INSTITUTO TECNOLOGICO DE CHALATENANGO
INCIDENCIA FISICA FINANCIERA DE LAS ORDENES DE CAMBIO
FACULTAD: TECNICO SUPERIOR EN INGENIERIA CIVIL II AÑO
DOCENTE: ING. HENRY CARDOZAREALIZADO POR:
MARIO ENRIQUE PERALTA RAMIREZ CRISTIAN VLADIMIR BENITEZ GOMEZ JOSUE ENMANUEL CARABANTES ARRIAGA EZEQUIEL REYES GUARDADO ALONSO JOSUE GUTIERREZ PORTILLO MARIO ERNESTO RIVERA MENJIVAR ROGELIO RUBEN RIVAS HERNANNDEZ HENRY JHOVANY CORNEJO FLORES SANTIAGO ALBERTO ALBERTO RIVERA JORGE LUIS FRANCO SANCHEZ
![Page 2: ORDEN DE CAMBIO.doc](https://reader030.fdocumento.com/reader030/viewer/2022032612/55cf9b55550346d033a5a581/html5/thumbnails/2.jpg)
21 DE OCTUBRE DE 2013
REPUBLICA DE EL SALVADOR
MINISTERIO DE EDUCACIONMINED
ORDEN DE CAMBIO Nº 1
CONTRATO:01/2010
PROYECTO:PROYECTO: REPARACIONES MENORES Y AULA PROVISIONAL” EN INSTITUTO NACIONAL DE SAN JOSÉ LAS FLORES, JURISDICCION DE SAN JOSÉ LAS FLORES, DEPARTAMENTO DE CHALATENANGO” PRESENTA:
CONSTRUCTOR OSCAR MORAN
JULIO DE 2010.
![Page 3: ORDEN DE CAMBIO.doc](https://reader030.fdocumento.com/reader030/viewer/2022032612/55cf9b55550346d033a5a581/html5/thumbnails/3.jpg)
INDICE DE ORDEN DE CAMBIO
CONTENIDO
1. INTRODUCCION
2. ASPECTOS CONTRACTUALES
3. DESCRIPCION Y JUSTIFICACION DEL TRABAJO
3.1 DESCRIPCION
3.2 JUSTIFICACION DEL TRABAJO
4. CUADRO GENERAL DE ORDEN DE CAMBIO Nº 1
4.1 CUADRO GENERAL
4.2 CUADRO RESUMEN
![Page 4: ORDEN DE CAMBIO.doc](https://reader030.fdocumento.com/reader030/viewer/2022032612/55cf9b55550346d033a5a581/html5/thumbnails/4.jpg)
1.0 INTRODUCCION
![Page 5: ORDEN DE CAMBIO.doc](https://reader030.fdocumento.com/reader030/viewer/2022032612/55cf9b55550346d033a5a581/html5/thumbnails/5.jpg)
1. INTRODUCCION
Con relación a las reparaciones menores y aula provisional” en instituto nacional de san
josé las flores, jurisdiccion de san josé las flores, departamento de Chalatenango”, trabajos
ejecutados por la Empresa Contratista CONSTRUCTOR OSCAR OSWALDO MORAN
RODRIGUEZ., con el propósito de optimizar los recursos asignados al proyecto , se ha
visto la necesidad de priorizar las obras a realizar por medio de un reacomodo e inclusión
de otras partidas, es por eso que se genera una Orden de Cambio No. 1, para lo cual se
llevaran a cabo las readecuaciones de las cantidades de obra en aumentos y disminuciones .
Generando cambio alguno según el monto asignado al proyecto y al plazo contractual.
Se hace necesario la elaboración de la presente Orden de Cambio No. 1, referente a la
readecuación de las cantidades de obra contractualmente asignadas e inclusión de otras así
como también, considerando que por la naturaleza de los trabajos y la notable necesidad de
dar un mejor servicio a los usuarios, se estableció un objetivo principal, que consistió en
desarrollar los trabajos prioritarios para mantener una adecuada educación mediante las
aulas del referido Proyecto, para lo cual se efectuó dicho incremento y un reacomodo de las
cantidades de obra de cada una de las partidas de tal manera de distribuir de la mejor forma
los recursos destinados.
Tomando en cuenta lo anteriormente descrito, se presenta el detalle de las partidas tanto de
la que se incrementa como la que se disminuyen y la inclusión de las partidas nuevas con
respecto a las cantidades de obra del contrato original.
