OBRAS DE CONCRETO SIMPLE
MOVIMIENTO DE TIERRAS03
OBRAS PROVISIONALES01
04
02 TRABAJOS PRELIMINARES
SEGURIDAD Y SALUD LABORAL
27.73
RELLENO COMPACTADO CON MATERIAL PROPIO
EXCAVACION PARA VIGAS DE 944.7644.92-
M3
34.07
03.04
M303.03HASTA 2.50 M TERRENO NORMALEXCAVACION PARA ZAPATAS 3,874.08113.21
899.84
26.32
65.4603.05 55.99 2,795.80
EXCAVACION PARA SARDINELES 3.20
CIMENTACION HASTA 1.40 MT
106.03TERRENO NORMAL
4.15
13.09
03.02
856.22
-
3,665.11M3
-
318.034.00UND02.04
TRAZO DE NIVELES Y REPLANTEO 368.9169.9766.79
99.31
1.16-
M202.03LIMPIEZA DE TERRENO MANUAL 473.8622.26- 451.60
232.15
1,395.51
39.01
03.06
M3
617.41
HASTA 2.00 MT TERRENO NORMALEXCAVACION PARA CIMIENTOS 1,437.52
62.80
-
243.88
39.0136.85M303.01
REMOCION DE ARBOLES 251.207.32
3,760.87
42.01
04.04
M3
SOBRECIMIENTOS MEZCLA 1:8 + 1,531.3665.03838.15628.18265.40
04.05
M3
M2
1:10 + 30% P.G.CIMIENTOS CORRIDOS MEZCLA 3,288.6075.932,446.13766.54177.57
305.65
5.77
04.06MEZCLA 1:8 + 25% P.M.CONCRETO EN SARDINELES 1,375.3444.12813.68517.54282.41
25% P.M.
M3
04.03
NORMAL EN SOBRECIMIENTOSENCOFRADO Y DESENCOFRADO 2,404.2041.46980.071,382.6740.0160.09
4.87
03.07
18.52
ELIMINACION CON TRANSPORTE 5,743.474,550.29- 1,193.1841.06
04.01
M3
M3
APISONADO MANUALNIVELACION INTERIOR Y 684.6618.3448.91
109.23
2.24
1.49
139.88
04.0230% P.G.SUB CIMIENTOS MEZCLA 1:12 + 1,714.7537.761,296.10380.89173.91
(CARGUIO A MANO) REN.=25 M3/DIA
M3
M2
CEMENTO HORMIGON + 30% P.G.SUB ZAPATA, MEZCLA 1:12 2,496.1654.631,884.57556.96175.9114.19
9.86
1.00
P/PERSONAL
PROVISIONALES P/PERSONALSERVICIOS HIGIENICOS 1,750.00- 1,750.00
GLB
1,750.00
1.00
GLB01.05ENERGIA ELECTRICA PROVICIONAL 3,600.00- 3,600.00
-
P/PERSONALVESTUARIOS PROVISIONALES 800.00800.00
HASTA 0.80 MT TERRENO NORMAL
800.001.00
01.06
01.07
8.00
COMEDOR PROVISIONAL 650.00- 650.00- 650.00
GLB
4,967.70
815.871.00UND01.02Y ALMACEN PROVISIONAL DE OBRACASETA DE GUARDIANIA, OFICINA
-
57.00
9.69
1,898.40230.7730.00M201.01
318.03
6,923.10
280.00
-
MES01.04AGUA PROVISIONAL PARA LA OBRA 2,240.00-
322.98
-
483.20
8.00MES01.03OBRA (BANNER 3.60x2.40 M.)CARTEL DE IDENTIFICACION DE LA 815.87
450.002,240.00
3,200.00
2,500.001.00GLB01.08.05SEGURIDADSEÑALIZACIÓN TEMPORAL DE
SEGURIDAD Y SALUD EN EL
-
-
-
-
1.00
01.08
01.08.04TRABAJO
3,200.00
561.91
M202.02Y MATERIALESTRANSPORTE DE HERRAMIENTAS 16,857.3011,687.70
-
2,919.60
2,500.00
30.00VJE02.01
Y SALUDCAPACITACIÓN EN SEGURIDAD 2,500.00
GLB
2,250.00
55,896.00
1.00GLB01.08.02
ADMINISTRACIÓN DEL PLAN DE
PERSONAL OBRERO
