Generative ComponentsVUW Presentation 21 May 2007
Michael Middlebrook
-
8/2/2019 VUW Presentation 2007
2/38
How is it different? Who uses it
Case studies
Why does Jasmax use it
Some examples
Generative Components
-
8/2/2019 VUW Presentation 2007
3/38
Long chain associativity. Build complexity from jigs
Allows conditional modelling: the ability to encode and exercise alternative implicationsallowing changes in behaviour or configuration.
Multiple Representation: the ability for the user to simultaneously create and operate ondifferent, complementary, linked representations
Extensible: the ability to turn parametric models into a new re-usable components, wherebehaviour of the component is defined by the original model.
Replicable Components: the ability to operate on sets of components, potentially where eachset member can uniquely respond to variations in its context.
Graphical and Transactional Model of Design with Symbolic view
Programmatic Design. Both within the transaction file and programming in C#
Parallels advances in fabrication mass customization and rapid prototyping
Enables generation of a large number of contenders for comparative analysis
Enables experimentation and discovery of new forms
Generative Components How is it different?
-
8/2/2019 VUW Presentation 2007
4/38
-
8/2/2019 VUW Presentation 2007
5/38
Part of a comprehensive BIM solution. Revit can do 95% of the types of buildings that we design veryefficiently, enabled us to move quickly to full 3D modelling of buildings and allow us to move towardsachieving Building Information Modelling. We need other software to enable us to do the 5% of buildings andcomponents that Revit cannot (yet?) do. GC can do the remainder but would not be economic for simplerbuilding forms.
Expect that Revit will continue to improve but that the potential solution set resulting from designing withinany one environment will be limited. We will always need additional tools and ways of approaching design.Interoperability is key. Common format is currently AutoCAD .DWG
Generative Components Why have Jasmax got it?
-
8/2/2019 VUW Presentation 2007
6/38
New building forms offer greater efficiencies both structurallyand for energy efficiency over traditional forms. Diagrid
structures, NURBS, tordos, twisters, forms that more
effectively follow environmental constraints.
Generative Components Why have Jasmax got it?
Santiago Calatrava
-
8/2/2019 VUW Presentation 2007
7/38
New geometric forms and design exploration. Generating new geometries. genetic
design, algorithmic design, kinetic architecture, mathematical forms, progressions,
algebraic geometry
Generative Components Why have Jasmax got it?
-
8/2/2019 VUW Presentation 2007
8/38
Nucleus for an advanced geometry group. Will explore potentials for GC.
Industry links. New Architecture. Genetic Architecture, biomimetic design
We continue to look at other software and shape generators. Starlogo, Ecotec,
Energy Plus, Nucalc
Have an in-house research groups looking at digital fabrication andmanufacturing, ESD/Ecological Design and a Technical Group
Generative Components Why have Jasmax got it?
-
8/2/2019 VUW Presentation 2007
9/38
Skytower - Curved aluminium faade. Surface of revolution of a Gordon Moller handsketched curve measured and defined mathematically using a Taylor Polynomial in Excel.This enabled us to give accurate coordinates of any point on the curved faade. The faadepanels were then defined as a series of conical rings and analyzed against the freeform curvemodel to prove that panels curved simply could be sprung into ciontinuous curved mullions.
Early Projects - Skytower
-
8/2/2019 VUW Presentation 2007
10/38
Ascot Metropolis Tower - Roof Dome. This form was based on the Ziggurat and used a seriesof nested paraboloids to define both the edges of the steps and the insteps with parabolassimilarly defining the vertices of the air intake louvres
Early Projects - Metropolis
-
8/2/2019 VUW Presentation 2007
11/38
Royal Sun Alliance/Vero Building - Halo. The halo was modelled in its entirety severaltimes non-parametrically using AutoCAD. Slight set out changes of structural setoutrequired extensive rework to meet the geometric constraints.