![Page 6: ORDEN DE CAMBIO.doc](https://reader030.fdocumento.com/reader030/viewer/2022032612/55cf9b55550346d033a5a581/html5/thumbnails/6.jpg)
2. ASPECTOS CONTRACTUALES
2. ASPECTOS CONTRACTUALES
A continuación se presenta un resumen de los principales aspectos contractuales del contrato de construcción:
Construcción:
Empresa: OSCAR MORAN
Contrato No: 01/2010
Fecha de Contrato:
![Page 7: ORDEN DE CAMBIO.doc](https://reader030.fdocumento.com/reader030/viewer/2022032612/55cf9b55550346d033a5a581/html5/thumbnails/7.jpg)
Fecha de Orden de Inicio:
Fecha de Finalización:
Monto de Contrato Original: $ 16,000.00
Incremento en Orden de Cambio No 1: $ 990.43
Nuevo monto del Contrato: $ 16,990.43
3. DESCRIPCION Y JUSTIFICACION DEL
TRABAJO
![Page 8: ORDEN DE CAMBIO.doc](https://reader030.fdocumento.com/reader030/viewer/2022032612/55cf9b55550346d033a5a581/html5/thumbnails/8.jpg)
3. DESCRIPCION Y JUSTIFICACION DEL TRABAJO.
3.1 DESCRIPCION
En la presente Orden de Cambio Nº 1 se incluye disminución en las siguientes partidas Columna caño galvanizado de 4" existente, incluye pedestal de concreto reforzado, Reconstrucción de acera de concreto, según el contrato original del proyecto.
El monto de esta disminución se utilizará para cubrir obras prioritarias de las partidas que se incrementan: Columna caño galvanizado de 4", incluye pedestal de concreto reforzado, Ventana solaire aluminio natural liviano, incluye defensa metálica de hierro cuadrado de 1/2"
3.2 JUSTIFICACION DEL TRABAJO
Debido al diagnóstico realizado desde el inicio del proyecto se fueron determinando
necesidades que no se tenían contempladas en el contrato original,
Por todo lo antes expuesto se consideró la necesidad de generar la ORDEN DE CAMBIO
Nº 1, la cual incrementa el monto según monto original; y el plazo contractual del Proyecto
01/2010
![Page 9: ORDEN DE CAMBIO.doc](https://reader030.fdocumento.com/reader030/viewer/2022032612/55cf9b55550346d033a5a581/html5/thumbnails/9.jpg)
4. CUADRO GENERAL DE ORDEN DE CAMBIO No 1
![Page 10: ORDEN DE CAMBIO.doc](https://reader030.fdocumento.com/reader030/viewer/2022032612/55cf9b55550346d033a5a581/html5/thumbnails/10.jpg)
PARTIDA: OBRAS MANEJO AGUA LLUVIA
MATERIAL CANTIDAD UNIDADCOSTO
UNITARIO COSTO TOTAL
BLOQUE DE 20X20X40 0.00 C/U $
