EXPEDIENTE REALIZADO POR FIRE
PresupuestoCONSTRUCCION DE UNA VIVIENDA BIFAMILIAR
DICEÑO PEREZ MAMANI RICHARD JONATHAN
Lugar AREQUIPA - AREQUIPA - J. L. BUSTAMANTE Y RIVERO
HOJA DE PRESUPUESTO
Item Descripción Und.
01.00.00 LOSAS DEPORTIVAS DE FULBITO
01.01.00 OBRAS PRELIMINARES
01.01.01 LIMPIEZA DE TERRENO MANUAL m2
01.01.02 TRAZO, NIVELES Y REPLANTEO m2
02.02.00 MOVIMIENTO DE TIERRAS
02.02.01 REFINE Y NIVELACION EN TERRENO NORMAL m2
02.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3
03.03.00 CONCRETO SIMPLE
03.03.01 ENCOFRADO Y DESENCOFRADO DE LOSA DE CONCRETO m2
EMPEDRADO PARA LOSA DEPORTIVA
03.03.03 CONCRETO PARA LOSAS DEPORTIVAS FROTACHADO f'c=175 kg/cm2 m3
03.03.04 RELLENO DE JUNTAS EN LOSAS CON ASFALTO RC-250 m
04.04.00 PINTURA
04.04.01 PINTURA DEMARCATORIA EN LOSA DEPORTIVA m2
05.05.00 CARPINTERIA METALICA
05.05.01 COLOCACION Y TRANSPORTE DE ARCOS DE FUTBOL glb
EXPEDIENTE REALIZADO POR FIRE 01.01.01
m2/DIA
CONSTRUCCION DE UNA VIVIENDA BIFAMILIAR Descripción Recurso
CAPATAZ
07/01/2013 OPERARIO
PEON
HERRAMIENTAS MANUALES
m2/DIA
HOJA DE PRESUPUESTO Descripción Recurso
CAPATAZ
Metrado Duracion Precio (S/.) TOTAL OPERARIO
PEON
540.00 1 día 6.09 3,286.42 YESO DE 28 Kg
540.00 1 día 4.52 2,440.77 MADERA TORNILLO
540.00 3 días 12.21 6,595.88
48.00 1 DIA 18.17 872.18 HERRAMIENTAS MANUALES
91.83 4 días 35.09 3,222.61
81.00 6 días 25.83 2,092.62
43.20 4 días 307.30 13,275.31
246.00 1 día 61.34 15,090.79 Rendimiento
15.51 1.00 13.66 211.98 Código
Mano de Obra
2.00 1.00 13.67 27.33
Materiales
Equipos
Rendimiento
Código
Mano de Obra
Equipos
CAMION VOLQUETE 4x2 120-140 HP 4 M3.
RETROEXCAVADOR S/LLANTAS 58 HP 1 YD3.
Partida
Rendimiento
01.04.06
01.04.05
m3/DIA
Descripción Recurso
CAPATAZ
OPERARIO
OFICIAL
PEON
PIEDRA CHANCADA DE 1/2"
ARENA GRUESA
CEMENTO PORTLAND TIPO I (42.5 kg)
AGUA
HERRAMIENTAS MANUALES
VIBRADOR DE CONCRETO 4 HP 2.40"
MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3
Partida
Rendimiento
Código
Partida
Rendimiento
Código
01.01.01
Descripción Recurso
HERRAMIENTAS MANUALES
Descripción Recurso
YESO DE 28 Kg
MADERA TORNILLO
Código
Materiales
Equipos
Código
Mano de Obra
Equipos
CAMION VOLQUETE 4x2 120-140 HP 4 M3.
RETROEXCAVADOR S/LLANTAS 58 HP 1 YD3.
Descripción Recurso
PIEDRA CHANCADA DE 1/2"
ARENA GRUESA
CEMENTO PORTLAND TIPO I (42.5 kg)
AGUA
HERRAMIENTAS MANUALES
VIBRADOR DE CONCRETO 4 HP 2.40"
MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3
Código
Código
capataz 17.20 oficial 12.60 operario 14.40 peon 11.56CAPATAZ 17.2 20.3 operario 14.4 17.0
oficial 12.6 14.9 peon 11.56 13.6
OFICIAL 14.9
LIMPIEZA DE TERRENO MANUAL
40.0000 EQ. 40.0000 Costo unitario directo por : m2 6.09
Unidad Cuadrilla Cantidad Precio S/.
