PCC - Costos Componentes

66
Lowering Component Costs That’s My Final Answer! BIU July 2001

Transcript of PCC - Costos Componentes

Page 1: PCC - Costos Componentes

LoweringComponent CostsThat’s My Final Answer!

BIU July 2001

Page 2: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

How Can We Lower ComponentCost Per Hour?• Reduce component repair & rebuild costs• Increase component lives

Page 3: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

Questions To Consider• What’s more important to component

life—design, maintenance or application?• Does the application of a machine affect

component lives and repair costs?• How significant are application changes to

component lives and repair costs?

Page 4: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

Questions To Consider• Does good maintenance really enhance

component lives and reduce costs? Iscontamination control important?

• What has happened in the ComponentManagement arena since BIU in 1997?

Page 5: PCC - Costos Componentes

LoweringComponent CostsThen & Now

Page 6: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

Then (In 1995)• Unsatisfactory major mining component life• Noncompetitive component rebuild costs• Product reliability issues• MARC health issues

Page 7: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

Unsatisfactory Component Life• Original life too low in difficult applications• Component second life 75% of original life• Component third life 45% to 55% of

original life• Payload contributed

Page 8: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

Causes Of Second And ThirdComponent Life Shortfalls• Dealer rebuild process• Reman quality• Component R & I process• Others?

Page 9: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

What Is The MAJOR ContributorTo Component Life Shortfalls?

Page 10: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

• Dealer rebuild process• Reman quality• Component R & I process

Page 11: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

Component R & I Process

Page 12: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

Dealer Audit Results

30

40

50

60

70

80

90

100

SHOP - 10%

CLEANLIN

ESS - 20%

COMP. ASSM. -

35%

TESTING - 1

5%

R&I - 20

%

Page 13: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

What Did We Do?• Documented R & I process• Developed CGM rebuild/installation

certification process• Increased emphasis on R & I process control

Page 14: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

Completed CGM Certification Audits1999: Finning Chile, Cashman, Westrac,

Hastings Deering, Gecolsa, Wheeler,Finning Canada

2000: Cat Reman Facilities, Wyoming,Rust, Ziegler

2001 YTD: Empire, Sotreq, Macrosa

Page 15: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

10/10/20 Payload Policy

“No more than 10% of payloads mayexceed 1.1 times the target payload,

and NO single payload shall everexceed 1.2 times the target payload.”

Page 16: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

Component Repair/RebuildCost Reduction• Develop repair/rebuild strategy• Enhance repair before failure capabilities• Establish contamination control standards

and procedures

Page 17: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

Repair/Rebuild Strategy• Dealer rebuild is the preferred source for 1st

and 2nd rebuilds when volume justifies• Reman for 3rd or other high value rebuilds• Cat to provide reman piece parts at

competitive prices to support dealer rebuilds

Page 18: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

Now (In 2001)• Generally, lives of original components have

increased 20% to 30%, depending on application• Generally, lives of rebuilt components have increased

to 85% to 90% of new• Component Rebuild Certification Program producing

desired results• Value of the Certification Program recognized by

customers worldwide• Continued focus on the R & I process

Page 19: PCC - Costos Componentes

LoweringComponent CostsContamination Control

Page 20: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

Page 21: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

Page 22: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

What Is ContaminationControl About?

Why Is It ImportantTo Our Customers?

Page 23: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

Contamination Is The Top CauseOf Premature Wearout

Page 24: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

Believers• Newmont• Exxon-Mobil• Morrison-Knudsen• Simplot• Billiton• Caterpillar Inc.

Page 25: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

Effects Of ContaminationHydraulic System experts attribute 75% to85% of all component failures to particlecontamination in the fluid and NOT a weaknessin the system components.

Page 26: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

Component Life vs.Contamination Level

ISO22/19

21/17

20/15

19/16

18/15

17/14

16/13

15/12

14/11

13/10

12/09

Component Life Over Time

---

----------

----

Clean New Oil

Con

tam

inat

ion

Page 27: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

What Is Contamination?

Anything in a fluid thatdoes not belong

Page 28: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

Where Does ContaminationCome From?• Generated WEAR• Factory or Rebuild Assembly Process• Installation Process System• Debris from Previous Failure• Fluid Storage and Refill Practices

Page 29: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

ISO Standards

• 29 ISO Levels• Particle count doubles at each level

Contamination Particle CountIn 1 mL of Fluid

Page 30: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

ISO Code ChartISO Code

232221201918171615141312

Number of Particles / mL40,000 - 80,00020,000 - 40,00010,000 - 20,0005000 - 10,0002500 - 50001300 - 2500640 - 1300320 - 640160 - 32080 - 16040 - 8020 - 40

----- Very Clean (Fill Oil) -----(16/13)

---- Clean (Hyd. System) ----(18/15)

----------Very Dirty ----------

Page 31: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

ISO Cleanliness Code• Explained in ISO Standard 4406• Expresses amount of contaminant in

1 mL of fluid

15 microns5 microns2 microns

AC Calibration

Page 32: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

ISO Cleanliness Code• Caterpillar uses the 2 factor code:

Express as X/Y whereX # particles > 5 micronsY # particles > 15 microns

e.g. ISO 18/15

Page 33: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

Cat HydraulicSystem Clearances

Particles You Cannot See Are Harmful!