0.89 $ -
DADO BLOQUE DE 20X20X200.00 C/U
$ 0.65
$ -
SOLERA BLOQUE DE 20X20X400.00 C/U
$ 1.05
$ -
BLOQUE DE 15X20X40120.00 C/U
$ 0.63
$ 75.60
DADO BLOQUE DE 15X20X2030.00 C/U
$ 0.50
$ 14.85
SOLERA BLOQUE DE 15X20X400.00 C/U
$ 0.80
$ -
BLOQUE 10X20X400.00 C/U
$ 0.50
$ -
DADP 10X20X400.00 C/U
$ 0.42
$ -
SOLERA 10X20X400.00 C/U
$ 0.66
$ -
HIERRO Ø5/8"0.00 VARILLA
$ 11.70
$ -
HIERRO Ø1/20.00 VARILLA
$ 7.31
$ -
HIERRO Ø3/8"8.00 VARILLA
$ 4.18
$ 33.43
HIERRO 1/4"0.00 VARILLA
$ 1.95
$ -
ALAMBRE AMARRE2.00 LBR
$ 0.98
$ 1.97
CEMENTO22.00 BLS
$ 11.25
$ 247.50
ARENA1.20 M3
$ 17.55
$ 21.06
GRAVA0.55 M3
$ 35.00
$ 19.25
TABLA PINO16.00 VR
$ 3.00
$ 48.00
CUARTON PINO6.00 VR
$ 1.80
$ 10.80
COSTANERA PINO6.00 VR
$ 0.90
$ 5.40
REGLA PACHA6.00 VR
$ 0.90
$ 5.40
CLAVO 21/2"1.00 LBR
$ 1.20
$ 1.20
CLAVO 4" 0.00 LBR $ $ -
![Page 11: ORDEN DE CAMBIO.doc](https://reader030.fdocumento.com/reader030/viewer/2022032612/55cf9b55550346d033a5a581/html5/thumbnails/11.jpg)
1.20
LADRILLO DE OBRA BARRO0.00 C/U
$ 0.17
$ -
MALLA CICLON 9X720.00 yda
$ 8.25
$ -
TUBO GALVANIZADO 2" 0.00 C/U $
31.50 $ -
TUBO GALVANIZADO 11/4"0.00 C/U
$ 24.00
$ -
TUBO 3/4" GALVANIZADO + ACCESORIOS
0.00 U $
375.00 $ -
ANGULO 21/2"X21/2"X1/4"0.00 U
$ 69.51
$ -
ANGULO 21/2"X21/2"X1/8"0.00 U
$ 52.50
$ -
ANGULO 11/2"X11/2"X1/8"1.00 U
$ 23.00
$ 23.00
TANQUE 2000L0.00 U
$ 525.00
$ -
ANGULO 2"X2"X1/8"0.00 U
$ 22.13
$ -
PLACA 3/8" 20X200.00 M2
$ 267.00
$ -
VARILLA 3/4"0.00
$ 21.75
$ -
ELECTRODO3.00 LBR
$ 1.20
$ 3.60
PEGAMENTO PVC0.66 PINTA
$ 4.80
$ 3.17
PIEDRA1.30 M3
$ 1.20
$ 1.56
TUBO PVC Ø8"1.00 UNIDAD
$ 62.30
$ 62.30
CURVA PVC 8"1.00 UNIDAD
$ 45.00
$ 45.00
$ 623.07
MANO DE OBRA CANTIDAD UNIDADCOSTO
UNITARIO COSTO TOTAL
PERFORACION HOYOS PLACA0.00
UNIDAD $
14.40 $ -
CORTE PLACA 0.00
LADOS $
13.50 $ -
AUXILIAR11.50
DIA $
15.00 $ 172.50
MECANICO1.00
SG $
32.14 $ 32.14
ALBAÑIL 10.35
SG $
22.00 $ 227.70
CORTE EN VARILLA0.00
U $
4.65 $ -
TORNO ROSCA 5/8" EN VARILLA 3/4"0.00
U $
14.40 $ -
FONTANERO0.50
SG $
28.00 $ 14.00
$ 446.34
TRANSPORTE CANTIDAD UNIDADCOSTO
UNITARIO COSTO TOTAL
TRANSPORTES VARIOS1.00 SG
$ 65.19
$ 65.19
TOTAL CON IVA E INDIRECTOS $ 1,134.60
![Page 12: ORDEN DE CAMBIO.doc](https://reader030.fdocumento.com/reader030/viewer/2022032612/55cf9b55550346d033a5a581/html5/thumbnails/12.jpg)
