8/2/2019 CNET 301 Presentation
1/21
Click to edit Master subtitle style
4/23/12
Presented By:
Mayur patelUrvashikumari patel
Rutvik chavanParneet kaur
Small Network Critical Issues andPlanning a Migration
8/2/2019 CNET 301 Presentation
2/21
4/23/12
Introduction
NETSOLs was established in year 2000.
Render networking solutions to small firmsproviding both technical support and networkmaintenance.
75 employees including IT consultants, technicians,network engineers and the management staff
8/2/2019 CNET 301 Presentation
3/21
4/23/12
Current State
8/2/2019 CNET 301 Presentation
4/21
4/23/12
Requirements Gathering
Gathering user and business requirements by surveys:
E-survey for users.
Gathering computing machine and application requirementfrom MIS staff.
Meeting with key managers for future expansion and facilities.
After gathering information, we had created thefollowing Requirement Documentation :
8/2/2019 CNET 301 Presentation
5/21
4/23/12
Network Segment Segment Type Utilization (Percent) Percent Increase in PastSix Months
Corporate Hub Workgroup 1 10 Mbps Shared Ethernet 55 15
Corporate Hub Workgroup 2 10 Mbps Shared Ethernet 50 12
Corporate Hub Workgroup 3 10 Mbps Shared Ethernet 42 8
Corporate Hub Workgroup 4 10 Mbps Shared Ethernet 57 18
Corporate Switch 10 Mbps Switched Ethernet66 (Port from corporate switch
to back bone switch)15
Server Room Switch 10 Mbps Switched Ethernet70(Port from server switch to
backbone switch)18
Classroom 1 Hubs 10 Mbps Shared Ethernet 5 to 10 on average0 (Traffic has remained flat
over the past 6 months
Classroom 2 Hubs 10 Mbps Shared Ethernet 5 to 10 on average0 (Traffic has remained flat
over the past 6 months
Classroon Switch 10 Mbps Switched Ethernet 10 to 20 on average0 (Traffic has remained flat
over the past 6 months
Corporate Backbone Switch toInternet
10 Mbps Switched Ethernet 20 20
Internet Router CPU Utilization
75 20
Current LAN Performance
8/2/2019 CNET 301 Presentation
6/21
4/23/12
Business Requirements Rank: 1=Good5= Unacceptable
Network Security 4.1
Internal Network
Performance
4.2
Web Access Performance 3.8
Implementation Costs 4
Network Scalability 3.5
Remote Access 3.6
Backup Capabilities 3.7
Network Fault Tolerance
4.8
Existing State Of The Network(Analysis From Management & MIS Staff)
8/2/2019 CNET 301 Presentation
7/214/23/12
User Requirements Rank : 1=Good5= Unacceptable
Availability of Printers 4.5
Quality of Printers 3
Ease of Use of Mail System 4.2Internal Network Speed 4.4
Internet Network Speed 4.4
Internet Access Speed 4
Overall Network Stability 4.4
Overall Network Availability 4.5
Access to Network fromHome
3.9
Computer System (PC to 4.4
Existing State Of The Network(Analysis From Users)
8/2/2019 CNET 301 Presentation
8/214/23/12
Current Network Issues
Availability of Printers
Internet speed and Internal Network
SpeedOverall Network Stability andAvailability
Computer Systems
8/2/2019 CNET 301 Presentation
9/21
4/23/12
Objective Of The Project
The network will be improved by adding the followingnetworking components:
Adding 1Gbps switches with PoE for each of the work groupand classrooms.
Adding 1Gbps backbone switches for redundancy and internetconnectivity.
Adding a VPN supporting to the network with firewall for safe,secure and faster internet connection.
Isolating Corporate network from classroom network
Provide higher bandwidth, availability, scalable, secure, and a
fault tolerance network.