Mano de Obra
HH 0.1 0.02 20.3hh 0.1000 0.0200 16.99
hh 2.0000 0.4000 13.64
Equipos
%MO 5.0000 5.80
TRAZO DE NIVELES Y REPLANTEO
500.0000 EQ. 500.0000 Costo unitario directo por : m2 4.52
Unidad Cuadrilla Cantidad Precio S/.
Mano de Obra
hh 1.0000 0.0160 20.30
hh 1.0000 0.0160 16.99
hh 3.0000 0.0480 13.64
Materiales
bls 0.0500 21.01
p2 0.0200 4.20
Equipos
%MO 3.0000 0.81
NIVELACION Y COMPACTACION MANUAL
m2/DIA MO. 40 Costo unitario directo por : m2 12.2146
Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.
capataz hh 0.1 0.02 20.30 OPERARIO hh 0.1 0.02 16.99
PEON hh 1 0.2 13.64
AGUA m3 0.25 10
HERRAMIENTAS MANUALES %MO 3 0.6 2.82
PLANCHA COMPACTADORA hm 2 0.4 15
NIVEL TOPOGRAFICO hm 0.5 0.1 8.1
ELIMINACION MATERIAL EXCEDENTE
m3/DIA MO. 190 Costo unitario directo por : m3 18.1705
Cuadrilla Cantidad Precio S/.
Descripción Recurso Unidad
CAPATAZ hh 0.1 0.004210526315789 20.30
PEON hh 2 0.084210526315789 13.64
CAMION VOLQUETE 4x2 120-140 HP 4 M3. hm 1 0.0421 210
RETROEXCAVADOR S/LLANTAS 58 HP 1 YD3. hm 1 0.0421 195
04.03.02 ENCOFRADO Y DESENCOFRADO DE LOSA DE LOSA
m2/DIA 16.0000 EQ. 16.0000 Costo unitario directo por : m2 35.09
Mano de Obra Cuadrilla Cantidad Precio S/.
CAPATAZ hh 0.1000 0.0500 20.30
OPERARIO hh 1.0000 0.5000 16.99
OFICIAL hh 1.0000 0.5000 14.87
PEON HH 1.0000 0.5000 13.64
Materiales
ALAMBRE NEGRO RECOCIDO # 8 kg 0.2600 3.42
CLAVOS C/C PARA MADERA (PROMEDIO) kg 0.1600 4.20
MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADO p2 3.3500 3.40
Equipos
HERRAMIENTAS MANUALES %MO 5.0000 16.94
Subpartidas
DESENCOFRADO m2 1.0000 4.35
EMPEDRADO PARA LOSA DEPORTIVA
u/DIA 25.0000 EQ. 800.0000 Costo unitario directo por : u 25.83
Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.
Mano de Obra
CAPATAZ hh 0.1000 0.0320 20.30
OFICIAL hh 5.0000 1.6000 14.87
Materiales
PIEDRA 6 " M3 0.1500 1.51
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 0.39
CONCRETO EN LOSAS ALIGERADAS F´C=210 kg/cm2
12.5000 EQ. 12.5000 Costo unitario directo por : m3 307.30
Unidad Cuadrilla Cantidad Precio S/.
Mano de Obra
hh 0.1563 0.1000 20.30
hh 1.5000 0.9600 16.99
hh 1.0000 0.6400 14.87
hh 6.5000 4.1600 13.64
Materiales
m3 0.8500 29.41
m3 0.4200 27.31
CEMENTO PORTLAND TIPO I (42.5 kg) bls 9.7400 18.07
m3 0.1840 3.36
Equipos
%MO 5.0000 84.60
VIBRADOR DE CONCRETO 4 HP 2.40" hm 0.5000 0.3200 8.40
MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3 hm 0.5000 0.3200 8.40
RELLENO DE JUNTAS EN LOSAS CON ASFALTO RC-250
u/DIA 50.0000 EQ. 800.0000 Costo unitario directo por : u 61.34
Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.
Mano de Obra
CAPATAZ hh 0.1000 0.0320 20.30
OFICIAL hh 5.0000 1.6000 14.87
PEON HH 2.0000 0.3200 13.64
Materiales
RC-250 0.0800 45.00
ARENA FINA 0.0020 54.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 28.80
17.04 PINTURA DEMARCATORIA EN LOSA DEPORTIVA
m2/DIA 20.0000 EQ. 20.0000 Costo unitario directo por : m2 13.66
Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.
