04 ELIMINACION DE MATERIAL EXCEDENTE m304.02 CONCRETO PARA SARDINELES04.02.01 ENCOFRADO Y DESENCOFRADO DE SARDINELES m204.02.02 CONCRETO EN SARDINELES F'c= 175 kg/cm2 m304.02.03 JUNTAS ASFLTICAS 1" m04.02.04 PINTURA DE SARDINELES C/ESMALTE ECONMICO m05 REAS VERDES05.01 SEMBRADO DE GRAS INCLUIDO TIERRA AGRCOLA m205.02 SEMBRADO DE PLANTONES und.

  • 06 VARIOS06.01 PLACA RECORDATORIA INSTALADA und.06.02 LIMPIEZA DE OBRA TERMINADA m206.03 NIVELACIN GENERAL DE BUZONES und.06.04 SEALIZACION DE PAVIMENTO m206.05 PRUEBA COMPACTACIN SUELOS (PROCTOR MODIFICADO DENSIDAD CAMPO) GLB06.06 ENSAYOS Y PRUEBAS GLB06.07 TRANSPORTE TERRESTRE - CEMENTO BOL06.08 TRANSPORTE DE MADERA p206.09 TRANSPORTE A LA OBRA - OTROS m3

    COSTO DIRECTOGASTOS GENERALES(10%)UTILIDAD(8%)SUBTOTALSUB TOTAL X FACTOR DE RELACION (0.90) =SUB TOTAL CONTRACTUAL =IGV(18%)PRESUPUESTO

    SON : UN MILLON SEISCIENTOS VEINTICINCO MIL SETECIENTOS DIECISIETE Y 20/100 NUEVOS SOLES

  • CONSTRUCCION DE LA PAVIMENTACION DE ASFALTO EN FRIO EN LAS CALLES DEL CIRCUITO VIAL DEL TRANSPORTE PUBLICO EN EL CENTRO POBLADO MENOR DE SALTUR, DISTRITO DE ZAA-CHICLAYO-LAMBAYEQUE

    GOBIERNO REGIONAL DE LAMBAYEQUE Sede Central (REGIN LAMBAYEQUE)

    CENTRO POBLADO MENOR DE SALTUR, DISTRITO DE ZAA-CHICLAYO-LAMBAYEQUE

    VALORIZACION 02 - MES OCTUBRE 2014Metrado Precio Unit. Parcial

    CANTERIOR ACTUAL

    Metrado Costo % Metrado9,651.75

    1.00 993.51 993.51 1 993.51 100.00% 05.00 1000.00 5,000.00 1 1000.00 20.00% 11.00 3658.24 3,658.24 0.6 2194.94 60.00% 0.15

    911,702.1617,086.05

    10,678.78 1.60 17,086.05 10678.78 17086.05 100.00% 060,069.46

    1,334.85 5.93 7,915.66 1334.85 7915.66 100.00% 010,678.78 2.63 28,085.19 10678.78 28085.19 100.00% 01,735.30 13.87 24,068.61 1388.24 19254.89 80.00% 347.06

    834,546.6510,678.78 16.15 172,462.30 6407.268 103477.38 60.00% 3203.63410,678.78 14.72 157,191.64 0 0.00 0.00% 9076.963

  • 10,678.78 6.39 68,237.40 0 0.00 0.00% 010,678.78 40.89 436,655.31 0 0.00 0.00% 0

    220,132.244,594.80

    2,871.75 1.60 4,594.80 0 0.00 0.00% 430.762535,669.56

    287.17 36.01 10,340.99 0 0.00 0.00% 43.0755415.93 8.39 3,489.65 0 0.00 0.00% 41.593373.33 31.32 11,692.70 0 0.00 0.00% 55.9995

    2,871.75 1.73 4,968.13 0 0.00 0.00% 0373.33 13.87 5,178.09 0 0.00 0.00% 0

    179,867.882,871.75 8.83 25,357.55 0 0.00 0.00% 287.1752,871.75 11.66 33,484.61 0 0.00 0.00% 287.175364.25 32.20 11,728.85 0 0.00 0.00% 36.42554.10 298.30 16,138.03 0 0.00 0.00% 0