3,119.60
59,568.00
(2MUDASx3MESES)
3,672.00- 7,446.008.00MES01.08.01
3,200.00
- IMPLEMENTACIÓN Y ELABORACIÓN,
IMPLEMENTOS DE SEGURIDAD
-
2,500.00 2,500.002,500.001.00GLB01.08.03PERSONAL TECNICOIMPLEMENTOS DE SEGURIDAD 3,119.603,119.60-
-
HUNTER - AREQUIPA - AREQUIPA
GOBIERNO REGIONAL DE AREQUIPA
"MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA JUAN PABLO VIZCARDO Y GUZMAN DE HUNTER, AREQUIPA"
01 - CONSTRUCCION DE TALLERES 01
Abril - 2013
Sub Presupuesto
Cliente
Obra
Ubicacion
Consorcio: Ing. YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES
Costo a :
Item Descripción Unidad Metrado Precio M.Obra Material Equipo Total
Presupuesto Desagregado
P.1/6
ZAPATAS
COLUMNAS
VIGAS
VIGAS DE CIMENTACION
OBRAS DE CONCRETO ARMADO
ESCALERAS
05
LOSAS ALIGERADAS
5,847.72KG05.04.04VIGAS
47.52 10,984.54ENCOFRADO Y 20,623.68329.849,309.30
4.50
DESENCOFRADO NORMAL EN
M3ALIGERADAS F'C=210 KG/CM2CONCRETO EN LOSAS 19,142.71505.0114,615.674,022.03
FY=4200 KG/CM2 GRADO 60
50.10
5,906.20
05.05.0105.05
ACERO ESTRUCTURAL 26,314.74701.7319,706.81
382.09
ACERO ESTRUCTURAL
2,413.27387.9728.95M305.04.01
05.04.03
FY=4200 KG/CM2 GRADO 60
11,231.73
39,782.481,060.8729,792.658,928.964.508,840.55
05.04
363.35
M2KG/CM2
13,033.53
CONCRETO EN VIGAS F'C=175 824.8017.14
8,445.58
189.23
372.88
2.27M305.04.02KG/CM2CONCRETO EN VIGAS F'C=210
434.00
618.43
F'C=210 KG/CM2
7,402.07
740.86899.8458.6428.44 1,667.7205.06.02 ENCOFRADO Y
CONCRETO EN ESCALERAS 2,718.8960.881,848.87809.14420.23
M2
383.13
KG
ENCOFRADO Y
FY=4200 KG/CM2 GRADO 60ACERO ESTRUCTURAL 1,706.99
27.02
1,278.34
05.06.01
4.50379.33KG05.06.03ESCALERASDESENCOFRADO NORMAL EN
45.52
DESENCOFRADO NORMAL EN
8,990.992,694.634.502,667.95KG
6.47
LOSAS ALIGERADASACERO ESTRUCTURAL
ENCOFRADO Y 164.115,467.3530.18431.86M2
05.05.03
3,046.93
05.05.02
05.06
ALIGERADO15X30X30 CM PARA TECHO LADRILLO HUECO DE ARCILLA 14,316.90
320.16
11,196.55
12,005.78
3.903,671.00UND05.05.04FY=4200 KG/CM2 GRADO 60
M3
73.42
5,158.40
65.97 3,901.66
05.03.04
DESENCOFRADO NORMAL EN ZAPATAS
05.01.03 KG 1,146.31 4.50 1,157.78
05.02.02
137.56
44.95
ACERO ESTRUCTURAL FY=4200 KG/CM2 GRADO 60
05.0205.02.01 M3 373.78 4,139.79 137.93 5,303.94CONCRETO EN VIGAS DE
CIMENTACION F'C= 210 KG/CM2
3,863.06
35.47
04.07 M2 55.32 34.31 1,417.30 438.13 42.60 1,898.03ENCOFRADO Y DESENCOFRADO NORMAL PARA SARDINELES
05.01
1,638.78
M3
2,196.91
352.36 1,690.15 10,564.38 243.68 12,498.21CONCRETO EN ZAPATAS F'C=210 KG/CM2
05.01.02 M2 86.80
1,026.22
05.01.01