MICRONS

Smallest VisibleTo The Eye

40

Human Hair

80

2Fuel

530

Page 34: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

Caterpillar Fluid Cleanliness StandardsFill Oil ISO 16/13

Fuel ISO 20/17/13

Hydraulic Systems ISO 18/15

OHT Final Drives / Diff ISO 21/17

Transmissions ( Electronic ) ISO18/15

Transmissions ( Mechanical ) ISO 21/17

Engine Rollout ISO 18/15

Pumps & Governors ISO 16/13

Injector Calibration Fluid ISO 15/13

Page 35: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

Particle Counter

Page 36: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

Portable Contamination Kit

Page 37: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

150 GPMKidney Loop Cart(5W-90W)183-9301

Page 38: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

OHT Axle/Final Drive/WheelGp./Diff. Off-Line Filtering

Page 39: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

90 GPMKidney Loop Cart(5W-50W)188-3242

Page 40: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

90 GPMKidney Loop Cart(5W-50W)194-2897

Page 41: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

Transfer Cart and FluidRecovery System

Page 42: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

When Do We Use Filter Carts?• When contamination exceeds specs• With extended oil changes• After any failure which created debris• After rebuild break-in• Fuel and oil dispensing

Page 43: PCC - Costos Componentes

Worldwide Filter Cart Sales

NACD 37

COSA 20

CACo 21

CAPL 24

Page 44: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

What percent of your customerspresently employ contaminationcontrol as part of their normal

maintenance program?

Page 45: PCC - Costos Componentes

What do these customers sayabout the benefits of a

contamination control program?

Page 46: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

How do you plan to increasecustomer awareness of the

importance of a contaminationcontrol program?

Page 47: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

What Is Contamination Control?• Awareness, Measurements, Standards• Build it Clean, Keep it Clean

Why Is It Important?• Helps maximize component life• Helps get lowest cost-per-ton

Page 48: PCC - Costos Componentes

LoweringComponent CostsApplication Management

Page 49: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

How does machine applicationinfluence component life?

Page 50: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

What application factors do YOUthink affect component life?

Page 51: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

Application Factors Like…

• Payload- Overloading, Underloading- Distribution—10, 10, 20 Rule

• Haul road condition• Haul road profile• Mine operational efficiency

Page 52: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

Powertrain Repair Cost Breakdown

793 Mining Truck

40%

4%9%7%

40% EngineConverterTransmissionDifferentialWheel Groups

Page 53: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

A Case Of Overloading?

Page 54: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

Payload problems?

Page 55: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

An Increase In Payload Causes:• Decrease in component lives/Increase in costs

– Wheel Groups—Significant– Differentials—Significant– Engines—May or May Not Be Significant

• Slight increase in production• Insignificant change in fuel efficiency

Page 56: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

Where is the haul road?

Page 57: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

Lowering Component Costs

• Component lives?• Machine productivity?• Fuel efficiency?

What is the impact of haul road rollingresistance changes on:

And…

Page 58: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

Are the changes significant?

And…

Page 59: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

What additional costs willthose changes drive?

Page 60: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

What Is Rolling Resistance?• The force that must be overcome to roll

a wheel over a surface• Affected by ground conditions and load• Normally 1.5% of GMW per inch of

tire penetration

Page 61: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

Increase In Rolling Resistance Causes:• Decrease in component lives

– Wheel Groups—Significant– Differentials—Significant– Engines—May or May Not Be Significant

• Significant decline in productivityand fuel efficiency

• Increase in MARC costs• Significantly higher repair costs

Page 62: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

An Increase In Haul Road GradeAlone Causes:• Significant decrease in differential and wheel

group lives• Minor changes in engine life• Minor changes in productivity

Page 63: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

SummaryWheel Gp/Diff

LifeWheel Gp/DiffLife Cost/Hr

EngineLife & Cost/Hr Production

FuelEfficiency

PayloadIncrease

Haul RoadResistance

Increase

Haul RoadGrade

Increase

SignificantDecrease

VerySignificantDecrease

VerySignificantDecrease

SignificantIncrease

VerySignificantIncrease

VerySignificantIncrease

InsignificantChange

May or MayNot Be

Significant

No Change No Change

SignificantDecrease

SlightIncrease

No Change

SignificantDecrease

InsignificantChange

Page 64: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

What Can You Do?• Emphasize the importance of minimizing

rolling resistance– Improve productivity– Lower fuel consumption and cost– Longer component lives– Lower component cost/ton– Keep motor graders and wheel dozers running

Page 65: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

What Can You Do?• Be alert to haul road profile changes

– Steeper grades significantly reduce certaincomponent lives and increase cost/hr

Page 66: PCC - Costos Componentes

BIU July 2001

Caterpillar Confidential Green

What Can You Do?• Emphasize the importance of

contamination control– Higher component lives & lower cost/hr– Reduced downtime from unexpected failures