Mano de Obra
CAPATAZ hh 0.1000 0.0400 20.30
OPERARIO hh 1.0000 0.4000 16.99
PEON hh 0.5000 0.2000 13.64
Materiales
THINNER ACRILICO gal 0.0100 15.00
LIJA u 0.1250 1.50
PINTURA ESMALTE SINTETICO gal 0.0400 35.00
PINTURA ANTICORROSIVA gal 0.0400 32.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 10.34
17.04 COLOCACION Y TRANSPORTE DE ARCOS DE FUTBOL
m2/DIA 20.0000 EQ. 20.0000 Costo unitario directo por : m2 13.67
Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.
Mano de Obra
CAPATAZ hh 0.1000 0.0400 20.30
OPERARIO hh 1.0000 0.4000 16.99
PEON hh 0.5000 0.2000 13.64
Materiales
THINNER ACRILICO gal 0.0100 15.00
SOLSADURA
LIJA u 0.1250 1.50
PINTURA ESMALTE SINTETICO gal 0.0400 35.00
PINTURA ANTICORROSIVA gal 0.0400 32.00
TUBO DE 4" ML 6.5000 32.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 10.34
CAPATAZ 17.2 20.3 operario 14.4 17.0oficial 12.6 14.9 peon 11.56 13.6
OFICIAL 14.9LIMPIEZA DE TERRENO MANUAL
Unidad Cuadrilla Cantidad Precio S/.
Equipos
%MO 5.0000 0.68
TRAZO DE NIVELES Y REPLANTEO
Unidad Cuadrilla Cantidad Precio S/.
Materiales
bls 0.0500 21.01
p2 0.0200 4.20
NIVELACION Y COMPACTACION MANUAL
Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.
AGUA m3 0.25 10
HERRAMIENTAS MANUALES %MO 3 0.6 2.82
PLANCHA COMPACTADORA hm 2 0.4 15
NIVEL TOPOGRAFICO hm 0.5 0.1 8.1
ELIMINACION MATERIAL EXCEDENTE
Cuadrilla Cantidad Precio S/.
Descripción Recurso Unidad
CAPATAZ hh 0.1 #REF! #REF!
PEON hh 2 #REF! #REF!
CAMION VOLQUETE 4x2 120-140 HP 4 M3. hm 1 0.0421 210
RETROEXCAVADOR S/LLANTAS 58 HP 1 YD3. hm 1 0.0421 195
ENCOFRADO Y DESENCOFRADO DE LOSA DE LOSA
Materiales
ALAMBRE NEGRO RECOCIDO # 8 kg 0.2600 3.42
CLAVOS C/C PARA MADERA (PROMEDIO) kg 0.1600 4.20
MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADO p2 3.3500 3.40
Equipos
HERRAMIENTAS MANUALES %MO 5.0000 #REF!
Subpartidas
DESENCOFRADO m2 1.0000 4.35
EMPEDRADO PARA LOSA DEPORTIVADescripción Recurso Unidad Cuadrilla Cantidad Precio S/.
Materiales
PIEDRA 6 " M3 0.1500 1.51
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 0.39
CONCRETO EN LOSAS ALIGERADAS F´C=210 kg/cm2
Unidad Cuadrilla Cantidad Precio S/.
Materiales
m3 0.8500 29.41
m3 0.4200 27.31
CEMENTO PORTLAND TIPO I (42.5 kg) bls 9.7400 18.07
m3 0.1840 3.36
Equipos
%MO 5.0000 #REF!
VIBRADOR DE CONCRETO 4 HP 2.40" hm 0.5000 0.3200 8.40
MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3 hm 0.5000 0.3200 8.40
RELLENO DE JUNTAS EN LOSAS CON ASFALTO RC-250
Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.
Materiales
RC-250 0.0800 45.00
ARENA FINA 0.0020 54.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 #REF!
PINTURA DEMARCATORIA EN LOSA DEPORTIVA
Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.
Materiales
THINNER ACRILICO gal 0.0100 15.00
LIJA u 0.1250 1.50
PINTURA ESMALTE SINTETICO gal 0.0400 35.00
PINTURA ANTICORROSIVA gal 0.0400 32.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 #REF!
COLOCACION Y TRANSPORTE DE ARCOS DE FUTBOL
Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.
Materiales
THINNER ACRILICO gal 0.0100 15.00
SOLSADURA
LIJA u 0.1250 1.50
PINTURA ESMALTE SINTETICO gal 0.0400 35.00
PINTURA ANTICORROSIVA gal 0.0400 32.00
TUBO DE 4" ML 6.5000 32.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 #REF!
capataz 17.20 oficial 12.60 operario 14.40 peon 11.56
METRADODURACION RECURSO
DIAS NECESARIO
Parcial S/.