F'C=175 KG/CM2
597.28 22,978.34CONCRETO EN COLUMNAS
M2
05.03.02
14.19
6.27 411.85 784.13 1,727.07 71.10
15,794.15
CONCRETO EN COLUMNAS F'C=210 KG/CM2
05.03.03 M2 657.57 51.65 20,805.52 12,533.28 624.69 33,963.49ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS
2,582.30
VIGAS DE CIMENTACION
113.53 42.75 2,873.45 1,893.68 86.28
M3
6,586.91
DESENCOFRADO NORMAL EN 4,853.41
05.02.03 KG 2,761.03
05.03436.2752.67
ENCOFRADO Y
05.03.01
4.50FY=4200 KG/CM2 GRADO 60ACERO ESTRUCTURAL 12,424.64331.339,304.672,788.64
M3
HUNTER - AREQUIPA - AREQUIPA
GOBIERNO REGIONAL DE AREQUIPA
"MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA JUAN PABLO VIZCARDO Y GUZMAN DE HUNTER, AREQUIPA"
01 - CONSTRUCCION DE TALLERES 01
Abril - 2013Costo a :
Cliente
Sub Presupuesto
Obra
Consorcio: Ing. YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES
Ubicacion
EquipoItem TotalM.Obra MaterialUnidad Metrado PrecioDescripción
Presupuesto Desagregado
P.2/6
PISOS Y PAVIMENTOS09
MOLDURAS
10 ZOCALOS Y CONTRAZOCALOS
06
CIELORRASOS08
MUROS Y TABIQUES DE
VARIOS
ALBAÑILERIA
07 REVOQUES, ENLUCIDOS Y
19,955.32VIGAS
07.05 M2
TARRAJEO EN SUPERFICIE DE
657.57 31.63 15,827.71 20,798.94473.45TARRAJEO EN SUPERFICIE DE COLUMNAS
07.06
4,497.78
C/MORTERO 1:5 X
EMPOT)07.03 M2 323.12 21.91 4,785.41 2,151.98 142.17
434.00
TARRAJEO EXTERIOR
416.641.5CM.(INC.COLUMNAS EMPOT)
07.04
TARRAJEO EN SARDINELES
M2
M2
45.98 13,927.06 5,611.62
7,079.56
26.79
239.85
M
130.80 7.25 377.90REVESTIMIENTO DE LAVATORIOS CONCRETO C/MORT. 1:4
17.01
M2
11.88
540.89 16.34 852.19REVESTIMIENTO DE ESCALERAS C/MORT. 1:4
07.10
SELLADO DE JUNTA DE
1:5 X1.5 CM.(INC.COLUMNAS
07.09
183.33
23.59 560.53 401.21 978.75C/MORTERO 1:5 X 1.5CM.
07.07 M 291.00
650.60
2,793.60
31.81
84.39 3,061.32VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS C:A 1:5 E=1.5 CM -
07.08 M2
41.49
10.52
ENCOFRADO DE MADERA
CONSTRUCCIONM2 1,523.44 3.06 1,889.07 2,742.19 30.4705.07.03 ADITIVO DESMOLDANTE PARA
4,492.56
05.07.04 M2 1,523.44 2.03 335.16 2,742.19 15.23 3,092.58
4,661.73
295.19
6.61
294.96
05.0705.07.01 M2 29.49 10.01 122.38
7,540.45
2.36
61.25
JUNTA DE CONSTRUCCION CON TEKNOPORT
05.07.02 M 360.27 20.93 2,986.64
06.01
170.45
PRIMARIO C/MORTERO 1:5
ADITIVO CURADOR DE
07.01 M2 6.25 17.90 70.75 39.00 2.13
ARCILLA DE SOGA C/M 1:4 X
TARRAJEO DE TIPO RAYADO O
MUROS DE LADRILLO KK DE
07.02 M2 363.41 19.89 4,666.18 2,420.31 141.73 7,228.22
111.88
1.0CM.
TARRAJEO INTERIOR C/MORTERO
M2 88.20 120.02 3,287.21 7,199.77 98.78 10,585.76
1.0CM.
