SECRETARIA DE COMUNICACIONES Y TRANSPORTES

SUBSECRETARIA DE INFRAESTRUCTURA

CENTRO S.C.T.

CCAAMMPPEECCHHEE

UNIDAD GENERAL DE SERVICIOS TECNICOS

IINNVVEENNTTAARRIIOO DDEE BBAANNCCOOSS

DDEE MMAATTEERRIIAALLEESS

22000099

(INFORMACION BASICA SOBRE LOCALIZACION Y APROVECHAMIENTO DE BANCOS DE MATERIALES PETREOS PARA CONSTRUCCION Y MANTENIMIENTO DE CARRETERAS)

Page 2: Bancos Camp 2009

CAMP/01 L O C A L I Z A C I O N D E B A N C O S D E M A T E R I A L E S N

1

6

12

1515

20

2005 : 754,730 Hab.

Page 3: Bancos Camp 2009

CARRETERA: XPUJIL-DZIBALCHEN

BCO. NUM.

KILOMETRO DESVIACIONFECHA

ESTUDIOFECHA DE

ACT.TIPO

PROP.TIPO MATERIAL

TRATAMIENTO

VOLUMEN X 1000 m3

ESPESOR DESPALME (m)

USOS. PROB.

USO EXPL.

ASPEC. ECONOM.

0001 108+300 D 00050 SEP-91 NOV-09 EJID. CALIZA ALT. N.R. 0 0.60 1 N.R. REC.

CARRETERA: XPUJIL-JUSTO SIERRA

0006 006+940 D 00020 JUL-96 NOV-09 EJID. CALIZA ALT. N.R. 00005 0.20 1 N.R. REC.

0012 009+140 D 00020 AGO-96 NOV-09 EJID. CALIZA ALT. N.R. 0008 0.30 1 N.R. REC.

CAMINO: RAMAL A XTAMPAC

0015 000+800 I 00050 ENE-03 NOV-09 EJID.ROCA CALIZA DE

PEPENATTC 0007 0.20

2-3-4-5-6-7-8-9-10-11

N.R. CONVE.

CARRETERA: CHENCOLLI-UMAN

0016 054+100 I 00020 ENE-03 NOV-09 PART.ROCA CALIZA DE

PEPENATTC 00020 0.20 2-4-5-10 N.R. CONVE.

CARRETERA: DIAZ ORDAZ-SABANCUY

0020 055+500 D 01900 MAR-89 NOV-09 PART.CALIZA ARENA CONCH. CEM.

TTC 0019 0.19 1-2-5-7-10 N.R. CONVE.

NOMENCLATURA Y ABREVIATURAS UTILIZADAS

- FECHA DE ACTUALIZACION - TIPO DE MATERIAL - TRATAMIENTO - USOS PROBABLES - RESTRICCIONES ECOLOGICAS(FECHA DE ACT.) CONG.- CONGLOMERADO NR.- NO REQUIERE TTC.- TRITURACION TOTAL Y CRIBADO 1.- REVESTIMIENTO 8.- SELLO CONSIDER.- CONSIDERABLE

VOLVC.- VOLCANICO D.- DISGREGACION CL.- CRIBADO Y LAVADO 2.- SUB-BASE 9.- MAMPOSTERIA- TIPO DE PROPIEDAD C.- CRIBADO TPL.- TRITURACION PARCIAL Y LAVADO 3.- SUB-BALASTO - ASPECTOS ECONOMICOSFED.- FEDERAL - USO DE EXPLOSIVOS TP.- TRITURACION PARCIAL TTL.- TRITURACION TOTAL Y LAVADO 4.- BALASTO 11.- ESCOLLERAS REC.- RECOMENDABLEMPL.- MUNICIPAL EXPL.- EXPLOSIVOS TT.- TRITURACION TOTAL 5.- BASE CONVE.- CONVENIENTEPART.- PARTICULAR NR.- NO REQUIERE L.- LAVADO EA.- ESTABILICACION CON ASFALTO 6.- CONCRETO ASFALTICO ACEP.- ACEPTABLECOM.- COMUNAL SR.- SIN RESTRICCIONES 7.- MEZCLA ASFALTICA EN EL LUGAR NR.- NO RECOMENDABLE

NO EXISTE

TPC.- TRITURACION PARCIAL Y CRIBADO

TPCL.- TRITURACION PARCIAL, CRIBADO Y LAVADO

ECP. ESTABILIZACION CON CEMENTO PORTLAND

10.- CONCRETO HIDRAULICO

"LA PIEDRA"

"km 54+100"

NO EXISTE

NO EXISTE

"km 9+140" POSIBLES

"SABANCUY I"

RESTRICC. ECOLOG.

POSIBLES

POSIBLES

"km 30+000"

"km 6+940"

CENTRO SCT CAMPECHE

UNIDAD GENERAL DE SERVICIOS TECNICOS

I N V E N T A R I O D E B A N C O S D E M A T E R I A L E S 2 0 0 9

NOMBRE

CAM/02

Page 4: Bancos Camp 2009

CAMP/03 L O C A L I Z A C I O N D E B A N C O S D E M A T E R I A L E S N

7

8

9

3

2

5

4

1013

14

17

18

2005 : 754,730 Hab.

Page 5: Bancos Camp 2009

CARRETERA: HALTUNCHEN-CAYAL

BCO. NUM.