8/2/2019 CNET 301 Presentation
10/21
4/23/12
Network Diagram
8/2/2019 CNET 301 Presentation
11/21
4/23/12
Logical Design
Replacing hubs and 10Mps switches with 1Gbpsswitches
Install UPS and NMS to provide fault tolerance andnetwork monitoring
High speed internet and servers for increased networkperformance
Implement a router to:
8/2/2019 CNET 301 Presentation
12/21
4/23/12
LOCATION VLAN IP RANGE HOSTS PERSUBNET
Classroom 1 VLAN201192.168.201.1
- 192.168.201.62 62
Classroom 2 VLAN202
192.168.202.1
- 192.168.202.62 62
Workgroup 1 VLAN101192.168.101.1
- 192.168.101.62 62
Workgroup 2 VLAN102192.168.102.1
- 192.168.102.62 62
Workgroup 3 VLAN103192.168.103.1
- 192.168.103.62 62
Workgroup 4 VLAN104192.168.104.1
- 192.168.104.62 62
Subnetting
8/2/2019 CNET 301 Presentation
13/21
4/23/12
FIRST YEAR(Network Upgrade Summery)
FIRST YEAR
Schedule No. Components Quantity PriceLaborCost /hour
LaborTime
(hours)
TotalLabor
Cost
Spring Break
1. CAT6 Cabling 1500M $650 $200 35 $7,000
2.Work group switches 1Gbps
(Cisco SGE2010P 48-Port)
2 $3997.98 $200 2 $400
3.Corporate switches 1 Gbps
(Cisco SGE2010P 48-Port)2 $3997.98 $200 2 $400
Good FridayLong Weekend
4. APC Smart UPS (8 outlet) 1 $789.99 $200 3 $600
Summer Break 5.Xerox - ColorQube 8870Solid Ink Color Printer
2 $4,998.00 $200 2 $400
Winter Break 6. HP Omni 120xt All-in-one PC 25 $13,749.75 $200 4 $800
7. Allstream E10-10 Mbps ISP 1$1,020/m
onth
TOTAL $28,183.7 $10,620
Total cost for the first year $38,803.70
8/2/2019 CNET 301 Presentation
14/21
4/23/12
SECOND YEAR(Network Upgrade Summery)
SECOND YEAR
Schedule No. Components Quantity PriceLaborCost /hour
LaborTime
(hours)
TotalLaborCost
Family Day LongWeekend
1. Xerox Phaser 3600N Laser Printer 2 $1,139.98 $200 2 $400
Spring Break
2.Class room backbone switch (1 Gbps
Linksys SGE2000 )1 $709.99 $200 2 $400
3. Cisco 2911 Router (Configure VPNand Firewall)
1 $1,290 $200 4 $800
4.Corporate Switch (1 Gbps Cisco
SLM20241 $1,630.22 $200 1 $400
Good Friday LongWeekend
5. HP Omni 120xt All-in-one PC 30 $16,499.70 $200 4 $800
Summer Break 6.Corporate Backbone Switch (1 Gbps
Linksys SGE2000 )1 $709.99 $200 2 $400
Winter Break
7.Server Switch ( 1 Gbps Cisco
SLM2024 )1 $1,630.22 $200 1 $200
8. Server Upgrades 2 $4,156 $200 8 $1,600
TOTAL $27766.10 $5,000
Total cost for the Second year $32,766.10
8/2/2019 CNET 301 Presentation
15/21
4/23/12
THIRD YEAR(Network Upgrade Summery)
THIRD YEAR
Schedule No. Components Quantity PriceLabor
Cost / hour
LaborTime
(hours)
TotalLaborCost
Spring Break
1. Cisco AP 541N WirelessAccess Point
2 $739.98 $200 2 $400
2. Wireless Dual Band
Router (Cisco RV220W)
2 $517.98 $200 2 $400
Summer Break
3. HP Omni 120xt All-in-one PC
25 $13,749.75 $200 3 $600
Winter Break
4. OpManager DeluxeEdition (NMS)
1 $3,599 $200 1 $200
5. Corporate BackboneSwitch (1 Gbps Linksys
SGE2000 )
2 $1,419.98 $200 4 $800
TOTAL $20,026.69 $2,400
Total cost for the Third year 22426.69
8/2/2019 CNET 301 Presentation
16/21
4/23/12
Physical Design Cost
Total 1st Year Cost - $38,803.70
Total 2nd Year Cost - $32,766.10
Total 3rd Year Cost - $22,426.69
Total Cost - $93,996.49
Budget - $120,000
Savings - $26,003.51
Recurring Costs - $1,020 / month (Internet)
8/2/2019 CNET 301 Presentation
17/21
4/23/12
Current Applications
CurrentApplications
Release LevelDaily Usage
(Hours)Number Copies
Windows XP 18 80
Microsoft Office 2003 6 80
Adobe AcrobatReader
7.0 3 80
Adobe Illustrator 8.0 2 2
Adobe Photoshop 5.5 3 43
Intuit Quick Books Pro 99 4 1
McAfee VirusScan 4.0.4057 0.1 60
Winzip 6.0 0.05 60
8/2/2019 CNET 301 Presentation
18/21
4/23/12
Recommended Applications
Future Applications Purpose EstimatedCost per User Comments
Microsoft Windows 7Professional
Operating System $199.99 Upgrade to Windows 7Professional
Microsoft Office2010Upgrade
All $469.00 Upgrade to 2010
Microsoft Expression Web4
Developers, Students $199 Replaced Front Page
Adobe Acrobat Reader X Document Reader Freeware Upgrade from 7.0
Adobe Illustrator Graphic Designers $199 Upgrade to CS5
Adobe InDesign Web Team $199 Upgrade to CS5
Quick Books Pro 2011 Administrative $199.99 Upgrade to latest version
Microsoft SecurityEssential
Antivirus Freeware Online definition updatesavailable
WinRar Compression Software $10.00 For 50-99 Licenses
8/2/2019 CNET 301 Presentation
19/21
4/23/12
Conclusions
The proposed network design meets the objective ofthe project fitting in the budget given and saves about$26,000 from the given budget which could be spendfor getting licensed copies for the softwares.
The new network provides a fast, reliable, scalable,secure, fault tolerance, and manageable network
8/2/2019 CNET 301 Presentation
20/21
4/23/12
Future Recommendations
New network supports wireless printers
Network is IP Phone ready to make VOIP service
available as expected by the management.Upgrade Internet when the ISP offers better value
8/2/2019 CNET 301 Presentation
21/21
4/23/12