ProCert Support
Project at XXXX
August, 20th 2004
Presented par:
Jean Denis,
Ninon L.,
Nathalie G.
-
8/21/2019 vibrationpart2presentation-131203204559-phpapp02
2/19
Assembly & Test
-
8/21/2019 vibrationpart2presentation-131203204559-phpapp02
3/19
Renaiscience :JL Denis 2004 slide 3
ObjectivesObjectives
Increase practical and applied knowledge for Problemesolution in !e" personnel
Organi#e $ Prioritise engine assembl" $ test issues
using the Pro%ert approach
-
8/21/2019 vibrationpart2presentation-131203204559-phpapp02
4/19
Renaiscience :JL Denis 2004 slide 4
&ummar" of 'ork Accomplished&ummar" of 'ork Accomplished
Pro%ert (eplo"ment
(etermined road blocks to (eplo"ment (eveloped means to improve $ accelerate deplo"ment
)entored Pro%ert leaders to understand and appl"
concepts Projects
Provided guidance and engineering support during projecte*ecution
-
8/21/2019 vibrationpart2presentation-131203204559-phpapp02
5/19
Plant XX Assembly
& TestProCert Deployment
-
8/21/2019 vibrationpart2presentation-131203204559-phpapp02
6/19
Renaiscience :JL Denis 2004 slide 6
IssueIssueProCert IntegrationProCert Integration
Pro%ert not considered in e*isting or planned
%ontinuous Improvement program: +ack of visibilit" of owner, strateg" $ deplo"ment plan for Procert
ualit" %linic and A%- teams not full" functional. missing part of infrastructure for Pro%ert deplo"ment
-ngine development occurring in production,overloaded P%- group identified to deplo" Pro%ert
Intense pressure to /uickl" solve major issues
Pro%ert ke" resources not "et identified or funded
)echanism lacking for topdown Project Identification $ &election A%- teams work from bottom-up, Pro%ert works mostl" top-down
)easurement $ &P% not routine practice within assembl" $ test,. therefore lacking reliable data, rigor $ e*perience
-
8/21/2019 vibrationpart2presentation-131203204559-phpapp02
7/19
Renaiscience :JL Denis 2004 slide 7
esolution1ecommendationProCert Integration
Implement bottomup means of integrating Pro%ert into
planned3 %ontinuous Improvement Program
Quality Clinic
Process
collects $ transforms info
into actions, priorities for
resolution and commits
resources to supportproblem resolution
Stakeholders:
Plant mgr
Quality mgrs
Program mgrs
ProCert leaders & teams
ACE pilots & cells
Procurement
Producers
etc.
stakeholder needs:
0 info to base decisions $ actions
0 status of issues0 clinic performance metrics
0 etc4
2define whether a stakeholder is
accountable for results, responsible for
action, should be consulted or simpl"
needs to be informed 53
Clinic Inputs:
ACE cell out-of-scope issues
QNs
QCPCs
MFA misses
quality escapes
Measurable Outputs:
clinic effectiveness
issues raised vs
closed
time to resolve escapes
! completion status
issues per part or
program
etc.
Deliverable Outputs:
Issue priorit" list
Identification of s"stemic and
common root causes
6%OP7
ProCert Project selections
etc4
Notes:
- ProCert elements in italics
- "o #e furt$er developed are: list of %tae$olders & t$eir needs'
QC process metrics' clinic delivera#les.- Criticism of e(isting Clinic design proposal is t$at $ig$ level
mgrs )ould #e at t$e mtg and t$at t$e mtg often deals )it$ lo)
level issues. "$erefore' it is useful to *st e(amine )$o t$e
stae$olders are and )$at t$eir real needs are' t$en tailor t$e
process and outputs to suit. ProCert is a NE+ stae$older,
-
8/21/2019 vibrationpart2presentation-131203204559-phpapp02
8/19
Renaiscience :JL Denis 2004 slide 8
esolutionesolution11ecommendationecommendationProCert IntegrationProCert Integration
8ormalise Top-downproject identification process
8ormalise Bottom-upproject identification process (efine $ 8ormalise deplo"ment process
use inputprocessoutputmetricsstakeholder anal"sis3
Identif" deplo"ment risk and acceleration factors
-
8/21/2019 vibrationpart2presentation-131203204559-phpapp02
9/19
Renaiscience :JL Denis 2004 slide 9
IIssuessueProblem-Solving StrategyProblem-Solving Strategy
Pro%ert not recognised as a problemsolving strateg"
for major %9 9op(own3 problems %omple*it" of appl"ing Pro%ert in Assembl" and 9est
for problemsolving
+owvolume, highl" comple* product lack of good, plentiful data from consistent e*amples
:igh unit costs difficult and costl" to e*periment for causes $ solutions
