PROJECT CONSOLIDATION OF SEWAGE DISPOSAL ACTIVITIES IN KUJANG AND ANBYON CITIES
Gran Contract –External Actions of the European Union – DCI-FOOD/2012/308-855
Eng. Jose Miguel Ruiz Verona -Land and Water Management Engineer, B.Sc.,M.Sc.
Head of Project & Technical Advisor
![Page 2: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/2.jpg)
Timeline
Duration: 3 years, starting from February 1th, 2013 till February 2016:• Inception phase including inception and planning workshop:
March - December 2013• Steering Committee establishment (SC) – November 2013.• Signing of Memorandum of Understanding with MoCM &
People’s Committee– January 2014.• Implementation of the physical actions in the project sites: since
April 2014
![Page 3: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/3.jpg)
Project objective and expected resultsStrengthen the resilience of urban communities, including social and health institutions, in Kujang City (North Pyong‘an Province) and Anbyon City (Kangwon Province) by improving food security, health and hygiene situation.Results:Urban water supply networks and sanitation facilities in private houses and
social/health institutions are rehabilitated and reinstalled.Decentralized storage units and sewage disposal systems (DEWATS) are developed and
constructed.A locally adapted concept in respect of reutilization of sewage waste products for
agriculture is defined and methods are applied.The capacities of the users/operators are strengthened by implementation measures.
![Page 4: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/4.jpg)
Target population, counterparts and other implementing partnersTarget population:• Anbyon City 27.500 inhabitants• Kujang City 29.290 inhabitantsCounterparts: • Ministry of City Management (MoCM)• People’s Committee/Department of City Planning & Household GroupOther implementing partners:• MoPH/DoPH, MoA/PAMC, MoE/PEMC, PED and Anti- epidemiological
Station
![Page 5: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/5.jpg)
INCEPTION PHASE March – December 2013• Ex-ante baseline survey: W&S coverages, water related diseases and
malnutrition recurrence, water consumption and availability (Q&Q) and effluents pollution load.
• Assessment, designing, feasibility and cost estimation of the different interventions.
• Operational Plan adjustment upon the findings and needs. • Inception and Planning Workshop.
![Page 6: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/6.jpg)
![Page 7: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/7.jpg)
![Page 8: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/8.jpg)
What is new in the project as a result of the assessment conducted during the inception phase
Under result 3 new issues were identified not included yet in the project:• Stormwater management (flood hazard map development and
drainage)• Flood control and prevention (river stabilization and regulation
measures)
![Page 9: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/9.jpg)
![Page 10: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/10.jpg)
Performed activities per expected result
![Page 11: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/11.jpg)
REHABILITATION OF WSS
《 SAFE DRINKING WATER SUPPLY》
WATER INTAKE AND TRANSMISION PIPELINE
OVERHEAD TANKS
DISTRIBUTION NETWORK AND INHOUSE GRID
WATER QUALITY TESTIN RUTINE
![Page 12: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/12.jpg)
WATER INTAKE 2014
LEAKING DAM DAMAGED WATER METER
INEFFICIENT WATER FILTERWATER FILTER AREA
![Page 13: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/13.jpg)
IMPROVED WATER INTAKE COMPONENTS & IMPROVED WATER QUALITY
![Page 14: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/14.jpg)
REPLACED WATER METER
![Page 15: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/15.jpg)
REHAB OF SETTLER & FILTER
![Page 16: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/16.jpg)
MODELLING OF THE RIVER CHANNEL SECTIONS FOR SUSPENSIN
BRIDGE DESIGN
(PEAK FLOW 150 mᶟ/s)
![Page 17: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/17.jpg)
SUSPENSION BRIDGE UNDER CONSTRUCTION
![Page 18: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/18.jpg)
COMPLETION OF SUSPENSION BRIDGE
BENEFICIARIES: 12950PP
![Page 19: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/19.jpg)
REHAB OF PUMP STATION IN KUJANG
PUMP STATION
NEWLY INSTALLED CONTROL BOX & VOLTAGE REGULATOR
REPLACEMENT OF PUMPS
INSTALLAATION OF TRANSFORMER
![Page 20: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/20.jpg)
PIPELINE PROTECTION STRUCTURE
![Page 21: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/21.jpg)
REPLACEMENT OF FITTINGS AT HH LEVEL
OLD FITTINGS