0.40592 539.00 10.78 1 10.780.34 540.00 10.8 1 10.85.46 540.00 10.8 1 10.85.80
0.29 540.00 10.8 1 10.80.29
Parcial S/.
0.32 540.00 10.8 1 10.80.27 540.00 10.8 1 10.80.22 540.00 10.8 1 10.80.81
1.05
0.21
1.26
2.44
2.44
Parcial S/.
0.40592 539.00 10.78 3 10.780.33984 540.00 10.8 3 10.80.272816 540.00 10.8 3 10.8
2.82
2.5 540.00 10.8 3 10.82.5
0.0846 540.00 10.8 3 10.86 540.00 10.8 3 10.8
0.81 540.00 10.8 3 10.86.8946
ELIMINACION MATERIAL EXCEDENTE
Parcial S/.
0.07 48.00 0.96 1 0.961.05 48.00 0.96 1 0.961.12 08.841 48.00 0.96 1 0.968.2095 48.00 0.96 1 0.96
17.0505
Parcial S/.
1.01 91.83 1.8366 4 1.83668.50 91.83 1.8366 4 1.83667.43 91.83 1.8366 4 1.83666.82 92.83 1.8566 5 1.856616.94
0.89 91.83 1.8366 4 1.83660.67 91.83 1.8366 4 1.836611.39 91.83 1.8366 4 1.836612.95
0.85 91.83 1.8366 4 1.83660.85
4.35 91.83 1.8366 4 1.83664.35
Parcial S/.
0.65 81.00 1.62 6 1.6223.79 81.00 1.62 6 1.6224.44
0.23 81.00 1.62 6 1.620.23
1.17 81.00 1.62 6 1.621.17
Parcial S/.
2.03 43.20 0.864 4 0.86416.31 43.20 0.864 4 0.8649.52 43.20 0.864 4 0.86456.75 43.20 0.864 4 0.86484.60
25.00 43.20 0.864 4 0.86411.47 43.20 0.864 4 0.864
176.00 43.20 0.864 4 0.8640.62 43.20 0.864 4 0.864
213.09
4.23 43.20 0.864 4 0.8642.69 43.20 0.864 4 0.8642.69 43.20 0.864 4 0.8649.61
Parcial S/.
0.65 246.00 4.92 1 4.9223.79 246.00 4.92 1 4.924.37
28.80 246.00 4.92 1 4.920
3.60 246.00 4.92 1 4.920.11 246.00 4.92 1 4.923.71 0
028.83 246.00 4.92 1 4.9228.83
Parcial S/.
0.81 15.51 0.31026 1 0.310266.80 15.51 0.31026 1 0.310262.73 15.51 0.31026 1 0.3102610.34
0.15 15.51 0.31026 1 0.310260.19 15.51 0.31026 1 0.310261.40 15.51 0.31026 1 0.310261.28 15.51 0.31026 1 0.310263.02
0.31 15.51 0.31026 1 0.310260.31
Parcial S/.
0.81 4 0.08 1 0.086.80 4 0.08 1 0.082.73 4 0.08 1 0.0810.34
0.15 4 0.08 1 0.084 0.08 1 0.08
0.19 4 0.08 1 0.081.40 4 0.08 1 0.081.28 4 0.08 1 0.08
208.00 4 0.08 1 0.083.02
0.31 4 0.08 1 0.080.31
METRADODURACION RECURSO
DIAS NECESARIO
Parcial S/.
0.17 540.00 10.8 1 10.80.17
Parcial S/.
1.05
0.21
1.26
Parcial S/.
2.5 540.00 10.8 3 10.82.5
0.0846 540.00 10.8 3 10.86 540.00 10.8 3 10.8
0.81 540.00 10.8 3 10.86.8946
ELIMINACION MATERIAL EXCEDENTE
Parcial S/.
0.07 48.00 0.96 1 0.96
1.05 48.00 0.96 1 0.961.12 08.841 48.00 0.96 1 0.968.2095 48.00 0.96 1 0.96
17.0505
0.89 91.83 1.8366 4 1.83660.67 91.83 1.8366 4 1.836611.39 91.83 1.8366 4 1.836612.95
#REF! 91.83 1.8366 4 1.8366#REF!
4.35 91.83 1.8366 4 1.83664.35
Parcial S/.
0.23 81.00 1.62 6 1.620.23
1.17 81.00 1.62 6 1.621.17
Parcial S/.
