Hoja 1 de 1
PROYECTO:
UBICACIN:
FECHA:
RUBRO DESCRIPCIN UNIDAD CANTIDADPRECIO
UNITARIOPRECIO TOTAL
33,038.50
SUB-TOTAL 33,038.50
APU-001 REPLANTEO Y NIVELACION M2 44.110 1.35 59.55
APU-002 EXCAVACION DE ESTRUCTURAS MENORES M3 50.720 10.02 508.21
APU-003 MURO HORMIGON SIMPLE f'c=210 Kg/cm2 + ENCOFRADO M3 97.620 223.06 21,775.12
APU-004 REPLANTILLO DE HORMIGON SIMPLE f'c= 180 Kg/cm M3 5.070 127.66 647.24
APU-005RELLENO COMPACTADO CON COMPACTADOR MECANICO,
MATERIAL DEL SITIOM3 8.530 7.82 66.70
APU-006RELLENO MATERIAL DE MEJORAMIENTO CON COMPACTADOR
MECANICO (MATERIAL DE PRESTAMO)M3 59.520 14.12 840.42
APU-007 DREN EN TUBERA PLASTICA 110 mm ML 35.700 1.79 63.90
APU-008 ACERO DE REFUERZO fy=4200 Kg/cm KG 4,033.930 2.14 8,632.61
APU-009 DREN EN TUBERA PVC = 160 mm PERFORADA ML 34.950 2.80 97.86
APU-010 GRAVA PARA DREN M3 10.140 22.66 229.77
APU-011 GEOTEXTIL NO TEJIDO NT 2000 M2 59.150 1.98 117.12
SUB-TOTAL 95,436.28
APU-012 REPLANTEO Y NIVELACION M2 108.510 1.35 146.49
APU-013EXCAVACIN A MAQUINA SIN CLASIFICAR, CON
RETROEXCAVADORAM3 877.290 2.93 2,570.46
APU-014 EXCAVACION SIN CLASIFICAR A MANO PARA REPLANTILLO M3 14.580 10.02 146.09
APU-015 REPLANTILLO DE HORMIGON SIMPLE f'c= 180 Kg/cm M3 10.760 127.66 1,373.62
APU-016 ACERO DE REFUERZO fy=4200 Kg/cm KG 14,186.670 2.14 30,359.47
APU-017HORMIGON EN MUROS F'c=210 Kg/cm2 , INCLUYE ENCOFRADO Y
MECHILANESM3 186.950 229.97 42,992.89
APU-018 HORMIGON SIMPLE FC=210 kg/cm2 M3 4.830 196.15 947.40
APU-019 DREN DE 0.4 X 0.6 m, INCLUYE GRAVA Y GEOTEXTIL ML 20.000 18.19 363.80
APU-020 MATERIAL FILTRANTE CON GRAVA M3 74.700 22.66 1,692.70
APU-021 DESALOJO DE MATERIAL M3 845.830 4.97 4,203.78
APU-022RELLENO COMPACTADO CON COMPACTADOR MECANICO,
MATERIAL DEL SITIOM3 155.840 7.82 1,218.67
APU-023RELLENO COMPACTADO CON COMPACTADOR MECNICO,
MATERIAL FILTRANTE, INCLUYE COSTO DE MATERIALM3 374.960 14.12 5,294.44
APU-024 TRANSPORTE DE MATERIAL > 3KM M3-KM 4,049.570 0.27 1,093.38
APU-025BORDILLOS DE H.SIMPLE f'c=180 kg/cm2 H=0.50 m., INCLUYE
REPLANTILLO DE PIEDRA Y ENCOFRADOML 20.000 19.51 390.20
APU-026ACERAS DE HORMIGON SIMPLE F'C=180 KG/CM2 ; E=5cm, y
REPLANTILLO DE PIEDRA E =15cmM2 27.000 20.23 546.21
APU-027 ENTIBADOS DE MADERA m 167.600 12.51 2,096.68
SUMA TOTAL 128,474.78
12 % IVA 15,416.97
TOTAL 143,891.75
Son: Ciento cuarenta y tres mil ochocientos noventa y un dlares con setenta y cinco centavos
ELABORADO POR: APROBADO POR:
MUROS DE CONTENCIN EN URB. TRABAJADORES AUTNOMOS "EL PARAISO"
MURO DE CONTENCIN PARA PREVENCIN DE DESLIZAMIENTOS EN EL AREA URBANA
RESIDENCIAL DE LA PARROQUIA EL CISNE, CANTN LOJA
ING. JOS MERECI
TCNICO DE OBRAS PBLICAS
GOBIERNO AUTONOMO DESCENTRALIZADO MUNICIPAL DE LOJA
GERENCIA DE OBRAS PBLICAS MUNICIPALES
TCNICO DE OBRAS PBLICAS
"MURO DE CONTENCIN PARA PREVENCIN DE DESLIZAMIENTOS EN EL AREA URBANA RESIDENCIAL DE LA
PARROQUIA EL CISNE, CANTN LOJA" y "MUROS DE CONTENCIN EN URB. TRABAJADORES AUTNOMOS "EL
PARAISO"
PARROQUIA EL CISNE Y PARROQUIA EL VALLE
MARZO 2015
ING. HOMERO VELEPUCHA IIGUEZ
TOTAL
GOBIERNO AUTONOMO DESCENTRALIZADO MUNICIPAL DE LOJA
RUBRO: HOJA: 1 DE 27
REPLANTEO Y NIVELACION1.001
DETALLE: UNIDAD: M2
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO Herramientas manuales(5% M.O.) 0.02503
Equipo topogrfico 1.00 10.0000 10.00000 0.05000 0.50000
SUBTOTAL (M) 0.52503