PARTIDA: CONTRAFUERTE 20X20X40
MATERIAL CANTIDAD UNIDADCOSTO
UNITARIO COSTO TOTAL
BLOQUE DE 20X20X40 5.35 C/U $
0.89 $ 4.73
DADO BLOQUE DE 20X20X200.00 C/U
$ 0.65
$ -
SOLERA BLOQUE DE 20X20X400.00 C/U
$ 1.05
$ -
BLOQUE DE 15X20X400.00 C/U
$ 0.63
$ -
DADO BLOQUE DE 15X20X200.00 C/U
$ 0.50
$ -
SOLERA BLOQUE DE 15X20X400.00 C/U
$ 0.80
$ -
BLOQUE 10X20X400.00 C/U
$ 0.50
$ -
DADP 10X20X400.00 C/U
$ 0.42
$ -
SOLERA 10X20X400.00 C/U
$ 0.66
$ -
HIERRO Ø5/8"0.00 VARILLA
$ 11.70
$ -
HIERRO Ø1/20.40 VARILLA
$ 7.31
$ 2.93
HIERRO Ø3/8"0.00 VARILLA
$ 4.18
$ -
HIERRO 1/4"0.00 VARILLA
$ 1.95
$ -
ALAMBRE AMARRE1.10 LBR
$ 0.98
$ 1.08
CEMENTO1.60 BLS
$ 11.25
$ 18.00
ARENA0.16 M3
$ 17.55
$ 2.81
GRAVA0.09 M3
$ 35.00
$ 3.15
TABLA PINO1.50 VR
$ 3.00
$ 4.50
CUARTON PINO1.50 VR
$ 1.80
$ 2.70
COSTANERA PINO2.00 VR
$ 0.90
$ 1.80
REGLA PACHA2.00 VR
$ 0.90
$ 1.80
CLAVO 21/2"0.50 LBR
$ 1.20
$ 0.60
CLAVO 4"0.33 LBR
$ 1.20
$ 0.40
LADRILLO DE OBRA BARRO0.00 C/U
$ 0.17
$ -
MALLA CICLON 9X720.00 yda
$ 8.25
$ -
TUBO GALVANIZADO 2" 0.00 C/U $
31.50 $ -
TUBO GALVANIZADO 11/4"0.00 C/U
$ 24.00
$ -
TUBO 3/4" GALVANIZADO + ACCESORIOS
0.00 U $
375.00 $ -
ANGULO 21/2"X21/2"X1/4"0.00 U
$ 69.51
$ -
![Page 13: ORDEN DE CAMBIO.doc](https://reader030.fdocumento.com/reader030/viewer/2022032612/55cf9b55550346d033a5a581/html5/thumbnails/13.jpg)
ANGULO 21/2"X21/2"X1/8"0.00 U
$ 52.50
$ -
ANGULO 11/2"X11/2"X1/8"0.00 U
$ 23.00
$ -
TANQUE 2000L0.00 U
$ 525.00
$ -
ANGULO 2"X2"X1/8"0.00 U
$ 22.13
$ -
PLACA 3/8" 20X200.00 M2
$ 267.00
$ -
VARILLA 3/4"0.00
$ 21.75
$ -
ELECTRODO0.00 LBR
$ 1.20
$ -
PEGAMENTO PVC0.00 PINTA
$ 4.80
$ -
PIEDRA0.00 M3
$ 1.20
$ -
TUBO PVC Ø8"0.00 UNIDAD
$ 62.30
$ -
CURVA PVC 8"0.00 UNIDAD
$ 45.00
$ -
$ 44.49
MANO DE OBRA CANTIDAD UNIDADCOSTO
UNITARIO COSTO TOTAL
PERFORACION HOYOS PLACA0.00
UNIDAD $
14.40 $ -
CORTE PLACA 0.00
LADOS $
13.50 $ -
AUXILIAR0.66
DIA $
15.00 $ 9.90
MECANICO0.00
SG $
32.00 $ -
ALBAÑIL 0.70
SG $
22.00 $ 15.40
CORTE EN VARILLA0.00
U $
4.65 $ -
TORNO ROSCA 5/8" EN VARILLA 3/4"0.00
U $
14.40 $ -
FONTANERO0.00
SG $
28.00 $ -
$ 25.30
TRANSPORTE CANTIDAD UNIDADCOSTO
UNITARIO COSTO TOTAL
TRANSPORTES VARIOS1.00 SG
$ 8.20
$ 8.20
TOTAL CON IVA E INDIRECTOS $ 77.99
PARTIDA: SOLERA DE FUNDACION 0,80*,30 6Ø1/2"+3/8"@15