25.00 43.20 0.864 4 0.86411.47 43.20 0.864 4 0.864
176.00 43.20 0.864 4 0.8640.62 43.20 0.864 4 0.864
213.09
#REF! 43.20 0.864 4 0.8642.69 43.20 0.864 4 0.8642.69 43.20 0.864 4 0.864
#REF!
Parcial S/.
0
3.60 246.00 4.92 1 4.920.11 246.00 4.92 1 4.923.71 0
0#REF! 246.00 4.92 1 4.92#REF!
Parcial S/.
0.15 15.51 0.31026 1 0.310260.19 15.51 0.31026 1 0.310261.40 15.51 0.31026 1 0.310261.28 15.51 0.31026 1 0.310263.02
#REF! 15.51 0.31026 1 0.31026#REF!
Parcial S/.
#REF!
0.15 4 0.08 1 0.084 0.08 1 0.08
0.19 4 0.08 1 0.081.40 4 0.08 1 0.081.28 4 0.08 1 0.08
208.00 4 0.08 1 0.083.02
#REF! 4 0.08 1 0.08#REF!
Item Descripción Und. Duracion
01.00.00 LOSAS DEPORTIVAS DE FULBITO
01.01.00 OBRAS PRELIMINARES
01.01.01 LIMPIEZA DE TERRENO MANUAL m2 1 día
01.01.02 TRAZO, NIVELES Y REPLANTEO m2 1 día
02.02.00 MOVIMIENTO DE TIERRAS
02.02.01 NIVELACION EN TERRENO NORMAL m2 3 días
02.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 1 DIA
03.03.00 CONCRETO SIMPLE
03.03.01 ENCOFRADO Y DESENCOFRADO DE LOSA DE CONCRETO m2 4 días EMPEDRADO PARA LOSA DEPORTIVA m2 6 días
03.03.03 CONCRETO PARA LOSAS DEPORTIVAS FROTACHADO f'c=175 kg/cm2 m3 4 días
03.03.04 RELLENO DE JUNTAS EN LOSAS CON ASFALTO RC-250 m 1 día
04.04.00 PINTURA
04.04.01 PINTURA DEMARCATORIA EN LOSA DEPORTIVA m2 1.00
05.05.00 CARPINTERIA METALICA
05.05.01 COLOCACION Y TRANSPORTE DE ARCOS DE FUTBOL glb 1.00
CAPATAZ
Item Descripción Und. Duracion
01.00.00 LOSAS DEPORTIVAS DE FULBITO
01.01.00 OBRAS PRELIMINARES
01.01.01 LIMPIEZA DE TERRENO MANUAL m2 1 día
01.01.02 TRAZO, NIVELES Y REPLANTEO m2 1 día
02.02.00 MOVIMIENTO DE TIERRAS
02.02.01 REFINE Y NIVELACION EN TERRENO NORMAL m2 3 días
02.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 1 DIA
03.03.00 CONCRETO SIMPLE
03.03.01 ENCOFRADO Y DESENCOFRADO DE LOSA DE CONCRETO m2 4 días EMPEDRADO PARA LOSA DEPORTIVA m2 6 días
03.03.03 CONCRETO PARA LOSAS DEPORTIVAS FROTACHADO f'c=175 kg/cm2 m3 4 días
03.03.04 RELLENO DE JUNTAS EN LOSAS CON ASFALTO RC-250 m 1 día
04.04.00 PINTURA
04.04.01 PINTURA DEMARCATORIA EN LOSA DEPORTIVA m2 1.00
05.05.00 CARPINTERIA METALICA
05.05.01 COLOCACION Y TRANSPORTE DE ARCOS DE FUTBOL glb 1.00
OFICIAL
Item Descripción Und. Duracion
01.00.00 LOSAS DEPORTIVAS DE FULBITO
01.01.00 OBRAS PRELIMINARES
01.01.01 LIMPIEZA DE TERRENO MANUAL m2 1 día
01.01.02 TRAZO, NIVELES Y REPLANTEO m2 1 día
02.02.00 MOVIMIENTO DE TIERRAS