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HORA COSTO-HORA RENDIMIENTO COSTO Cadenero 2 3.22 6.44000 0.05000 0.32200Topgrafo 2: titulo exper. mayor a 5 aos(Estr.Oc.C1) 1 3.57 3.57000 0.05000 0.17850
SUBTOTAL (N) 0.50050
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
Estacas,varios global 0.3300 0.3000 0.09900
SUBTOTAL (O) 0.09900
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL (P)
Estos precios no incluyen IVA
TOTAL COSTOS DIRECTOS (M+N+O+P) 1.12
INDIRECTOS Y UTILIDADES 20.00% 0.22
OTROS INDIRECTOS
COSTO TOTAL DEL RUBRO 1.35
VALOR OFERTADO 1.35
GERENCIA DE OBRAS PBLICAS MUNICIPALES
ANALISIS DE PRECIOS UNITARIOS
RUBRO: HOJA: 2 DE 27
EXCAVACION DE ESTRUCTURAS MENORES1.001
DETALLE: UNIDAD: M3
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO Herramientas manuales(5% M.O.) 1.00 0.39750
1.00
SUBTOTAL (M) 0.39750
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HORA COSTO-HORA RENDIMIENTO COSTO Pen 1 3.18 3.18000 2.50000 7.95000
SUBTOTAL (N) 7.95000
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
SUBTOTAL (O)
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL (P)
Estos precios no incluyen IVA
TOTAL COSTOS DIRECTOS (M+N+O+P) 8.35
INDIRECTOS Y UTILIDADES 20.00% 1.67
OTROS INDIRECTOS
COSTO TOTAL DEL RUBRO 10.02
VALOR OFERTADO 10.02
ANALISIS DE PRECIOS UNITARIOS
RUBRO: HOJA: 3 DE 27
MURO HORMIGON SIMPLE f'c=210 Kg/cm2 + ENCOFRADO1.001
DETALLE: UNIDAD: M3
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO Herramientas manuales(5% M.O.) 3.84046
Concretera 1.00 1.5000 1.50000 1.98833 2.98250
Vibrador 1.00 1.5000 1.50000 1.98833 2.98250
SUBTOTAL (M) 9.80546
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HORA COSTO-HORA RENDIMIENTO COSTO Pen 9 3.18 28.62000 1.98833 56.90600Albail 1 3.22 3.22000 1.98833 6.40242Encofrador 1 3.22 3.22000 1.98833 6.40242Maestro mayor en ejecucin de obras civiles 1 3.57 3.57000 1.98833 7.09834
SUBTOTAL (N) 76.80918
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
Arena Gruesa m3 0.6000 14.0000 8.40000
Grava m3 0.7000 14.0000 9.80000
Agua Lt. 200.0000 0.0020 0.40000
Cemento kg 375.0000 0.1400 52.50000
Tabla de Encofrado 20 cm * 3 m u 6.0000 3.0000 18.00000
Listn de Encofrado 2.8 m u 2.6000 1.5000 3.90000
Puntales de 3m u 2.4000 1.2500 3.00000
Clavos KG 0.7500 1.8000 1.35000
Diesel Lt 0.1500 0.3000 0.04500
Aditivo Plastificante KG 1.5000 1.2500 1.87500
SUBTOTAL (O) 99.27000
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL (P)
Estos precios no incluyen IVA
TOTAL COSTOS DIRECTOS (M+N+O+P) 185.88
INDIRECTOS Y UTILIDADES 20.00% 37.18
OTROS INDIRECTOS
COSTO TOTAL DEL RUBRO 223.06
VALOR OFERTADO 223.06
ANALISIS DE PRECIOS UNITARIOS
RUBRO: HOJA: 4 DE 27
REPLANTILLO DE HORMIGON SIMPLE f'c= 180 Kg/cm1.001
DETALLE: UNIDAD: M3
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO Herramientas manuales(5% M.O.) 1.77450
Concretera 1.00 1.5000 1.50000 1.00000 1.50000
SUBTOTAL (M) 3.27450
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HORA COSTO-HORA RENDIMIENTO COSTO Pen 7 3.18 22.26000 1.00000 22.26000Albail 3 3.22 9.66000 1.00000 9.66000Maestro mayor en ejecucin de obras civiles 1 3.57 3.57000 1.00000 3.57000
SUBTOTAL (N) 35.49000
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
Arena Gruesa m3 0.6500 14.0000 9.10000
Grava m3 0.8000 14.0000 11.20000
Cemento kg 334.7500 0.1400 46.86500
Agua Lt. 226.0000 0.0020 0.45200
SUBTOTAL (O) 67.61700
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL (P)
Estos precios no incluyen IVA