MATERIAL CANTIDAD UNIDADCOSTO
UNITARIO COSTO TOTAL
BLOQUE DE 20X20X40 0.00 C/U $
0.89 $ -
DADO BLOQUE DE 20X20X20 0.00 C/U $ $ -
![Page 14: ORDEN DE CAMBIO.doc](https://reader030.fdocumento.com/reader030/viewer/2022032612/55cf9b55550346d033a5a581/html5/thumbnails/14.jpg)
0.65
SOLERA BLOQUE DE 20X20X400.00 C/U
$ 1.05
$ -
BLOQUE DE 15X20X400.00 C/U
$ 0.63
$ -
DADO BLOQUE DE 15X20X200.00 C/U
$ 0.50
$ -
SOLERA BLOQUE DE 15X20X400.00 C/U
$ 0.80
$ -
BLOQUE 10X20X400.00 C/U
$ 0.50
$ -
DADP 10X20X400.00 C/U
$ 0.42
$ -
SOLERA 10X20X400.00 C/U
$ 0.66
$ -
HIERRO Ø5/8"0.00 VARILLA
$ 11.70
$ -
HIERRO Ø1/21.20 VARILLA
$ 7.31
$ 8.78
HIERRO Ø3/8"2.50 VARILLA
$ 4.18
$ 10.45
HIERRO 1/4"0.00 VARILLA
$ 1.95
$ -
ALAMBRE AMARRE1.66 LBR
$ 0.98
$ 1.63
CEMENTO2.66 BLS
$ 11.25
$ 29.93
ARENA0.16 M3
$ 17.55
$ 2.74
GRAVA0.11 M3
$ 35.00
$ 3.85
TABLA PINO3.00 VR
$ 3.00
$ 9.00
CUARTON PINO0.50 VR
$ 1.80
$ 0.90
COSTANERA PINO0.50 VR
$ 0.90
$ 0.45
REGLA PACHA0.66 VR
$ 0.90
$ 0.59
CLAVO 21/2"0.50 LBR
$ 1.20
$ 0.60
CLAVO 4"0.00 LBR
$ 1.20
$ -
LADRILLO DE OBRA BARRO0.00 C/U
$ 0.17
$ -
MALLA CICLON 9X720.00 yda
$ 8.25
$ -
TUBO GALVANIZADO 2" 0.00 C/U $
31.50 $ -
TUBO GALVANIZADO 11/4"0.00 C/U
$ 24.00
$ -
TUBO 3/4" GALVANIZADO + ACCESORIOS
0.00 U $
375.00 $ -
ANGULO 21/2"X21/2"X1/4"0.00 U
$ 69.51
$ -
ANGULO 21/2"X21/2"X1/8"0.00 U
$ 52.50
$ -
ANGULO 11/2"X11/2"X1/8"0.00 U
$ 23.00
$ -
TANQUE 2000L0.00 U
$ 525.00
$ -
ANGULO 2"X2"X1/8"0.00 U
$ 22.13
$ -
PLACA 3/8" 20X200.00 M2
$ 267.00
$ -
VARILLA 3/4"0.00
$ 21.75
$ -
ELECTRODO 0.00 LBR $ $ -
![Page 15: ORDEN DE CAMBIO.doc](https://reader030.fdocumento.com/reader030/viewer/2022032612/55cf9b55550346d033a5a581/html5/thumbnails/15.jpg)
1.20
PEGAMENTO PVC0.00 PINTA
$ 4.80
$ -
PIEDRA0.00 M3
$ 1.20
$ -
TUBO PVC Ø8"0.00 UNIDAD
$ 62.30
$ -
CURVA PVC 8"0.00 UNIDAD
$ 45.00
$ -
$ 68.91
MANO DE OBRA CANTIDAD UNIDADCOSTO
UNITARIO COSTO TOTAL
PERFORACION HOYOS PLACA0.00
UNIDAD $
14.40 $ -
CORTE PLACA 0.00
LADOS $
13.50 $ -
AUXILIAR1.33
DIA $
15.00 $ 19.95
MECANICO0.00
SG $
32.00 $ -
ALBAÑIL 0.80
SG $
22.00 $ 17.60
CORTE EN VARILLA0.00
U $
4.65 $ -
TORNO ROSCA 5/8" EN VARILLA 3/4"0.00
U $
14.40 $ -
ARMADOR0.33
SG $
28.00 $ 9.24
$ 46.79
TRANSPORTE CANTIDAD UNIDADCOSTO
UNITARIO COSTO TOTAL
TRANSPORTES VARIOS1.00 SG
$ 12.00