-
8/21/2019 vibrationpart2presentation-131203204559-phpapp02
10/19
Renaiscience :JL Denis 2004 slide 10
esolutionesolution11ecommendationecommendationProblem-Solving StrategyProblem-Solving Strategy
-stablished $ walked management through a 9op
down problem solving strateg" for major %9problems;
-
8/21/2019 vibrationpart2presentation-131203204559-phpapp02
11/19
Renaiscience :JL Denis 2004 slide 11
IssueIssueVibe Measurement UncertaintyVibe Measurement Uncertainty
=ibe measurement uncertaint" unknown %auses multiple vibe surve"s to be done Passes engines that should be failed %auses rebuild $ retest of engines that should be passed
%onfuses and masks causes of e*cess vibration Incurs tremendous costs and multiplication of production dela"s
-*tremel" costl" to assess uncertaint" b"
conventional Pro%ert methodolog" gage $3 >eed to develop practical and effective alternative 5
-
8/21/2019 vibrationpart2presentation-131203204559-phpapp02
12/19
Renaiscience :JL Denis 2004 slide 1$
Adapted and transferred means of assessing vibrationmeasurement uncertaint" Approach and methodolog" to perform assessment
in most economical fashion Identification $ grouping of influential variables 9est Procedures (ata anal"sis of transducer variation
>e*t &teps; Identif" greatest contributors to uncertaint" and improve where
possible Implement &P% in 9est %ells
esolution1ecommendationVibe Measurement Uncertainty
-
8/21/2019 vibrationpart2presentation-131203204559-phpapp02
13/19
Plant Assembly &
TestPro%ets
-
8/21/2019 vibrationpart2presentation-131203204559-phpapp02
14/19
Renaiscience :JL Denis 2004 slide 14
8acilitated improvement of Pro%ert )andate form
Identified, got consensus on :igh+evel %ustomerissues and priorities: :igh rotor $ +ow rotor =ibration?
&pecific 8uel %onsumption? Inter9urbine 9emperature?
Operabilit"
'ork Accomplished
-
8/21/2019 vibrationpart2presentation-131203204559-phpapp02
15/19
Renaiscience :JL Denis 2004 slide 1&
8acilitated identification and prioritisation of
contributor" elements midlevel projects3:@3 :P9 Ass" $ Install process
23 :P9 alancing processes
B3 :P9@ =ane $ +P9B =ane ring Ass" $ flow measurement43 +P9 Ass" balancing process
C3 +P9 install process
D3 :P9 tip clearance 9urbine3
E3 :P9 tip clearance shroud3
'ork Accomplished
-
8/21/2019 vibrationpart2presentation-131203204559-phpapp02
16/19
Renaiscience :JL Denis 2004 slide 16
)apped !e" Process at midlevel
:P 9urbine assembl" $ install, including tieshaft r1o aseline Anal"sis of )ap using e*isting data Assessed statistical control, identified suspects;
9urbine assembl" $ install using proprietar" algorithm;random outcome, not a capable process for P' B0F :P9 or :P%,could be either:assembl" process or AGIA) process
:P% $ :P9 component initial outofbalanceselect alternate datum points and revise mfg process
AGIA) dimensioning and stacking processinvestigate, compare with earlier model engine data $ e*perience 9est %ell =ibration )easurement
initial anal"sis of transducers suggests large contributor to variation
'ork Accomplished
-
8/21/2019 vibrationpart2presentation-131203204559-phpapp02
17/19
Renaiscience :JL Denis 2004 slide 17
'ork Accomplished'ork Accomplished
Identified lowerlevel projects;
:P9 assembl" :P% assembl" Assessment of =ibration )easurement Hncertaint" (imensioning $ stacking process 9ieshaft stretching :P% $ :P9 component initialoutofbalance
&upplied concepts not considered within Pro%ert training:
(ata collection strateg" and toolsevolves to control planJ later3
Project planning structure to establish time and resourcere/uirements and commitments
-
8/21/2019 vibrationpart2presentation-131203204559-phpapp02
18/19
Renaiscience :JL Denis 2004 slide 18
>e*t &teps>e*t &teps
(efine $ write project mandates
Prepare draft Project Plans Identif" project team members and launch projects;
Implement structured data collection plan in specific areas of
assembl" and test Identif" practical, costeffective means for developing
needed but missing information through(esigned -*periments )an" designed e*periments to be conducted
-*ecute projects +arge /uantit" of processes to certif"
-
8/21/2019 vibrationpart2presentation-131203204559-phpapp02