    NOTES:

    ????????????????????????????????????????????????????????????????

    NOTE

    THIS SYMBOL INDICATES A CONDITION WHICHREQUIRES AN ANSWER OR VERIFICATIONFROM THE ARCHITECT OR ENGINEER.

    3 05-23-14 M-200

    CELLAR FLOOR MECHANICAL PIPINGSHOP DRAWING

    PRELIMINARY SHOP DRAWING09-16-14

    REFERENCESDESCRIPTIONNo. DATE DWG

    No. DATER-0

    DESCRIPTION

    REVISIONS

    PROJECT

    PARTIAL PLAN - CELLAR FLOOR

    DWG. TITLE

    DATE SCALE DWN BY JOB No. DWG. No.

    AS NOTED09-16-14

    CHRYSTIE STREETHOTEL

    215 CRYSTLE STREETNEW YORK, NY

    BIMcorp.Inc

    MECHANICAL CONTRACTOR

    HENICK - LANEINC

    45-39 DAVIS STREETLIC NY 11101

    CHRYSTIE STREET HOTEL

    251 CRYSTLE STREETNEW YORK NY

    MP-102-A

    ADDENDUM 12

    06-06-14 FO-103 ADDENDUM 21A-100 ADDENDUM 2

    05-07-15R-3

    ?

    THIS SYMBOL INDICATES A CONDITION WHICHREQUIRES AN ANSWER OR VERIFICATIONFROM THE ARCHITECT OR ENGINEER.

    REVISED AP PER REVISIONS (11-07-14)10-21-14R-1

    06-06-14FO-103

    ?

    CONFLICT WITH CEILING.

    REVISED AS PER COORDINATION TRADES01-06-15R-2

    PIPES ARE EXPOSED.

    ?

    REVISED AS PER ENGINEER COMMENTS (02-09-15)

    CONFLICT WITH DUCT.

    ????????????????????????????????????????????????????????????????????????????????????????????? ? ??? ??????????????????????????????????????????????????????????? ???? ???? ????? ???? ??? ???? ???? ??????????? ?????????????? ??? ????? ???????????? ??? ???? ????????????????????????????????????????????????????? ??????????????????????????????????????????

    ????????????????????????????????????????????????????????????????????????????????????????????????????????????????????

    4 01-30-15 A-100 SKC-17B