    ProCert Support

    Project at XXXX

    August, 20th 2004

    Presented par:

    Jean Denis,

    Ninon L.,

    Nathalie G.

  • 8/21/2019 vibrationpart2presentation-131203204559-phpapp02

    2/19

    Assembly & Test

  • 8/21/2019 vibrationpart2presentation-131203204559-phpapp02

    3/19

    Renaiscience :JL Denis 2004 slide 3

    ObjectivesObjectives

    Increase practical and applied knowledge for Problemesolution in !e" personnel

    Organi#e $ Prioritise engine assembl" $ test issues

    using the Pro%ert approach

  • 8/21/2019 vibrationpart2presentation-131203204559-phpapp02

    4/19

    Renaiscience :JL Denis 2004 slide 4

    &ummar" of 'ork Accomplished&ummar" of 'ork Accomplished

    Pro%ert (eplo"ment

    (etermined road blocks to (eplo"ment (eveloped means to improve $ accelerate deplo"ment

    )entored Pro%ert leaders to understand and appl"

    concepts Projects

    Provided guidance and engineering support during projecte*ecution

  • 8/21/2019 vibrationpart2presentation-131203204559-phpapp02

    5/19

    Plant XX Assembly

    & TestProCert Deployment

  • 8/21/2019 vibrationpart2presentation-131203204559-phpapp02

    6/19

    Renaiscience :JL Denis 2004 slide 6

    IssueIssueProCert IntegrationProCert Integration

    Pro%ert not considered in e*isting or planned

    %ontinuous Improvement program: +ack of visibilit" of owner, strateg" $ deplo"ment plan for Procert

    ualit" %linic and A%- teams not full" functional. missing part of infrastructure for Pro%ert deplo"ment

    -ngine development occurring in production,overloaded P%- group identified to deplo" Pro%ert

    Intense pressure to /uickl" solve major issues

    Pro%ert ke" resources not "et identified or funded

    )echanism lacking for topdown Project Identification $ &election A%- teams work from bottom-up, Pro%ert works mostl" top-down

    )easurement $ &P% not routine practice within assembl" $ test,. therefore lacking reliable data, rigor $ e*perience

  • 8/21/2019 vibrationpart2presentation-131203204559-phpapp02

    7/19

    Renaiscience :JL Denis 2004 slide 7

    esolution1ecommendationProCert Integration

    Implement bottomup means of integrating Pro%ert into

    planned3 %ontinuous Improvement Program

    Quality Clinic

    Process

    collects $ transforms info

    into actions, priorities for

    resolution and commits

    resources to supportproblem resolution

    Stakeholders:

    Plant mgr

    Quality mgrs

    Program mgrs

    ProCert leaders & teams

    ACE pilots & cells

    Procurement

    Producers

    etc.

    stakeholder needs:

    0 info to base decisions $ actions

    0 status of issues0 clinic performance metrics

    0 etc4

    2define whether a stakeholder is

    accountable for results, responsible for

    action, should be consulted or simpl"

    needs to be informed 53

    Clinic Inputs:

    ACE cell out-of-scope issues

    QNs

    QCPCs

    MFA misses

    quality escapes

    Measurable Outputs:

    clinic effectiveness

    issues raised vs

    closed

    time to resolve escapes

    ! completion status

    issues per part or

    program

    etc.

    Deliverable Outputs:

    Issue priorit" list

    Identification of s"stemic and

    common root causes

    6%OP7

    ProCert Project selections

    etc4

    Notes:

    - ProCert elements in italics

    - "o #e furt$er developed are: list of %tae$olders & t$eir needs'

    QC process metrics' clinic delivera#les.- Criticism of e(isting Clinic design proposal is t$at $ig$ level

    mgrs )ould #e at t$e mtg and t$at t$e mtg often deals )it$ lo)

    level issues. "$erefore' it is useful to *st e(amine )$o t$e

    stae$olders are and )$at t$eir real needs are' t$en tailor t$e

    process and outputs to suit. ProCert is a NE+ stae$older,

  • 8/21/2019 vibrationpart2presentation-131203204559-phpapp02

    8/19

    Renaiscience :JL Denis 2004 slide 8

    esolutionesolution11ecommendationecommendationProCert IntegrationProCert Integration

    8ormalise Top-downproject identification process

    8ormalise Bottom-upproject identification process (efine $ 8ormalise deplo"ment process

    use inputprocessoutputmetricsstakeholder anal"sis3

    Identif" deplo"ment risk and acceleration factors

  • 8/21/2019 vibrationpart2presentation-131203204559-phpapp02

    9/19

    Renaiscience :JL Denis 2004 slide 9

    IIssuessueProblem-Solving StrategyProblem-Solving Strategy

    Pro%ert not recognised as a problemsolving strateg"

    for major %9 9op(own3 problems %omple*it" of appl"ing Pro%ert in Assembl" and 9est

    for problemsolving

    +owvolume, highl" comple* product lack of good, plentiful data from consistent e*amples