    2,871.75 29.99 86,123.78 0 0.00 0.00% 02,871.75 0.81 2,326.12 0 0.00 0.00% 0896.94 5.25 4,708.94 0 0.00 0.00% 0

    44,275.184,503.37

    900.91 1.60 1,441.46 0 0.00 0.00% 032.31 36.01 1,163.48 0 0.00 0.00% 042.01 31.32 1,315.75 0 0.00 0.00% 042.01 13.87 582.68 0 0.00 0.00% 0

    39,771.81215.43 32.20 6,936.85 0 0.00 0.00% 048.47 298.30 14,458.60 0 0.00 0.00% 0

    179.53 5.25 942.53 0 0.00 0.00% 01,615.74 10.79 17,433.83 0 0.00 0.00% 0

    55,744.531,475.71 35.89 52,963.23 0 0.00 0.00% 0219.00 12.70 2,781.30 0 0.00 0.00% 0

  • 55,788.351.00 498.64 498.64 0 0.00 0.00% 0

    14,451.44 0.98 14,162.41 0 0.00 0.00% 025.00 523.73 13,093.25 0 0.00 0.00% 15

    2,972.80 6.23 18,520.54 0 0.00 0.00% 01.00 2500.00 2,500.00 0.25 625.00 25.00% 0.251.00 2500.00 2,500.00 0 0.00 0.00% 0

    3,459.00 0.95 3,286.05 0 0.00 0.00% 691.84,958.00 0.12 594.96 0 0.00 0.00% 0

    10.00 63.25 632.50 6 379.50 60.00% 1 S/. 1,297,294.21 S/. 181,012.12 13.95% S/. 129,729.42 S/. 18,101.21 S/. 103,783.54 S/. 14,480.97 S/. 1,530,807.16 S/. 213,594.30 S/. 1,377,726.46 S/. 192,234.87 S/. 1,377,726.46 S/. 192,234.87 S/. 247,990.76 S/. 34,602.28 S/. 1,625,717.22 S/. 226,837.15

    SON : UN MILLON SEISCIENTOS VEINTICINCO MIL SETECIENTOS DIECISIETE Y 20/100 NUEVOS SOLES

  • CONSTRUCCION DE LA PAVIMENTACION DE ASFALTO EN FRIO EN LAS CALLES DEL CIRCUITO VIAL DEL TRANSPORTE PUBLICO EN EL CENTRO POBLADO MENOR DE SALTUR, DISTRITO DE ZAA-CHICLAYO-LAMBAYEQUE

    CENTRO POBLADO MENOR DE SALTUR, DISTRITO DE ZAA-CHICLAYO-LAMBAYEQUE

    VALORIZACION 02 - MES OCTUBRE 2014C

    ACTUAL ACUMULADO SALDOCosto % Metrado Costo % Metrado Costo %

    0.00 0.00% 1 993.51 100.00% 0.00 0.00 0%1000.00 20.00% 2 2000.00 40.00% 3.00 3000.00 60%

    548.74 15.00% 0.75 2743.68 75.00% 0.25 914.56 25%

    0.00 0.00% 10678.78 17086.05 100.00% 0.00 0.00 0%

    0.00 0.00% 1334.85 7915.66 100.00% 0.00 0.00 0%0.00 0.00% 10678.78 28085.19 100.00% 0.00 0.00 0%

    4813.72 20.00% 1735.3 24068.61 100.00% 0.00 0.00 0%

    51738.69 30.00% 9610.902 155216.07 90.00% 1,067.88 17246.23 10%133612.90 85.00% 9076.963 133612.90 85.00% 1,601.82 23578.75 15%

  • 0.00 0.00% 0 0.00 0.00% 10,678.78 68237.40 100%0.00 0.00% 0 0.00 0.00% 10,678.78 436655.31 100%

    689.22 15.00% 430.7625 689.22 15.00% 2,440.99 3905.58 85%

    1551.15 15.00% 43.0755 1551.15 15.00% 244.09 8789.84 85%348.97 10.00% 41.593 348.97 10.00% 374.34 3140.69 90%

    1753.90 15.00% 55.9995 1753.90 15.00% 317.33 9938.79 85%0.00 0.00% 0 0.00 0.00% 2,871.75 4968.13 100%0.00 0.00% 0 0.00 0.00% 373.33 5178.09 100%