02.02.01 REFINE Y NIVELACION EN TERRENO NORMAL m2 3 días
02.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 1 DIA
03.03.00 CONCRETO SIMPLE
03.03.01 ENCOFRADO Y DESENCOFRADO DE LOSA DE CONCRETO m2 4 días EMPEDRADO PARA LOSA DEPORTIVA m2 6 días
03.03.03 CONCRETO PARA LOSAS DEPORTIVAS FROTACHADO f'c=175 kg/cm2 m3 4 días
03.03.04 RELLENO DE JUNTAS EN LOSAS CON ASFALTO RC-250 m 1 día
04.04.00 PINTURA
04.04.01 PINTURA DEMARCATORIA EN LOSA DEPORTIVA m2 1.00
05.05.00 CARPINTERIA METALICA
05.05.01 COLOCACION Y TRANSPORTE DE ARCOS DE FUTBOL glb 1.00
OPERARIO
Item Descripción Und. Duracion
01.00.00 LOSAS DEPORTIVAS DE FULBITO
01.01.00 OBRAS PRELIMINARES
01.01.01 LIMPIEZA DE TERRENO MANUAL m2 1 día
01.01.02 TRAZO, NIVELES Y REPLANTEO m2 1 día
02.02.00 MOVIMIENTO DE TIERRAS
02.02.01 REFINE Y NIVELACION EN TERRENO NORMAL m2 3 días
02.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 1 DIA
03.03.00 CONCRETO SIMPLE
03.03.01 ENCOFRADO Y DESENCOFRADO DE LOSA DE CONCRETO m2 4 días EMPEDRADO PARA LOSA DEPORTIVA m2 6 días
03.03.03 CONCRETO PARA LOSAS DEPORTIVAS FROTACHADO f'c=175 kg/cm2 m3 4 días
03.03.04 RELLENO DE JUNTAS EN LOSAS CON ASFALTO RC-250 m 1 día
04.04.00 PINTURA
04.04.01 PINTURA DEMARCATORIA EN LOSA DEPORTIVA m2 1.00
05.05.00 CARPINTERIA METALICA
05.05.01 COLOCACION Y TRANSPORTE DE ARCOS DE FUTBOL glb 1.00
PEON
RECURSO
NECESARIO DIAS CALENDARIO 1 2 3 4 5 6 7 8
6-Jan-14 7-Jan-14 8-Jan-14 9-Jan-14 10-Jan-14 11-Jan-14 12-Jan-14 13-Jan-14
10.8 10.80
10.8 10.8
10.8 10.8 10.8 10.8
1.9
1.9 1.9 1.9 1.9
0.0 0.0
56.7
0.0
0.3
0.1
SUMA TOTAL 10.8 10.8 10.8 10.8 10.8 1.9 1.9 1.9
6-Jan-14 7-Jan-14 8-Jan-14 9-Jan-14 10-Jan-14 11-Jan-14 12-Jan-14 13-Jan-14 14-Jan-14 15-Jan-14 16-Jan-14 17-Jan-14 18-Jan-14 19-Jan-14 20-Jan-14 21-Jan-140.0
10.0
20.0
30.0
40.0
50.0
60.0
PEON
RECURSO
NECESARIO DIAS CALENDARIO 1 2 3 4 5 6 7 8
6-Jan-14 7-Jan-14 8-Jan-14 9-Jan-14 10-Jan-14 11-Jan-14 12-Jan-14 13-Jan-14
10.8 10.78
10.8 10.8
10.8 10.78 10.78 10.78
1.0
1.8 1.8 1.8 1.8
1.6 1.6
0.9
4.9
0.3
0.1
SUMA TOTAL 10.8 10.8 10.8 10.8 10.8 1.8 1.8 3.5
6-Jan-14 7-Jan-14 8-Jan-14 9-Jan-14 10-Jan-14 11-Jan-14 12-Jan-14 13-Jan-14 14-Jan-14 15-Jan-14 16-Jan-14 17-Jan-14 18-Jan-14 19-Jan-14 20-Jan-14 21-Jan-140.0
10.0
20.0
30.0
40.0
50.0
60.0
PEON
6-Jan-14 7-Jan-14 8-Jan-14 9-Jan-14 10-Jan-14 11-Jan-14 12-Jan-14 13-Jan-14 14-Jan-14 15-Jan-14 16-Jan-14 17-Jan-14 18-Jan-14 19-Jan-14 20-Jan-14 21-Jan-140.0
2.0
4.0
6.0