ARCILLA DE CABEZA C/M 1:4 X
CONCRETO EN OBRA
06.02 M2 147.83 67.27 3,160.60 6,647.92 136.00 9,944.52
MUROS DE LADRILLO KK DE
2,350.20
PISO CERAMICO ANTIDESLIZANTE
6,019.74293.65
31.81
1,567.90107.17M209.05
10.01
PISO DE CEMENTO PULIDO E=5
M
43.80841.801,464.6039.1760.00M209.0440X40 CM
CM. MORTERO 1:4
10.02
4,176.85
NIVELCERAMICO DE 20 X 30 CM EN 2DO 1,315.8814.87803.93497.0884.95
VEREDA DE CONCRETO DE 4"
M2
56.17
H=10 CMCONTRAZOCALO DE CERAMICO 3,682.6074.121,130.262,478.2215.90231.61
15.49
8,313.30
2,189.7428.70178.90M209.01
C/MORTERO 1:5TARRAJEO DE CIELO RASO 14,558.00
2,699.60
5,994.22M2 33.71431.86
3,552.75
08.01
4,158.19
4,300.47123.62-
250.48
CONTRAPISO 5 CM. MORTERO 1:5
245.09
2,077.741,432.1759.7159.50M2
BRUÑAS DE 20mm
09.034,104.23233.77
1:10 (C:H)5,134.43FALSO PISO DE 4" DE CONCRETO
1,961.6009.0242.84
M2 175.77 23.35 1,908.86
HUNTER - AREQUIPA - AREQUIPA
"MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA JUAN PABLO VIZCARDO Y GUZMAN DE HUNTER, AREQUIPA"
GOBIERNO REGIONAL DE AREQUIPA01 - CONSTRUCCION DE TALLERES 01
Abril - 2013Ubicacion Costo a :
Obra
Cliente
Consorcio: Ing. YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES
Sub Presupuesto
Equipo TotalMaterialM.ObraMetradoUnidadDescripciónItem Precio
Presupuesto Desagregado
P.3/6
SISTEMA DE AGUA FRIA
PINTURA
CERRAJERIA14
12 CARPINTERIA DE MADERA
SISTEMA DE DESAGUE
CARPINTERIA METALICA
17
13
18
11
15 VIDRIOS, CRISTALES Y SIMILARES
CUBIERTAS
16
PINTURA LATEX EXTERIOR
SALIDA DE AGUA FRIA PVC-SAP 1/2"
M
14.49 3,134.27 1,454.04M2 4,682.01
34.169.026.20M
MUROS Y COLUMNAS 2 MANOS
17.02
93.70
182.84
17.03TUBERIA PVC-SAP 1/2" 55.921.0520.71
6,288.66PINTURA LATEX VIGAS 2 MANOS
8.00
M2
106.00
12.82 1,477.35 822.78 43.88 2,344.01PINTURA LATEX INTERIOR MUROS Y COLUMNAS 2 MANOS
16.04
16.03
202.63
505.20
M
53.46
16.07
3.45
MANOSPINTURA LATEX EN ESCALERAS 2
115.23
13.06
14.49
436.7914.4945.03M216.06CONCRETO 2 MANOSPINTURA LATEX EM LAVATORIOS
652.48
PINTURA LATEX EN DERRAMES 2
11.60
172.14
387.6063.158.00PTO17.01
291.00MANOS
323.12
2,103.9334.92893.37
M2 11.88
1,175.647.23
16.05
189.24
18.01
1.4225.0047.6037.012.00PZAREGISTRO DE BRONCE 2"TUBERIA PVC SAL 2" P/DESAGUE
18.05
3.3174.52111.4120.579.20M18.03TUBERIA PVC SAL 4" P/DESAGUE
18.04
18.06H=0.60CAJA DE REGISTRO 0.60x0.30 100.321.4550.4248.45100.32
74.02
PZA
78.21
SUMIDERO DE BRONCE 2" 59.621.4210.6047.6029.812.00PZA1.00
1.00
PZA17.05BRONCE 1/2"VALVULA DE COMPUERTA DE 68.271.2126.69
190.44
68.27
40.37
PZA17.04TUBERIA PVC-SAP 3/4" 38.930.7115.0823.149.27
40.37
14.56
4.20
108.9921.169.00M18.02599.68100.64
1.00