TOTAL COSTOS DIRECTOS (M+N+O+P) 106.38
INDIRECTOS Y UTILIDADES 20.00% 21.28
OTROS INDIRECTOS
COSTO TOTAL DEL RUBRO 127.66
VALOR OFERTADO 127.66
ANALISIS DE PRECIOS UNITARIOS
RUBRO: HOJA: 5 DE 27
RELLENO COMPACTADO CON COMPACTADOR MECANICO, MATERIAL DEL SITIO1.001
DETALLE: UNIDAD: M3
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO Herramientas manuales(5% M.O.) 1.00 0.11786
Compactador mecnico 1.00 5.4500 5.45000 0.74126 4.03987
SUBTOTAL (M) 4.15773
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HORA COSTO-HORA RENDIMIENTO COSTO Pen 1 3.18 3.18000 0.74126 2.35721
SUBTOTAL (N) 2.35721
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
SUBTOTAL (O)
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL (P)
Estos precios no incluyen IVA
TOTAL COSTOS DIRECTOS (M+N+O+P) 6.51
INDIRECTOS Y UTILIDADES 20.00% 1.30
OTROS INDIRECTOS
COSTO TOTAL DEL RUBRO 7.82
VALOR OFERTADO 7.82
ANALISIS DE PRECIOS UNITARIOS
RUBRO: HOJA: 6 DE 27
RELLENO MATERIAL DE MEJORAMIENTO CON COMPACTADOR MECANICO
(MATERIAL DE PRESTAMO) 1.001
DETALLE: UNIDAD: M3
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO Herramientas manuales(5% M.O.) 1.00 0.11786
Compactador mecnico 1.00 5.4500 5.45000 0.74126 4.03987
SUBTOTAL (M) 4.15773
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HORA COSTO-HORA RENDIMIENTO COSTO Pen 1 3.18 3.18000 0.74126 2.35721
SUBTOTAL (N) 2.35721
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
Material de mina m3 1.0500 5.0000 5.25000
SUBTOTAL (O) 5.25000
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL (P)
Estos precios no incluyen IVA
TOTAL COSTOS DIRECTOS (M+N+O+P) 11.76
INDIRECTOS Y UTILIDADES 20.00% 2.35
OTROS INDIRECTOS
COSTO TOTAL DEL RUBRO 14.12
VALOR OFERTADO 14.12
ANALISIS DE PRECIOS UNITARIOS
RUBRO: HOJA: 7 DE 27
DREN EN TUBERA PLASTICA 110 mm1.001
DETALLE: UNIDAD: ML
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO Herramientas manuales(5% M.O.) 1.00 0.01590
SUBTOTAL (M) 0.01590
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HORA COSTO-HORA RENDIMIENTO COSTO Pen 1 3.18 3.18000 0.10000 0.31800
SUBTOTAL (N) 0.31800
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
Tubera Perforada = 110mm U 0.3300 3.5000 1.15500
SUBTOTAL (O) 1.15500
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL (P)
Estos precios no incluyen IVA
TOTAL COSTOS DIRECTOS (M+N+O+P) 1.49
INDIRECTOS Y UTILIDADES 20.00% 0.30
OTROS INDIRECTOS
COSTO TOTAL DEL RUBRO 1.79
VALOR OFERTADO 1.79
ANALISIS DE PRECIOS UNITARIOS
RUBRO: HOJA: 8 DE 27
ACERO DE REFUERZO fy=4200 Kg/cm1.001
DETALLE: UNIDAD: KG
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO Herramientas manuales(5% M.O.) 0.01533
Cizalla 1.00 3.0000 3.00000 0.03200 0.09600
SUBTOTAL (M) 0.11133
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HORA COSTO-HORA RENDIMIENTO COSTO Pen 2 3.18 6.36000 0.03200 0.20352Fierrero 1 3.22 3.22000 0.03200 0.10304
SUBTOTAL (N) 0.30656
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
Acero de refuerzo kg 1.0500 1.2200 1.28100
Alambre de amarre kg 0.0520 1.6000 0.08320
SUBTOTAL (O) 1.36420
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL (P)
Estos precios no incluyen IVA
TOTAL COSTOS DIRECTOS (M+N+O+P) 1.78
INDIRECTOS Y UTILIDADES 20.00% 0.36
OTROS INDIRECTOS
COSTO TOTAL DEL RUBRO 2.14
VALOR OFERTADO 2.14
ANALISIS DE PRECIOS UNITARIOS
RUBRO: HOJA: 9 DE 27
DREN EN TUBERA PVC = 160 mm PERFORADA1.001
