Gigafactory!
Others!
Lishen!
BYD!
BAK!
ATL!
Maxell!
Sony!
Panasonic!
LGC!
SDI!
Source: IIT Takeshita 2013
500,000 Vehicles
Global cell supply growing, but almost
entirely in Asia
Planned 2020 Gigafactory Production Exceeds 2013 Global Production
Battery pack cost/kWh reduced >30% by Gen III volume ramp in 2017
35,000
Vehicles
G
Wh/
Year
Pro
duct
ion
Module
Cathode Manufacturing
Aluminum Foil
Cathode Electrode
Anode Electrode
Separator Manufacturing Separator Winding
Cell
Asse
mbly
Anode Manufacturing
Copper Foil
Raw
Mat
eria
ls
Cell
Cell
Cell
Cell
…
Pack
Module
Module
Module
Module
…
Pack Enclosure
Vehicle Assembly (Fremont, CA)
Can & Cap
Battery Pack Lifetime Usage
Battery Pack Recycling
Raw Steel/Aluminum
Gigafactory Process Flow
Electrolyte Manufacturing
Gigafactory Projected Figures
2020 Tesla Vehicle Volume ≈500,000/yr
2020 Gigafactory Cell Output 35 GWh/yr
2020 Gigafactory Pack Output 50 GWh/yr
Space Requirement Up to 10M ft2
w/ 1-2 levels
Total Land Area (acres) 500-1000
Employees ≈6,500
New Local Renewables
Solar and Wind
Tesla Gigafactory
Rendering
Gigafactory Location Finalists
Finished battery packs from the Gigafactory to Fremont, CA for vehicle assembly. Final site selection activities are underway.
ACTIVE
TODAY
2014 2015 2016 2017
Site Selection
Zoning & Design / Build
Partner Discussions
Initial Project Design
2020 (500k Veh/Yr)
Facility Construction Equipment Installation Production Launch and
Ramp
Tesla and its partners will invest ≈$4-5 billion in the Gigafactory through 2020. CapEx will be shared by Gigafactory partners.
Tesla will directly invest ≈$2 billion.
Gigafactory Projected Timeline
Forward Looking Statements
Certain statements in this communication, including statements regarding the Tesla Gigafactory and its development plans, production capacity, cost savings, costs, timeline and vehicle production estimates, are “forward-looking statements” that are subject to risks and uncertainties. These forward-looking statements are based on management’s current expectations, and as a result of certain risks and uncertainties, actual events or results may differ materially from those contained in the forward-looking statements. Various important factors could cause actual results to differ materially from those in the forward-looking statements, including potential difficulties in finding a suitable Tesla Gigafactory site, obtaining required permits, negotiating terms with technology and other partners, maintaining implementation schedules, output and cost estimates and vehicle demand. Please refer to Tesla’s most recent Annual Report on Form 10-K and its other filings with the Securities and Exchange Commission. These filings contain and identify important factors that could cause actual results to differ materially from those contained in Tesla’s forward-looking statements. Tesla disclaims any obligation to update information contained in these forward-looking statements.