74.96
56.58
PTO
125.86
PRE-FABRICADAS P/VALVULASCAJAS METALICAS 56.581.2115.00
3.24484.48
12,518.9912.01
5,932.50206.8893.75M212.02 178.13
PUERTA DE MADERA TABLEROS
19,395.00
555.876,452.365,510.76360.5734.72
2,277.60
REBAJADOS DE 4.5 MM DE CEDRO
12,200.17124.801,553.76599.04156.0013.02
BARANDA METALICA DE Ø 2"
13,284.37
253.23
P/DRENAJE EN TECHOS
985.24480.8127.95M13.01
VENTANA DE MADERA
13,438.64
3,553.20
M2
11.02CON MEZCLALADRILLO PASTELERO ASENTADO COBERTURA AZOTEA CON 18,711.00
33.64
15,051.96
194.23
74.25252.00M211.01
SALIDA DE DESAGUE EN PVC 2"
1,953.00
105.84
11.03 GARGOLA DE CONCRETO, 220.835.3138.07177.4573.61
M2
UND
14.60
COB. POLICARBONATOCLARABOYA DE FIERRO C/PERFIL 6,533.90380.132,497.433,656.34
3.00
CERRADURA PARA PUERTA 2
42.4011,545.601,257.729.091,413.17P2
PZAGOLPES
LAMINA DE SEGURIDAD
957.10
M
755.00
VARILLA DE SEGURIDAD DE LISO
95.7110.00
15.01
125.24
4,209.8014.49434.00M216.02MANOS
12,845.72
6,257.65
VIDRIO DOBLE INCOLORO INC.
1,943.374,189.0414.49431.86M216.01
196.20
PINTURA LATEX CIELO RASO 2
1,760.01
22.00UND13.04
14.02
PASAMANO DE TUBO F°G° DE 1
24.04
107.301/2" EN ESCALERA
536.64191.5512.55M13.03Ø1/2"
5.90
18.72PESADO DE 4''X4''BISAGRA DE ACERO ALUMINIZADO
2,403.95
1,282.32
141.24
644.80618.8024.66
383.46
PZA14.01
ESTRIADO 2''X1 1/8''CANTONERIA DE ALUMIONIO 528.884.18
52.00
HUNTER - AREQUIPA - AREQUIPA
GOBIERNO REGIONAL DE AREQUIPA
"MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA JUAN PABLO VIZCARDO Y GUZMAN DE HUNTER, AREQUIPA"
Abril - 2013
01 - CONSTRUCCION DE TALLERES 01Cliente
Sub Presupuesto
Consorcio: Ing. YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES
Obra
Costo a :Ubicacion
M.Obra EquipoMaterial TotalPrecioMetradoUnidadDescripciónItem
Presupuesto Desagregado
P.4/6
VARIOS, LIMPIEZA
26
CAJAS
27
23
ARTEFACTOS
19 SALIDA DE INSTALACIONES ELECTRICAS
CANALIZACIONES Y/O TUBERIAS
24
20
22
POZO DE PUESTA A TIERRA
88,364.85
SALIDA PARA COMUNICACIONES
239,483.43
CONDUCTORES Y/O CABLES
TABLEROS
21
25
381,963.96
337.48
Mmm2
75.90
CONDUCTOR TIPO NH-80 2-1x2.5 156.603.1251.48102.0013.05
23.04 14.14 133.95 2.25
1,858.12
212.10CABLE DE COBRE DESNUDO 25 mm2
1.00PZA
12.00
24.01
15.00
M
20.15
23.01
TUBERIA PVC-SAP Ø50MM 300.844.14156.40140.30
102.00
46.00
65.36
22.07TUBERIA PVC-SAP Ø40MM 63.200.9031.8030.506.32
6.54
M
23.032-1x4mm2+1x4mm2(T)CONDUCTOR TIPO NH-80 80.601.0445.5634.00
M
4.00
M
23.02mm2CONDUCTOR TIPO N2XH 3-1x16 6,666.7226.525,773.20867.00
1,510.52
10.00
253.05
EVACUACIONSEÑALES DE SEGURIDAD Y 233.601.00185.00
UND
23.36
2.00
PZA27.01
EMERGENCIAEQUIPO AUTONOMO DE LUZ DE 3,118.207.65