DETALLE: UNIDAD: ML
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO Herramientas manuales(5% M.O.) 1.00 0.01590
SUBTOTAL (M) 0.01590
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HORA COSTO-HORA RENDIMIENTO COSTO Pen 1 3.18 3.18000 0.10000 0.31800
SUBTOTAL (N) 0.31800
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
Tubera PVC Drenaje = 160 mm U 0.3300 6.0500 1.99650
SUBTOTAL (O) 1.99650
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL (P)
Estos precios no incluyen IVA
TOTAL COSTOS DIRECTOS (M+N+O+P) 2.33
INDIRECTOS Y UTILIDADES 20.00% 0.47
OTROS INDIRECTOS
COSTO TOTAL DEL RUBRO 2.80
VALOR OFERTADO 2.80
ANALISIS DE PRECIOS UNITARIOS
RUBRO: HOJA: 10 DE 27
GRAVA PARA DREN1.001
DETALLE: UNIDAD: M3
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO Herramientas manuales(5% M.O.) 0.19925
SUBTOTAL (M) 0.19925
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HORA COSTO-HORA RENDIMIENTO COSTO Pen 4 3.18 12.72000 0.25000 3.18000Albail 1 3.22 3.22000 0.25000 0.80500
SUBTOTAL (N) 3.98500
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
Grava m3 1.0500 14.0000 14.70000
SUBTOTAL (O) 14.70000
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL (P)
Estos precios no incluyen IVA
TOTAL COSTOS DIRECTOS (M+N+O+P) 18.88
INDIRECTOS Y UTILIDADES 20.00% 3.78
OTROS INDIRECTOS
COSTO TOTAL DEL RUBRO 22.66
VALOR OFERTADO 22.66
ANALISIS DE PRECIOS UNITARIOS
RUBRO: HOJA: 11 DE 27
GEOTEXTIL NO TEJIDO NT 20001.001
DETALLE: UNIDAD: M2
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO Herramientas manuales(5% M.O.) 1.00 0.01358
SUBTOTAL (M) 0.01358
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HORA COSTO-HORA RENDIMIENTO COSTO Maestro mayor en ejecucin de obras civiles 1 3.57 3.57000 0.04000 0.14280Instalador de revestimiento en general 1 3.22 3.22000 0.04000 0.12880
SUBTOTAL (N) 0.27160
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
Geotextil No Tejido NT 2000 M2 1.0500 1.3000 1.36500
SUBTOTAL (O) 1.36500
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL (P)
Estos precios no incluyen IVA
TOTAL COSTOS DIRECTOS (M+N+O+P) 1.65
INDIRECTOS Y UTILIDADES 20.00% 0.33
OTROS INDIRECTOS
COSTO TOTAL DEL RUBRO 1.98
VALOR OFERTADO 1.98
ANALISIS DE PRECIOS UNITARIOS
RUBRO: HOJA: 12 DE 27
REPLANTEO Y NIVELACION1.001
DETALLE: UNIDAD: M2
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO Herramientas manuales(5% M.O.) 0.02503
Equipo topogrfico 1.00 10.0000 10.00000 0.05000 0.50000
SUBTOTAL (M) 0.52503
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HORA COSTO-HORA RENDIMIENTO COSTO Cadenero 2 3.22 6.44000 0.05000 0.32200Topgrafo 2: titulo exper. mayor a 5 aos(Estr.Oc.C1) 1 3.57 3.57000 0.05000 0.17850
SUBTOTAL (N) 0.50050
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
Estacas,varios global 0.3300 0.3000 0.09900
SUBTOTAL (O) 0.09900
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL (P)
Estos precios no incluyen IVA
TOTAL COSTOS DIRECTOS (M+N+O+P) 1.12
INDIRECTOS Y UTILIDADES 20.00% 0.22
OTROS INDIRECTOS
COSTO TOTAL DEL RUBRO 1.35
VALOR OFERTADO 1.35
ANALISIS DE PRECIOS UNITARIOS
RUBRO: HOJA: 13 DE 27
EXCAVACIN A MAQUINA SIN CLASIFICAR, CON RETROEXCAVADORA1.001
DETALLE: UNIDAD: M3
Mediante uso de retroexcavadora
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO Herramientas manuales(5% M.O.) 1.00 0.03988
Retroexcavadora 1.00 20.0000 20.00000 0.08032 1.60640
SUBTOTAL (M) 1.64628