Early Projects Vero Building
-
8/2/2019 VUW Presentation 2007
12/38
-
8/2/2019 VUW Presentation 2007
13/38
Design Data: 72 modules with 5deg twist per floor
179.8m tall. 40 levels 2.75m floor to ceiling height, 4.15m flr-flr Diameters: 1st floor 50m, 17th floor 57m, 38th
floor 30m Diagrid structure = 20% less steel. Deep thin
beam, clear internal floors, core carries gravityloads only. Change of structure at 158m (L38) tofully welded steel lattice
Diagrid glazing. 5500 panes of glass. All floorsdifferent sized triangles and need to managethese variations, operable, air slots
Double skin. Uniform faade with blinds toachieve thermal control.
6 storey voids for light penetration Low wind impact both externally and structurally Clear dome to complete lattice at apex Modelled in GC and Xsteel
Foster and Partners 30 St Mary Axe
-
8/2/2019 VUW Presentation 2007
14/38
BMUs (Building Maintenance Units)
operate both up (hydraulic arm)and down (cradles) the buildingfrom garages at levels 36 and 40.There is also a rescue trolley foruse if other systems fail
Foster and Partners 30 St Mary Axe
-
8/2/2019 VUW Presentation 2007
15/38
Foster and Partners 30 St Mary Axe
-
8/2/2019 VUW Presentation 2007
16/38
Foster and Partners 30 St Mary Axe
-
8/2/2019 VUW Presentation 2007
17/38
Foster and Partners 30 St Mary Axe
-
8/2/2019 VUW Presentation 2007
18/38
Grimshaw Architects are another firm with a specialisedgeometry group using Generative Components. This is a newrailway station at Spencer Street in Melbourne designed inassociation with Jackson Architects. The design allowed forstaged construction over a working station and is based on awarped sinusoidal surface.
Grimshaw Architects Southern Cross Station
-
8/2/2019 VUW Presentation 2007
19/38
National Space Centre
Grimshaw Architects Various Projects
Cutty Sark Restoration
Eden Project
-
8/2/2019 VUW Presentation 2007
20/38
Grimshaw Architects NY Transit Station
-
8/2/2019 VUW Presentation 2007
21/38
Grimshaw Architects NY Transit Station
-
8/2/2019 VUW Presentation 2007
22/38
Bernhard Franken ABB Architekten BMW Pavilion
-
8/2/2019 VUW Presentation 2007
23/38
Bernhard Franken ABB Architekten BMW Pavilion
-
8/2/2019 VUW Presentation 2007
24/38
Jasmax One Fanshawe Street
-
8/2/2019 VUW Presentation 2007
25/38
GC Beijing Olympic Stadiums PTW Herzog de Meuron
-
8/2/2019 VUW Presentation 2007
26/38
Jasmax One Fanshawe Street
-
8/2/2019 VUW Presentation 2007
27/38
Jasmax One Fanshawe Street
-
8/2/2019 VUW Presentation 2007
28/38
Jasmax One Fanshawe Street
-
8/2/2019 VUW Presentation 2007
29/38
-
8/2/2019 VUW Presentation 2007
30/38
-
8/2/2019 VUW Presentation 2007
31/38
-
8/2/2019 VUW Presentation 2007
32/38
GC Flexible Form
-
8/2/2019 VUW Presentation 2007
33/38
GC Images
Fabian Evers
-
8/2/2019 VUW Presentation 2007
34/38
GC NYC Workshop 2007
Asymptote
-
8/2/2019 VUW Presentation 2007
35/38
GC NYC Workshop 2007
Component Radius
Jeroen Coenders
Peter Vemeii
Andrew Saunders
-
8/2/2019 VUW Presentation 2007
36/38
GC NYC Workshop 2007
SOM
Sigrid Adriaenssens
-
8/2/2019 VUW Presentation 2007
37/38
GC NYC Workshop 2007
Ben Doherty
Jane Kimpian
Arman Chowdhury
-
8/2/2019 VUW Presentation 2007
38/38
Thanks