8.0
10.0
12.0
CAPATAZ
RECURSO NECESARIO DIAS CALENDARIO 1 2 3 4 5 6 7 8
6-Jan-14 7-Jan-14 8-Jan-14 9-Jan-14 10-Jan-14 11-Jan-14 12-Jan-14 13-Jan-14
0.0 0.00
0.0 0
0.0 0 0 0
0.0
1.6 1.6 1.6 1.6
1.6 1.6
0.94.9
0.0
0.0
SUMA TOTAL 0.0 0.0 0.0 0.0 0.0 1.6 1.6 3.2
6-Jan-14 7-Jan-14 8-Jan-14 9-Jan-14 10-Jan-14 11-Jan-14 12-Jan-14 13-Jan-14 14-Jan-14 15-Jan-14 16-Jan-14 17-Jan-14 18-Jan-14 19-Jan-14 20-Jan-14 21-Jan-140.0
2.0
4.0
6.0
8.0
10.0
12.0
CAPATAZ
6-Jan-14
7-Jan-14
8-Jan-14
9-Jan-14
10-Jan-14
11-Jan-14
12-Jan-14
13-Jan-14
14-Jan-14
15-Jan-14
16-Jan-14
17-Jan-14
18-Jan-14
19-Jan-14
20-Jan-14
21-Jan-14
0.0
1.0
2.0
3.0
4.0
5.0
6.0
OFICIAL
OPERARIORECURSO
NECESARIO DIAS CALENDARIO 1 2 3 4 5 6 7 8
6-Jan-14 7-Jan-14 8-Jan-14 9-Jan-14 10-Jan-14 11-Jan-14 12-Jan-14 13-Jan-14
10.8 10.80
10.8 10.8
0.0 0 0 0
0.0
0.0 0.0 0.0 0.0
0.0 0.0
0.90.0
0.3
0.1
SUMA TOTAL 10.8 10.8 0.0 0.0 0.0 0.0 0.0 0.0
6-Jan-14
7-Jan-14
8-Jan-14
9-Jan-14
10-Jan-14
11-Jan-14
12-Jan-14
13-Jan-14
14-Jan-14
15-Jan-14
16-Jan-14
17-Jan-14
18-Jan-14
19-Jan-14
20-Jan-14
21-Jan-14
0.0
2.0
4.0
6.0
8.0
10.0
12.0
OPERARIO
PEON
9 10 11 12 13 14 15 16
14-Jan-14 15-Jan-14 16-Jan-14 17-Jan-14 18-Jan-14 19-Jan-14 20-Jan-14 21-Jan-14
1.9
1.9
0.0 0.0 0.0 0.0 0.0
56.7 56.7 56.7 56.7
0.0
0.3
0.11.9 0.0 56.7 56.7 56.7 56.7 0.1 2.2
6-Jan-14 7-Jan-14 8-Jan-14 9-Jan-14 10-Jan-14 11-Jan-14 12-Jan-14 13-Jan-14 14-Jan-14 15-Jan-14 16-Jan-14 17-Jan-14 18-Jan-14 19-Jan-14 20-Jan-14 21-Jan-140.0
10.0
20.0
30.0
40.0
50.0
60.0
PEON
9 10 11 12 13 14 15 16
14-Jan-14 15-Jan-14 16-Jan-14 17-Jan-14 18-Jan-14 19-Jan-14 20-Jan-14 21-Jan-14
1.0
1.8
1.6 1.6 1.6 1.6 1.6
0.9 0.9 0.9 0.9
4.9
0.3
0.13.5 1.6 2.5 2.5 2.5 0.9 5.0 1.3
6-Jan-14 7-Jan-14 8-Jan-14 9-Jan-14 10-Jan-14 11-Jan-14 12-Jan-14 13-Jan-14 14-Jan-14 15-Jan-14 16-Jan-14 17-Jan-14 18-Jan-14 19-Jan-14 20-Jan-14 21-Jan-140.0
10.0
20.0
30.0
40.0
50.0
60.0
PEON
6-Jan-14 7-Jan-14 8-Jan-14 9-Jan-14 10-Jan-14 11-Jan-14 12-Jan-14 13-Jan-14 14-Jan-14 15-Jan-14 16-Jan-14 17-Jan-14 18-Jan-14 19-Jan-14 20-Jan-14 21-Jan-140.0
2.0
4.0
6.0
8.0
10.0
12.0
CAPATAZ
9 10 11 12 13 14 15 16
14-Jan-14 15-Jan-14 16-Jan-14 17-Jan-14 18-Jan-14 19-Jan-14 20-Jan-14 21-Jan-14
0.0
1.6
1.6 1.6 1.6 1.6 1.6
0.9 0.9 0.9 0.9
4.9
0.0
0.03.2 1.6 2.5 2.5 2.5 0.9 4.9 0.0
6-Jan-14 7-Jan-14 8-Jan-14 9-Jan-14 10-Jan-14 11-Jan-14 12-Jan-14 13-Jan-14 14-Jan-14 15-Jan-14 16-Jan-14 17-Jan-14 18-Jan-14 19-Jan-14 20-Jan-14 21-Jan-140.0