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HORA COSTO-HORA RENDIMIENTO COSTO
Pen 2 3.18 6.36000 0.08032 0.51084Op. de Retroexcavadora 1 3.57 3.57000 0.08032 0.28674
SUBTOTAL (N) 0.79758
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
SUBTOTAL (O)
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL (P)
Estos precios no incluyen IVA
TOTAL COSTOS DIRECTOS (M+N+O+P) 2.44
INDIRECTOS Y UTILIDADES 20.00% 0.49
OTROS INDIRECTOS
COSTO TOTAL DEL RUBRO 2.93
VALOR OFERTADO 2.93
ANALISIS DE PRECIOS UNITARIOS
RUBRO: HOJA: 14 DE 27
EXCAVACION SIN CLASIFICAR A MANO PARA REPLANTILLO1.001
DETALLE: UNIDAD: M3
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO Herramientas manuales(5% M.O.) 1.00 0.39750
1.00
SUBTOTAL (M) 0.39750
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HORA COSTO-HORA RENDIMIENTO COSTO Pen 1 3.18 3.18000 2.50000 7.95000
SUBTOTAL (N) 7.95000
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
SUBTOTAL (O)
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL (P)
Estos precios no incluyen IVA
TOTAL COSTOS DIRECTOS (M+N+O+P) 8.35
INDIRECTOS Y UTILIDADES 20.00% 1.67
OTROS INDIRECTOS
COSTO TOTAL DEL RUBRO 10.02
VALOR OFERTADO 10.02
ANALISIS DE PRECIOS UNITARIOS
RUBRO: HOJA: 15 DE 27
REPLANTILLO DE HORMIGON SIMPLE f'c= 180 Kg/cm1.001
DETALLE: UNIDAD: M3
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO Herramientas manuales(5% M.O.) 1.77450
Concretera 1.00 1.5000 1.50000 1.00000 1.50000
SUBTOTAL (M) 3.27450
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HORA COSTO-HORA RENDIMIENTO COSTO Pen 7 3.18 22.26000 1.00000 22.26000Albail 3 3.22 9.66000 1.00000 9.66000Maestro mayor en ejecucin de obras civiles 1 3.57 3.57000 1.00000 3.57000
SUBTOTAL (N) 35.49000
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
Arena Gruesa m3 0.6500 14.0000 9.10000
Grava m3 0.8000 14.0000 11.20000
Cemento kg 334.7500 0.1400 46.86500
Agua Lt. 226.0000 0.0020 0.45200
SUBTOTAL (O) 67.61700
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL (P)
Estos precios no incluyen IVA
TOTAL COSTOS DIRECTOS (M+N+O+P) 106.38
INDIRECTOS Y UTILIDADES 20.00% 21.28
OTROS INDIRECTOS
COSTO TOTAL DEL RUBRO 127.66
VALOR OFERTADO 127.66
ANALISIS DE PRECIOS UNITARIOS
RUBRO: HOJA: 16 DE 27
ACERO DE REFUERZO fy=4200 Kg/cm1.001
DETALLE: UNIDAD: KG
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO Herramientas manuales(5% M.O.) 0.01533
Cizalla 1.00 3.0000 3.00000 0.03200 0.09600
SUBTOTAL (M) 0.11133
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HORA COSTO-HORA RENDIMIENTO COSTO Pen 2 3.18 6.36000 0.03200 0.20352Fierrero 1 3.22 3.22000 0.03200 0.10304
SUBTOTAL (N) 0.30656
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
Acero de refuerzo kg 1.0500 1.2200 1.28100
Alambre de amarre kg 0.0520 1.6000 0.08320
SUBTOTAL (O) 1.36420
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL (P)
Estos precios no incluyen IVA
TOTAL COSTOS DIRECTOS (M+N+O+P) 1.78
INDIRECTOS Y UTILIDADES 20.00% 0.36
OTROS INDIRECTOS
COSTO TOTAL DEL RUBRO 2.14
VALOR OFERTADO 2.14
ANALISIS DE PRECIOS UNITARIOS
RUBRO: HOJA: 17 DE 27
HORMIGON EN MUROS F'c=210 Kg/cm2 , INCLUYE ENCOFRADO Y MECHILANES1.001
DETALLE: UNIDAD: M3
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO Herramientas manuales(5% M.O.) 3.86300
Concretera 1.00 1.5000 1.50000 2.00000 3.00000
Vibrador 1.00 1.5000 1.50000 2.00000 3.00000
SUBTOTAL (M) 9.86300