![Page 22: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/22.jpg)
WATER INTAKE PROTECTION STRUCTURE AND RIVER CHANNEL STABILIZATION WORK
![Page 23: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/23.jpg)
SANITATION FACILITIES
• CONSTRUCTION OF DOUBLE PIT VIP LATRINES (550 units)
• CONSTRUCTION OF COMMUNITY SANITATION CENTER (4)
• INSTALLATION OF INDOOR TOILETS AND DOWNPIPES (500 units)
• INTALLATION OF INDOOR TOILETS AT SOCIAL/PUBLIC BUILDINGS
![Page 24: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/24.jpg)
DOUBLE PIT VIP LATRINE
![Page 25: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/25.jpg)
COMMUNITY SANITATION CENTER (CSC)
OLD CSC
CSC UNDER CONSTRUCTION
NEWLY CONSTRUCTED
![Page 26: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/26.jpg)
INDOOR TOILET
330 HH IN KUJANG
170HH IN ANBYONOLD INDOOR TOILET
![Page 27: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/27.jpg)
REHABILITATED INDOOR & OUTDOOR TOILETS IN ANBYON HOSPITAL
![Page 28: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/28.jpg)
REHABILITATED OUTDOOR TOILET
IN HAKSONG SCHOOL (BENEFICIARIES: 350 PP)
![Page 29: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/29.jpg)
REHABILITATED INDOOR TOILETS IN SOCIAL/HEALTH INSTITUTIONS
INDOOR TOILET IN
ANBYON GUEST HOUSE
REHABILITATED INDOOR
TOILET IN ANBYON ANTI-
EPIDEMIOLOGICAL CENTER
![Page 30: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/30.jpg)
Wastewater treatment, reuse and disposal
• Simplified sewer system (Kujang): 1 full flash DEWATS constructed, 8 under construction.
• Solid free sewer systems (Anbyon): 12 septic tanks constructed and 4 DEWATS constructed, 4 under construction.
![Page 31: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/31.jpg)
Simplified sewer system conceptual model design
![Page 32: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/32.jpg)
Solid free sewer system conceptual model design
![Page 33: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/33.jpg)
WASTEWATER TREATMENT, REUSE AND DISPOSAL
KUJANG COUNTY
DEWATS 9
BENEFICIARIES 5093
DRYING BED 456 ㎡
ANBYON COUNTY
DEWATS 8
BENEFICIARIES 3479
DRYING BED 240㎡
![Page 34: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/34.jpg)
DEWATS design sector 18 – 182 families
![Page 35: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/35.jpg)
![Page 36: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/36.jpg)
KUJANG DEWATS IN OPERATION
DEWATS 182 HH/DAYOUTLET
SLUDGE CHECK
SETTLER
![Page 37: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/37.jpg)
HOUSE CONNECTION AND INSPECTION CHAMBER
![Page 38: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/38.jpg)
DEWATS 303 HH UNDER CONSTRUCTION
CONSTRUCTION SITE
CONSTRUCTION UNDER DEVELOPMENT
FINALIZED DEWATS TREATMENT UNIT
![Page 39: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/39.jpg)
SEPTIC TANKS IN ANBYON (18)
![Page 40: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/40.jpg)
CONSTRUCTION OF DRAINAGE CHANNEL FOR FLOOD MANAGEMENT
![Page 41: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/41.jpg)
SETTLER, DRAINAGE CHANNEL AND REGULATION STRUCTURES (STORMWATER MANAGEMENT)
![Page 42: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/42.jpg)
Reutilization of sewage waste products
• Composting yard site selected, designed and construction materials in process of procurement.
• Conduct a meeting with PC, MoA/AMC to define the use of sewage products for agriculture/horticulture production, aquaculture and environmental purposes
• Risk chain assessment scheme for the unsuitable use of sludge an untreated excretes as fertilizer for horti/agriculture production
![Page 43: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/43.jpg)
![Page 44: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/44.jpg)
![Page 45: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/45.jpg)
SLUDGE DRYING BEDS IN ANBYON AND KUJANG
ITEMS FOR THE SAFE HANDLING OF SLUDGE
![Page 46: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/46.jpg)
SOLAR GREENHOUSE IN ANBYON CITY
![Page 47: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/47.jpg)
Capacity building• Onsite concrete workshops ( 2 events)• DEWATS design and construction (2 events)• O&M of the water supply systems (2 events)• O&M of DEWATS, reuse of wastewater (2 events)• Hydraulic calculation for the design of WSS (2 events)• Catchment hydrology (1 event)• Hygiene promotion campaign (2 events) • Water quality testing ( 2 events)
![Page 48: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/48.jpg)
HYGIENE PROMOTION CAMPAIGN
![Page 49: Presentation 2015 EN PRK 1055](https://reader036.fdocumento.com/reader036/viewer/2022081514/58d00a081a28abad3e8b505d/html5/thumbnails/49.jpg)
THANK YOU FOR LISTENING