$ 12.00
TOTAL CON IVA E INDIRECTOS $ 127.70
PARTIDA: PARED 20X20X40
MATERIAL CANTIDAD UNIDADCOSTO
UNITARIO COSTO TOTAL
BLOQUE DE 20X20X40 12.00 C/U $
0.89 $ 10.62
DADO BLOQUE DE 20X20X202.00 C/U
$ 0.65
$ 1.29
SOLERA BLOQUE DE 20X20X400.00 C/U
$ 1.05
$ -
BLOQUE DE 15X20X400.00 C/U
$ 0.63
$ -
DADO BLOQUE DE 15X20X200.00 C/U
$ 0.50
$ -
SOLERA BLOQUE DE 15X20X400.00 C/U
$ 0.80
$ -
BLOQUE 10X20X400.00 C/U
$ 0.50
$ -
DADP 10X20X40 0.00 C/U $ $ -
![Page 16: ORDEN DE CAMBIO.doc](https://reader030.fdocumento.com/reader030/viewer/2022032612/55cf9b55550346d033a5a581/html5/thumbnails/16.jpg)
0.42
SOLERA 10X20X400.00 C/U
$ 0.66
$ -
HIERRO Ø5/8"0.00 VARILLA
$ 11.70
$ -
HIERRO Ø1/20.55 VARILLA
$ 7.31
$ 4.02
HIERRO Ø3/8"0.00 VARILLA
$ 4.18
$ -
HIERRO 1/4"0.90 VARILLA
$ 1.95
$ 1.76
ALAMBRE AMARRE1.00 LBR
$ 0.98
$ 0.98
CEMENTO1.70 BLS
$ 11.25
$ 19.13
ARENA0.09 M3
$ 17.55
$ 1.49
GRAVA0.07 M3
$ 35.00
$ 2.45
TABLA PINO2.00 VR
$ 3.00
$ 6.00
CUARTON PINO1.50 VR
$ 1.80
$ 2.70
COSTANERA PINO2.00 VR
$ 0.90
$ 1.80
REGLA PACHA2.00 VR
$ 0.90
$ 1.80
CLAVO 21/2"0.50 LBR
$ 1.20
$ 0.60
CLAVO 4"0.00 LBR
$ 1.20
$ -
LADRILLO DE OBRA BARRO0.00 C/U
$ 0.17
$ -
MALLA CICLON 9X720.00 yda
$ 8.25
$ -
TUBO GALVANIZADO 2" 0.00 C/U $
31.50 $ -
TUBO GALVANIZADO 11/4"0.00 C/U
$ 24.00
$ -
TUBO 3/4" GALVANIZADO + ACCESORIOS
0.00 U $
375.00 $ -
ANGULO 21/2"X21/2"X1/4"0.00 U
$ 69.51
$ -
ANGULO 21/2"X21/2"X1/8"0.00 U
$ 52.50
$ -
ANGULO 11/2"X11/2"X1/8"0.00 U
$ 23.00
$ -
TANQUE 2000L0.00 U
$ 525.00
$ -
ANGULO 2"X2"X1/8"0.00 U
$ 22.13
$ -
PLACA 3/8" 20X200.00 M2
$ 267.00
$ -
VARILLA 3/4"0.00
$ 21.75
$ -
ELECTRODO0.00 LBR
$ 1.20
$ -
PEGAMENTO PVC0.00 PINTA
$ 4.80
$ -
PIEDRA0.00 M3
$ 1.20
$ -
TUBO PVC Ø8"0.00 UNIDAD
$ 62.30
$ -
CURVA PVC 8"0.00 UNIDAD
$ 45.00
$ -
$ 54.64
![Page 17: ORDEN DE CAMBIO.doc](https://reader030.fdocumento.com/reader030/viewer/2022032612/55cf9b55550346d033a5a581/html5/thumbnails/17.jpg)
MANO DE OBRA CANTIDAD UNIDADCOSTO
UNITARIO COSTO TOTAL
PERFORACION HOYOS PLACA0.00
UNIDAD $
14.40 $ -
CORTE PLACA 0.00
LADOS $
13.50 $ -
AUXILIAR0.66
DIA $
15.00 $ 9.90
MECANICO0.00
SG $
32.00 $ -
ALBAÑIL 1.00
SG $
10.45 $ 10.45
CORTE EN VARILLA0.00
U $
4.65 $ -
TORNO ROSCA 5/8" EN VARILLA 3/4"0.00
U $
14.40 $ -
FONTANERO0.00
SG $
28.00 $ -
$ 20.35