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HORA COSTO-HORA RENDIMIENTO COSTO Pen 9 3.18 28.62000 2.00000 57.24000Albail 1 3.22 3.22000 2.00000 6.44000Encofrador 1 3.22 3.22000 2.00000 6.44000Maestro mayor en ejecucin de obras civiles 1 3.57 3.57000 2.00000 7.14000
SUBTOTAL (N) 77.26000
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
Arena Gruesa m3 0.6000 14.0000 8.40000
Grava m3 0.7000 14.0000 9.80000
Agua Lt. 200.0000 0.0020 0.40000
Cemento kg 375.0000 0.1400 52.50000
Tabla de Encofrado 20 cm * 3 m u 6.0000 3.0000 18.00000
Listn de Encofrado 2.8 m u 2.6000 1.5000 3.90000
Puntales de 3m u 2.4000 1.2500 3.00000
Clavos KG 0.7500 1.8000 1.35000
Diesel Lt 0.1500 0.3000 0.04500
Aditivo Plastificante KG 1.5000 1.2500 1.87500
TUBERA DESAGUE E/C 75mm x 3 m U 0.6000 8.7500 5.25000
SUBTOTAL (O) 104.52000
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL (P)
Estos precios no incluyen IVA
TOTAL COSTOS DIRECTOS (M+N+O+P) 191.64
INDIRECTOS Y UTILIDADES 20.00% 38.33
OTROS INDIRECTOS
COSTO TOTAL DEL RUBRO 229.97
VALOR OFERTADO 229.97
ANALISIS DE PRECIOS UNITARIOS
RUBRO: HOJA: 18 DE 27
HORMIGON SIMPLE FC=210 kg/cm21.001
DETALLE: UNIDAD: M3
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO Herramientas manuales(5% M.O.) 3.98211
Concretera 1.00 1.5000 1.50000 3.57140 5.35710
SUBTOTAL (M) 9.33921
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HORA COSTO-HORA RENDIMIENTO COSTO Pen 6 3.18 19.08000 3.57140 68.14231Albail 1 3.22 3.22000 3.57140 11.49991
SUBTOTAL (N) 79.64222
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
Arena Gruesa m3 0.7000 14.0000 9.80000
Grava m3 0.8600 14.0000 12.04000
Agua Lt. 220.0000 0.0020 0.44000
Cemento kg 360.0000 0.1400 50.40000
Aditivo Plastificante KG 1.4400 1.2500 1.80000
SUBTOTAL (O) 74.48000
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL (P)
Estos precios no incluyen IVA
TOTAL COSTOS DIRECTOS (M+N+O+P) 163.46
INDIRECTOS Y UTILIDADES 20.00% 32.69
OTROS INDIRECTOS
COSTO TOTAL DEL RUBRO 196.15
VALOR OFERTADO 196.15
ANALISIS DE PRECIOS UNITARIOS
RUBRO: HOJA: 19 DE 27
DREN DE 0.4 X 0.6 m, INCLUYE GRAVA Y GEOTEXTIL1.001
DETALLE: UNIDAD: ML
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO Herramientas manuales(5% M.O.) 1.00 0.31935
SUBTOTAL (M) 0.31935
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HORA COSTO-HORA RENDIMIENTO COSTO Pen 2 3.18 6.36000 0.66670 4.24021Albail 1 3.22 3.22000 0.66670 2.14677
SUBTOTAL (N) 6.38698
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
Piedra m3 0.2000 20.0000 4.00000
Tubera Perforada = 110mm U 0.3300 3.5000 1.15500
Geotextil No Tejido NT 2000 M2 2.0000 1.3000 2.60000
Grava m3 0.0500 14.0000 0.70000
SUBTOTAL (O) 8.45500
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL (P)
Estos precios no incluyen IVA
TOTAL COSTOS DIRECTOS (M+N+O+P) 15.16
INDIRECTOS Y UTILIDADES 20.00% 3.03
OTROS INDIRECTOS
COSTO TOTAL DEL RUBRO 18.19
VALOR OFERTADO 18.19
ANALISIS DE PRECIOS UNITARIOS
RUBRO: HOJA: 20 DE 27
MATERIAL FILTRANTE CON GRAVA1.001
DETALLE: UNIDAD: M3
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO Herramientas manuales(5% M.O.) 0.19925
SUBTOTAL (M) 0.19925
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HORA COSTO-HORA RENDIMIENTO COSTO Pen 4 3.18 12.72000 0.25000 3.18000Albail 1 3.22 3.22000 0.25000 0.80500
SUBTOTAL (N) 3.98500
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
Grava m3 1.0500 14.0000 14.70000