    2535.76 10.00% 287.175 2535.76 10.00% 2,584.58 22821.80 90%3348.46 10.00% 287.175 3348.46 10.00% 2,584.58 30136.14 90%1172.89 10.00% 36.425 1172.89 10.00% 327.83 10555.97 90%

    0.00 0.00% 0 0.00 0.00% 54.10 16138.03 100%0.00 0.00% 0 0.00 0.00% 2,871.75 86123.78 100%0.00 0.00% 0 0.00 0.00% 2,871.75 2326.12 100%0.00 0.00% 0 0.00 0.00% 896.94 4708.94 100%

    0.00 0.00% 0 0.00 0.00% 900.91 1441.46 100%0.00 0.00% 0 0.00 0.00% 32.31 1163.48 100%0.00 0.00% 0 0.00 0.00% 42.01 1315.75 100%0.00 0.00% 0 0.00 0.00% 42.01 582.68 100%

    0.00 0.00% 0 0.00 0.00% 215.43 6936.85 100%0.00 0.00% 0 0.00 0.00% 48.47 14458.60 100%0.00 0.00% 0 0.00 0.00% 179.53 942.53 100%0.00 0.00% 0 0.00 0.00% 1,615.74 17433.83 100%

    0.00 0.00% 0 0.00 0.00% 1,475.71 52963.23 100%0.00 0.00% 0 0.00 0.00% 219.00 2781.30 100%

  • 0.00 0.00% 0 0.00 0.00% 1.00 498.64 100%0.00 0.00% 0 0.00 0.00% 14,451.44 14162.41 100%

    7855.95 60.00% 15 7855.95 60.00% 10.00 5237.30 40%0.00 0.00% 0 0.00 0.00% 2,972.80 18520.54 100%

    625.00 25.00% 0.5 1250.00 50.00% 0.50 1250.00 50%0.00 0.00% 0 0.00 0.00% 1.00 2500.00 100%

    657.21 20.00% 691.8 657.21 20.00% 2,767.20 2628.84 80%0.00 0.00% 0 0.00 0.00% 4,958.00 594.96 100%

    63.25 10.00% 7 442.75 70.00% 3.00 189.75 30% S/. 212,315.79 16.37% S/. 393,327.91 30.32% S/. 903,966.30 69.68% S/. 21,231.58 S/. 39,332.79 S/. 90,396.63 S/. 16,985.26 S/. 31,466.23 S/. 72,317.30 S/. 250,532.63 S/. 464,126.94 S/. 1,066,680.24 S/. 225,479.37 S/. 417,714.24 S/. 960,012.22 S/. 225,479.37 S/. 417,714.24 S/. 960,012.22 S/. 40,586.29 S/. 75,188.56 S/. 172,802.20 S/. 266,065.66 S/. 492,902.81 S/. 1,132,814.41

  • RESUMEN DE VALORIZACION 02 - MES OCTUBRE

    Obra: CONSTRUCCION DE LA PAVIMENTACION DE ASFALTO EN FRIO EN LAS CALLES DEL CIRCUITO VIAL DEL TRANSPORTE PUBLICO EN EL CENTRO POBLADO MENOR DE SALTUR, DISTRITO DE ZAA-CHICLAYO-LAMBAYEQUE

    Cliente: GOBIERNO REGIONAL DE LAMBAYEQUE Sede Central (REGIN LAMBAYEQUE)Lugar: CENTRO POBLADO MENOR DE SALTUR, DISTRITO DE ZAA-CHICLAYO-LAMBAYEQUE

    MONTO DE CONTRATRO S/. 1,625,717.22

    ITEM DESCRIPCION PRESUPUESTOVALORIZACION ANTERIOR

    MONTO VALORIZADO AVANCE %

    001 OBRAS PROVISIONALES S/. 9,651.75 4188.45 43.40%002 PAVIMENTACIN FLEXIBLE S/. 911,702.16 175819.17 19.28%003 VEREDAS DE CONCRETO S/. 220,132.24 0.00 0.00%004 SARDINELES DE CONCRETO S/. 44,275.18 0.00 0.00%005 REAS VERDES S/. 55,744.53 0.00 0.00