416.33
47.60
M2
10.00
LIMPIEZA FINAL DE OBRA 887.6826.55- 861.1327.02
379.35
207.88
27.03EXTINGUIDORES DE 12 KG 342.741.24300.0041.50171.37
2.34
6.83
2,857.50
201.3467.00PZA26.01
OHMIOS
11,306.25
764.83
63.65
341.67764.831.00UND25.01
TABLERO DISTRIBUCION TD-6 1,858.12
POZO A TIERRA PARA R < 25
506.24
15.00PZA26.03HERMETICA 2x36WARTEFACTO FLUORESCENTE 3,339.84
2,119.88
2,818.40
10.12
208.7416.00PZA26.02REJILLA 2x36WARTEFACTO FLUORESCENTE 13,489.78
15.20
INTERRUPTOR DE CONMUTACION76.98 112.80 345.72 3.36 461.88INTERRUPTOR UNIPOLAR DOBLE
19.05 PTO 2.00 94.85 54.34 133.72
126.55
189.7019.04
20.01 PTO 5.00 72.58 126.55 232.55 3.80 362.90SALIDA PARA TELEFONO20.02 PTO 5.00 53.40
1.64
32.4019.01 PTO 98.00 102.00 4,420.78 5,531.12 44.10 9,996.00SALIDA DE TECHO19.02 PTO 24.00 175.08
6.007.00
PZA
SALIDA PARA TVC
527.243.92391.72
1,082.64
75.32
3,086.88
PZA19.03BIPOLAR DOBLE - PAREDSALIDA DE TOMACORRIENTE 4,201.92
M
131.60
89.28
22.03 UND 1.00 275.37 125.06 139.89 10.42 275.37BUZON DE REGISTRO 0.70x0.70x0.70 m
22.04 M 5.58
PROPIO (REDES EXT.ELEC.SANIT).
45.75
INTERRUPTOR UNIPOLAR SIMPLE
136.65
22.06TUBERIA PVC-SAP Ø25MM 85.35
39.0438.25
1.445.6915.00M22.05
TUBERIA PVC-SAP Ø20MM 16.001.35
16.46
18.61M322.01
CAJA DE PASE DE 200X200X100 MM 49.380.69
29.25
23.1321.01 3.00PTO
RELLENO MANUAL CON MATERIAL
267.00
48.80
3.80
25.56
257.19
528.52
291.9427.0525.7911.32M322.02
EXCAVACION DE ZANJAS PARA 544.3415.82
7.70
- REDES EXT.SANIT.ELECT.
COSTO TOTAL PRESUPUESTAL 798,538.77
GUZMAN DE HUNTER, AREQUIPA"
52,526.117.40 %709,812.24
12,776.6223,423.803.30 %
"MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA JUAN PABLO VIZCARDO Y
COSTO DIRECTOGASTOS GENERALES
GOBIERNO REGIONAL DE AREQUIPA
GASTOS DE LIQUIDACION 1.80 %
HUNTER - AREQUIPA - AREQUIPA
GASTOS DE SUPERVISION
01 - CONSTRUCCION DE TALLERES 01
Abril - 2013
Consorcio: Ing. YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES
Cliente
Obra
Ubicacion
Sub Presupuesto
Costo a :
TotalM.Obra Material EquipoPrecioMetradoUnidadDescripciónItem
Presupuesto Desagregado
P.5/6
SETECIENTOS NOVENTA Y OCHO MIL QUINIENTOS TREINTA Y OCHO CON 77/100 NUEVOS SOLESSon :
GOBIERNO REGIONAL DE AREQUIPA
HUNTER - AREQUIPA - AREQUIPA
"MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA JUAN PABLO VIZCARDO Y GUZMAN DE HUNTER, AREQUIPA"
Abril - 2013
01 - CONSTRUCCION DE TALLERES 01
Obra
Ubicacion
Consorcio: Ing. YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES
Costo a :
Sub Presupuesto
Cliente
Descripción TotalEquipoMaterialM.ObraPrecioUnidadItem Metrado
Presupuesto Desagregado
P.6/6