SUBTOTAL (O) 14.70000
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL (P)
Estos precios no incluyen IVA
TOTAL COSTOS DIRECTOS (M+N+O+P) 18.88
INDIRECTOS Y UTILIDADES 20.00% 3.78
OTROS INDIRECTOS
COSTO TOTAL DEL RUBRO 22.66
VALOR OFERTADO 22.66
ANALISIS DE PRECIOS UNITARIOS
RUBRO: HOJA: 21 DE 27
DESALOJO DE MATERIAL 1.001
DETALLE: UNIDAD: M3
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
Herramientas manuales(5% M.O.) 1.00 0.07965
Volquete de 8 m3 1.00 22.0000 22.00000 0.11211 2.46642
SUBTOTAL (M) 2.54607
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HORA COSTO-HORA RENDIMIENTO COSTO CHOFER: Volquetas 1 4.67 4.67000 0.11211 0.52355Pen 3 3.18 9.54000 0.11211 1.06953
SUBTOTAL (N) 1.59308
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
SUBTOTAL (O)
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL (P)
Estos precios no incluyen IVA
TOTAL COSTOS DIRECTOS (M+N+O+P) 4.14
INDIRECTOS Y UTILIDADES 20.00% 0.83
OTROS INDIRECTOS
COSTO TOTAL DEL RUBRO 4.97
VALOR OFERTADO 4.97
ANALISIS DE PRECIOS UNITARIOS
RUBRO: HOJA: 22 DE 27
RELLENO COMPACTADO CON COMPACTADOR MECANICO, MATERIAL DEL SITIO1.001
DETALLE: UNIDAD: M3
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO Herramientas manuales(5% M.O.) 1.00 0.11786
Compactador mecnico 1.00 5.4500 5.45000 0.74126 4.03987
SUBTOTAL (M) 4.15773
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HORA COSTO-HORA RENDIMIENTO COSTO Pen 1 3.18 3.18000 0.74126 2.35721
SUBTOTAL (N) 2.35721
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
SUBTOTAL (O)
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL (P)
Estos precios no incluyen IVA
TOTAL COSTOS DIRECTOS (M+N+O+P) 6.51
INDIRECTOS Y UTILIDADES 20.00% 1.30
OTROS INDIRECTOS
COSTO TOTAL DEL RUBRO 7.82
VALOR OFERTADO 7.82
ANALISIS DE PRECIOS UNITARIOS
RUBRO: HOJA: 23 DE 27
RELLENO COMPACTADO CON COMPACTADOR MECNICO, MATERIAL
FILTRANTE, INCLUYE COSTO DE MATERIAL 1.001
DETALLE: UNIDAD: M3
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO Herramientas manuales(5% M.O.) 1.00 0.11785
Compactador mecnico 1.00 5.4500 5.45000 0.74120 4.03954
SUBTOTAL (M) 4.15739
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HORA COSTO-HORA RENDIMIENTO COSTO Pen 1 3.18 3.18000 0.74120 2.35702
SUBTOTAL (N) 2.35702
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
Material de mina m3 1.0500 5.0000 5.25000
SUBTOTAL (O) 5.25000
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL (P)
Estos precios no incluyen IVA
TOTAL COSTOS DIRECTOS (M+N+O+P) 11.76
INDIRECTOS Y UTILIDADES 20.00% 2.35
OTROS INDIRECTOS
COSTO TOTAL DEL RUBRO 14.12
VALOR OFERTADO 14.12
ANALISIS DE PRECIOS UNITARIOS
RUBRO: HOJA: 24 DE 27
TRANSPORTE DE MATERIAL > 3KM1.001
DETALLE: UNIDAD: M3-KM
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
Herramientas manuales(5% M.O.) 1.00 0.00258
Volquete de 12 m3 1.00 26.0000 26.00000 0.00655 0.17030
SUBTOTAL (M) 0.17288
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HORA COSTO-HORA RENDIMIENTO COSTO CHOFER: Volquetas 1 4.67 4.67000 0.00655 0.03059Engrasador o abastecedor responsable (Estr.Oc.D2) 1 3.22 3.22000 0.00655 0.02109
SUBTOTAL (N) 0.05168
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
1.3000
SUBTOTAL (O)
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL (P)
Estos precios no incluyen IVA
TOTAL COSTOS DIRECTOS (M+N+O+P) 0.22
INDIRECTOS Y UTILIDADES 20.00% 0.04
OTROS INDIRECTOS