    :igh unit costs difficult and costl" to e*periment for causes $ solutions

  • 8/21/2019 vibrationpart2presentation-131203204559-phpapp02

    10/19

    Renaiscience :JL Denis 2004 slide 10

    esolutionesolution11ecommendationecommendationProblem-Solving StrategyProblem-Solving Strategy

    -stablished $ walked management through a 9op

    down problem solving strateg" for major %9problems;

  • 8/21/2019 vibrationpart2presentation-131203204559-phpapp02

    11/19

    Renaiscience :JL Denis 2004 slide 11

    IssueIssueVibe Measurement UncertaintyVibe Measurement Uncertainty

    =ibe measurement uncertaint" unknown %auses multiple vibe surve"s to be done Passes engines that should be failed %auses rebuild $ retest of engines that should be passed

    %onfuses and masks causes of e*cess vibration Incurs tremendous costs and multiplication of production dela"s

    -*tremel" costl" to assess uncertaint" b"

    conventional Pro%ert methodolog" gage $3 >eed to develop practical and effective alternative 5

  • 8/21/2019 vibrationpart2presentation-131203204559-phpapp02

    12/19

    Renaiscience :JL Denis 2004 slide 1$

    Adapted and transferred means of assessing vibrationmeasurement uncertaint" Approach and methodolog" to perform assessment

    in most economical fashion Identification $ grouping of influential variables 9est Procedures (ata anal"sis of transducer variation

    >e*t &teps; Identif" greatest contributors to uncertaint" and improve where

    possible Implement &P% in 9est %ells

    esolution1ecommendationVibe Measurement Uncertainty

  • 8/21/2019 vibrationpart2presentation-131203204559-phpapp02

    13/19

    Plant Assembly &

    TestPro%ets

  • 8/21/2019 vibrationpart2presentation-131203204559-phpapp02

    14/19

    Renaiscience :JL Denis 2004 slide 14

    8acilitated improvement of Pro%ert )andate form

    Identified, got consensus on :igh+evel %ustomerissues and priorities: :igh rotor $ +ow rotor =ibration?

    &pecific 8uel %onsumption? Inter9urbine 9emperature?

    Operabilit"

    'ork Accomplished

  • 8/21/2019 vibrationpart2presentation-131203204559-phpapp02

    15/19

    Renaiscience :JL Denis 2004 slide 1&

    8acilitated identification and prioritisation of

    contributor" elements midlevel projects3:@3 :P9 Ass" $ Install process

    23 :P9 alancing processes

    B3 :P9@ =ane $ +P9B =ane ring Ass" $ flow measurement43 +P9 Ass" balancing process

    C3 +P9 install process

    D3 :P9 tip clearance 9urbine3

    E3 :P9 tip clearance shroud3

    'ork Accomplished

  • 8/21/2019 vibrationpart2presentation-131203204559-phpapp02

    16/19

    Renaiscience :JL Denis 2004 slide 16

    )apped !e" Process at midlevel

    :P 9urbine assembl" $ install, including tieshaft r1o aseline Anal"sis of )ap using e*isting data Assessed statistical control, identified suspects;

    9urbine assembl" $ install using proprietar" algorithm;random outcome, not a capable process for P' B0F :P9 or :P%,could be either:assembl" process or AGIA) process

    :P% $ :P9 component initial outofbalanceselect alternate datum points and revise mfg process

    AGIA) dimensioning and stacking processinvestigate, compare with earlier model engine data $ e*perience 9est %ell =ibration )easurement

    initial anal"sis of transducers suggests large contributor to variation

    'ork Accomplished

  • 8/21/2019 vibrationpart2presentation-131203204559-phpapp02

    17/19

    Renaiscience :JL Denis 2004 slide 17

    'ork Accomplished'ork Accomplished

    Identified lowerlevel projects;

    :P9 assembl" :P% assembl" Assessment of =ibration )easurement Hncertaint" (imensioning $ stacking process 9ieshaft stretching :P% $ :P9 component initialoutofbalance

    &upplied concepts not considered within Pro%ert training:

    (ata collection strateg" and toolsevolves to control planJ later3

    Project planning structure to establish time and resourcere/uirements and commitments

  • 8/21/2019 vibrationpart2presentation-131203204559-phpapp02

    18/19

    Renaiscience :JL Denis 2004 slide 18

    >e*t &teps>e*t &teps

    (efine $ write project mandates

    Prepare draft Project Plans Identif" project team members and launch projects;

    Implement structured data collection plan in specific areas of

    assembl" and test Identif" practical, costeffective means for developing

    needed but missing information through(esigned -*periments )an" designed e*periments to be conducted

    -*ecute projects +arge /uantit" of processes to certif"

  • 8/21/2019 vibrationpart2presentation-131203204559-phpapp02

    19/19

    To Reach Us

    'e(n Denis

    e-m(il : %ld*+(lues,"m(il*om