KILOMETRO DESVIACIONFECHA

ESTUDIOFECHA DE

ACT.TIPO

PROP.TIPO MATERIAL

TRATAMIENTO

VOLUMEN X 1000 m3

ESPESOR DESPALME (m)

USOS. PROB.

USO EXPL.

ASPEC. ECONOM.

0003 000+400 I 1500 JUL-00 NOV-09 PART. ROCA CAL. TTC 1913 0.152-3-4-5-6-7-8-9-10-11

N.R. CONVE.

CARRETERA: ESCARCEGA-CHAMPOTON

0007 020+800 I 00300 JUL-89 NOV-09 PART. ROCA CAL. TTC 0046 0.202-3-4-5-6-7-8-9-10-11

SR REC.

CARRETERA: CD. DEL CARMEN-CAMPECHE

0002 175+500 I 02000 JUL-00 NOV-09 MPL. ROCA CAL. TTC 0050 0.202-3-4-5-6-7-8-9-10-11

SR CONVE.

0008 108+040 D 00900 MAY-89 NOV-09 PART.CALIZA ARENA CONCH. CEM.

TTC 0073 0.20 2-5-10 N.R. REC.

0009 136+060 D 00040 MAY-89 NOV-09 PART.CALIZA ARENA CONCH. CEM.

TTC 0071 0.20 2-5-10 N.R. REC.

0005 124+600 D 00700 MAR-03 NOV-09 PART.CALIZA ARENA CONCH. CEM.

TTC 098 0.20 2-5 S.R. REC.

0004 090+000 D 03300 MAR-03 NOV-09 PART.CALIZA ARENA CONCH. CEM.

TTC 0133 0.40 2-5-10 N.R. CONVE.

0010 113+200 D 00200 MAR-03 NOV-09 EJID.CALIZA ARENA CONCH. CEM.

TTC 0112 0.20 2-5-10 N.R. REC.

0013 109+960 D 00200 MAY-03 NOV-09 EJID.CALIZA ARENA CONCH. CEM.

TTC 0109 0.20 2-5-10 N.R. REC.

0014 107+940 D 01000 MAY-03 NOV-09 PART.CALIZA ARENA CONCH. CEM.

TTC 0113 0.20 2-5-10 N.R. CONVE.

0017 038+200 D 02000 AGO-03 NOV-09 PART. ARENA DE MAR EA. 0113 0.15 2-5-7 N.R. CONVE.

0018 176+500 I 2500 MAY-03 NOV-09 PART. ROCA CAL. TTC 0981 0.502-3-4-5-6-7-8-9-10-11

S.R. REC.

NOMENCLATURA Y ABREVIATURAS UTILIZADAS

- FECHA DE ACTUALIZACION - TIPO DE MATERIAL - TRATAMIENTO - USOS PROBABLES - RESTRICCIONES ECOLOGICAS(FECHA DE ACT.) CONG.- CONGLOMERADO NR.- NO REQUIERE TTC.- TRITURACION TOTAL Y CRIBADO 1.- REVESTIMIENTO 8.- SELLO CONSIDER.- CONSIDERABLE

VOLVC.- VOLCANICO D.- DISGREGACION CL.- CRIBADO Y LAVADO 2.- SUB-BASE 9.- MAMPOSTERIA- TIPO DE PROPIEDAD C.- CRIBADO TPL.- TRITURACION PARCIAL Y LAVADO 3.- SUB-BALASTO - ASPECTOS ECONOMICOSFED.- FEDERAL - USO DE EXPLOSIVOS TP.- TRITURACION PARCIAL TTL.- TRITURACION TOTAL Y LAVADO 4.- BALASTO 11.- ESCOLLERAS REC.- RECOMENDABLEMPL.- MUNICIPAL EXPL.- EXPLOSIVOS TT.- TRITURACION TOTAL 5.- BASE CONVE.- CONVENIENTEPART.- PARTICULAR NR.- NO REQUIERE L.- LAVADO EA.- ESTABILIZACION CON ASFALTO 6.- CONCRETO ASFALTICO ACEP.- ACEPTABLECOM.- COMUNAL SR.- SIN RESTRICCIONES 7.- MEZCLA ASFALTICA EN EL LUGAR NR.- NO RECOMENDABLE

"PAYUCAN" NO EXISTE

"PLAYA AZUL"

"SAN LUIS CARPIZO" NO EXISTE

CENTRO SCT CAMPECHE

UNIDAD GENERAL DE SERVICIOS TECNICOS

I N V E N T A R I O D E B A N C O S D E M A T E R I A L E S 2 0 0 9

NOMBRERESTRICC. ECOLOG.

NO EXISTE

"PUNTA XEN I"

"PUNTA XEN II"

"PLAYA GUADALUPE"

"SAN PABLITO"

NO EXISTE

NO EXISTE

"km 020+800" NO EXISTE

NO EXISTE"VILLAMADERO"

TPC.- TRITURACION PARCIAL Y CRIBADO

TPCL.- TRITURACION PARCIAL, CRIBADO Y LAVADO

ECP. ESTABILIZACION CON CEMENTO PORTLAND

10.- CONCRETO HIDRAULICO

NO EXISTE

NO EXISTE

NO EXISTE

"SAN JULIAN"

"CHEN KAN"

"MONSERRAT-PAYUCAN" NO EXISTE

POSIBLES

CAM/04