COSTO TOTAL DEL RUBRO 0.27
VALOR OFERTADO 0.27
ANALISIS DE PRECIOS UNITARIOS
RUBRO: HOJA: 25 DE 27
BORDILLOS DE H.SIMPLE f'c=180 kg/cm2 H=0.50 m., INCLUYE REPLANTILLO
DE PIEDRA Y ENCOFRADO 1.001
DETALLE: UNIDAD: ML
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO Herramientas manuales(5% M.O.) 1.00 0.24003
Concretera 0.50 1.5000 0.75000 0.16750 0.12563
Vibrador 0.50 1.5000 0.75000 0.16750 0.12563
SUBTOTAL (M) 0.49129
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HORA COSTO-HORA RENDIMIENTO COSTO Pen 8 3.18 25.44000 0.16750 4.26120Albail 1 3.22 3.22000 0.16750 0.53935
SUBTOTAL (N) 4.80055
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
Arena Gruesa m3 0.0400 14.0000 0.56000
Grava m3 0.0700 14.0000 0.98000
Cemento kg 30.0000 0.1400 4.20000
Agua M3 0.0200 1.2000 0.02400
Piedra m3 0.0400 20.0000 0.80000
Clavos de 2" a 4" Kg 0.0850 1.0000 0.08500
Tablas de encofrado trozada u 0.6000 6.5000 3.90000
Liston de encofrado u 0.7000 0.6000 0.42000
SUBTOTAL (O) 10.96900
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL (P)
Estos precios no incluyen IVA
TOTAL COSTOS DIRECTOS (M+N+O+P) 16.26
INDIRECTOS Y UTILIDADES 20.00% 3.25
OTROS INDIRECTOS
COSTO TOTAL DEL RUBRO 19.51
VALOR OFERTADO 19.51
ANALISIS DE PRECIOS UNITARIOS
GOBIERNO AUTONOMO DESCENTRALIZADO MUNICIPAL DE LOJA
RUBRO: HOJA 26 DE 27
ACERAS DE HORMIGON SIMPLE F'C=180 KG/CM2 ; E=5cm, y REPLANTILLO DE
PIEDRA E =15cm APU-026
DETALLE: UNIDAD: M2
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO Herramientas manuales(5% M.O.) 1.00 0.35481
SUBTOTAL (M) 0.35481
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HORA COSTO-HORA RENDIMIENTO COSTO Pen 4 3.18 12.72000 0.37037 4.71111Instalador de revestimiento en general 1 3.22 3.22000 0.37037 1.19259Albail 1 3.22 3.22000 0.37037 1.19259
SUBTOTAL (N) 7.09629
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
Arena Gruesa m3 0.0390 14.0000 0.54600
Grava m3 0.1470 14.0000 2.05800
Piedra m3 0.1500 20.0000 3.00000
Agua Lt. 13.5600 0.0020 0.02712
Cemento kg 23.0000 0.1400 3.22000
Listn u 0.3300 1.6800 0.55440
SUBTOTAL (O) 9.40552
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL (P)
Estos precios no incluyen IVA
TOTAL COSTOS DIRECTOS (M+N+O+P) 16.86
INDIRECTOS Y UTILIDADES 20.00% 3.37
OTROS INDIRECTOS
COSTO TOTAL DEL RUBRO 20.23
VALOR OFERTADO 20.23
ANALISIS DE PRECIOS UNITARIOS
GERENCIA DE OBRAS PBLICAS MUNICIPALES
GOBIERNO AUTONOMO DESCENTRALIZADO MUNICIPAL DE LOJA
RUBRO: HOJA 27 DE 27
ENTIBADOS DE MADERAAPU-027
DETALLE: UNIDAD: m
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO Herramientas manuales(5% M.O.) 0.06645
SUBTOTAL (M) 0.06645
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HORA COSTO-HORA RENDIMIENTO COSTO Albail 1 3.22 3.22000 0.13330 0.42923Pen 1 3.18 3.18000 0.13330 0.42389Maestro mayor en ejecucin de obras civiles 1 3.57 3.57000 0.13330 0.47588
SUBTOTAL (N) 1.32900
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
Clavos de 2" a 3" kg 0.2500 2.6300 0.65750
Puntal de eucalipto 3m U 2.0000 1.2100 2.42000
Tablon de encofrado sin cepillar U 0.7000 8.5000 5.95000
SUBTOTAL (O) 9.02750
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL (P)
Estos precios no incluyen IVA
TOTAL COSTOS DIRECTOS (M+N+O+P) 10.42
INDIRECTOS Y UTILIDADES 20.00% 2.08
OTROS INDIRECTOS
COSTO TOTAL DEL RUBRO 12.51
VALOR OFERTADO 12.51
ANALISIS DE PRECIOS UNITARIOS
GERENCIA DE OBRAS PBLICAS MUNICIPALES