TRANSPORTE CANTIDAD UNIDADCOSTO
UNITARIO COSTO TOTAL
TRANSPORTES VARIOS1.00 SG
$ 7.00
$ 7.00
TOTAL CON IVA E INDIRECTOS $ 81.99
PARTIDA: DEMOLICION PIEDRA
MATERIAL CANTIDAD UNIDADCOSTO
UNITARIO COSTO TOTAL
BLOQUE DE 20X20X40 0.00 C/U $
0.89 $ -
DADO BLOQUE DE 20X20X200.00 C/U
$ 0.65
$ -
SOLERA BLOQUE DE 20X20X400.00 C/U
$ 1.05
$ -
BLOQUE DE 15X20X400.00 C/U
$ 0.63
$ -
DADO BLOQUE DE 15X20X200.00 C/U
$ 0.50
$ -
SOLERA BLOQUE DE 15X20X400.00 C/U
$ 0.80
$ -
BLOQUE 10X20X400.00 C/U
$ 0.50
$ -
DADP 10X20X400.00 C/U
$ 0.42
$ -
SOLERA 10X20X400.00 C/U
$ 0.66
$ -
HIERRO Ø5/8"0.00 VARILLA
$ 11.70
$ -
HIERRO Ø1/20.00 VARILLA
$ 7.31
$ -
HIERRO Ø3/8"0.00 VARILLA
$ 4.18
$ -
HIERRO 1/4"0.00 VARILLA
$ 1.95
$ -
![Page 18: ORDEN DE CAMBIO.doc](https://reader030.fdocumento.com/reader030/viewer/2022032612/55cf9b55550346d033a5a581/html5/thumbnails/18.jpg)
ALAMBRE AMARRE0.00 LBR
$ 0.98
$ -
CEMENTO0.00 BLS
$ 11.25
$ -
ARENA0.00 M3
$ 17.55
$ -
GRAVA0.00 M3
$ 35.00
$ -
TABLA PINO0.00 VR
$ 3.00
$ -
CUARTON PINO0.00 VR
$ 1.80
$ -
COSTANERA PINO0.00 VR
$ 0.90
$ -
REGLA PACHA0.00 VR
$ 0.90
$ -
CLAVO 21/2"0.00 LBR
$ 1.20
$ -
CLAVO 4"0.00 LBR
$ 1.20
$ -
LADRILLO DE OBRA BARRO0.00 C/U
$ 0.17
$ -
MALLA CICLON 9X720.00 yda
$ 8.25
$ -
TUBO GALVANIZADO 2" 0.00 C/U $
31.50 $ -
TUBO GALVANIZADO 11/4"0.00 C/U
$ 24.00
$ -
TUBO 3/4" GALVANIZADO + ACCESORIOS
0.00 U $
375.00 $ -
ANGULO 21/2"X21/2"X1/4"0.00 U
$ 69.51
$ -
ANGULO 21/2"X21/2"X1/8"0.00 U
$ 52.50
$ -
ANGULO 11/2"X11/2"X1/8"0.00 U
$ 23.00
$ -
TANQUE 2000L0.00 U
$ 525.00
$ -
ANGULO 2"X2"X1/8"0.00 U
$ 22.13
$ -
PLACA 3/8" 20X200.00 M2
$ 267.00
$ -
VARILLA 3/4"0.00
$ 21.75
$ -
ELECTRODO0.00 LBR
$ 1.20
$ -
PEGAMENTO PVC0.00 PINTA
$ 4.80
$ -
PIEDRA0.00 M3
$ 1.20
$ -
TUBO PVC Ø8"0.00 UNIDAD
$ 62.30
$ -
CURVA PVC 8"0.00 UNIDAD
$ 45.00
$ -
$ -
MANO DE OBRA CANTIDAD UNIDADCOSTO
UNITARIO COSTO TOTAL
AUXILIAR1.20
DIA $ 15.00
$ 18.00
MECANICO0.00
SG $ 32.00
$ -
ALBAÑIL 0.08
SG $ 10.45
$ 0.84
$ 18.84
![Page 19: ORDEN DE CAMBIO.doc](https://reader030.fdocumento.com/reader030/viewer/2022032612/55cf9b55550346d033a5a581/html5/thumbnails/19.jpg)
TRANSPORTE CANTIDAD UNIDADCOSTO
UNITARIO COSTO TOTAL
ROTOMARTILLO DEMOLEDOR0.50 DIA
$ 50.00
$ 25.00
TRANSPORTES VARIOS0.07 SG
$ 7.00
$ 0.46
$ 25.46
TOTAL CON IVA E INDIRECTOS $ 44.29