2.0
4.0
6.0
8.0
10.0
12.0
CAPATAZ
6-Jan-14
7-Jan-14
8-Jan-14
9-Jan-14
10-Jan-14
11-Jan-14
12-Jan-14
13-Jan-14
14-Jan-14
15-Jan-14
16-Jan-14
17-Jan-14
18-Jan-14
19-Jan-14
20-Jan-14
21-Jan-14
0.0
1.0
2.0
3.0
4.0
5.0
6.0
OFICIAL
9 10 11 12 13 14 15 16
14-Jan-14 15-Jan-14 16-Jan-14 17-Jan-14 18-Jan-14 19-Jan-14 20-Jan-14 21-Jan-14
0.0
0.0
0.0 0.0 0.0 0.0 0.0
0.9 0.9 0.9 0.9
0.0
0.3
0.10.0 0.0 0.9 0.9 0.9 0.9 0.1 0.3
6-Jan-14
7-Jan-14
8-Jan-14
9-Jan-14
10-Jan-14
11-Jan-14
12-Jan-14
13-Jan-14
14-Jan-14
15-Jan-14
16-Jan-14
17-Jan-14
18-Jan-14
19-Jan-14
20-Jan-14
21-Jan-14
0.0
2.0
4.0
6.0
8.0
10.0
12.0
OPERARIO
CAPATAZ 17.2 20.3 operariooficial 12.6 14.9 peon
14.4 17.011.56 13.6
17.212.6
RECURSO NECESARIO
LIMPIEZA DE TERRENO MANUAL
6-Jan-14
Descripción Recurso UnidadEquipos
HERRAMIENTAS MANUALES %MO 10.8
TRAZO DE NIVELES Y REPLANTEO
7-Jan-14
Descripción Recurso UnidadMateriales
YESO DE 28 Kg blsMADERA TORNILLO p2
NIVELACION Y COMPACTACION MANUALCódigo Descripción Recurso Unidad
MaterialesAGUA 10.8
Equipos 8-Jan-14
HERRAMIENTAS MANUALES %MO 10.8PLANCHA COMPACTADORA hm 10.8
NIVEL TOPOGRAFICO hm 10.8
ELIMINACION MATERIAL EXCEDENTEEquipos
CAMION VOLQUETE 4x2 120-140 HP 4 M3. hm 0.96RETROEXCAVADOR S/LLANTAS 58 HP 1 YD3. hm 0.96
ENCOFRADO Y DESENCOFRADO DE LOSA DE LOSA
11-Jan-14
1.83661.83661.8366
HERRAMIENTAS MANUALES 1.8366
DESENCOFRADO 1.8366
EMPEDRADO PARA LOSA DEPORTIVADescripción Recurso
PIEDRA 6 " 1.6213-Jan-14
HERRAMIENTAS MANUALES 1.62
CONCRETO EN LOSAS ALIGERADAS F´C=210 kg/cm2
16-Jan-14
Descripción Recurso UnidadMateriales
PIEDRA CHANCADA DE 1/2" m3 0.864ARENA GRUESA m3 0.864
CEMENTO PORTLAND TIPO I (42.5 kg) bls 0.864AGUA m3 0.864
EquiposHERRAMIENTAS MANUALES %MO 0.864
VIBRADOR DE CONCRETO 4 HP 2.40" hm 0.864MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3 hm 0.864
RELLENO DE JUNTAS EN LOSAS CON ASFALTO RC-250Descripción Recurso
RC-250 4.92ARENA FINA 4.92
20-Jan-14
HERRAMIENTAS MANUALES 4.92
Código Descripción Recurso
THINNER ACRILICO 0.31026LIJA 0.31026
PINTURA ESMALTE SINTETICO 0.31026PINTURA ANTICORROSIVA 0.31026 21-Jan-14
HERRAMIENTAS MANUALES 0.31026
Código Descripción Recurso
THINNER ACRILICO 0.08SOLSADURA 0.08
LIJA 0.08PINTURA ESMALTE SINTETICO 0.08 20-Jan-14
PINTURA ANTICORROSIVA 0.08TUBO DE 4" 0.08
HERRAMIENTAS MANUALES 0.08
1
1
3
2 dias cruze4
6 2 dias crve 3 dias de cruce con concreto dde loa1 dia normal
4
1
1
1